Full day work = 9 hours; Weekly hours = 45 ; Office hours this month=

Name Ranjeet Twayna


Designation:Jr. Officer - Mechanical Engineer Month Ashad, 2077
Supervisor: Sunil Maharjan Day1= 03-01-77
Line Manager:
Date
Day Description Estimated hrs Agreed hrs Actual hrs Remarks
(B.S.)
Design considerations of penstock, type of installation of
1 2 9
penstock, penstock pipe materials
20
Design considerations of penstock, type of installation of
2 3 9
penstock, penstock pipe materials
3 4 9
Theoritical study on Anchor blocks and support piers, surge tank
4 5 25 9
Theoritical study on Anchor blocks and support piers, surge tank
5 6 9
Theoritical study on Anchor blocks and support piers, surge tank
6 7 Saturday
Study about hydraulic turbines : Pelton turbine, Francis turbine
7 1 9
and cavitation effect on the turbine
Study about hydraulic turbines : Pelton turbine, Francis turbine
8 2 25 9
and cavitation effect on the turbine
Study about hydraulic turbines : Pelton turbine, Francis turbine
9 3 9
and cavitation effect on the turbine
Preparation of Contract Documents of Mathillo Mailung Khola
10 4 9
Jalvidhyut Aayojana – Volume I
Preparation of Contract Documents of Mathillo Mailung Khola
11 5 30 9
Jalvidhyut Aayojana – Volume I
Preparation of Contract Documents of Mathillo Mailung Khola
12 6 9
Jalvidhyut Aayojana – Volume I
13 7 Saturday
Preparation of Contract document of Mathilo Mailun Khola
14 1 9
Jalvidhyut Aayojana – Vol II (Revision of HM CAD drawing)
Preparation of Contract document of Mathilo Mailun Khola
15 2 9
Jalvidhyut Aayojana – Vol II (Revision of HM CAD drawing)
Preparation of Contract document of Mathilo Mailun Khola
16 3 48 9
Jalvidhyut Aayojana – Vol II (Revision of HM CAD drawing)
Preparation of Contract document of Mathilo Mailun Khola
17 4 9
Jalvidhyut Aayojana – Vol II (Revision of HM CAD drawing)
Preparation of Contract document of Mathilo Mailun Khola
18 5 9
Jalvidhyut Aayojana – Vol II (Revision of HM CAD drawing)
Hydro Mechanical cost estimation of Upper Suri Khola
19 6 35 9
Hydropower Project
20 7 Saturday
Hydro Mechanical cost estimation of Upper Suri Khola
21 1 - 9
Hydropower Project
Hydro Mechanical cost estimation of Likhu Cascade Hydropower
22 2 10 9
Project
Hydro Mechanical cost estimation of Upper Suri Khola
23 3 - 9
Hydropower Project
24 4 Plate Procurement of steel lining – Middle Tamor HPP 12 9
Hydro Mechanical cost estimation of Upper Suri Khola
25 5 - 9
Hydropower Project
Monthly cost estimation of HM works in Mathilo Mailun Khola
26 6 30 9
Jalvidhyut Aayojana
27 7 Saturday
Monthly cost estimation of HM works in Mathilo Mailun Khola
28 1 9
Jalvidhyut Aayojana
-
Monthly cost estimation of HM works in Mathilo Mailun Khola
29 2 9
Jalvidhyut Aayojana
Review of IPC bill & reports of Padam Khola small hydropower
30 3 9
project
20
Review of IPC bill & reports of Padam Khola small hydropower
31 4 9
project
Total Hrs. 255 0 243