SL no. Supplier Name Date of Purchase Item details Quantity Unit Rate
1 Suraj Sanitery 27.06.2023 Door bend 110 mm (T/S) 2 Nos 127.12
2 SS/0373/2023-24 Plain Tee 110 mm SUP 4 Nos 152.54
3 Plain Bend 110 mm (87.5) 2 Nos 97.46
4 Vent cowel 75mm 1 Nos 16.95
5 Syphon complet(BR) 4 Nos 110.17
6 Plain bend 75mm (87.5) 1 Nos 59.32
7 20" OT Pan white 4 Nos 476.69
8 S/S 3M 110mm Pipe (Suprime) 4 Nos 491.53
9 S/S 3M 75 mm Pipe (Suprime) 1 Nos 288.14
10 Transportation Charges 1 Nos 500
11 Loading and Unloading charges 1 Nos 500
Total =
Profit 15%
Total =
Existing Building waste water & Electrical Cable covering Materials (B)
SL no. Supplier Name Date of Purchase Item details Quantity Unit Rate
1 K.P Industries 10.05.2023 D-rex 100 mm X 3m pipe (SN8) 66 Mtr 148.74
2 INVOICE NO-P/0070/2023-24 D-rex 100 mm X 6m pipe (SN8) 90 Mtr 139.86
3 ,, 946 ml PVC 100mm solvent cemen 1 TIN 346.5
4 ,, Drain pro pipe 160mm S/S (3m) 27 Pcs. 1719.08
5 ,, Drain pro pipe 110mm D/S (3m) 4 Pcs. 928.84
6 ,, Drain pro pipe 160mm D/S (3m) 2 Pcs. 1856.36
7 ,, Drain pro TEE 110 mm 1 Pcs. 179.52
8 ,, Drain pro 160 mm bend (45°) 10 Pcs. 235.84
9 ,, Drain pro 160 mm bend (87.5°) 18 Pcs. 261.36
9 ,, Drain pro 110 mm Y 1 Pcs. 184.8
11 ,, Drain pro reducer Y 160x110 3 Pcs. 448.36
12 ,, Drain pro R cupler 160x110 2 Pcs. 141.68
13 ,, Rubber lubricant 250 ml 1 TIN 38.5
14 ,, Delivery charges 1 No 5000
15 ,, Loading and Unloading charges 1 No 1000
16 13.05.2023 8 mm Nilon rope 4.5 kg 1 Roll 664.00
17 27.05.2023 Hanger for U clamp for waste pipe 1 Lot 3217.00
18 20.05.2023 Sweeper payment 1 LS 1000.00
20 03.06.2023 M-seal 1 Pcs. 360.00
21 09.06.2023 Pastic sheet 12.6 KG 1 Roll 1906.00
22 07.06.2023 Anchor Fastner bolt 1 box 470.00
23 Transportation Charges 1 Nos 2000.00
24 Loading and Unloading Charges 1 Nos 1000.00
Total =
Profit 15%
Total =
Existing Building waste water And Plumbing Materials (C)
SL no. Supplier Name Date of Purchase Item details Quantity Unit Rate
1 K.P Industries 06.06.2023 SWR 110 mm vent Cowl 1 Pcs. 22.55
2 Drain Pro 110 mm bend 45° 6 Pcs. 90.2
3 Drain Pro Bend 110 mm 6 Pcs. 112.64
4 Transportation Charges 1 Nos 500
5 Loading and Unloading Charges 1 Nos 300
Total =
Profit 15%
Plumbing work
materials invoice no-
SS/0373/2023-24
Total=
Sub Total =
Balance Mateials at the site
Amount Sl no Item details Quantity Unit Remarks
254.24 1 D-rex pipe 100mm x 3m 13 Nos
610.16 2 D-rex pipe 100mm x 1.5m 3 Nos
194.92 3 D-rex pipe 100mm x 1.0 m 3 Nos
16.95 4 Drain Pro pipe 160mm S/S 3m 5 Nos
440.68 5 Drain Pro pipe 160mm S/S 1.7m 4 Nos
59.32 6 Drain Pro pipe 160mm S/S 2m 2 Nos
1906.76 7 Drain Pro pipe 160mm S/S 1.1m 3 Nos
1966.12 8 Drain Pro pipe 110mm S/S 3m 2 Nos
288.14 9 Drain Pro pipe 110mm S/S 1.5m 1 Nos
500
500
6737.29
1010.59
7747.88
erials (B)
Amount
9816.84
12587.4
346.5
46415.16
3715.36
3712.72
179.52
2358.4
4704.48
184.8
1345.08
283.36
38.5
5000
1000
664
3217
1000
360
1906
470
2000
1000
102305.12
15345.77
117650.89
C)
Amount
22.55
541.2
675.84
500
300
2039.59
305.94
2345.53
es (D)
77703.00
15540.60
93243.60
220987.90
Bamboo Scaffolding For pipe Line Work
SL no. Supplier Name Date of Purchase Item details Quantity Unit
Bamboo, Narial rope, transport.
At existing ramp area for plumbing work
purpose
1 360.609 Cu m
Rate Amount
90 32454.84
Total = 32454.84
Misc. Machinery and Labour charges for pump room supporting work protecting form earth collapsing
SL no. Supplier Name Date of Purchase Item details Quantity Unit
Profit 15%
g form earth collapsing (D)
Rate Amount
9000.00 9000.00
3500.00 3500.00
36500.00 20202.75
Total = 32702.75
4905.41
Total= 37608.16
Paver Block Bed Materials (E)
SL no. Supplier Name Date of Purchase Item details Quantity Unit
08.06.2023
Providing & Laying sand under existing
1 paving fixing 70 Bag
Providing & Laying P.C.C M-10 grade at
2 09.06.2023 pipe joint and others wrk. 0.25 cu m
Profit 15%
105 7350.00
6650.00 1662.50
Total = 9012.50
1351.88
Total = 10364.38
135 4525.2
14889.58
Rate per sq m= 444.20
Existing Building waste water & Electrical Cable covering Misc. Labour charges (F)
SL no. Date of work Description of work Quantity Unit Rate
2 29.05.2023 Labour JMR no-16 4 Head 600.00
3 21.05.2023 Labour JMR no-21 1 Head 600.00
4 ,, Masson JMR no-21 1 Head 700.00
5 08.06.2023 Labour JMR no-48 1 Head 600.00
6 Masson JMR no-49 1 Head 700.00
20.06.2023
Existing Paver removing and stacking properly
7 at cable laying area. JMR no-57 8 Head 600.00
8 ,, Masson JMR no-57 2 Head 700.00
9 14.06.2023 Labour JMR no-58 2 Head 600.00
10 Masson JMR no-58 1 Head 700.00
11 18.06.2023 JMR no- 62 Labour 2 Head 600.00
12 29.06.2023 JMR no-64 Labour 14 Head 600.00
13 18.07.2023 JMR n0-66 Labour 4 Head 600.00
14 02.07.2023 JMR no-67 Labour 3 Head 600.00
15 12.07.2023 JMR no-76 Labour 5 Head 600.00
16 24.08.2023 JMR no-79 Labour 8 Head 600.00
18 09.06.2023 JMR no-53 Labour 1 LS 3112.00
Total =
Profit 20%
Total =
ur charges (F)
Amount
2400.00
600.00
700.00
600.00
700.00
4800.00
1400.00
1200.00
700.00
1200.00
8400.00
2400.00
1800.00
3000.00
4800.00
3112.00
37812.00
7562.4
45374.40
PROJECT -:PARK HOSPITAL
2,Rawdon street, kolkata -700017
Project : Work Order no. Date : Name of the
NBW&CCC M/S S.M. Nirman Infrastruc
Item As per BOQ
SL No. Description of work UOM Rate
Code QTY
1
NON SCHEDULE WORK (RA-01)
Brick masonry chamber of standard design with first class bricks with cement mortar 1:4. NOS 23050
In side 12mm thick plastering (1:4) with floating coat of neat cement. Making necessary
connections. Internal size of chember 600 X 600 mm. 35 MT capacity DI manhole cover
with frame. The manhole cover fixing at top RCC slab of manhole with necessary steel &
shuttering work as complete.
Filling the excavated chamber with excavated earth, making necessary connections as
required complete.
2 Electrical Cable Pit (1.1 x .85 x 1.3) excluding top cover. As same as Itam no-1. No 23050
3 Level raised (650 mm ) existing HIDCO pit ( 600 x 600) including DI Manhole cover. No 23050
Existing top cover dismanteling and re-fixing DI manhole cover (35 MT)
4 Supplying, installing, testing and commissioning of R.C.C NP3 class Hume pipe 300mm RM 3125.00
dia laid to the required level and grade with spigot and socket joint using Elastomeric
Ring (EPDM) of Type-1/2/3 and sealing with CM 1:3 in water tight manner and filling the
excavated trench with approved quality saturated sand on sides, bottom and top surface
of pipe with all leads and lifts, making necessary connections as required complete.
5 RED SAND FILLING at inside Cable Tranch. Different cost Red sand vs Silver sand. Silver CUM 1100.00
sand cost =1750 /cu m, and red sand cost =2850 /cu m
6 Screed concrete average 50 mm thick at Electrical Meter Room near Transformer sqm 75.00
foundation.
7 Notch Making(40mm x 25mm) for electrical Tranch at electrical Meter room. It has been RM 125.00
made for trench ms cover fixing
8 Removing MS Structure with of color coated galvalum sheet .5 mm thick (Make TATA/ Sqm 250.00
JSW) over Fencing including all labour, machineries tools tackles screws etc. Complete as
required for fixing. Measurment (29.4 L X 2.1 H) . 29.4 = (20.9 + 8.5) . It is done due to U
shape sheet pile uninstallation work.
9 Fixing MS Structure with of color coated galvalum sheet .5 mm thick (Make TATA/ JSW) Sqm 450.00
over Fencing including all labour, machineries tools tackles screws etc. Complete as
required for fixing. It is done due to U shape sheet pile uninstallation work
Same measurment as aboe
10 Sq m 700.00
Sheeting and structure removal and fitting at road side (East & Assana side)
11 Making MS electrical Panel Box (2.7 x2.3 x0.68) at site as instruction by client. L.S. 12000.00
12 Green Net Fixing / safety barication and others. JMR no-17 Sqm 95.00
13 Crane Hire Charge for Transforma Shifting JMR no-27. (4 hours) L.S. 5500.00
14 Extra Pipe Line work instruction by client (Pile water supply and hutment) JMR no-28 L.S. 3500.00
29.05.2023/21.06.2023/
1 30.06.2023/02.07.2023 JCB rent JMR NO- 59,65,91,22 4 Days
2 02.07.2023 Poclen-200 rent jmr NO-67 1 Hrs.
Profit 15%
Rate Amount
6800 27200
2750 2750
Total = 29950
4492.50
Total= 34442.50