Watering and Ramming) 1 x 1 13' - 9'' 11' - 9'' 0' - 9'' 121.17
121.17 Fc
3 ½"Ø Mildsteel bar for short Column ½"Ø
2 x 26 13' - 9'' 715.00
2 x 22 11' - 9'' 517.00
1,232.00 823.0 Lb
4 6" TK (1:2:4) R.C.C for footing slab 1 x 1 13' - 9'' 11' - 6'' 0' - 6'' 79.06
79.06 Fc
5 9" T.K (1:3) C.M Brick walling
(L) 1 x 2 12' - 9'' 0' - 9'' 5' - 0'' 95.63
(B) 1 x 2 9' - 3'' 0' - 9'' 5' - 0'' 69.38
165.01 Fc
6 ½"TK (1:3) C.M Plastering
Flooring 1 x 1 11' - 3'' 9' - 3'' 104.06
Walling internal (L) 1 x 2 11' - 3'' 5' - 0'' 112.50
(B) 1 x 2 9' - 3'' 5' - 0'' 92.50
Walling External (L) 1 x 2 12' - 9'' 2' - 6'' 63.75
(B) 1 x 2 10' - 9'' 2' - 6'' 53.75
426.56 Fs
7 Formwork For R.C.C Cover
Under cover slab 1 x 1 12' - 9'' 10' - 9'' 137.06
Side of cover slab (L) 1 x 2 11' - 3'' 0' - 4'' 7.50
(B) 1 x 2 9' - 3'' 0' - 4'' 6.17
150.73 Fs
8 ½"Ø Mildsteel bar for Cover ½"Ø
2 x 24 12' - 0'' 576.00
2 x 20 10' - 0'' 400.00
976.00 Fr
652.0 Lb
9 (1:2:4) for Cover
1 x 1 12' - 0'' 10' - 0'' 0' - 4'' 40.00
40.00 Fc
10 Plastic Paint (3)Coat
(L) 1 x 2 12' - 9'' 2' - 10'' 72.25
2
Name of Work ၃၂၀၀ဆံ့ ေျမေအာက္ေရေလွာင္ကန္(၁)လံ ု း ေဆာက္လုပ္ျခင္းလု ပ္င န္း
DETAIL OF MEASUREMENT
Measurements Dedu
NO DESCRIPTION Qty. Contents Total of each
L B H ction
5.875
4
Builder's Estimate
Builder's Estimate
Builder's Estimate
16110
Total 2,364,543
7
Total 2,364,543
8
Bill Of Quantity
A Material Cost
1,530,129
B Labour
Bill Of Quantity
TOTAL 1,934,888
4 Brick
က ေတာင္ကုတ္မွသေဘာၤဆိပ္သို႕(3)မို င္
ကားျဖင့္ သယ္ယူပို ႔ေဆာင္ခ) ေခါက္ 2.2 10,000 22,276
ခ ကားေပၚတင္ခ ခ်ပ္ 2227.64 6 13,366
ဂ ကားေပၚမွခ်ခ ခ်ပ္ 2227.64 6 13,366
49,008
5 Brick
က ေတာင္ကုတ္သေဘၤာဆိပ္မွငေမာက္ေခ်ာင္းအေရွ႕ဘက္ခ်င္းရြာဆိပ္ကမ္းသို ႕ေရမို င္ (10)မို င္
စက္ေလွျဖင့္ သယ္ယူပို ႔ေဆာင္ခ) ေခါက္ 2.23 9,750 21,719
Name of Work ၃၂၀၀ဆံ့ ေျမေအာက္ေရေလွာင္ကန္(၁)လံ ု း ေဆာက္လုပ္ျခင္းလု ပ္င န္း
8 Wood
က ေတာင္ကုတ္သေဘၤာဆိပ္မွငေမာက္ေခ်ာင္းအေရွ႕ဘက္ခ်င္းရြာဆိပ္ကမ္းသို ႕ေရမို င္ (10)မို င္
စက္ေလွျဖင့္ သယ္ယူပို ႔ေဆာင္ခ) Ton 0.24 9,750 2,368
ခ စက္ေလွေပၚတင္ခ Ton 0.24 7,000 1,700
ဂ စက္ေလွေပၚမွခ်ခ Ton 0.24 6,000 1,457
5,525
9 Wood
က ခ်င္းရြာဆိပ္ကမ္းမွလု ပ္င န္းခြ င္သို႕ (2)မို င္
ေထာ္လာဂ်ီျဖင့္ သယ္ယူပို ႔ေဆာင္ခ) Ton 0.24 10,000 2,428
ခ ေထာ္လာဂ်ီေပၚတင္ခ Ton 0.24 7,000 1,700
ဂ ေထာ္လာဂ်ီေပၚမွခ်ခ Ton 0.24 6,000 1,457
5,585
Name of Work ၃၂၀၀ဆံ့ ေျမေအာက္ေရေလွာင္ကန္(၁)လံ ု း ေဆာက္လုပ္ျခင္းလု ပ္င န္း
Total
Mile 1 2 2 4 1 10
Rate 7500 13000 11000 18000 2500 52000
Total
Mile 1 2 2 4 1 10
Rate 7500 13000 11000 18000 2500 52000