ROAD PART
NO ITEM ROW No(Est/Rate/Qty) NO
0 Picking…..Bitu. ( Mec / Man ) 0 Mechanical . 331 0 15 0 260 0 15 0
0 Picking…..Metal surface 331 0 28 0 291 0 29 0
0 Box cutting 240 0 54 0 351 0 55 0
0 E/W cutting road sec. 237 0 69 0 393 0 70 0
0 Sand compaction (F / M / C ) 1 Using medium sand. 1 (With Stac0 81 0 423 0 82 0
0 Stone dust 1 (With Stac0 87 0 436 0 88 0
0 Stone dust & sand (F / M / C ) 1 Using medium sand. 1 (With Stac0 92 0 448 0 93 0
0 Sub-base (Brick & medium sand, chips &…sand) 1 (With Stac0 99 0 462 0 99 0
0 G.S.B. 2 Coarse sand:- 0 By Plant Mix Method 0 (Without S0 111 0 487 0 108 0
0 W.M.M 0 (Without S0 133 0 571 0 130 0
0 Patching Pothole ( Jhama , Laterite & Stone metal ) 269 0 138 0 586 0 135 0
0 Mending Pothole ( stitching Jhama Brick ) 0 157 0 643 0 153 0
0 Jhama Metal with moorum Scr. / Laterite. 1 (With Stac0 173 0 664 0 162
0 Stone metal (Mech/Man) 1 By Manual Means. 1 (With Stac0 185 0 689 0 173 0
0 Moorum(roller) 1 (With Stac0 201 0 737 0 189
0 Blindage…. using moorum 1 (With Stac0 206 0 749 0 194
0 Prime coat 0 211 0 761 0 199
0 Tack coat . 0 226 0 794 0 211
0 Repair to P.H. (with BM) 1 (With Stac0 244 0 837 0 226
0 Patch repair (20 P.C & SC-B), over Rep. to P.H 0 Sand (SC) 1 (With Stac0 252 0 856 0 232
0 Patch repair (12 P.C ), over Rep. to P.H 1 (With Stac0 259 0 875 0 238
0 Patch repair ( 6 P.C ), over Rep. to P.H 1 (With Stac0 265 0 889 0 243
0 Rep.ing P.H. (pre../grout) (M/P) 0 Light duty) 279 0 271 0 903 0 248
0 Bituminous P.C.C ……. Mobile HMP (Light dury) 1 (With Stac0 285 0 946 0 262
0 BM ( H iii / ii / I /M ) 3 ight duty) 252 1 (With Stac0 291 0 963 0 267
0 0 DBM (Lime) ( H iii / ii / i ) 0 to 60 TPH. 0 (Without S0 302 0 998 0 278
0 SDBC ( H iii/ H ii / H i ) 0 to 60 TPH. 0 (Without S0 313 0 1036 0 289
0 0 BC (Lime) ( H iii / ii / i ) 0 to 60 TPH. 0 (Without S0 324 0 1070 0 300
0 Mastic 0 with medium sand 0 (Without S0 336 0 1106 0 311
0 20 P.S. ( H iii / ii / I / M / ) 3 ight duty) 1 (With Stac0 347 0 1141 0 320
0 S.C.(type-B) 1 Grit (Me/Ma) 0 By mechanical Means. 1 (With Stac0 354 0 1156 0 326
0 Pre-coating stone agg. 0 363 0 1172 0 334
0 Lab. Rep ..with pre-coated 0 369 0 1185 0 339
EXTRA ITEM
GST 0% GST no
L.W.Cess 0% L.W.Ce
STRUCTURAL PART
NO ITEM ROW No(Est/Rate/Qty) NO
0 Dismentling (conc.) (Ma/Me) 0 Manual 0 513 0 1495 0 463 * 0
0 Dismentling (brick) 236 0 525 0 1525 0 475 0
0 Removal Hume Pipe 0 540 0 1564 0 490 0
* 0 E/W in foundation (Ma/Me) 0 by manual means. 0 553 0 1594 0 502 0
* 0 Sand filling (F / M / C ) 0 Using fine sand. 1 (With Stac0 597 0 1710 0 548 0
* 0 S.Layer B.F.S (PWD Shc. Don't use normally) 12 0 603 0 1725 0 555 0
0 1 st Class Brick Work 0 (Without S0 608 0 1734 0 561 0
* 0 F/W (Shuttering) Minor Str. C/BC/CD Upto 4m 0 617 0 1761 0 570 0
* 0 Steel Foundation (own supply) 0 5% overhead charge 0 627 0 1782 0 591 0
0 Steel Sub-Str. (own supply) 0 5% overhead charge 0 633 0 1800 0 597 0
0 Steel Super-Str. (own supply) 0 5% overhead charge 0 639 0 1818 0 602 0
* 0 M-15,20,25(CM)30,35.(CM/BM) 0 Conc. mixer Minor Str. C/BC/CD 0 645 0 1836 0 607 0
0 Superplastisizer (Mixing in Conc.) 0 663 0 1899 0 630 0
* 0 W.C. 0 No Format C 0 673 0 1920 0 639 0
* 0 Weep hole 0 678 0 1933 0 644 0
* 0 Cement Plaster (PWD Shc. Don't use normally) 164 0 No Format C 0 684 0 1944 0 650 0
0 Net cement (PWD Shc. Use in special case, Don't use normally) 0 No Format C 0 709 0 2015 0 685 0
0 Dry Lean Cement Concrete Sub- base 0 714 0 2028 0 690
0 *Cement Concrete Pavement (Laying with Fixed form/slip form paver)* 0 721 0 2042 0 695 0
0 *Cement Concrete Pavement (laying manual) 0 Batch Mix 0 727 0 2067 0 700 0
0 Roller Compacted Concrete Pavement 0 739 0 2096 0 706 0
0 Rect.Conc Block Pavement. 0 No Format C 0 745 0 2110 0 711 0
0 Precast R.C.C railing of M 30 grade 0 751 0 2124 0 716 0
0 H.P. NP3/NP4 Single Row (Own) 0 757 0 2137 0 721 0
0 H.P. NP3/NP4 Single Row (Dep.. Exclu..) 0 769 0 2195 0 730 0
0 Back Filling (Sub-Str.) Abt.,Wing, Return 1 (With Stac0 781 0 2251 0 739 0
0 Filter media Back filling Sub-Str. 1 (With Stac0 790 0 2275 0 748 0
0 E/W filling (Found …150m) 0 km extra lead, prior approval of E.E 0 803 0 2311 0 762 0
0 E/W filling (Found. & Back…150-300m)……(sandi soil) 277 0 809 0 2323 0 767 0
0 R.C. guard post 0 No Format C 0 815 0 2334 0 772 0
0 KM post 0 No Format C 0 820 0 2347 0 777 0
0 Concrete Sign Bord 0 No Format C 0 830 0 2372 0 786 0
0 Retro. Ref. Traffic Sign 0 No Format C 0 836 0 2385 0 792 0
0 Retro. ef. Direc.. Place..90 cm 0 No Format C 0 852 0 2436 0 807
0 Retro. Ref. Direc.Place..>90 cm 0 No Format C 0 858 0 2450 0 812
0 Road Markers/Road Stud /Cats Eye 0 864 0 2464 0 817
0 Road Marking ..bitu. ..surface 0 869 0 2475 0 822
Important Instruction
1) For a Fresh Estimate, to transfer a whole item from "R.S.Est"/ "R.S.Qty"/"R.S.Rate" to "Estimate"/ "Quantity"/"Rate"
done quickly. ** Link Between Lead for stone of Road part & Str. part normaly.
For a Fresh Estimate, to transfer a whole item from "R.S.Est"/ "R.S.Qty"/"R.S.Rate" to "Estimate"/ "Quantity"/"Rate"
done quickly. ** Link Between Lead for stone of Road part & Str. part normaly.
2) For inserting an Item in the middle of an 'Estimate in which some row are in Hide ' or shifting an Item from one place to
compulsary. Don't do "cut from 'B' cell to double line & insert cut cell". Alternate way is, do "cut from 'B' cell to double
3) If some row of an Item are in hide, then total cut for that item will not allow by the system. First of all unhide those row
line" may be done to Insert or Paste an Item in an Estimate where there is no row in Hide (to assure this do unhide whol
4) To shift calculation portion from one Item/Sub-Item to another Item/Sub-Item, do "Total copy & insert coppied cell". If
insert some row in the destination Item/Sub-Item , then do "Total copy & paste". Total cut will not allow by the system
5) Page break line will be fall in between two border col.
6) To change any text & figure , go to the input cell of input sheet & change . If in inpute cell a formula is given, then go to t
7) To create an item/sub-item manually from an item / sub-item where option exist …. Mark this (any other) which is manu
&" insert copied cell" at bottom line, then again do "total copy " of this new insert cells & " insert copied cell" at top line
8) Upper border of Hide/Delete row will remain if upper border done by lower border. Similarly lower border …………
9) For Insert if Selected Upper Border:- A) done by Lower i) If lower border done by Lower, border
B) done by Upper i) If previous of upper border done by Upper, bord
10) In R.S.Est. sheet 'C' Col. to 'U' Col. = In R.S.Qty. sheet 'P' Col. to 'AH' Col. & 'AO' Col. to 'BG' Col
Structural Part
Not updated / old Item
77 Steel(department supply) ### 189 ### 161
78 Cement Concrete ### 194 ### 189
79 M-40 (CM/BM) 45,50,55 (BM) 0 Conc. mixer ### 227 ### 295
80 Rule pointing ### 281 ### 423
81 Flashing joint ( pitching..) ### 286 ….
82 Painting one..Tim/Plas. …primer ### 463 ….
83 Panting ( any shade….) S.E.P. Timber or plaster/steel or other ### 468 ….
84 Painting with acrylic exterior ### 485 ….
85 Painting aluminium paimts ### 491 ….
86 Painting..Curing compound…water curing not ### 587 ….
87 Chipping …& stripping off ### 593 ….
88 Removing corroded worn ### 598 ### 880
89 Anti-corrosive protective ### 603 ….
90 10 mm th. Epoxy morter ### 608 ….
91 Removal of ext. W.Course ### 613 ….
92 Guniting concrete. ### 618 ….
93 Inserting nipples … ### 623 ….
94 Sealing of cracks ### 628 ….
95 Conc. Dep 35 mm guniting ### 637 ….
96 Epoxy bonding ### 642 ….
97 Cleaning...sand blasting ### 647 ….
98 C.C(1:1.5:3) .37.5 Th..wire net. (PWD) ### 652 ### 912
um Highway Division-I, 2012, July 2014 ,Dec 2015
ROAD PART
ITEM ROW No(Est/Rate/Qty) NO
E/W…Borrow 50m & 1.5m (.../ M.comp ) 0 No.Compac. 0 379 0 1206 0 348
E/W...Borrow 500m & 3.0m (.../ M.comp ) 0 No.Compac0 No.Royalty 0 Departmen0 386 0 1219 0 355
E/W…carrried..1 km 0 Borrow pith 0 No.Compac0 No.Royalty 0 Departmen0 393 0 1237 0 362
E/W (Embk) earth from box cutting,drain,foundation etc. 237 0 401 0 1255 0 370
E/W (Embk)…………...…1 km 0 No.Royalty 0 Departmen0 411 0 1269 0 375
E/W (Shoulder)……….…1 km 1 Pre & Pos 0 No.Royalty 0 Departmen0 422 0 1286 0 381
E/W (Mtc.Shoulder) Making up loss..fresh……1 km 0 No.Royalty 0 Departmen0 433 0 1304 0 388
E/W (Mtc.Shoulder)..Stripping of excess soil 0 442 0 1320 0 394
Removal Un. Servicesable. Soil…..1 km 0 449 0 1331 0 399
Dressing & Chil. 0 457 0 1344 0 404
Cutting kutcha drain 0 462 0 1355 0 409
Spreading of Sand 0 472 0 1376 0 418
EXTRA ITEM
20 MSS (A & B ) 0 (Without S0 1171 0 3268 0 1110
STRUCTURAL PART
ITEM ROW No(Est/Rate/Qty) NO
Painting the vertical 273 0 875 0 2486 0 827
Painting (cement wash) on concrete surface (unplastered) 5 (2nd ) 0 884 0 2507 0 840
Painting S.E.P. Cir. or Rect. panel load class, No of Bridge/Cul 321 0 889 0 2518 0 845
Painting New Letter and Figures 0 895 0 2529 0 850
Painting (one coat)guard post 0 909 0 2551 0 859
Painting (one coat ). Km post 0 915 0 2562 0 864
Drum sheet walling 338 0 924 0 2583 0 873
Close bamboo 0 934 0 2604 0 882
Weaving ware 0 946 0 2634 0 894
Filling Empty sausage 1 (With Stac0 952 0 2645 0 899
Empty cement bag 1 (With Stac0 961 0 2668 0 908
Boulder Apron on rever bed 1 (With Stac0 973 0 2704 0 920
Boulder Apron on rever bed (with Cretes) 1 (With Stac0 979 0 2717 0 925
Pitching on slope 1 (With Stac0 985 0 2730 0 930
Filter material 1 (With Stac0 995 0 2756 0 939
Geotextile Filter 0 1001 0 2770 0 945
Drainage spout 0 1007 0 2781 0 850
EXTRA ITEM
Foundation M-20,25,30,35 (0/1) 286 1 Batching p0 1015 0 2794 0 957
Sub-Structure M-20,25,30,35,40 (0/1) 302 1 Batching p0 1040 0 2881 0 981
Super-Structure M-20,25,30 (0/1/2/3) 3 Batching,T-Beam & Slab 0 1131 0 3148 0 1071
"W" metal beam crash barrier 272 0 1184 0 3300 0 1125
"Thrie" metal beam crash barrier 0 1190 0 3311 0 1130
Overhead Sign …. Truss and Vertical Support. 0 1196 0 3322 0 1135
Overhead Sign … Aluminium Alloy Plate for Over Head Sign. 0 1203 0 3334 0 1141
Painting Lines,Dashes, Arrow. … on new road 274 0 1210 0 3346 0 1147
Painting Lines,Dashes, Arrow … on old road 0 1220 0 3367 0 1156
Restoration of rain cuts 271 0 1230 0 3388 0 1165
Removal of existing WC 320 0 1236 0 3399 0 1170
Earthwork in excavation for Hume pipe 0 1242 0 3410 0 1175
Concrete cradle bedding with M-15 for Hume pipe 0 1248 0 3421 0 1180
1st class bedding(sand/moorum) for HP 0 Using fine sand. 0 (Without S0 1254 0 3435 0 1185
Road Delineators (road way indicator,hazard marker,object markers) 0 1264 0 3458 0 1194
These Items not done here
uction
ty"/"Rate" sheet , do "Total cut & paste ". But "cut from 'B' cell to double line & paste" will be
e place to another in an 'Estimate in which some row are in Hide ' "Total cut & insert cut cell" is
to double line & paste in a blank sheet & then do "Total cut & insert cut cell"
those row of that Item & then total cut of whole item may be done. "Cut from 'B' cell to double
nhide whole of destination sheet).
ed cell". If any way "Total copy & insert coppied cell" not allow by the syetem then first of all
he system.
ng Only
Lead.... Outlet ..Rod (Own) = 0 Lead……..…Corroded Rod (Own) = 116 X
Lead……………....Rod (Dept) = 45 X
Lead..HP(Own).. 600.. i.e (a.) 0
Lead..HP(Own).. 900.. i.e (b.) 0
Lead..HP(Dept).. 600.. i.e (a.) 0
Lead..HP(Dept).. 900.. i.e (b.) 0
ESTIMATE
Name of Work :- Kotasur - Ramnagar Road 0 kmp to 17.425 kmp: Widening and Streangthening from 12.00 kmp
to 17.25 kmp under Sainthia Highway Sub-Division of Birbhum Highway Division-I, in the District
of Birbhum.
(Unless stated specially rates as per P.W.D Volume - III , 2018 Schedule including 9th Add. & Corr. )
ROAD WORK
Sl.N Amount. (in
o. Discription of item. Quantity Unit Rate
Rs.)
0 Depth above 150 mm and upto 300 mm. sqm 0.00 0.00
0 Depth above 300 mm and upto 450 mm. sqm 0.00 0.00
0 Depth above 450 mm and upto 600 mm. sqm 0.00 0.00
0 In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) cum 0.00 0.00
0 In mixed hard soil (i,e hard moorum and soil containing laterite cum 0.00 0.00
0 With stone metal(Gr.-2) & Stone Scr. Type B.(0.21 cum) cum 0.00 0.00
0 With jhama metal(Gr-1) & Moorum Scr. (0.2385 cum) cum 0.00 0.00
0 With stone metal(Gr.-1) & Stone Scr. Type B.(0.21 cum) cum 0.00 0.00
0 With stone metal(Gr.-1) & Stone Scr. Type A.(0.1322 cum) cum 0.00 0.00
Sl.N Amount. (in
o. Discription of item. Quantity Unit Rate
Rs.)
0 Grading-1 Agg. (63-45mm) & Stone Scr. Type B (11.2mm) cum 0.00 0.00
0 Grading-2 Agg. (53-22.4mm) & Stone Scr. Type B (11.2mm) cum 0.00 0.00
0 For WBM / WMM Surface (with primer @ 0.85 kg / Sqm ). sqm 0.00 0.00
With Grading 2 B.M (19 mm nominal size, 50-75 mm thick.) cum 0.00 0.00
Sl.N Amount. (in
o. Discription of item. Quantity Unit Rate
Rs.)
Seal coat Type B with sand (2.36 mm to 180 mic) sqm 0.00 0.00
EXTRA ITEM
###
STRUCTURAL PART
STRUCTURAL WORK
0 Page No.233, Item No.2.05.
Dismantling of existing structures like culverts, bridges, retaining
walls and other str... of masonry, cement con. …etc.
0 Lime Concrete By Manual Means. cum 0.00 0.00
0 Without pumping out water including shoring as required. cum 0.00 0.00
0 Without pumping out water including shoring as required. cum 0.00 0.00
0 Without pumping out water including shoring as required. cum 0.00 0.00
Sl.N Amount. (in
o. Discription of item. Quantity Unit Rate
Rs.)
0 With Stone Metal (Gr-2) & Coarse Sand. cum 0.00 0.00
0 With Stone Metal (Gr-1) & Coarse Sand. cum 0.00 0.00
0 With bamboos of length above 2.00m and upto 2.50m. metre 0.00 0.00
0 With bamboos of length above 2.50m and upto 3.00m metre 0.00 0.00
0 With C.C. Blocks of size 0.3x0.3x0.3 m cast in C.C grade M15. cum 0.00 0.00
EXTRA ITEM
0 RCC Grade M20, using Batching Plant,Transit Mixer&Con.Pump. cum 0.00 0.00
0 PCC Grade M25, using Batching Plant,Transit Mixer&Con.Pump. cum 0.00 0.00
0 RCC Grade M25, using Batching Plant,Transit Mixer&Con.Pump. cum 0.00 0.00
0 PCC Grade M30, using Batching Plant,Transit Mixer&Con.Pump. cum 0.00 0.00
Sl.N Amount. (in
o. Discription of item. Quantity Unit Rate
Rs.)
0 RCC Grade M30, using Batching Plant,Transit Mixer&Con.Pump. cum 0.00 0.00
0 RCC Grade M35, using Batching Plant,Transit Mixer&Con.Pump. cum 0.00 0.00
0 PCC Grade M25 : Height upto 5m, using Batching Plant, Transit
Mixer & Concrete Pump. cum 0.00 0.00
0 PCC Grade M30 : Height upto 5m, using Batching Plant, Transit
Mixer & Concrete Pump. cum 0.00 0.00
0 RCC Grade M20 : Height upto 5m, using Batching Plant, Transit
Mixer & Concrete Pump. cum 0.00 0.00
0 RCC Grade M25 : Height upto 5m, using Batching Plant, Transit
Mixer & Concrete Pump. cum 0.00 0.00
0 RCC Grade M30 : Height upto 5m, using Batching Plant, Transit
Mixer & Concrete Pump. cum 0.00 0.00
0 RCC Grade M35 : Height upto 5m, using Batching Plant, Transit
Mixer & Concrete Pump. cum 0.00 0.00
0 RCC Grade M40 : Height upto 5m, using Batching Plant, Transit
Mixer & Concrete Pump. cum 0.00 0.00
0 Type-B: Using 1.9 kg bitumen per Sq.m. surface area. Sq.m. 0.00 0.00
* a. Aluminium Alloy Plate for Over Head Sign. sqm 0.00 0.00
###
###
EXTRA ITEM
ROAD PART
0.20
No.18.01(a/b/c/d)( i/ ii )
Picking up existing metalled road surface to a specified ave
Picking up existing metaled road surface to a specified ave
R.S.Rate
No. 3.16(a)/(b).
Depth upto 150 mm. = 14.40 Box cutting or filling in Road embankment in all sorts of so
additional each 150 mm = 19.00 Box cutting or filling in Road embankment in all sorts of so
R.S.Rate
0.20
in schedule only Gr-2 & Type B Screening given for Patching of Pothole
*** Rate of Jhama Metal not given in Schedule for Purulia, so this item can not be execute.
R.S.Rate
Controversial as screening not stated & Laterite boulder rate for Birbhum not given
nil
R.S.Rate
854.00 862.54
No.4.10. (i/ii/ii)
Sub-Base Course Water Bound Macadam Sub Base by consolidating Jhama m
Water Bound Macadam Sub Base by consolidating Jhama m
R.S.Rate
*** Rate of Jhama Metal not given in Schedule for Purulia, so this item can not be execute.
Grading-I,II etc
R.S.Rate
No.5.02. (i/ii/ii)
Providing and applying tack coat with Cationic Bitumen Em
Providing & applying tack coat with Cationic Bitumen Emul
With 22.4mm; 11.2mm; 5.6mm. With pr . With premixed Chips or Bajrees with 54 kg of bitumen per
this may be adopted with prior discussion with EE
1129.00 1140.29
1235.00 1247.35
nil
Mode of measurment same as Item No. 3.11 as compaction same as that Item.
R.S.Rate
nil
R.S.Rate
nil
R.S.Rate
For Small Qty. E/W "Borrow pit" measurment & for other case "Pre & Post Level" measurment.
nil
R.S.Rate
R.S.Rate 2 x 1.00 x 1.00 x 0.100 = 0.20
0.20
In mixed soil.
In mixed hard soil.
nil
R.S.Rate
101.00
100.00
3.00
104.00
104.00
CROSS CHECK by selecting cell
Rupees One Hundred Four Only
STRUCTURAL PART
0.20
The excavation of earth, dismantling of stone masonry Removing all types of Hume pipes and stacking within a le
work in head walls and protection works is not included Removing all types of Hume pipes and stacking within a le
which is to be measured and paid separately.Credit for
retrieved stone from masonry work may be taken as per
actual availability
.S.Rate
The excavation of earth, dismantling of stone masonry
work in head walls and protection works is not included
which is to be measured and paid separately.Credit for
retrieved stone from masonry work may be taken as per
actual availability
2 x 1.00 x 1.00 x 0.100 = 0.20
R.S.Rate
0.20
278.00 nil
R.S.Rate
0.20
NIL
R.S.Rate
(Ground floor).[Excluding cost of chipping over concrete nil Plaster (to wall, floor, ceiling etc.) with sa
(PWD Shc. Don't use normally) including rounding off or chamfering cor
raking out joints including throating, nos
scaffolding/staging where necessary (Gro
cost of chipping over concrete surface]
R.S.Rate
nil
R.S.Rate
R.S.Rat
Supplying fitting and fixing R.C. guard post 1.37m long with
R.S.Rate
Supplying fitting and fixing R.C. guard post 1.37m long with
2 x 1.00 x 1.00 x 0.100 = 0.20
0.20
nil
R.S.Rate
60 cm x 45 cm rectangular
2 x 1.00 x 1.00 x 0.100 = 0.20
0.20
60 cm x 60 cm square
90 cm high octagon
238
nil
R.S.Rate
nil
R.S.Rate
NB:- Add the cost of required sand or moorum or granular material as the case may be.
*** So this item may also be done by granular material
100.00
12.00
112.00
1.12
113.12
3.36
116.48
116.00
CROSS CHECK by selecting cell
Rupees One Hundred Sixteen Only
If # or #NAME Again put formula =rswords(refer cell)
er or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as direct
er or sand selealing coat from old black topped surface …….….etc
a specified average depth, including screening and stacking the pavement materials.
a specified average depth ..Including screening and stacking .…..…etc.
n all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and ro
n all sorts of soil including spreading the spoils properly over the flank ...…etc.
n correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m(Mode of measurement: pre works a
n correct profile inc. removal of spoils .. initial lead of 50m ....etc (Pre & Post)
to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and
to required thickness, in layers not exceeding 150 mm to proper ...…etc.
ne Dust to a depth of 100 mm and above at desired density and C.B.R. as per Specification with power roller to proper gradient and cam
ne Dust to a depth of 100 mm and above at desired density and C.B.R. …etc.
uniform and homogeneous mixture of Stone Dust and sand (mixed in proportion of 3:1 by volume and by any approved method as pe
form homogeneous mixture of stone dust & sand (mixed in proportion of 3:1 by volume )……..etc.
ials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in p
ials, spreading in uniform layers with Motor grader……..mixing by mix in place method with Rotavator at OMC, ……etc.
ding graded material, mixing in Wet Mix Plant at OMC, carriage of mixed material to work site, spreading in uniform layers with Motor
ding graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepare
ding graded material, mixing…….at OMC,……compacting with …..etc.
graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the m
raded stone aggregates to Wet Mix Macadum specification …………..etc.
tting the pothole area to rectangular shape with vertical edges, removing all loose materials, screening and stacking the same for reuse
dditional volume of crushed stone materials / laterite / Jhama / broken shingles / coated stones of Pakur...& Scr. as applicable.....etc.
dating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after com
idating Jhama metal / Laterite chelly or stone metal / shingles..... requisite thickness (measured after compaction) incl. screening…..e
stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, roll
tone aggregates of specific size to water bound macadam specification..…etc.
orum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including
orum to a depth of 75mm at desired density & C.B.R …….with power roller …..etc.
opping using sand / moorum / kiln rubbish etc. in approximately 6mm thick layer, including watering and rolling complete.
opping using moorum in approximately 6 mm thick layer………….etc.
tionic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base in
ationic Bitumen Emulsion of approved grade ...…surface of granular base …...using Mechanical means ……....etc.
nic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moisten
Bitumen Emulsion of approved grade conferming to…………….……etc.
terial, trimming the sides to vertical and leveling the bottom, cleaning the same with compressed air or any appropriate method filled
terial, trimming the sides to vertical and leveling the bottom, ...filled with B.M (... not > 75 mm in single layer) applying ... prime coat .
BM with 20 mm premix carpet and seal coat Type B as per drawings and technical specification Clause 1904.2 for Rural Roads of MO
BM with 20 mm premix carpet and seal coat Type B as per ... Clause 1904.2 for Rural Roads of MORD.(Excluding tack coat)
BM with 12 mm premix carpet using premixed stone chips of approved quality with hot matrix using 1.00 m3 of 11.2 mm chips and 0
BM with 12 mm premix carpet using premixed stone chips of approved quality …etc.(Excluding tack coat)
BM with 6 mm premix carpet using premixed stone chips of approved quality with hot matrix using 0.80 m3 of 11.2 mm chips and 0.2
BM with 6 mm premix carpet using premixed stone chips of approved quality …etc.(Excluding tack coat)
epressions with ramming or power rolling including screening, cleaning chips or metals and washing, drying as necessary and heating th
pressions with ramming or power rolling including. Scr.….etc.(excl. tack coat)
of bitumen per m3 of loose net volume of stone chips using concrete mixer machine. (The payment is to be made on the basis of loose
m3 of loose net volume of course aggregate. Requirement of key aggregate may be taken as 10% of coarse aggregate and size 11.2 mm
of bitumen per m3 of loose net volume of stone chips using concrete mixer machine. (The payment is to be made on the basis of loose
rective Course using Mobile Hot Mix Plant (Light Duty) and using aggregates of Grading-2 of Table-33 premixed with 75kg of bitumen
rective Course using Mobile H.M.P (Light duty) and using aggr. of Gr-2 ...... with 75kg of bitumen per cum, .….etc.( excl. tack coat).
with Hot Mix Plant using approved crushed aggregates of specified grading as per Table 500.7 premixed with bituminous binder, trans
with Mobile Hot Mix Plant (Light Duty) using approved crushed aggregates of specified grading as per Table 500.7 premixed with bitum
th …... approved crushed aggregates of specified grading….etc.( excl. tack coat)
cadam with Hot Mix Plant using crushed aggregate of specified grading, filler ( Cement / hudrated lime / Rock dust ) premixed with bitu
cadam with ...... using crushed agg. of specified…., filler ... etc.( excl. tack coat)
Concrete (SDBC) as wearing coarse by Hot Mix Plant, using coarse aggregates, fine aggregates, filler materials and binder of required sp
Concrete (SDBC) as wearing coarse....using coarse aggr. fine....etc.(excl. tack coat)
with Hot Mix Plant using crushed aggregate of specified grading, filler ( Cement / hudrated lime / Rock dust ) premixed with bituminous
with ... using crushed aggregate of specified grading, filler ( Cement / hudrated lime / Rock dust )... etc (excl. tack coat )
g course with paving grade bitumen meeting the requirements given in table 500-29 using approved coarse aggregate, fine aggregate,
g course with paving grade bitumen meeting the requirements given in table 500-29 …...etc.(excl. tack coat) (Bitumen-Packed 10/20 .
d premix surfacing of 20 mm thickness composed of 13.2 mm (@ 0.018 m³ per m²) and 11.2 mm (@ 0.009 m³ per m²) size stone aggr
d premix surfacing of 20 mm thickness composed of 13.2 mm (@ 0.018 m³ per m²) and 11.2 mm (@ 0.009 m³ per m²) size stone aggr
premix surfacing of 20 mm thickness composed of 13.2 mm (@ 0.018 m³ per m²) and 11.2 mm (@ 0.009 m³ per m²)……...etc.(excl. tac
pe B) with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tac
pe B) with approved quality sand/grit @ 0.6 m 3/ 100 m2 and bitumen binder …..etc.(excluding tack coat.)
x @ 56 kg/m3 of net volume of stone aggregate in concrete mixer including preheating the stone aggregate at a suitable temperature
x @ 56 kg/cum of net volume of stone aggregate in concrete mixer….including cost of stone agg. & bitumen…..etc. ..…(excl. tack coa
materials including cutting, loading pre-coated stone materials at departmental stack-yard or any other approved pre-defined location,
materials including cutting, loading pre-coated stone materials at dept. stack-yard or any other approved …….…etc.(excl. tack coat.)
and owned/arranged by the Department) and depositing in layers of 250 mm. including breaking clods in embankment works and to fi
…....with an initial lead up to 50 m and initial lift up to 1.5 m …..…etc.
and owned/arranged by the Department) and depositing in layers of 250 mm. including breaking clods in embankment works and to fi
…..depositing in …….....with in a lead up to 500 m and lift up to 3.0 m …..…etc.
and owned/arranged by the Department) and depositing in layers of 250 mm. including breaking clods in embankment works and to fi
…depositing in …..……with carried earth with in a lead upto 1.00 Km.. …..…etc.
ng cutting and filling with earth up to 150 mm average thickness finished with outward cross-grade of 1 in 30. (Extra quantity of earth
g cutting and filling with earth upto 150 mm average thickness …….….etc.
rts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wh
rts, bridges, retaining walls and other str... of masonry, cement con. …etc.
rts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stackin
rts, bridges, retaining walls and other...comprising of brick masonry .…etc.
king within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202 for Rura
king within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per ……….... Clause 202 for Rural Roads of MOR
tructures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 15
tructures as per drawing ...including... backfilling... within a lead of 150 m …etc.
he back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each lay
he back of abutments, wing-walls etc. with good local sand………...etc.
r in steining of well, pier, abutment, wing wall, parapets cross drain. H.P. culverts, guard wall etc. including curing, scaffolding, raking o
r in steining of well, pier, abutment, wing wall, parapets, cross drain. .....etc.
or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracin
or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate…....etc.
D bar reinforcement in Bridge Foundation including initial straightening, straightening of coils bars, removal of loose rust (if any), cutti
D bar reinforcement in Bridge Foundation including initial straightening, straightening … .etc. (Own Supply.)
forcement in Sub-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite
orcement in Sub-structure including initial straightening, straightening … .etc. (Own Supply.)
orcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to
orcement in Bridge Super-structure including initial straightening, straightening … .etc. (Own Supply.)
r plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal siz
r Plain/ R.C work in any part of bridge (excluding bottom plugging) with....etc.
ring coat M-30 grade with graded stone chips 19mm down including screening and cleaning approved stone chips and sand as necessa
ring coat M-30 grade with graded stone chips 19mm down ……….etc.
ain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure
in / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe extending through the full width of the str..…etc.
ub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 2
ub- base over a prepared sub-grade with coarse & fine aggregate conf. to IS: 383, the size of coarse agg. not exceeding 25 mm,....MoR
d, plain cement concrete pavement over a prepared sub base with cement content as per IRC:15-2011, coarse and fine aggregate con
d, plain cement concrete pavement over a prepared sub base with cement content as per IRC:15-2011, coarse & fine aggr. Conf.to IS
d at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with c
d at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with c
Pavement (RCCP) with coarse and fine aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25 mm with mini
Pavement (RCCP) with coarse and fine aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25 mm ...MORD.
locks of size 0.450 m x 0.300 m x 0.15 m of Cement Concrete (C.C.) M30 grade and spreading 25 mm thick sand underneath and filling
locks of size 0.450 m x 0.300 m x 0.15 m of Cement Con... M30 grade .. spreading 25 mm thick sand ... on existing W.B.M. base……. of
Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to cen
Grade, agg….. not exceeding 12 mm, ... ver. RCC post not to exceed 1 in 500, c/c spacing between vertical post not to exceed 2000 m
anular materials/stone crushed aggregates/brick aggregates /river bed materials satisfying the requirements laid down in clause 2504.
anular materials / stone crushed agg./brick agg. /river ... th. of not < 600 mm .... behind abutment, wing wall and return wall to full ht.
with good earth in layers not exceeding 15cm. including watering and ramming layer by layer complete with earth obtained from exca
with good earth ... not exceeding 15cm. including ..... of foundation or from fresh excavation of …. by Department within a lead of 150
t the back of abutments with good earth (sandy soil) in layers not exceeding 15 cm. including watering and ramming layer by layer co
the back ... (sandy soil) in layers not exceeding 15cm… earth obtained by fresh ..... by Dept....beyond 150m but witthin 300m…all lifts..
1.37m long with C.C. 1:2:4 with graded stone chips of 13.2mm down casting , curing complete including cost of providing 4nos.of 12m
1.37m long with C.C. 1:2:4 with graded stone chips of 13.2mm down ..…….etc.
er IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer
er IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips……..etc.
autionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminiu
utionary, mandatory & informatory sign as per IRC :67 made of...…fixed over aluminium sheeting, 1.5 mm thick……..etc.
dentification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeti
dentification retro-reflectorised sign as per IRC:67 made……area not exceeding 0.9 sqm supported on mild steel single ...…etc.
dentification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium shee
dentification retro- reflectorised sign as per IRC :67 made .…area exceeding 0.9 sqm supported on a mild steel angle iron ....…etc.
kers / Road Studs / Cats Eye made of polycarbonate moulded body and reflective panels with micro prismatic lens capable of providin
kers / Road Studs / Cats Eye made of polycarbonate moulded body and …etc.
minous Surface with hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, t
minous Surface with hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm ....etc
eel guards or railing or parapet with alternate bands of different colours as directed by the Engineer-in-charge with approved synthetic
eel guards or railing or parapet with….. approved synthetic enamel paint.
washing with admixture of pigment if necessary as per direection of enginee- in-charge to unplastered concrete surface after cleaning
washing …. to unplastered concrete surface after cleaning the sur. ......etc.
int Circular panel (upto 30cm dia.) or Rectangular panel (size 38cm to 30cm x 25cm to 20cm) including the Load classification number
ints Circular panel………Rectangular panel …..load classification number …number of bridge or culvert painted thereon in a diff...etc..
with synthetic enamel paint black or any other approved colour to give an even shade as per drawings and Technical Specification Cla
with synthetic enamel paint black or any other approved colour …….Clause 801 of Specifications ……... Works of MoRT&H (5th Revisio
of 16cm wide horizontal alternate band in different colours after the scrapping the surface free from old paint etc. as directed with bes
of 16cm wide horizontal alternate... synthetic enamel paint ... after fixing old existing guard post in correct position true to line ……etc
ality synthetic enamel paint of approved make and brand of different shades as directed after cleaning and washing the surface includi
lity synthetic enamel paint…....mending good damages as necessary…..etc.
-bullah / Eucalyptus bullah piling 10 cm dia. and 3.25m long driven 1.75m (av.) below G.L. and 75cm centre to centre including fitting fi
-bullah / Eucalyptusbullah piling 10 cm dia. and 3.25m long driven 1.75m (av.) below G.L. and 75cm centre to centre….etc.
5mm dia. bamboos (in single line) driven about half-length into the ground side by side, with stout stays at an interval of 1m, 3nos. of h
5mm dia. bamboos (in single line) driven about half-length into ground…...…etc.
e of 4mm dia. and making sausage crate of required shape after tying all intersections including joining longitudinal ends, closing ends
e of 4mm dia. and making sausage crate of required shape .…including cost of supply of G.I. wire. (With 100mm x 100mm mesh.)
ith boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of bou
ith boulders of any size & shape with hand packing after preparation ....etc.
be execute.
r sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete includ
r sand, stitching the bag (cost of thread included) and carrying and …..…etc.
mixed with grit, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complet
r bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical speci
bed for protection against scour with stone boulders weighing not less than 40 kg each complete …... Boulder Laid Dry Without Wire C
n wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10
n wire crates made with 4mm dia GI wire ... in 100mm x 100mm mesh ...... with stone boulders weighing not less than 40 kg each.
g and embankment slopes on which pitching is laid to prevent escape of the embankment material through the voids of the stone pitc
g & embankment slopes on which pitching is laid to prevent …. stone pitching / C.C blocks ... without creating any uplift head on the pi
g providing drip mouldings and also including supplying, fitting and fixing approved type of materials complete as per drawing and Tech
g providing drip mouldings and also including supplying, fitting and fixing approved type ...... no.2705 of MoRT&H’s Specification. .…etc
n foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate no
n foundation with or ….., in any part of foundation of bridges / culverts... including cost of formwork …..etc
structure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, b
structure with coarse aggregates ….including the cost of necessary form work and staging …etc
ssed Cement concrete in Super-structure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) confo
ssed Cement concrete in Super-structure with coarse aggregates …….. including the cost of necessary form work and staging .…etc
rfacing (MSS) :-Providing, laying and rolling of close graded premix surfacing using materials of 20mm thickness composed of 11.2mm
rash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel
rash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC ....etc.
m crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC series chan
m crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC ….etc.
a corrosion resistant 2mm thick aluminium alloy sheet reflectorized with high intensity retro-reflective sheeting of encapsulated lens t
a corrosion resistant 2mm thick aluminium alloy sheet reflectorized with high intensity retro-reflective sheeting …....etc.
a corrosion resistant 2mm thick aluminium alloy sheet reflectorized with high intensity retro-reflective sheeting of encapsulated lens t
a corrosion resistant 2mm thick aluminium alloy sheet reflectorized with high intensity retro-reflective sheeting …....etc.
in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous surface, including cleaning the su
in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous surface, including cleaning …etc.
in two coats on old work with ready mixed road marking paint conforming to IS: 164 on bituminous surface, including cleaning the sur
in two coats on old work with ready mixed road marking paint conforming to IS: 164 on bituminous surface, including cleaning ….etc.
gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm an
gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm …
ng coat including its disposal complete as per Technical specification without causing any detrimental effect to any part of the bridge s
ng coat including its disposal complete as ….. without causing any detrimental effect to any part of the bridge ... (Thickness 75 mm).
tructures upto 3 m depth as per drawing and technical specification Clause 1104 for Rural Roads of MORD including setting out, const
tructures upto 3 m depth as per drawing and technical specification Clause 1104 for Rural Roads of MORD including setting out …….. E
ad way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips
ad way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm … etc.
erial as directed.
amber and rolling the sub-grade with power roller to proper camber and grade as per direction andsatisfaction of Engineer-in-charge in
d packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate ea
dient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where nec
method as per direction of Engineer-in-Charge) to the required thickness in layers at 97% Proctor Density (not less than 1.7 gm/cc) wit
ng by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guard
s with Motor grader on prepared surface in proper grade and camber, compacting with vibratory power roller to achieve the desired d
er on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting,
emixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Pa
me for reuse with new materials as per requirement, filling the pothole area with additional volume of crushed stone materials / later
able.....etc.
ed after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages w
screening…..etc.
packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of scree
ber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to prot
anular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen em
oom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants a
method filled with B.M (thickness not more than 75 mm in single layer) applying bitumen emulsion prime coat at the bottom and bitum
prime coat .... tack coat ..... Clauses 502 and 503 for Rural Roads of MORD. (Exclu. material cost for primer & tack coat.)
Roads of MORD.
m chips and 0.6m3 of 5.6 mm chips per 100 m2 of surface, including preheating the stone chips on suitable pans and intimately mixing
chips and 0.25m3 of 5.6 mm chips per 100 m2 of surface, including preheating the stone chips on suitable pans and intimately mixing
and heating the chips or metal where necessary, cutting pot holes to regular shapes with vertical edges, cleaning the disintegrated mat
d size 11.2 mm.[Payment to the Contractor is to be made on the basis of loose net volume of coarse aggregate only excluding key aggre
g of bitumen per cum, transported to site laid over apreviously prepared surface at specified laying temperature to the required grade
ack coat).
binder, transported to site laid over a previously prepared surface at specified laying temperature with paver finisher to the required
ed with bituminous binder, transported to site laid over a previously prepared surface at specified laying temperature by means of app
ixed with bituminous binder of approved grade @ 4.0 % ( min ) for grading-1 and 4.5 % ( min ) for grading-2 by weight of total mix as p
of required specification and grading as per approved job mix formula, over thoroughly cleaned surface coated with tack coat, includin
h bituminous binder of specified grading @ 5.2 % ( min ) for Gr.-1 and 5.4 % ( min ) for Gr.-2 as per table 500-17 and mix design done
e aggregate, filler material and bitumen, prepared by using Mastic cooker including cost and carriage of all ingredients, cost of heating
cked 10/20 . Own Supply)
ze stone aggregates, including thoroughly cleaning of the surface, screening, cleaning and pre-heating stone chips and fully pre-coating
ze stone aggregates, including thoroughly cleaning of the surface, screening, cleaning and pre-heating stone chips and fully pre-coating
.etc.(excl. tack coat)
ated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron
temperature including the cost of carriage of the stone aggregate at the mixing yard and carriage of the pre-coated materials for dum
excl. tack coat.)
ned location, including carriage of pre-coated stone materials from source to different kilometers of road by truck and laying directly f
ack coat.)
works and to fill up back of abutments, depressions and ruts with an initial lead up to 50 m and initial lift up to 1.5 m making bunds at to
works and to fill up back of abutments, depressions and ruts with an initial lead up to 500 m and initial lift up to 3.0 m making bunds at
orks and to fill up back of abutments, depressions and ruts with carried earth with an initial lead up to 1.0 Km and initial lift up to 1.5
ntity of earth for filling shall be obtained from road side borrow pits.)
caffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable materi
al and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specifications Clause 202for Rural Roads of MO
ding, raking out joints etc. complete including cost and carriage of all materials.
quired bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross-dra
t (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every i
g to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hoo
y), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every interse
te nominal size and grading, fine aggregate (sand)conforming to proper grading zone, both of approved quality and cement, as necessa
nd as necessary laying, finishing complete to camber and grade, curing with water, including cost and carriage of all materials and hire
the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications.
he str..…etc.
ot exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement c
5 mm,....MoRT&H (5th Revision).
ggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batch mix plant as per approved m
gr. Conf.to IS 383, max. size of coarse agg....mixed in a batch mix plant as per approved mix design (as per IRC:44 2008)....MoRT&H (5t
b base, with cement content as per IRC: 15-2011, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate
b base, with cement content as per IRC: 15-2011, coarse and fine aggr. conforming to IS:383, max size of coarse aggr. not exceeding 25
mm with minimum aggregate cement ratio of 5:1 mm and with minimum cement content of 310 kg per cum, aggregate gradation to b
mm ...MORD.
ath and filling joints with sand on existing W.B.M. base as per Technical Specification Clause 1503 for Rural Roads of MORD.
. base……. of MORD.
centre to centre spacing between vertical post not to exceed 2000 mm. leaving adequate space between vertical post for expansion, c
xceed 2000 mm, ….etc.
clause 2504.2.2 of MoRT&HSpecifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size tow
wall to full ht. …..etc
ed from excavation of foundation or from fresh excavation of land arranged by Department within a lead of 150 m.
n a lead of 150 m.
er by layer complete with earth obtained by fresh excavation from land arranged by Department beyond 150 m. but within 300 m. incl
00m…all lifts.. ..etc.
4nos.of 12mm dia. rod of length 1.54m as main reinforcement and 6 nos. of round shaped 8mm dia rods used as binders; the placing
double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of heigh
over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by
minium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fi
.…etc.
uminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos.
....…etc.
le of providing total internal reflection of the light entering the lens face which shall support a load of 13635 kg tested in accordance to
er sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35.The finished surface to be level, uniform and
er sqm ....etc.
fter cleaning the surface of dirt oil grease efflorescence and using cement @ 2.50 kg per 10 sqm. of surface.
ation number or the number of bridge or culvert painted thereon in a different colour, complete as directed by Engineer-in-charge.
a diff...etc..
ecification Clause 801 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
H (5th Revision).
cted with best quality synthetic enamel paint of approved make and brand after fixing old existing guard post in correct position true t
o line ……etc
uding fitting fixing 3 nos. of half bullah pieces (from 10 cm dia) and drum(empty bitumen) sheet (approved condition) of height 1.5m , c
1m, 3nos. of half split bamboo runner of same dia fitted and fixed with nails etc. complete as per direction. (Measurement to be taken
, closing ends of sausage, carriage of wire to site of work complete in all respect as per direction of the Engineer-in-charge including co
m mesh.)
arriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wir
rges complete including cost of stone dust mixed with grit and gunny bags.
including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each.
0 kg each.
he stone pitching/cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching
ead on the pitching.
wing and Technical specificationvide clause no. 2705 of MoRT&H’s Specification for Road & Bridge Works.
fication. .…etc.
ppropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zo
ading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all m
e (sand) conforming to proper grading zone, both of approved quality and cement and admixtures, as necessary, including labour, cost
aging .…etc
d of 11.2mm to 0.09mm ( For Type- A) or 13.2mm to 0.09mm ( For Type- B) aggregates using penetration grade bitumen to the require
eries channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and
C series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 2 m high with 1.15 m below ground level, all steel parts an
C ….etc.
sulated lens type with vertical and lateral clearance given in clause 802.2 and 802.3 and installed as per clause 802.6 over a designed s
sulated lens type with vertical and lateral clearance given in clause 802.2 and 802.3 and installed as per clause 802.6 over a designed s
eaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control (Referenceto MORT&H's specificatio
eaning …etc.
aning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control (Reference to MORT&H's specificatio
aning ….etc.
ng 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings
ng 250 mm …etc.
of the bridge structure and removal of dismantled material with all lifts and lead upto 1000m (Thickness 75 mm).
ss 75 mm).
ng out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfil
ng out …….. Etc
m wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the gro
m … etc.
r-in-charge including uprooting and removing plants and jungles when and where necessary.
adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever
dh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks and depressions by rolling where neces
.7 gm/cc) with power roller to proper gradient and amber, including watering as necessary, lighting , guarding, barricading and making
ghting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on
the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants and cost of qua
ding lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control comple
ayers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired dens
terials / laterite / Jhama / broken shingles / coated stones of Pakur variety etc. and screenings as applicable, and compacting the same
ng in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh
type of screening / binding materials to fill up the interstices of coarse aggregate, watering including lighting, guarding, barricading an
ssary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental cha
bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoR
d lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
om and bitumen emulsion tack coat on sides and on bottom as per technical specifications Clauses 502 and 503 for Rural Roads of MO
mately mixing the hot chips separately with hot matrix @ 56 kg per m3 of stone chips, laying the mixture uniformly over the surface and
mately mixing the hot chips separately with hot matrix @ 70 kg per m3 of stone chips, laying the mixture uniformly over the surface and
tegrated materials, heating matrix and applying tack coat (including sides), finishing the top of repaired surface levelled with adjoinin
equired grade, level and alignment, as per apecification to achieve the desired compaction including cost and carriage of stone materia
the required grade, level and alignment and rolled with suitable power roller for break down, inter-mediate and finished rolling as per
means of approved and suitable arrangements to the required grade, level and alignment and rolled with suitable power roller for bre
total mix as per table 500-10 and mix design done as per table 500-11 and job mix formula as per clause 505.3.3 of MoRTH ( 5th Revisi
coat, including screening, cleaning of aggregates, mixing the components as per approved Job Mix Formula with hot binder, carrying th
design done as per table 500-10 and job mix formula as per clause 505.3.3 including screening, cleaning of chips and preparing a unifo
ost of heating aggregates and binder, mixing in specified proportions conforming to approved Job Mix Formula and laid to required lev
y pre-coating the same either using viscosity grade paving bitumen or cut-back or emulsion, carrying the mixture by tipper trucks or by
y pre-coating the same either using viscosity grade paving bitumen or cut-back or emulsion, carrying the mixture by any suitable arran
n 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing t
rials for dumping at a suitable place as directed including cost and carriage of bitumen and hire charges of machineries and all inciden
ying directly from truck and compacting with plate compactor / power roller including cutting the pot hole to regular shape clearing th
Roads of MORD.
m, and backfilling with approved material complete as per direction of the Engineer-in-Charge
nd is to be approved by the Engineer-in-charge.
ert, cross-drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.
280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of
ersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unload
every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading
nt, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by th
rials and hire charges for form work including reinforcement complete as per drawing and Technical Specifications vide clause no. 2702
0-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, con
r approved mix design (as per IRC:44 2008), transported to site, laid with a fixed form or slip form paver, spread, compacted and fini
.MoRT&H (5th Rev.)
se aggregate not exceeding 25 mm, mixed in a batch mix plant / RMC and appropriate weigh batcher using approved mix design (as
exceeding 25 mm, mixed in a batch mix plant / RMC and appropriate weigh batcher using approved mix design (as per IRC:44 2008)
radation to be as per Table 602.2 after blending, mixing in concrete mixer at optimum moisture content, transporting to site, laying wi
expansion, complete as per MoRT&H standard drawing no SD/202 and technical specifications.
bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compac
; the placing of the first binder should be at 75mm below the top finished surface and the other 5 nos of binders should be placed at 2
mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including dig
he ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground le
6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 x 45 x 60 cm, 60 cm be
mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 6
accordance to ASTM D 4280 Type H and complying to clause no 804 of MoRT&H's specification for Road &Sridge Works (Fifth Rev.). M
uniform and free from streaks and holes complete as per Clause 803 of Specifications for Road & Bridge Works of MoRT&H (5th Revis
n-charge.
osition true to line and level with repacking the ground at base properly and mending good damages if necessary complete in all respe
eight 1.5m , cutting and straightening drum sheet (each joint must have lap length of min.50mm) including cost of necessary nails, bol
t to be taken along the length of piling after finishing the works).
crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and
n the pitching.
per grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all mater
rriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality con
labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and
o the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, layin
teel parts and fitments to be galvanized by hot dip process, all fittings to conform to IS:1367 andIS:1364, metal beam rail to be fixed on
steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed o
a designed support system of aluminium alloy or galvanised steel trestles and trusses of sections and type as per structural design req
a designed support system of aluminium alloy or galvanised steel trestles and trusses of sections and type as per structural design req
H's specification803).
ng where necessary including all incidental charges of roller, cost of fuel & lubricants complete as per specification.
ing and making adequate earhen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks a
e metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th
and cost of quality control complete as per Clause 401 ofSpecifications for Road & Bridge Works of MoRT&H (5th Revision).
control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
he desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting, guarding, bar
acting the same with static roller as per Water Bound Macadam Specification, including cost of all materials and machineries.
earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or fillin
barricading and making necessary earthen bundh of one metre width on each side and preparing the bed by necessary cutting or fillin
ll incidental charges of roller, cost of fuel & lubricants etc. complete as per specification.
ral Roads of MORD. (Excluding material cost for primer & tack coat.)
the surface and rolling with power roller, after hand packing and pinning adequately to ensure a compact surface.
the surface and rolling with power roller, after hand packing and pinning adequately to ensure a compact surface.
d with adjoining area, including cost and carriage of stone aggregates and matrix, excluding cost of applying tack coat. [Tack coat is to
of stone materials and bitumen, hire charges of machinery and equipment, cost of fuel and lubricants and wages of operational staff, q
ed rolling as per specification to achieve the desired compaction including cost and carriage of stone materials and bitumen, hire charg
wer roller for break down, inter-mediate and finished rolling as per specification to achieve the desired compaction including cost and c
RTH ( 5th Revision )including screening, cleaning of chips, transporting the hot mix to work site, laying the mixed materials at specified
nder, carrying the mixture by tipper truck or any other approved suitable arrangements, laying the mixture uniformly, maintaining the
reparing a uniform and quality mix, transporting the hot mix to work site, laying the mixed materials at specified laying temparature, a
to required level and slope after cleaning the surface, compacting, sealing the construction joints and surface finishing conforming to
per trucks or by any other suitable arrangements, laying the mixture uniformly over the surface with paver finisher, including manual
y suitable arrangements, laying the mixture uniformly over the surface, including line, grade and level to serve as wearing course on a
ans, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of bi
ape clearing the pot holes of loose materials, drying the bed of pot holes, where necessary, by soaking with gunny bags and using lime
nd direction.
wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of
loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-cha
d cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications. (Own Supply.)
f the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and m
clause no. 2702 of MoRT&H’s Specification for Road & Bridge Works.
onstruction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver wi
pacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint
mix design (as per IRC:44 2008), laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene fi
er IRC:44 2008), ...Clause 1501 for Rural Roads
o site, laying with wheel barrows or steel pans or with mechanical paver, compacting with 80-100 kN smooth wheel, tandem vibratory
height compacted to a firm condition complete as per drawing and technical specification.
d be placed at 245mm c/c ; the guard post is of octagonal section with inscribed circle of dia 24cm at the base tapering to correspondin
GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete inc
below ground level as per approved drawing and Clause 801 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
60 cm, 60 cm below ground level as per approved drawing and Clause 801 of Specifications for Road & Bridge Works of MoRT&H (5th R
cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawingand Clause 801 of Specifications for Road & Bridge Works of M
s (Fifth Rev.). Marker height shall not be less than 10 mm and shall not exceed 20 mm, width shall not exceed 130mm and with minimu
essary nails, bolts, nuts etc. and providing 2 to 3m long half bullah ties of 10cm dia. @ 2.25 m centre to centre fixed with 10 cm dia. bu
necessary and as directed by the Engineer-in charge. [Rate provided is exclusive of the cost of sausage crate]
age of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, s
t for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form
r-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cos
able plant, laying and rolling with a smooth wheeled roller 8 - 10 tonne capacity and finishing to required level and grade etc. includin
il to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per Clause 811.3 of Spec
rail to be fixed on the vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm long complete as per Clause 811.3 of Spe
tural design requirements and approved plans (Reference to MORT&H's specification 802).
y cutting or filling, including cost of all materials and hire and labour charges of all men and machinery and compacting to the required
[Tack coat is to be considered separately]
men, hire charges of machinery andequipment, cost of fuel and lubricants and wages of operational staff, quality control complete as
uding cost and carriage of stone materials and bitumen, hire charges of machinery and equipment, cost of fuel and lubricants and wag
ials at specified laying temparature, as specified in Table 500-2 with a hydrostatic paver finisher with sensor control to the required gra
maintaining the specified laying temperature, thorough rolling with power roller with necessary hand packing and pinning to give an un
temparature, as specified in Table 500-2 with a hydrostatic paver finisher with sensor control to the required grade, level and alignme
conforming to specifications including providing antiskid surface with bitumen pre-coated fine-grained hard stone chipping of 13.2 mm
cluding manual operations as and when required for proper line, grade and level to serve as wearing course on a previously prepared b
ing course on a previously prepared base, including mixing in Mobile Hot Mix Plant (Light Duty) and thoroughly rolling with a smooth w
nd carriage of binder and aggregates, cost of heating the binder and aggregates and all other incidental charges, cost of fuel and lubrica
s and using lime, where necessary, before laying of pre-coated materials etc. complete as per direction of Engineer-in-charge.
nd direction of Engineer-in-charge. (Own Supply)
Supply.)
of labour and materials for formwork & reinforcement works.
with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.(As per clause 601 of specificatio
nal joints, joint filler, separation membrane, sealant primer, joint polysulphide sealant, debonding strip, dowel bar, tie rod, admixtures
ick polythene film, wedges, steel plates including levelling the formwork as per drawing, spreading the concrete with shovels, rakes, co
ndem vibratory roller, to achieve, the designed flexural strength, finishing and curing as per drawings and Technical Specification Claus
to corresponding dimensions of 16cm at the top including two coats of painting with best quality synthetic enamel paint of approved m
c. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is
Revision).
MoRT&H (5th Revision)..
nd with minimum reflective area of 13 sq.cm. on each side and slope to the base shall be 35 ± 5 degree. Fixing will be without nails bu
h 10 cm dia. bullah posts driven 1.5m below G.L. including cost of all materials and one coat of coal tarring to all bullah etc. complete a
uality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical sp
necessary form work and staging complete as per drawing and technical specifications.
ncluding the cost of necessary form work and staging complete. as per drawing and technical specifications.
de etc. including all other incidental charges, quality control as per clause 508 of specifications for Road & Bridge Works of MoRT&H (5
e 811.3 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
se 811.3 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
of roller, cost of fuel & lubricants.
Clause 406 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Rev
to the required density, as per Clause 404 of Specifications for Road & Bridge of MoRT&H (5th Revision).
ol complete as per Clause 504 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
icants and wages of operational staff, quality control complete as per Specifications for Road & Bridge Works of MoRT&H (5th Revision
the required grade, level and alignment over prepared surface coated with tack coat, rolling with smooth wheeled and vibratory or tan
ng to give an uniform surface to achieve the desired density of at least 98% of that of Laboratory Marshall specimen, including the cos
vel and alignment over prepared surface coated with tack coat, rolling with smooth wheeled and vibratory or tandem rollers or with a
ping of 13.2 mm nominal size at the rate of 0.005 cum per 10 sqm and at an approximate spacing of 10 cm center to center in both dir
usly prepared base, including mixing in Hot Mix Plant and thoroughly rolling with a smooth wheeled roller 8-10 tonne capacity, finishe
with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades including the cost and carriage of stone chips a
fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per
harge.
01 of specifications for Road & Bridge Works of MoRT&H (5th Revision).
rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing and clause 602 of Specifications for Road
hovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contracti
ecification Clause 1502 for Rural Roads of MORD.
nt of approved make and grade to form 6 nos. horizontal alternate bands in white/tannery yellow and black to 90 cm length standing u
ge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.)
without nails but by using epoxy resin based adhesive as per manufacturer's recommendation including site clearance etc. and complet
etc. complete as per direction.
and technical specifications
s of MoRT&H (5th Revision) complete, excluding cost of applying Tack coat.
oRT&H (5th Revision).
&H (5th Revision).
vibratory or tandem rollers or with a pneumatic tyre roller of 12 to 15 tonne weight with a tyre pressure of at least 0.56 MPa, to achie
cluding the cost and carriage of aggregates, filler and binder, heating the binder, preheating the aggregates, and filler to the specified
ollers or with a pneumatic tyre roller of 12 to 15 tonne weight with a tyre pressure of at least 0.56 MPa, to achieve the desired density
enter in both directions, pressed into surface when the temperature of surfaces not less than 100°C, protruding 1 mm to 4 mm over ma
apacity, finished to required level and grades including the cost and carriage of stone chips and matrix, heating the matrix, preheating
of stone chips and matrix, heating the matrix, preheating the aggregates to required temperature and including the hire charges of M
omplete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
ations for Road & Bridge Works of MoRT&H (5th Revision).
ion of contraction and xpansion, construction joints, applying debonding strips, primer, polysulphide sealant, dowel bars, near approa
ngth standing up above ground after mending good damages if any during striking off shuttering,making hole in ground of 47cm dep
tc. and complete as directed by the Engineer in Charge .The contractor will have to provide a test certificate from a reputable national
6 MPa, to achieve the desired density as per clause 505.3.5, all including cost and carriage of bitumen, crushed aggregates, filler mater
o the specified temperature, including the hire charges of Hot Mix Plant and other machineries, pay of operators, cost of fuel and lubr
desired density as per clause 505.3.5, all including cost and carriage of bitumen, crushed aggregates, filler materials and hire charges o
o 4 mm over mastic surface, including the hire charges of all tools and plants and machinery, pay of operators, cost of fuel and lubrican
trix, preheating the aggregates to required temperature and including the hire charges of Hot Mix Plant and other machinery, pay of o
re charges of Mobile Hot Mix Plant (Light Duty) and other machinery, pay of operators, cost of fuel and lubricants etc. complete to be f
ars, near approaches to bridge/ culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using cur
d of 47cm depth and 30cm. minimum dia, fixing the guard posts in the same holes and repacking the earth properly so as to keep th
utable national/international laboratory conforming the above specifications.
tes, filler materials and hire charges of machinery and equipment for construction and quality control complete as per Clause 505 of S
d hire charges of machinery and equipment for construction and quality control complete as per Clause 507 of Specifications for Road
uel and lubricants and all other incidental charges and quality control all complete as per Clause 516 of Specifications for Road & Bridg
hinery, pay of operators, cost of fuel and lubricants etc. complete as per Clause 510 of Specifications for Road & Bridge Works of MoR
omplete to be followed by seal coat of either Type A or Type B as per Technical Specification Clause 508 for Rural Roads of MORD.
-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Claus
so as to keep the guard posts standing properly erect in correct position true to line and length including carriage of R. C. Guard Post w
Clause 505 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
or Road & Bridge Works of MoRT&H (5th Revision). (Bitumen-Packed 10/20 . Own Supply)
QUANTITY EVALUATION
Name of Work:- Kotasur - Ramnagar Road 0 kmp to 17.425 kmp: Widening and Streangthening from 12.00 kmp
to 17.25 kmp under Sainthia Highway Sub-Division of Birbhum Highway Division-I, in the District
of Birbhum.
(Unless stated specially rates as per P.W.D Volume - III , 2018 Schedule including 9th Add. & Corr. )
ROAD WORK
Sl.N Discription of item. No Length Breadth Height Perce Quantity Unit
o. (M) (M) (M) ntage
1.00 sqm
0 Page No.240, Item No.3.16.
Box cutting or filling in Road embankment in all
sorts of soil including spreading the spoils
properly over the flank ...…etc.
0 Depth upto 150 mm.
1 1.00 1.00 - 1.00
1.00 sqm
0 Depth above 150 mm and upto 300 mm.
1 1.00 1.00 - 1.00
1.00 sqm
0 Depth above 300 mm and upto 450 mm.
1 1.00 1.00 - 1.00
1.00 sqm
0 Depth above 450 mm and upto 600 mm.
1 1.00 1.00 - 1.00
1.00 sqm
0 Page No.237, Item No.3.04.
Earthwork in cutting to form road section in
correct profile inc. removal of spoils .. initial lead
of 50m ....etc (Pre & Post)
0 In ordinary soil.
1 1.00 1.00 1.000 1.00
1.00 cum
0 In mixed soil (i,e. clay mixed with kankar, peb
1 1.00 1.00 1.000 1.00
1.00 cum
0 In mixed hard soil (i,e hard moorum and soil co
2 x 1/2 ( 10.50 + 15.25 ) x 4.55 x 0.25 = 28.70
28.70 cum
0 Page No.245, Item No.4.05.
Supplying, spreading and compacting sand to
required thickness, in layers not exceeding 150
mm to proper ...…etc.
a. Using medium sand.
1 1.00 1.00 1.000 1.00
1.00 cum
0 Page No.245, Item No.4.06.
Supplying, spreading and consolidating stone
dust to a depth of 100 mm and above at desired
density and C.B.R. …etc.
1 1.00 1.00 1.000 1.00
1.00 cum
0 Page No.250, Item No.4.16
Supplyng spreadng and consolidating an uniform
homogeneous mixture of stone dust & sand
(mixed in proportion of 3:1 by volume )……..etc.
a. Using medium sand.
1 1.00 1.00 1.000 1.00
1.00 cum
0 Page No.247, Item No.4.09.
Construction of Sub Base using Local Materials,
spreading in uniform layers with Motor
grader……..mixing by mix in place method with
0 By compacting
Rotavator at OMC,1st class brick aggregates (40
……etc.
mm down) and medium sand (in proportion
of 60:40).
Sl.N Discription of item. No Length Breadth Height Perce Quantity Unit
o. (M) (M) (M) ntage
1.00 cum
0 Page No.280. Item No.10.09.
Mending Potholes and depressions by stitching
picked jhama bricks with one brick-on-edge laid
in herring bone pattern and including necessary
0 One of
cushion brick-on-edge
sand belowlaidthein soling
herring(and
bone
in
pattern on a layer of brick flat (thickness
between layers) including cutting the pothole 75
1 1.00 1.00 - 1.00
areamm.
to plus 125 mm)shape with vertical edges,
rectangular
removing all loose materials, finishing the 1.00 sqm
0 One tobrick-on-edge
surface laid inareascomplete
match with adjacent herring bondas
per pattern (thickness 125 mm)
direction. 1 1.00 1.00 - 1.00
1.00 sqm
0 Page No.247. Item No.4.10.
Water Bound Macadam Sub Base by
consolidating Jhama metal / Laterite chelly or
stone metal / shingles..... requisite thickness
0 For Construction
(measured after of Sub Base by consolidating
compaction) incl.
Jhama metal
screening…..etc. (63 mm to 45 mm) with
moorum screening :
1 1.00 1.00 1.000 1.00
1.00 cum
0 For Construction of Sub Base by consolidating
Laterite (90 mm to 45 mm):
1 1.00 1.00 1.000 1.00
1.00 cum
0 Page No.248, Item No.4.11.
Providing, laying, spreading & compacting stone
aggregates of specific size to water bound
macadam specification..…etc.
By Manual Means.
0 Grading-1 Agg. (63-45mm) & Stone Scr. Type
1 1.00 1.00 1.000 1.00
1.00 cum
0 Grading-1 Agg. (63-45mm) & Stone Scr. Type
1 1.00 1.00 1.000 1.00
1.00 cum
0 Grading-2 Agg. (53-22.4mm) & Stone Scr. Typ
1 1.00 1.00 1.000 1.00
1.00 cum
0 Grading-1 Agg. (63-45mm) & Moorum as Scree
1 1.00 1.00 1.000 1.00
1.00 cum
0 Page No.245, Item No.4.04.
Supplying, spreading and consolidating Moorum
to a depth of 75mm at desired density & C.B.R
…….with power roller …..etc.
1 1.00 1.00 1.000 1.00
1.00 cum
0 Page No.245, Item No.4.07.
Supplying and spreading blindage for road
topping using moorum in approximately 6 mm
thick layer………….etc.
1 1.00 1.00 - 1.00
1.00 sqm
0 Page No.251, Item No.5.01.
Providing and applying primer coat with
Cationic Bitumen Emulsion of approved grade ...
…surface of granular base …...using Mechanical
means ……....etc.
Sl.N Discription of item. No Length Breadth Height Perce Quantity Unit
o. (M) (M) (M) ntage
Providing and applying primer coat with
Cationic Bitumen Emulsion of approved grade ...
…surface of granular base …...using Mechanical
0 For ……....etc.
means WBM / WMM Surface (with primer @ 0.85
1 1.00 1.00 - 1.00
1.00 sqm
0 For Stabilised soil bases / Crusher Run
Macadam Surface. (with primer @ 1.05 kg /
Sqm ). 1 1.00 1.00 - 1.00
1.00 sqm
0 For prepared surface of Repair to pot holes
with B.M. item (with primer @ 0.85 kg /
Sqm ). 1 1.00 1.00 - 1.00
1.00 sqm
0 Page No.251, Item No.5.02.
Providing & applying tack coat with Cationic
Bitumen Emulsion of approved grade conferming
to…………….……etc.
0 On Bituminous Surface (Using…emulsion @ 0.
1 1.00 1.00 - 1.00
1.00 sqm
0 On Granular surface treated with primer.
(Using Bitumen emulsion @ 0.275 kg/Sqm)
1 1.00 1.00 - 1.00
1.00 sqm
0 On Cement concrete pavement (Using
Bitumen emulsion @ 0.325 kg/Sqm)
1 1.00 1.00 - 1.00
1.00 sqm
0 On surface treated with primer of Repair to
pot holes with B.M item. (Using Bitumen
emulsion @ 0.275 kg/Sqm). 1 1.00 1.00 - 1.00
1.00 sqm
0 Page No.278, Item No.10.05(i).
Repair to pot holes by removal of failed material,
trimming the sides to vertical and leveling the
bottom, ...filled with B.M (... not > 75 mm in
With
singleGrading
layer) 2applying
B.M (19 mm nominal
... prime size,....
coat 50-75
tackm
coat ....etc. (Exclu. material cost for primer & 1 1.00 1.00 1.000 1.00
tack coat.) 1.00 cum
0 Page No.278, Item No.10.05(ii).
Patch repair on already filled pot holes with BM
with 20 mm premix carpet and seal coat Type B
as per ... Clause 1904.2 for Rural Roads of MORD.
Seal coat Type
(Excluding tackBcoat)
with sand (2.36 mm to 180 mic)
1 1.00 1.00 1.000 1.00
1.00 sqm
0 Page No.278, Item No.10.05(iii).
Patch repair on already filled pot holes with BM
with 12 mm premix carpet using premixed stone
chips of approved quality …etc.(Excluding tack
coat) 1 1.00 1.00 1.000 1.00
1.00 sqm
0 Page No.278, Item No.10.05(iv).
Patch repair on already filled pot holes with BM
with 6 mm premix carpet using premixed stone
chips of approved quality …etc.(Excluding tack
coat) 1 1.00 1.00 1.000 1.00
1.00 sqm
0 Page No.279, Item No.10.07.
Repairing pot-hole and making up small
depressions with ramming or power rolling
including. Scr.….etc.(excl. tack coat)
Sl.N Discription of item. No Length Breadth Height Perce Quantity Unit
o. (M) (M) (M) ntage
Repairing pot-hole and making up small
depressions with ramming or power rolling
including. Scr.….etc.(excl. tack coat)
0 With premixed Chips.
Using Mobile H.M.P (Light duty)
1 1.00 1.00 1.000 1.00
1.00 cum
0 By grouting method.
1 1.00 1.00 1.000 1.00
1.00 cum
0 With premixed Chips.
Using Mobile H.M.P (Light duty)
1 1.00 1.00 1.000 1.00
1.00 cum
0 Page No.261, Item No.5.19.
Providing and laying Bituminous Profile
Corrective Course using Mobile H.M.P (Light
duty) and using aggr. of Gr-2 ...... with 75kg of
bitumen per cum, .….etc.( excl. tack coat). 1 1.00 1.00 1.000 1.00
1.00 cum
0 Page No.252, Item No.5.04.
Providing & laying Bituminous Macadam with
…... approved crushed aggregates of specified
grading….etc.( excl. tack coat)
0 For Grading 1 (40 mm nominal size, 80-100 mm
Using Mobile HMP (Light duty)
1 1.00 1.00 1.000 1.00
1.00 cum
0 For Grading 2 (19 mm nominal size, 50-75 mm t
Using Mobile HMP (Light duty)
1 1.00 1.00 1.000 1.00
1.00 cum
0 Page No.253, Item No.5.05
Providing and laying Dense Bituminous
Macadam with ...... using crushed agg. of
specified…., filler ... etc.( excl. tack coat)
0 For Grading 1 (37.5 mm nominal size, 75-100 m
Using Drum mix type HMP of minimum capacity
40 to 60 TPH.
1 1.00 1.00 1.000 1.00
1.00 cum
0 For Grading 2 (26.5 mm nominal size, 50-75 mm
Using Drum mix type HMP of minimum capacity
40 to 60 TPH.
1 1.00 1.00 1.000 1.00
1.00 cum
0 Page No.254, Item No.5.07
Providing & laying Semi-dense Bituminous
Concrete (SDBC) as wearing coarse....using
coarse aggr. fine....etc.(excl. tack coat)
0 For Grading 1 (13 mm nominal size, 35-40 mm t
Using Drum mix type HMP of minimum capacity
40 to 60 TPH.
1 1.00 1.00 1.000 1.00
1.00 cum
0 For Grading 2 (10 mm nominal size, 25-30 mm t
Using Drum mix type HMP of minimum capacity
40 to 60 TPH.
1 1.00 1.00 1.000 1.00
Sl.N Discription of item. No Length Breadth Height Perce Quantity Unit
o. (M) (M) (M) ntage
1.00 cum
0 Page No.255, Item No.5.08
Providing and laying Bituminous Concrete with ...
using crushed aggregate of specified grading,
filler ( Cement / hudrated lime / Rock dust )... etc
0 Fortack
(excl. Grading
coat )1 (19 mm nominal size, 50 mm thic
Using Drum mix type HMP of minimum capacity
40 to 60 TPH.
1 1.00 1.00 1.000 1.00
1.00 cum
0 For Grading 2 (13.2 mm nominal size, 30 mm/4
Using Drum mix type HMP of minimum capacity
40 to 60 TPH.
1 1.00 1.00 1.000 1.00
1.00 cum
0 Page No.259, Item No.5.14.
Providing and laying Mastic asphalt wearing
course with paving grade bitumen meeting the
requirements given in table 500-29 …...etc.(excl.
0 25
tack mm(Bitumen-Packed
coat) thickness 10/20 . Own Supply)
1 1.00 1.00 - 1.00
1.00 sqm
0 50 mm thickness
1 1.00 1.00 - 1.00
1.00 sqm
0 Page No.257, Item No.5.11.
Providing, laying & rolling of Open - graded
premix surfacing of 20 mm thickness composed
of 13.2 mm (@ 0.018 m³ per m²) and 11.2 mm
Using Mobile
(@ 0.009 HMP
m³ per (Light duty)
m²)……...etc.(excl. tack coat)
1 1.00 1.00 - 1.00
1.00 sqm
0 Page No.258, Item No.5.13 B.
Providing and laying Premixed Seal Coat (Type B)
with approved quality sand/grit @ 0.6 m3/ 100
m2 and bitumen binder …..etc.(excluding tack
With
coat.)grit (2.36 mm to 180 mic)
I. By mechanical Means.
i. With Hot Bitumen Binder (@ 6.80 kg / 10
sqm.)
1 1.00 1.00 - 1.00
1.00 sqm
0 Page No.278, Item No.10.06 A.
Pre-coating stone aggregates with hot matrix @
56 kg/cum of net volume of stone aggregate in
concrete mixer….including cost of stone agg. &
bitumen…..etc. ..…(excl. tack coat.) 1 1.00 1.00 1.000 1.00
1.00 cum
0 Page No.279, Item No.10.06 B.
Repairing pot holes with pre-coated stone
materials including cutting, loading pre-coated
stone materials at dept. stack-yard or any other
0 Within…….…etc.(excl.
approved a distance up to 10 coat.)
tack kms.
1 1.00 1.00 1.000 1.00
1.00 cum
0 Within a distance above 10 kms and up to 20
1 1.00 1.00 1.000 1.00
1.00 cum
Sl.N Discription of item. No Length Breadth Height Perce Quantity Unit
o. (M) (M) (M) ntage
STRUCTURAL PART
Sl.N Discription of item. No Length Breadth Height Perce Quantity Unit
o. (M) (M) (M) ntage
STRUCTURAL WORK
Length of Abutment = 10.000 Hight ,Sand Filling = 0.150 Length of Face Wall at top
Top width of Abt. = 0.425 Hight of BFS = 0.075 Top width of F.W.
C.D Portion
Bottom width of Abt. = 0.650 Hight of Base Slab= 0.200 Bottom width of F.W.
Hight of Abt.= ………………………….………………………………. 3.000 Hight of F.W.
Clear span = 1.000 Hight of Deck Slab= 0.300
Offset = 0.100 Hight of W .C = 0.085 Offset = 0.100
Width of Base Slab = 2.500 Width of Dack Slab = 1.850
All Dim
Length of Parapet at top = 1.850
Parapet Wall
Top width of Parapet = 0.300
Bottom width of Parapet = 0.500 If Face Wall not required put "Length
Hight of Parapet = ………………………………………………………… 0.500 Parapet not required Put H
2 2.50 - - 5.00
5.00 metre
0 Above 600 mm to 900 mm dia Hume pipe.
2 2.50 - - 5.00
5.00 metre
0 Above 900 mm dia Hume pipe.
2 2.50 - - 5.00
5.00 metre
0 Page No.284 Item No.12.01 ( I ).
Earth work in excavation of foundation of
structures as per drawing ...including...
backfilling... within a lead of 150 m …etc.
In all sorts of soil excluding marshy soil & rocks (so
by manual means.
0 Depth upto 3.0 m
0 With pumping out water including shoring as
required.
1 1.00 1.00 1.000 1.00
1.00 cum
0 With pumping out water excluding shoring
1 1.00 1.00 1.000 1.00
1.00 cum
0 Without pumping out water including
shoring as required.
1 1.00 1.00 1.000 1.00
1.00 cum
* 0 Without pumping out water and shoring
Abutment:- ( 10.000 + 0.300 ) ( 2.500 + 0.300 ) x 3.000 = 86.52
Face Wall:- 4 ( 2.000 - 0.325 ) ( 0.850 + 0.300 ) x 3.000 = 23.12
109.64 cum
0 Depth above 3.0 m & upto 6.0 m
0 With pumping out water including shoring as
required.
1 1.00 1.00 1.000 1.00
1.00 cum
0 With pumping out water excluding shoring
1 1.00 1.00 1.000 1.00
1.00 cum
0 Without pumping out water including
shoring as required.
1 1.00 1.00 1.000 1.00
1.00 cum
* 0 Without pumping out water and shoring
Abutment:- ( 10.000 + 0.300 ) ( 2.500 + 0.300 ) x 0.575 = 16.58
Face Wall:- 4 ( 2.000 - 0.325 ) ( 0.000 + 0.300 ) x 0.425 = 0.85
17.43 cum
0 Depth above 6.0 m
0 With pumping out water including shoring as
required.
1 1.00 1.00 1.000 1.00
1.00 cum
0 With pumping out water excluding shoring
1 1.00 1.00 1.000 1.00
1.00 cum
0 Without pumping out water including
shoring as required.
Sl.N Discription of item. No Length Breadth Height Perce Quantity Unit
o. (M) (M) (M) ntage
2 2.50 - - 5.00
5.00 metre
0 With bamboos of length above 2.00m and
upto 2.50m.
2 2.50 - - 5.00
5.00 metre
0 With bamboos of length above 2.50m and
upto 3.00m
2 2.50 - - 5.00
5.00 metre
0 Page No.336. Item No.18.30.
Weaving wire mattress as directed with wire of
4mm dia. and making sausage crate of required
shape .…including cost of supply of G.I. wire.
(With 100mm x 100mm mesh.) 1 1.00 1.00 - 1.00
1.00 sqm
0 Page No.336. Item No.18.31.
Filling properly the empty sausage crates with
boulders of any size & shape with hand packing
after preparation ....etc.
0 With Boulder of size 150 mm to 225mm.
1 1.00 1.00 1.000 1.00
1.00 cum
0 With Boulder 30/45 kg .
1 1.00 1.00 1.000 1.00
1.00 cum
0 Page No.336 ,Item No.18.29 & 18.28
Filling empty Cement bags with dry earth or
sand, stitching the bag (cost of thread included)
and carrying and …..…etc.
0 With sand.
4 - - - 4.00
4.00 bag
0 With earth.
4 - - - 4.00
4.00 bag
0 With 'stone dust mixed with grit'.
4 - - - 4.00
4.00 bag
0 Page No.317. Item No.15.01.
Providing & laying boulders apron on river bed
for protection against scour with stone boulders
weighing not less than 40 kg each complete …...
Boulder Laid Dry Without Wire Crates. 1 1.00 1.00 1.000 1.00
1.00 cum
0 Page No.317. Item No.15.02.
Providing and laying of boulder apron laid in wire
crates made with 4mm dia GI wire ... in 100mm x
100mm mesh ...... with stone boulders weighing
not less than 40 kg each. 1 1.00 1.00 1.000 1.00
1.00 cum
0 Page No.317. Item No.15.03.
Providing and laying Pitching on slopes laid over
prepared filter media including boulder apron
laid dry in front of toe of embankment complete
as0 per
With Stone &
drawing Boulder 30/45kg .
Tech. specifications.
1 1.00 1.00 1.000 1.00
Sl.N Discription of item. No Length Breadth Height Perce Quantity Unit
o. (M) (M) (M) ntage
1.00 cum
0 With C.C. Blocks of size 0.3x0.3x0.3 m cast in
C.C grade M15.
1 1.00 1.00 1.000 1.00
1.00 cum
0 Page No.317.Item No.15.04.
Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
Technical specification.
a. With Brick Aggregates & Coarse Sand.
1 1.00 1.00 1.000 1.00
1.00 cum
0 Page No.318.Item No.15.05.
Laying of a geotextile filter between pitching &
embankment slopes on which pitching is laid to
prevent …. stone pitching / C.C blocks ... without
creating any uplift head on the pitching. 1 1.00 1.00 - 1.00
1.00 sqm
0 Page No.313 . Item No. 14.09.
Drainage Spouts in Superstructure including
providing drip mouldings and also including
supplying, fitting and fixing approved type ......
no.2705 of MoRT&H’s Specification. .…etc. 4 - - - 4.00
4.00 each
EXTRA ITEM
0.50 cum
0 Page No.282 . Item No. 11.02(i)
Providing and laying concrete cradle bedding
with M15 Grade Cement Concrete as per Clause
1105 (i) for Rural Roads of MORD.
1 1.00 1.00 1.00
1.00 cum
0 Page No.282 . Item No. 11.02(ii)
Providing and laying (First Class) bedding on well
compacted sand, moorum or approved granular
material as per Clause 1105 (ii) for Rural Roads of
0 Using fine sand.
MORD.
1 1.00 1.000 - 1.00
1.00 cum
0 Using moorum.
1 1.00 1.000 - 1.00
1.00 cum
0 Page No.271 . Item No. 8.11
Supplying and installation of delineators (road
way indicators, hazard markers, object markers),
80-100 cm high above ground level, painted
black and white in 15 cm … etc. 1 1.00 1.00
1.00 each
ROAD PART
No.18.01(a/b/c/d)( i/ ii )
R.S.Est.
R.S.Est. R.S.Est. R.S.Est. R.S.Est. R.S.Est. R.S.Est.
0
0
0
0
No. 3.16(a)/(b).
0
R.S.Est.
0
R.S.Est.
0
R.S.Est.
No.4.10. (i/ii/ii)
R.S.Est.
0
R.S.Est.
0
R.S.Est.
0
R.S.Est.
No.5.02. (i/ii/ii)
R.S.Est.
0.00
R.S.Est.
0.00
R.S.Est.
0.00
R.S.Est.
0.00
R.S.Est.
0
R.S.Est.
R.S.Est.
0
R.S.Est.
0
0
0
0
0
0
0
0
R.S.Est. R.S.Est. R.S.Est. R.S.Est. R.S.Est.
0
0
0
0
0
STRUCTURAL PART
………………………………………………….
Length of Face Wall at top= 2.000 Hight of Sand Filling = 0.150
Top width of F.W. = 0.425 Hight of BFS = 0.075
Face Wall
Bottom width of F.W. = 0.650 Hight of Bottom Slab= 0.200
of Bottom Slab =
all not required put "Length of Face Wall at top" = " 0" in drawing or…. and If
Parapet not required Put Height of Parapet = "0" in drawing or ……
0
R.S.Est.
0
R.S.Est.
0
.S.Est.
R.S.Est. R.S.Est.
0
.S.Est. R.S.Est. R.S.Est. R.S.Est. R.S.Est.
0
0
0
0
0
R.S.Est.
0
R.S.Est.
0
R.S.Est.
correction on 01.09.14
0
R.S.Est.
0
R.S.Est.
0
R.S.Est.
R.S.Est.
0
R.S.Est.
+
R.S.Est.
0
(PWD Shc. May be use in special case, Don't use normally)
R.S.Est.
0
R.S.Est.
0
R.S.Est.
0
R.S.Est.
0
R.S.Est.
0
R.S.Est.
0
R.S.Est.
0
0
0
0
0
0
0
R.S.Est. R.S.Est. R.S.Est. R.S.Est. R.S.Est. R.S.Est. R.S.Est.
0
0
0
0
0
0
.S.Est. R.S.Est. R.S.Est. R.S.Est. R.S.Est. R.S.Est. R.S.Est. R.S.Est
0
0
0
0
0
0
0
R.S.Est.
0
R.S.Est.
0
R.S.Est.
0
R.S.Est.
0
R.S.Est.
0
R.S.Est.
R.S.Est. R.S.Est. R.S.Est. R.S.Est. R.S.Est.
0
0
0
0
0
R.S.Est.
analysis for M35 to M55 not done here
0
R.S.Est. R.S.Est. R.S.Est. R.S.Est.
0
R.S.Est. R.S.Est. R.S.Est. R.S.Est. R.S.Est. R.S.Est. R.S.Est. R.S.Est.
0
0
R.S.Est. R.S.Est. R.S.Est. R.S.Est.
0
ROAD PART
ANALYSIS OF RATES
Name of Work:- Kotasur - Ramnagar Road 0 kmp to 17.425 kmp: Widening and Streangthening from 12.00 kmp
to 17.25 kmp under Sainthia Highway Sub-Division of Birbhum Highway Division-I, in the
District of Birbhum.
(Unless stated specially rates as per P.W.D Volume - III , 2018 Schedule including 9th Add. & Corr. )
ROAD WORK
Lead for Pakur Variety Stone material from Purulia Railway Yard :-
Distance from ……………... quarry to ……………... = 0.00 Km
Distance from …………...... to ……………… = 0.00 Km
Distance from ……………….. to Kotasur (0.0 kmp of this road) = 0.00 Km
Average of work site. = 0.00 Km
Lead 0.000 Km
Say 0.00 Km
Carriage cost at Work Site per m3 :- (P-230 , Table -1)
upto 0.00 Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
Total= Rs. 0.00
Lead for Moorum from …… :-
Distance from source to work site = 5.00 Km
Lead 5.000 Km
Say 5.00 Km
Carriage cost at Work Site per m3 :- (P-230 , Table -1)
upto 5.00 Km =Rs. 124.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
Total= Rs. 124.00
Lead for Laterite Boulder from …… :-
Distance from source to work site = 5.00 Km
Lead 5.000 Km
Say 5.00 Km
Carriage cost at Work Site per m3 :- (P-230 , Table -1)
upto 5.00 Km =Rs. 124.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
Total= Rs. 124.00
Cost of material at Work site per m3 :- (P-225, Table III-1 ; P- 227 , It-1.03 , )
SL. No. 1 2 3 4 5 6 7 8 9
Stone Dust
Size 37.5mm 26.5mm 22.4mm 13.2mm 11.2mm 5.6mm Stone Grit mixed with Moorum
grit
SL. No. 10 11 12 13 14 15 16 17 18
Boulder, Gr-1 (63- Gr-2 (53- Stone Stone 20mm 10mm Laterite
Boulder,
Size 30/45 kg
225mm to
45mm) 22.4mm)
Screening Screening
Nominal Nominal Boulder
150mm Type-A Type-B
OWN SUPPLY
Lead for Bitumen (Packed) VG-30 (60/70) from Haldia:-
Distance from Haldia to ...Sainthia(T.M.)… = 0.00 Km
Distance from ..Sainthia(T.M)..to Kotasur (0.0 kmp of K.R.Rd) = 0.00 Km
Distance from 0.0 kmp of K.R.Rd to 12.0 kmp of K.R.Rd = 0.00 Km
Average of work site. = 0.00 Km
Lead= 0.00 Km
Say 0.00 Km
Cost of Bitumen (Packed) VG-30 (60/70) at Work Site per MT:-
Ex-outlet rate at Haldia:- (9 th A & C ) =Rs. 0.00
Add Overhead Charges:- 5% of Rs. 0.00 =Rs. 0.00
0.00
Contracter's profit:- 10% of Rs. 0.00 =Rs. 0.00
Loading & Unloading:- (P- 228 , It-1.03 ) 0% of Rs 0.00 =Rs. 0.00
Carriage:- (P-230 , Table -1) upto 0.00 Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
Deduct cost of container:- (-ve)=Rs. 0.00
Rs. 0.00 /MT
Lead for Bituminous Emulsion (Packed) MS type from Dhulagarh Jn.(on NH-6):-
Distance from Dhulagarh Jn. to ....Sainthia(T.M.).. = 0.00 Km
Distance from ..Sainthia(T.M)..to Kotasur (0.0 kmp of K.R.Rd) = 0.00 Km
Distance from 0.0 kmp of K.R.Rd to 12.0 kmp of K.R.Rd = 0.00 Km
Average of work site. = 0.00 Km
Lead= 0.00 Km
Say 0.00 Km
Cost of Bituminous Emulsion (Packed) MS type at Work Site per MT:-
Ex-outlet rate at Dhulagarh Jn.(on NH-6):- (9 th A & C ) =Rs. 0.00
Add Overhead Charges:- 5% of Rs. 0.00 =Rs. 0.00
0.00
Contracter's profit:- 10% of Rs. 0.00 =Rs. 0.00
Loading & Unloading:- (P- 228 , It-1.03 ) 0% of Rs 0.00 =Rs. 0.00
Carriage:- (P-230 , Table -1) upto 0.00 Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
Deduct cost of container:- (-ve)=Rs. 0.00
Rs. 0.00 /MT
DEPARTMENTAL SUPPLY
Distance from Haldia to ………….. Stack Yard = 0.00 Km
Issue Rate of Bitumen (Packed) VG-30 (60/70) at ………….. Stack Yard per MT :-
Ex-outlet rate at Haldia:- (9 th A & C ) =Rs. 0.00
Loading , Unloading & Stacking :- (P- 228 , It-1.03 ) =Rs. 0.00
Carriage:- (P-230 , Table -1) upto 0.00 Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
Storage Charge:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00 /MT
0 For av. depth above 75 mm but not exceeding 150 mm by manual means.
0 Stone metal surface.
0 In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.)
0 In mixed hard soil (i,e hard moorum and soil containing laterite and boulders which do not require blasting)
0 By compacting stone chips (5.6mm) and medium sand (in proportion of 40:60).
(With Stack)
5.6 mm stone chips :- 0.51 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Medium sand:- (P-222 ) 0.77 m3 @ Rs. 416.00 /m3 =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 Grading - II.
(Without Stack)
37.5 mm stone chips:- 0.1920 m3 @ Rs. 0.00 /m3 =Rs. 0.00
22.4 mm stone chips :- 0.1280 m3 @ Rs. 0.00 /m3 =Rs. 0.00
11.2 mm stone chips :- 0.1280 m3 @ Rs. 0.00 /m3 =Rs. 0.00
5.6 mm stone chips :- 0.1536 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Coarse sand:- (P-222 ) 0.6784 m3 @ Rs. 516.75 /m3 =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 Grading - III.
(Without Stack)
26.5 mm stone chips :- 0.4480 m3 @ Rs. 0.00 /m3 =Rs. 0.00
5.6 mm stone chips :- 0.5760 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Coarse sand:- (P-222 ) 0.2560 m3 @ Rs. 516.75 /m3 =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 Grading - IV.
(Without Stack)
26.5 mm stone chips :- 0.4480 m3 @ Rs. 0.00 /m3 =Rs. 0.00
5.6 mm stone chips :- 0.5120 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Coarse sand:- (P-222 ) 0.3200 m3 @ Rs. 516.75 /m3 =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 Grading - V.
(Without Stack)
37.5 mm stone chips:- 0.2560 m3 @ Rs. 0.00 /m3 =Rs. 0.00
22.4 mm stone chips :- 0.2560 m3 @ Rs. 0.00 /m3 =Rs. 0.00
11.2 mm stone chips :- 0.1920 m3 @ Rs. 0.00 /m3 =Rs. 0.00
5.6 mm stone chips :- 0.3200 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Coarse sand:- (P-222 ) 0.2560 m3 @ Rs. 516.75 /m3 =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 Grading - VI.
(Without Stack)
37.5 mm stone chips:- 0.1536 m3 @ Rs. 0.00 /m3 =Rs. 0.00
22.4 mm stone chips :- 0.1536 m3 @ Rs. 0.00 /m3 =Rs. 0.00
11.2 mm stone chips :- 0.1536 m3 @ Rs. 0.00 /m3 =Rs. 0.00
5.6 mm stone chips :- 0.2816 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Coarse sand:- (P-222 ) 0.5376 m3 @ Rs. 516.75 /m3 =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
(With Stack)
Jhama metal:- (P-222 ) 1.09 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Moorum :- (as screening ) 0.26 m3 @ Rs. 303.00 /m3 =Rs. 0.00
Labour cost :- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
(With Stack)
Moorum:- 0.006 m3 @ Rs. 303.00 /m3 =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
Bituminous Emulsion (Packed) MS type:- 0.85 kg @ Rs. 0.00 /MT =Rs. 0.00
Labour cost : =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 For Stabilised soil bases / Crusher Run Macadam Surface. (with primer @ 1.05 kg / Sqm ).
Bituminous Emulsion (Packed) MS type:- 1.05 kg @ Rs. 0.00 /MT =Rs. 0.00
Labour cost : =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 For prepared surface of Repair to pot holes with B.M. item (with primer @ 0.85 kg / Sqm ).
Bituminous Emulsion (Packed) MS type:- 0.85 kg @ Rs. 0.00 /MT =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
Bituminous Emulsion (Packed) MS type:- 0.250 kg @ Rs. 0.00 /MT =Rs. 0.00
Labour cost :- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 On Granular surface treated with primer. (Using Bitumen emulsion @ 0.275 kg/Sqm)
Bituminous Emulsion (Packed) MS type:- 0.275 kg @ Rs. 0.00 /MT =Rs. 0.00
Labour cost :- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 On surface treated with primer of Repair to pot holes with B.M item. (Using Bitumen emulsion @ 0.275
kg/Sqm).
Bituminous Emulsion (Packed) MS type:- 0.275 kg @ Rs. 0.00 /MT =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 By grouting method.
(With Stack)
37.5 mm stone chips :- 0.60 m3 @ Rs. 0.00 /m3 =Rs. 0.00
22.4 mm stone chips:- 0.40 m3 @ Rs. 0.00 /m3 =Rs. 0.00
11.2 mm stone chips:-(as key aggregate) 0.10 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Bitumen (Packed) VG-30 (60/70):- 70.00 kg @ Rs. 0.00 / MT =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
Earth excavation:- In ordinary soil. 1.00 m3 @ Rs. 89.90 /m3 =Rs. 0.00
Manual compaction:- 1.00 m3 @ Rs. 20.00 /m3 =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
Earth excavation:- In ordinary soil. 1.00 m3 @ Rs. 89.90 /m3 =Rs. 0.00
Additional lead:- 50 m to 200.00 m @ Rs. 12.50 /50m=Rs. 0.00
Additional lead:- 200.00 m to 500.00 m @ Rs. 15.00 /50m=Rs. 0.00
Additional lift:- 1.5 m to 3.00 m @ Rs. 10.00 /1.5m=Rs. 0.00
Manual compaction:- 1.00 m3 @ Rs. 20.00 /m =Rs.3
0.00
Compensation of earth (For Contractor Supply ) 1.00 m3 @ Rs. 25.00 /m =Rs.3
0.00
Royalty : (6 th A & C ) 1.00 m3 @ Rs. 29.00 /m =Rs.3
0.00
Cesses : (6 th A & C ) 1.00 m3 @ Rs. 5.30 /m3 =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 Page No.237,Item No.3.01 & Page No.239,Item No.3.15. Unit:- cum
Earthwork in excavation from borrow pits……depositing in …..……with carried earth with in a lead upto 1.00 Km..
…..…etc.
Borrow pit measurment
Land owned / arranged by the Department
Earth excavation:- In ordinary soil. 1.00 m3 @ Rs. 89.90 /m3 =Rs. 0.00
Unloading:- (P-224) 40 % of 1.20 m3 @ Rs. 77.00 /m3 =Rs. 0.00
Lead upto :- 1.00 Km. 0.90 m3 @ Rs. 95.00 /m3 =Rs. 0.00
Manual compaction:- 1.00 m3 @ Rs. 20.00 /m3 =Rs. 0.00
Compensation of earth (For Contractor Supply ) 1.00 m3 @ Rs. 25.00 /m3 =Rs. 0.00
Royalty : (6 th A & C ) 1.00 m3 @ Rs. 29.00 /m3 =Rs. 0.00
Cesses : (6 th A & C ) 1.00 m3 @ Rs. 5.30 /m3 =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 Page No.239, Item No.3.12. Unit:- cum
Construction of embankment with approved materials deposited at site from roadway cutting and excavation
from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and
300.2 as per Technical Specification Clause 301.5 for Rural Roads of MORD including carriage of material for a
distance of 1.00 km. (Pre work & Post work measurment)
EXTRA ITEM
RTRUCTURAL PART
STRUCTURAL WORK
Lead for Pakur Variety Stone material from Purulia Railway Yard :-
Distance from ……………... quarry to ……………... = 0.00 Km
Distance from …………...... to ……………… = 0.00 Km
Distance from ……………….. to Kotasur (0.0 kmp of this road) = 0.00 Km
Average of work site. = 0.00 Km
Lead 0.000 Km
Say 0.00 Km
Carriage cost at Work Site per m3 :- (P-230 , Table -1)
upto 0.00 Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
Total= Rs. 0.00
Lead for Moorum from …… :-
Distance from source to work site = 0.00 Km
Lead 5.000 Km
Say 5.00 Km
Carriage cost at Work Site per m3 :- (P-230 , Table -1)
upto 5.00 Km =Rs. 124.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
Total= Rs. 124.00
Lead for Laterite Boulder from …… :-
Distance from source to work site = 0.00 Km
Lead 5.000 Km
Say 5.00 Km
Carriage cost at Work Site per m3 :- (P-230 , Table -1)
upto 5.00 Km =Rs. 124.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
Total= Rs. 124.00
Cost of material at Work Site per m3 :- (P-225, Table III-1 ; P- 227 , It-1.03 , )
SL. No. 1 2 3 4 5 6 7 8 9
Stone Dust
Size 37.5mm 26.5mm 22.4mm 13.2mm 11.2mm 5.6mm Stone Grit mixed with Moorum
grit
SL. No. 10 11 12 13 14 15 16 17 18
Boulder, Gr-1 (63- Gr-2 (53- Stone Stone 20mm 10mm Laterite
Boulder,
Size 30/45 kg
225mm to
45mm) 22.4mm)
Screening Screening
Nominal Nominal Boulder
150mm Type-A Type-B
0 Cement mortar.
0 Mud Mortar.
0 Page No.14 . Item No. 1 . of P.W.D Sch. Vol. I, 2017. Unit:- sqm
Single Brick Flat Soling of picked jhama bricks incl. ramming and dressing bed to proper level and filling with
local sand.
0 In 1 : 6 proportion.
(Without Stack)
1 st Class Brick (kiln burnt) :- (P-222) 389 Nos@Rs. 6.154 /No =Rs. 0.00
Labour cost, etc :- Rs. 0.00
Deduct: 0.055 m3 x 50 kg / 0.035 m3 i.e. 78.57 Kg. @ Rs. 6.289 /Kg. (-ve)=Rs. 0.00
Add: 78.57 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 Naptha based.
0 Page No.189 , Item No.1(ii/i) . of P.W.D Sch. Vol. I, 2017. Unit:- sqm
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as
directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary.
0 With 1:4 cement mortar.
0 10 mm thick plaster.
0 15 mm thick plaster.
0 20 mm thick plaster.
0 20 mm thick plaster.
0 25 mm thick plaster.
0 Page No.192 , Item No.15 . of P.W.D Sch. Vol. I, 2017. Unit:- sqm
Neat cement punning about 1.5mm thick in all,dado,window sill,floor etc. NOTE:Cement 0.152 cu.m per100
sq.m.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 400.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Sand:- (P-222 ) 0.450 m3 @ Rs.( 396.75 - 39.68 )/m3 =Rs. 0.00
Reinforcement (For dowel bar & tie rod):-
Steel:- SAIL / TATA / RINL (7 th A & C ) 0.0100 MT @ Rs. 42800.00 / MT =Rs. 0.00
0 600 mm dia.
Lead from …Patelnagarh…
Distance from …Patelnagarh… to ………………….. = 0.00 Km
Distance from ……………….. to ...Kotasur... (0.0 kmp of K.R.Rd) = 0.00 Km
Distance from ...0.0 kmp of K.R.Rd... to ...12.0 kmp of K.R.Rd… = 0.00 Km
Average of work site. = 0.00 Km
Lead 0.000 Km
Say 0.00 Km
Carriage : (P-230)
upto 0.00 Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
Total= Rs. 0.00
600 dia NP-3 spigot :- (P-223) 1.00 No.@ Rs. 2258.00 /m =Rs. 0.00
Carriage:- =Rs. 0.00
Loading & Unloading : (P-228,It-1.03 j) 75% of Rs. 25.92 /m =Rs. 0.00
Lobour charge: 1 m @ Rs. 382.00 /m =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 900 mm Dia:-
Lead from …Patelnagarh…
Distance from …Patelnagarh… to ………………….. = 0.00 Km
Distance from ……………….. to ...Kotasur... (0.0 kmp of K.R.Rd) = 0.00 Km
Distance from ...0.0 kmp of K.R.Rd... to ...12.0 kmp of K.R.Rd… = 0.00 Km
Average of work site. = 0.00 Km
Lead 0.000 Km
Say 0.00 Km
Carriage : (P-230)
upto 0.00 Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
Total= Rs. 0.00
900 dia NP-3 spigot :- (P-223) 1.00 No.@ Rs. 3564.00 /m =Rs. 0.00
Carriage:- =Rs. 0.00
Loading & Unloading : (P-228,It-1.03 j) 75% of Rs. 43.20 /m =Rs. 0.00
Lobour charge: 1 m @ Rs. 618.00 /m =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 Page. No.282, Item. No.11.03. Unit:- metre
Providing & laying R.C.C pipe NP3 with spigot socket for culverts on first class bedding of granular material in
single row including fixing with cement mortar 1:2 as per Technical Specification Clause 1106 for Rural Roads of
MORD. (Dept.Supply, excl. cost of R.C.C pipe)
0 600 mm dia.
Lead from …………..stack yard.
Distance from ………stack yard to ………………….. = 0.00 Km
Distance from ……………….. to ...Kotasur... (0.0 kmp of K.R.Rd) = 0.00 Km
Distance from ...0.0 kmp of K.R.Rd... to ...12.0 kmp of K.R.Rd… = 0.00 Km
Average of work site. = 0.00 Km
Lead 0.000 Km
Say 0.00 Km
Carriage : (P-230)
upto 0.00 Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
Total= Rs. 0.00
0 900 mm Dia.
Lead from …………..stack yard.
Distance from ………stack yard to ………………….. = 0.00 Km
Distance from ……………….. to ...Kotasur... (0.0 kmp of K.R.Rd) = 0.00 Km
Distance from ...0.0 kmp of K.R.Rd... to ...12.0 kmp of K.R.Rd… = 0.00 Km
Average of work site. = 0.00 Km
Lead 0.000 Km
Say 0.00 Km
Carriage : (P-230)
upto 0.00 Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
above 0.00 Km upto 0.00 Km = 0.00 Km @ Rs. 0.00 /Km =Rs. 0.00
Total= Rs. 0.00
(7 th A & C )
Schedule Rate:- =Rs. 0.00
Deduct: (P-218 ) 0.0000 Kg. @ Rs. 6.289 /Kg. (-ve)=Rs. 0.00
Add: 0.0000 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 Page No.271 , Item No.8.10. Unit:- each.
Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in position
including painting and printing etc.
0 5th kilometre stone (precast).
(7 th A & C )
Schedule Rate:- =Rs. 0.00
Deduct: (P-218 ) 0.0000 Kg. @ Rs. 6.289 /Kg. (-ve)=Rs. 0.00
Add: 0.0000 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
(7 th A & C )
Schedule Rate:- =Rs. 0.00
Deduct: (P-218 ) 0.0000 Kg. @ Rs. 6.289 /Kg. (-ve)=Rs. 0.00
Add: 0.0000 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
(7 th A & C )
Schedule Rate:- 1 No @ Rs. 4087.00 /No =Rs. 0.00
Deduct: (P-218 ) 0.0000 Kg. @ Rs. 6.289 /Kg. (-ve)=Rs. 0.00
3 3
[ (0.45 x 0.45 x 0.60 ) m x 350.00 kg / m = 42.5250 Kg ]
Add: 0.0000 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 60 cm equilateral tringle.
(7 th A & C )
Schedule Rate:- 1 No @ Rs. 2652.00 /No =Rs. 0.00
Deduct: (P-218 ) 0.0000 Kg. @ Rs. 6.289 /Kg. (-ve)=Rs. 0.00
3 3
[ (0.45 x 0.45 x 0.60 ) m x 350.00 kg / m = 42.5250 Kg ]
Add: 0.0000 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 60 cm circular.
(7 th A & C )
Schedule Rate:- 1 No @ Rs. 3591.00 /No =Rs. 0.00
Deduct: (P-218 ) 0.0000 Kg. @ Rs. 6.289 /Kg. (-ve)=Rs. 0.00
3 3
[ (0.45 x 0.45 x 0.60 ) m x 350.00 kg / m = 42.5250 Kg ]
Add: 0.0000 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 80 cm x 60 cm rectriangular.
(7 th A & C )
Schedule Rate:- 1 No @ Rs. 5049.00 /No =Rs. 0.00
Deduct: (P-218 ) 0.0000 Kg. @ Rs. 6.289 /Kg. (-ve)=Rs. 0.00
3 3
[ (0.45 x 0.45 x 0.60 ) m x 350.00 kg / m = 42.5250 Kg ]
Add: 0.0000 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
(7 th A & C )
Schedule Rate:- =Rs. 0.00
Deduct: (P-218 ) 0.0000 Kg. @ Rs. 6.289 /Kg. (-ve)=Rs. 0.00
3 3
[ (0.45 x 0.45 x 0.60 ) m x 350.00 kg / m = 42.5250 Kg ]
Add: 0.0000 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 Page No.270 , Item No.8.06. Unit:- sqm
Providing and erecting direction and place identification retro- reflectorised sign as per IRC :67 made .…area
exceeding 0.9 sqm supported on a mild steel angle iron ....…etc.
(7 th A & C )
Schedule Rate:- =Rs. 0.00
Deduct: (P-218 ) 0.0000 Kg. @ Rs. 6.289 /Kg. (-ve)=Rs. 0.00
3 3
[2 x (0.45 x 0.45 x 0.60 )m x 350.00 kg / m = 85.0500 Kg ]
Add: 0.0000 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 Two coat.
Schedule rate:- Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 Using Sal-bullah.
0 With earth.
Earth excavation:- (In ordinary soil.) 0.028 /1.20 m3 @ Rs. 89.90 /m3 =Rs. 0.00
Cement bag:- 1 No @ Rs. 3.30 /No =Rs. 0.00
Labour cost:- 1 No @ Rs. 3.50 /No =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
EXTRA ITEM
0 PCC Grade M25 : Height upto 5m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 420.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 PCC Grade M25 : Height 5m to 10m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 420.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 PCC Grade M25: Height above 10m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 420.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 PCC Grade M30 : Height upto 5m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 430.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 PCC Grade M30 : Height 5m to 10m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 430.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 PCC Grade M30 : Height above 10m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 430.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M20 : Height upto 5m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 400.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M20 : Height 5m to 10m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 400.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M20: Height above 10m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 400.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M25 : Height upto 5m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 420.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M25 : Height 5m to 10m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 420.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M25 : Height above 10m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 420.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M30 : Height upto 5m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 430.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M30 : Height 5m to 10m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 430.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M30: Height above 10m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 430.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M35 : Height upto 5m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 440.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M35 : Height 5m to 10m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 440.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M35 : Height above 10m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 440.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M40 : Height upto 5m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 450.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M40 : Height 5m to 10m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 450.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M40 : Height above 10m, using Batching Plant, Transit Mixer & Concrete Pump.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 450.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 1 x 400.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M20 : Using Batching Plant, Transit Mixer & Concrete Pump: For T-beam & slab: Height 5m to
10m.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 1 x 400.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M20 : Using Batching Plant, Transit Mixer & Concrete Pump: For T-beam & slab: Height above
10m.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 1 x 400.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M25 : Using Batching Plant, Transit Mixer & Concrete Pump: For T-beam & slab: Height upto 5m.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 1 x 420.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M25 : Using Batching Plant, Transit Mixer & Concrete Pump: For T-beam & slab: Height 5m to
10m.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 1 x 420.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M25 : Using Batching Plant, Transit Mixer & Concrete Pump: For T-beam & slab: Height above
10m.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 1 x 420.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M30 : Using Batching Plant, Transit Mixer & Concrete Pump: For T-beam & slab: Height upto 5m.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 1 x 430.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M30 : Using Batching Plant, Transit Mixer & Concrete Pump: For T-beam & slab: Height 5m to
10m.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 1 x 430.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 RCC Grade M30 : Using Batching Plant, Transit Mixer & Concrete Pump: For T-beam & slab: Height above
10m.
(without stack)
20 mm N. graded stone agg. :- 60% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
10 mm N. graded stone agg. :- 40% x 0.90 m3 @ Rs. 0.00 /m3 =Rs. 0.00
Cement:-(PPC/PSC/OPC43) (P-218 ) 1 x 430.00 Kg. @ Rs. 5.717 /Kg. =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
0 Up to 10 cm in width
0 Up to 10 cm in width
0 Using moorum.
(Without Stack)
Moorum:- 1/0.67 m3 @ Rs. 287.50 /m3 =Rs. 0.00
Labour cost:- =Rs. 0.00
Rs. 0.00
GST:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
L.W.Cess:- 0% of Rs. 0.00 =Rs. 0.00
Rs. 0.00
Lead from
Lead from Dhulagarh Jn. (on NH-6) to Burdwan =101
Lead From Lead From Dhulagarh Haldia (AS
Jn. (on NH-6)
Durgapur Kolkata (As per PER
Schedule)
Schedule)
Bolpur(SY) :- 58 160 173 267 7 th A&C
Ahamedpur :- 76 178
Sainthia(ROB) :- 91 193
Mollarpur (O):- 108 210
Rampurhat(SY) :- 122 224 233 327
Kirnahar :- 86 170 180 272
Suri ( SY):- 88 200 204 281
Dubrajpur :- 66 205
Panagarh:- 18
*** All Input Data & Input Text in Red INK ***
545
591
659
710
494 Input Data for Other Materials Rate
290
Coarse Medium Fine Sand Jhama Metal Brick Bats
226 Sand Sand >40mm >40mm
97
123 (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
536.00 416.00 358.00 0.00 857.00
19.25 19.25 19.25 20.75 20.75
516.75 396.75 338.75 -20.75 836.25
273
290 Rate for RCC pipe & Admixture are same for all Dist. Vide page-220.
483 Rate for Lime are same for all Dist. Except Kol,24Pgs,How, Dar.Hill ,Vide page-220.
545
352 Input Data for Other Materials Rate
102 1 st Class Moorum:- West M,Ban,Pur,Bir only remaining districts may add necessary carriage cost as a
Brick Agg.
607 <40mm Brick (kiln Laterite:- West Midnapur,Bankura district only, remaining districts may add necessary carr
burnt
624 PPC,PSC,OPC-33,43 OPC-53 Composit
433 (Rs.) (Rs.) Cement( Other/ 53 gr/Composit )
268 1081.00 6.190 Dep 6.289 6.460 6.384
19.25 0.036 Own 5.717 5.873 5.804
1061.75 6.154 *****New (1st A & C)
4
56 82 7.3 6.7 6.3 5.6 5.3
654.5 5.3
5
654.5 5.3
7
56 82 7.3 6.7 6.3 5.6 5.3
8
56 82 7.3 6.7 6.3 5.6 5.3
9
30.4 7.5
45.2 15
12.90
9.50
19.00
R.S.Est
12.90
25.50
19.00
14.40
14.40
19.00
R.S.Est
14.40
19.00
14.40
19.00
79.90
R.S.Est
89.90
109.90
CS 536.00 516.75
MS 416.00 396.75
FS 358.00 338.75
R.S.Est
207.00
CS 536.00 516.75
MS 416.00 396.75
FS 358.00 338.75
R.S.Est
0.51
0.77
210.00
(1 st A&C) 0
0.3456 221 399 214
0.2944 214 393 203
0.1280 202 381 198
0.1280 204 384 199
0.3840 212 391 208
CS 536.00 516.75 210 389 201
MS 416.00 396.75
FS 358.00 338.75
(1 st A&C)
0.1920 221 399
0.1280 214 393
0.1280 202 381
0.1536 204 384
0.6784 212 391
CS 536.00 516.75 210 389
MS 416.00 396.75
FS 358.00 338.75
(1 st A&C)
221 399
0.4480 214 393
0.5760 202 381
0.2560 204 384
CS 536.00 516.75 212 391
MS 416.00 396.75 210 389
R.S.Est
FS 358.00 338.75
(1 st A&C)
221 399
0.4480 214 393
0.5120 202 381
0.3200 204 384
CS 536.00 516.75 212 391
MS 416.00 396.75 210 389
FS 358.00 338.75
(1 st A&C)
0.2560 221 399
0.2560 214 393
0.1920 202 381
0.3200 204 384
0.2560 212 391
CS 536.00 516.75 210 389
MS 416.00 396.75
FS 358.00 338.75
(1 st A&C)
0.1536 221 399
0.1536 214 393
0.1536 202 381
0.2816 204 384
0.5376 212 391
CS 536.00 516.75 210 389
MS 416.00 396.75
FS 358.00 338.75
0.3960
0.2640
0.3564
R.S.Est
0.3036
334
in schedule only Gr-2 & Type B Screening given for Patching of Pothole
1.00
0.21
443.00
1.00
R.S.Est
0.21
R.S.Est
443.00
443.00
Controversial as screening not stated & Laterite boulder rate for Birbhum not given
443.00
818.00
R.S.Est
518.00
No.4.10. (i/ii/ii)
jhama laterite
63-45 90-45 JM>40 1162.00 1141.25
408.00 260.00
1.09 1.45
R.S.Est
0.26 ---
jhama laterite
63-45 90-45 JM>40 1162.00 1141.25
408.00 260.00
1.09 1.45
0.26 ---
Controversial as & Laterite boulder rate for Birbhum not given.
213 350
210 347
214 351
172
R.S.Est
6.30
OB. 0.00
No.5.02. (i/ii/ii)
OB. 0.00
0.4241
DP. 0.00 0.2827
OP. 0.00 0.3534
R.S.Est
0.006
0.68
60.00
0
0.016
0.0105
DP. 0.00
OP. 0.00 Pan
OB. 0.00 691.00
Mob.
384.00
DP. 0.00
OP. 0.00
OB. 0.00
R.S.Est
608.00
With 22.4mm; 11.2mm; 5.6mm. & this may be adopted with prior discussion with EE
0
0
0.4241
DP. 0.00 0.2827
OP. 0.00 0.3534
OB. 0.00 0.2121
R.S.Est
0.1414
75.00
940.00
0.2831
0.4245
DP. 0.00 0.4245
OP. 0.00 0.1415
OB. 0.00 0.1415
72
1241.00
1154.00
1132.00
R.S.Est
941.00
0.4241
DP. 0.00 0.2827
OP. 0.00 0.3534
OB. 0.00 0.2121
0.1414
75.00
1239.00
1153.00
1131.00
940.00
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
0.2945
0.1472
DP. 0.00 0.2208
OP. 0.00 0.2945
OB. 0.00 0.1472
0.3681
3 44.00
99.00
1301.00
1203.00
R.S.Est
1191.00
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
0.2197
DP. 0.00 0.2197
OP. 0.00 0.3662
OB. 0.00 0.2197
0.4394
4 44.00
111.00
1292.00
1194.00
? 1183.00
0.1469
DP. 0.00 0.2938
OP. 0.00 0.5877
OB. 0.00 0.4114
44
104
1273.00
1174.00
R.S.Est
1150.00
1135.00
1204.00
1187.00
0.0005
0.0079
0.0079
0.0111
10.2900
5.71
0.0143
25mm 50mm
OP(10/20) 0.00 172.00 235.00
DP. 0.00
R.S.Est
OP. 0.00
OB. 0.00
R.S.Es
0.0005
0.0157
0.0157
0.0224
20.48
11.43
0.0143
25mm 50mm
172.00 235.00
24.10
DP. 0.00 0.018 22.00
OP. 0.00 0.009 21.20
R.S.Est
7.00 bitumen
R.S.Est
1129.00
R.S.Est
1235.00
O = 89.90
M = 99.90
MH=119.90
R.S.Est
Hide 20.00
For Small Qty. E/W "Borrow pit" measurment & for other case "Pre & Post Level" measurment.
O = 89.90 1 km = 95.00
M = 99.90 2 = 106.90 77.00
R.S.Est
5 = 142.60
5 -10 = 10.50/km
1 km = 95.00
2 = 106.90
R.S.Est
46.80 3 = 118.80
Hide (Put lead only in KM)
4 = 130.70
5 = 142.60
5 -10 = 10.50/km
1 km = 95.00
2 = 106.90
85.60 3 = 118.80
R.S.Est
5 -10 = 10.50/km
1 km = 95.00
2 = 106.90
R.S.Est
94.80 3 = 118.80
Hide (Put lead only in KM)
Hide 25.00
Hide 29.00
Hide 5.30
4 = 130.70
5 = 142.60
5 -10 = 10.50/km
26.20
R.S.Est
13.20
R.S.Est
1 km = 95.00
2 = 106.90
3 = 118.80
4 = 130.70
27.90 5 = 142.60
R.S.Est
12.20
R.S.Est
14.40
R.S.Est
16.20
R.S.Est
173.00
R.S.Est
Boulder, Stone
Gr-1 (63- Gr-2 (53- Screening Stone
225mm Screening
to150mm 45mm) 22.4mm) Type-A Type-B
545
591
659 Input Data for Other Materials Rate
710
Coarse Medium Jhama Metal Brick Bats
494 Sand Sand Fine Sand >40mm >40mm
Always Hide this portion
Rate for RCC pipe & Admixture are same for all Dist. Vide page-220.
Rate for Lime are same for all Dist. Except Kol,24Pgs,How, Dar.Hill ,Vide page-220.
Lime:- 3.70
Cut & paste/Cut &
340.00
R.S.Est
399.00 470.00
1011.00 773.00
221.00
280.00
R.S.Est
197.00
185.00
154.00
R.S.Est
208.00
357.00
124.00 47.00
123.00 47.00
115.00 46.00
114.00 46.00
165.00 55.00
164.00 55.00
R.S.Est
148.00 52.00
146.00 52.00
228.00 69.00
226.00 69.00
197.00 64.00
195.00 64.00
0.835
R.S.Est
193.00
266.00
R.S.Est
0.00
1 st Brick 6.190 6.1540 144.00
354.00
R.S.Est
214.00
0
….. add cost & carriage of 1.05 MT (considering 5% wastage) of steel materials to arrive at the final consolidated item
#NAME?
#NAME?
38160, 37844 & 36750
96.00
R.S.Est
OH.C =5% for road work, 15% for Bridge work , 30% (1 st A & C)
for Bridge repair work. (CD/culvert is not to be treated as Bridge-?)
3175.00
96.00
R.S.Est
OH.C =5% for road work, 15% for Bridge work , 30% (1 st A & C)
for Bridge repair work. (CD/culvert is not to be treated as Bridge-?)
3308.00
96.00
R.S.Est
OH.C =5% for road work, 15% for Bridge work , 30% (1 st A & C)
for Bridge repair work. (CD/culvert is not to be treated as Bridge-?)
4226.00
0
22.4 mm stone chips :- 10 280
11.2 mm stone chips:- 15 350
20 400
Cement, 53 gr,Composit
Other, 25 420
6.289 6.460 6.384 30 430
5.717 5.873 5.804 35 440
350 40 450
1406 **Page-B60 Vol.I 15-16 for M- grade 45 450
20mm =0.54 cum & 10mm =0.36 cum ;
1:2:4 - 0.66 & 0.22 ; 1:1.5:3 -0.573 & 50 450
0.287
55 450
10 280
Cement, 53 gr,Composit
Other, 15 350
6.289 6.460 6.384 20 400
5.717 5.873 5.804 25 420
400 30 430
1470 35 440
40 450
45 450
50 450
55 450
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
R.S.Est
420
1524
CM BM 10 280
1528.00 1296.00 15 350 1447.00
20 400
Cement, 53 gr,Composit
Other, 25 420
430 6.289 6.460 6.384 30 430
5.717 5.873 5.804 35 440
40 450
45 450
50 450
55 450
CM BM
1554.00 1322.00
Other, Cement, 53 gr,Composit 35 440
6.289 6.460 6.384
440 5.717 5.873 5.804
176.00
R.S.Est
73.10
0
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
10 9356 9027
R.S.Est
115.00
R.S.Est
0
(PWD Shc. Don't use normally)
Cement, 53 gr,Composit
Other,
121.00 6.289 6.460 6.384 PWD-?
5.717 5.873 5.804
Cement, 53 gr,Composit
Other,
149.00 6.289 6.460 6.384 PWD-?
5.717 5.873 5.804
Cement, 53 gr,Composit
Other,
170.00 6.289 6.460 6.384 PWD-?
5.717 5.873 5.804
R.S.Est
Cement, 53 gr,Composit
Other,
133.00 6.289 6.460 6.384 PWD-?
5.717 5.873 5.804
Cement, 53 gr,Composit
Other,
151.00 6.289 6.460 6.384 PWD-?
5.717 5.873 5.804
Cement, 53 gr,Composit
Other,
176.00 6.289 6.460 6.384 PWD-?
5.717 5.873 5.804
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
R.S.Est
150
852.00
R.S.
22.4 mm stone chips :-
11.2 mm stone chips:-
0
1) Construction wing will add the cost & carriage of 0.9 cum/m 3 crushed stone
aggregates,cement, dowel bar &tie rod and cost of Sand only (vide TableII-1 of Vol.III-
PWD SOR,Pg-219 excl.10% Contractor's profit) as per design & drawing to arrive the
consolidated rate. 2) 5% for overhead
charge &10% contractors profit to be added seperetely over the cost of materials of
SL.no.-1 3) Charracteristic
flexural strength of concrete shall not be less than 4.5 MPa.
a) Cement & Sand
= As per Grade of Concrete .
Hide if required, giving Qty. of sand= 0 . Qty. of sand given from Table3.2-1 page-208
Approx. Qty. =10 kg .this Qty. should be calculate from design of pavement.(variation may be 10 to 12 kg )
10 280
15 350
96.00 20 400
Incomplete CS 536.00 516.75 25 420
Analysis MS 416.00 396.75 30 430
FS 358.00 338.75 35 440
985 Other,Cement, 53 gr,Composit 40 450
6.289 6.460 6.384 45 450
0
1) Construction wing will add the cost & carriage of 0.9 cum/m 3 crushed stone
aggregates,cement, dowel bar &tie rod and cost of Sand only (vide TableII-1 of Vol.III-
PWD SOR,Pg-219 excl.10% Contractor's profit) as per design & drawing to arrive the
consolidated rate. 2) 5% for overhead
charge &10% contractors profit to be added seperetely over the cost of materials of
SL.no.-1 3) Charracteristic
flexural strength of concrete shall not be less than 4.5 MPa.
a) Cement & Sand
= As per Grade of Concrete .
BMP RMC
1615.00 1724.00
Hide if required, giving Qty. of sand= 0 . Qty. of sand given from Table3.2-1 page-208
Approx. Qty. =10 kg .this Qty. should be calculate from design of pavement.(variation may be 10 to 12 kg )
R.S.Est
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
R.S.Est
310
2066.00
10 280
15 350
20 400
932.00 Cement, 53 gr,Composit
Other, 25 420
6.289 6.460 6.384 30 430
R.S.Est
50 450
55 450
11 1835.00 1752.00
R.S.Est
CS 536.00 516.75
MS 416.00 396.75
FS 358.00 338.75
JM>40 1162.00 1141.25
BB >40 857.00 836.25
423.00
CS 536.00 516.75
MS 416.00 396.75
FS 358.00 338.75
JM>40 1162.00 1141.25
575.00 BB >40 857.00 836.25
BA <40 1081.00 1061.75
R.S.Est
575.00
575.00
161.00
R.S.Est
2230.00
Cement, 53 gr,Composit
Other,
R.S.Est
255.00
R.S.Est
584.00
R.S.Est
62.00
R.S.Est
99.00
18.30
R.S.Est
55.00
R.S.Est
0.80
R.S.Est
0.50
120.00
R.S.Est
104.00
R.S.Est
67.00
1244.00
R.S.Est
1569.00
448.00
R.S.Est
517.00
587.00
201.00
R.S.Est
CS 536.00 516.75
MS 416.00 396.75
FS 358.00 338.75
JM>40 1162.00 1141.25
3.30 BB >40 857.00 836.25
3.50 BA <40 1081.00 1061.75
O = 89.90
R.S.Est
M = 99.90 3.30
MH=119.90 3.50
3.30
3.50
This is not a schedule item, may be taken during Flood Situation
in which Spot Bid are to be done after discussion with EE.(Please
change in description accordingly)
*** Rate of Stone Spalls not given in Schedule. So taken same as Boulder (>225 mm)
R.S.Est
496.00
*** Rate of Stone Spalls not given in Schedule. So taken same as Boulder (>225 mm)
R.S.Est
1255.00
0
502
1918
*** Rate of Stone Spalls not given in Schedule. So taken same as Boulder (>225 mm)
496.00
R.S.Est
Cement, 53 gr,Composit
Other, 10 280
6.289 6.460 6.384 15 350
5.717 5.873 5.804 20 400
25 420
350 30 430
1832.00 35 440
40 450
45 450
50 450
55 450
CS 536.00 516.75
MS 416.00 396.75
FS 358.00 338.75
JM>40 1162.00 1141.25
BB >40 857.00 836.25
R.S.Est
109.00
R.S.Est
783.00
R.S.Est
0
10 280
Cement, 53 gr,Composit
Other, 15 350
6.289 6.460 6.384 20 400
5.717 5.873 5.804 25 420
30 430
35 440
40 450
2043 45 450
22.4 mm stone chips :- 50 450
11.2 mm stone chips:- 55 450
10 280
Cement, 53 gr,Composit
Other, 15 350
6.289 6.460 6.384 20 400
5.717 5.873 5.804 25 420
30 430
CM 2042 35 440
BM 1777 40 450
45 450
50 450
55 450
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2141
BM 1878
10 280
Cement, 53 gr,Composit
Other, 15 350
6.289 6.460 6.384 20 400
5.717 5.873 5.804 25 420
R.S.Est
30 430
CM 2140 35 440
BM 1877 40 450
45 450
50 450
55 450
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2140 2302 *
BM 1877 2039 *
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2135
BM 1872
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2161
BM 1899
0
10 280
Cement, 53 gr,Composit
Other, 15 350
6.289 6.460 6.384 20 400
5.717 5.873 5.804 25 420
30 430
35 440
40 450
2316 45 450
22.4 mm stone chips :- 50 450
10 280
Cement, 53 gr,Composit
Other, 15 350
6.289 6.460 6.384 20 400
5.717 5.873 5.804 25 420
30 430
CM 2452 35 440
BM 2173 40 450
45 450
50 450
55 450
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2650
BM 2361
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2897
BM 2596
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2466
BM 2187
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2665
BM 2376
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2915
BM 2613
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2313
BM 2033
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2493
BM 2203
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2718
BM 2415
Cement, 53 gr,Composit
Other, 10 280
6.289 6.460 6.384 15 350
5.717 5.873 5.804 20 400
25 420
30 430
CM 2451 35 440
BM 2171 40 450
45 450
R.S.Est
50 450
55 450
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2629
BM 2340
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2896
BM 2593
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2459
BM 2179
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2613
BM 2326
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2832
BM 2533
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2524
BM 2246
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2649
BM 2364
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2835
BM 2542
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2728
BM 2395
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 2858
BM 2518
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
CM 3054
BM 2702
0
analysis for M35 to M55 not done here 10 280
15 350
20 400
25 420
Cement, 53 gr,Composit
Other, 30 430
6.289 6.460 6.384 35 440
5.717 5.873 5.804 40 450
45 450
2743 2966 2437 2647 50 450
55 450
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
R.S.Est
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
2286.00
R.S.Est
2881.00
R.S.Est
R.S.Est
0
Note:1. The cost of excavation and foundation
concrete for fixing of vertical support system to be
worked out separately as per the approved
drawing/designand to be included in the estimate.
2.
Lettering and arrow marks on sign board to be
R.S.Est
89.00
R.S.Est
75.00
0
62.00
R.S.Est
67.00
140.00
R.S.Est
113.00
R.S.Est
104.00
R.S.Est
R.
Cement, 53 gr,Composit
Other,
6.289 6.460 6.384
5.717 5.873 5.804
R.S.Est
1563.00
CS 536.00 516.75
MS 416.00 396.75
FS 358.00 338.75
0.835
179.00
R.S.Est
NB:- Add the cost of required sand or moorum or granular material as the case may be.
*** So this item may also be done by granular material
179.00
386.00
R.S.Est
districts may add necessary carriage cost as applicable.)
y, remaining districts may add necessary carriage cost as applicable.)
(Unless stated specially rates as per P.W.D Volume - III , 2018 Schedule including 9th Add. & Corr. )
(A) TOTAL=Rs.
(B) Total excluding L.W.Cess = (A) / 1.01 =Rs.
(C) Contingency @ 3% of (B) =Rs.
(D) Grand TOTAL = (A) + (C) =Rs.
Grand TOTAL ,Say =Rs.
###
###
Sl.N Amount. (in
o. Discription of item. Quantity Unit Rate
Rs.)
Sl.N Amount. (in
o. Discription of item. Quantity Unit Rate
Rs.)
Sl.N Amount. (in
o. Discription of item. Quantity Unit Rate
Rs.)
Sl.N Amount. (in
o. Discription of item. Quantity Unit Rate
Rs.)
TOTAL=Rs. 0.00
Say Rs. 0.00
Contingency @ 3% = Rs. 0.00
Grand TOTAL=Rs. 0.00
Rupees Nil
Sl.N Amount. (in
o. Discription of item. Quantity Unit Rate
Rs.)
+ 1
101.00
100.00
3.00
104.00
104.00
CROSS CHECK by selecting cell
Rupees One Hundred Four Only
100.00
12.00
112.00
1.12
113.12
3.36
116.48
116.00
CROSS CHECK by selecting cell
Rupees One Hundred Sixteen Only
If # or #NAME Again put formula =rswords(refer cell)
100.00
100.00
3.00
103.00
CROSS CHECK by selecting cell
Rupees One Hundred Three Only
If # or #NAME Again put formula =rswords(refer cell)
QUANTITY EVALUATION
Name of Work:- Kotasur - Ramnagar Road 0 kmp to 17.425 kmp: Widening and Streangthening from 12.00 kmp
to 17.25 kmp under Sainthia Highway Sub-Division of Birbhum Highway Division-I, in the District
of Birbhum.
(Unless stated specially rates as per P.W.D Volume - III , 2018 Schedule including 9th Add. & Corr. )
(Unless stated specially rates as per P.W.D Volume - III , 2018 Schedule including 9th Add. & Corr. )
Approx. LEAD (Variation may be + or - 1.00 km
KMP on NH-60 (data cullacted from NH & this should be varify from NH once again.
Variation may be + or - 1.00 km
Rampurhat = 388.00 Kmp
Munsuba more (Rampurhat) 387.00 Kmp
Baina More (Mollarpur) = 375.00 Kmp ?
Mollarpur ROB(near Mollarpur Sub-Divn. Office) = 374.00 Kmp
Sutsal = 363.00 Kmp
Deucha = 359.00 Kmp
Md Bazar x-ing = 352.00 Kmp
Saurakuri = 349.00 Kmp
Tilpara Barrage = 344.00 Kmp
Lambodarpur X-ing = 342.00 Kmp
(Suri Stack Yard)
Please inform Other Important Lead for Estimate Checking Physically or by Mail/Phone
Lead From Lead From Lead from Lead from
Dhulagarh Jn. Haldia (AS
Durgapur Kolkata (on NH-6) PER Schedule)
31.3 kmp
Currection after completion of project ,Suri Ahamedpur Road by PWD-?
New
ESTIMATE
(Unless stated specially rates as per P.W.D Volume - III , 2018 Schedule including 9th Add. & Corr. )
Sl.N
o. Discription of item. Quantity Unit Rate Amount. (in
Rs.)
QUANTITY EVALUATION
(Unless stated specially rates as per P.W.D Volume - III , 2018 Schedule including 9th Add. & Corr. )
Sl.N Discription of item. No Length Breadth Height Perce Quantity Unit
o. (M) (M) (M) ntage
ANALYSIS OF RATES
(Unless stated specially rates as per P.W.D Volume - III , 2018 Schedule including 9th Add. & Corr. )
Col. Width=10, Row Ht =16.5 & Margin=0.25 side & 0.50 T&B 0.0 H&F (with one row gap at T&B) (Calibri , 11 ).
Name of Work :- Kotasur - Ramnagar Road 0 kmp to 17.425 kmp: Widening and Streangthening from 12.00 kmp
to 17.25 kmp under Sainthia Highway Sub-Division of Birbhum Highway Division-I, in the
District of Birbhum.
1850
85 (av) W.C.
425 425
10 ɸ @ 150 c/c
16 ɸ @ 150 c/c
3000
B.F.S 75
. . . . : . . . . . . . : . . . . . : . . . : . . . . . .. . . : . : .
:. : .. :: . : .. : : :. : . . : :. : . . . Sand Filling . . : :. . . : : . . : . . . . . : . . .
. . : . : . . . : . . : . . . . : . . . : . : . . . . . . . . : . :. . . .: . . :. . . . . . . . . . . .: . 150
2500
(M15) 150
425
300
500
P.C.C (M15)
P.C.C (M15) 3000
500
75
:. . .. .. :. Sand Filling :: .. .. :.
. :. : . . . : . : . . . : : . . . 150
850
NOT TO SCALE
The Estimated amount including 1% cess, 12% GST and 3% contingency stands of Rs. 0.00
#NAME?
Name of Work:- Kotasur - Ramnagar Road 0 kmp to 17.425 kmp: Widening and Streangthening
from 12.00 kmp to 17.25 kmp under Sainthia Highway Sub-Division of Birbhum
Highway Division-I, in the District of Birbhum.
Guard Post:-
C.C (1:2:4):
Volumn= 1/2 ( 8 x 1/2 x 0.066 x 0.080 +
8 x 1/2 x 0.099 x 0.120 ) x 1.37
= 0.0470 m3
Cement = 0.0470x0.22x50/0.035
= 14.7714 Kg
5 Km Post :-
C.C (1:4:8) =
Volumn= 0.800 x 0.550 x 0.600 = 0.2640 m3
Less= 0.500 x 0.250 x 0.450 = 0.0563 m3
0.2077 m3
C.C (M-15) :
Volumn= 0.500 x 0.250 x 0.450 = 0.0563 m3
0.520 x 0.270 x 0.130 = 0.0183 m3
0.500 x 0.250 x 0.695 = 0.0869 m3
1/2 x Л x 0.250 2 x 0.250 = 0.0246 m3
0.1861 m3
Cement = 0.2077x0.12x50/0.035 + 0.1861x350.00
= 100.7407 Kg
Ordinary Km Post :
C.C (1:4:8) =
Volumn= 0.650 x 0.550 x 0.600 = 0.2145 m3
Less= 0.350 x 0.250 x 0.450 = 0.0394 m3
0.1751 m3
C.C (M-15) :
Volumn= 0.350 x 0.250 x 0.450 = 0.0394 m3
0.370 x 0.270 x 0.100 = 0.0100 m3
0.350 x 0.250 x 0.385 = 0.0337 m3
1/2 x Л x 0.175 2x 0.250 = 0.0120 m3
0.0951 m3
Cement = 0.1751x0.12x50/0.035 + 0.0951x350.00
= 63.3021 Kg
Boundary Piller :-
C.C (1:4:8) =
Volumn= 0.500 x 0.500 x 0.750 = 0.1875 m3
Less:- Л x h x 1/3 (R2 + Rr + r2 )
=22/7 x 0.600 x 1/3 (0.102 + 0.10 x 0.082 + 0.0822)= 0.0157 m3
0.1718 m3
C.C (1:2:4) :
Volumn= Л x h x 1/3 (R2 + Rr + r2 )
=22/7 x 0.825 x 1/3 (0.102 + 0.10 x 0.075 + 0.0752)= 0.0200 m3
1/2 x 4/3 x Л x 0.0753 = 0.0009 m3
0.0209 m3
0.200
ecked once again as per schedule