Power Transformer foundation design edited and DTL maharani baug tender
6/1/2022 Sub-Station working 9:00 6:00 9:00
Power Transformer foundation design and Synopsis of bore hole for uganda
6/2/2022 Sub-Station tender 9:00 6:00 9:00
6/3/2022 Sub-Station BPI and HBPI Documentation Updated as RIV-B 9:00 7:00 10:00

6/6/2022 Sub-Station SA 225 KV Documentation as RIV - B and 9:00 6:00 9:00


6/7/2022 Sub-Station SA 52 KV Documentation as RIV - A and Foundation Documentation 9:00 6:00 9:00
6/8/2022 Sub-Station SA 52 KV Foundation Drawing 9:00 6:00 9:00
6/9/2022 Sub-Station DTL Maharani baug tender and FOD's Review 9:00 6:00 9:00
Gantry Tower structural drawing Correcting and Power transformer drawing
6/10/2022 Sub-Station checking 9:00 6:00 9:00

Gantry tower Drawing checking T1 and T2 and Power trasnsformer drawing


6/13/2022 Sub-Station checking 9:00 6:00 9:00

6/14/2022 Sub-Station Power transformer Design as combine and Final documentation generated 9:00 6:00 9:00

6/15/2022 Sub-Station Power transformer Drawing check and Control room builiding Drawing check 9:00 6:00 9:00
6/16/2022 Sub-Station Control Room Building Staad modelling 9:00 6:00 9:00
6/17/2022 Sub-Station Control Room Building Staad modelling and Bus bar deflection calculation 9:15 6:15 9:00

6/20/2022 Sub-Station Control Room Building Staad modelling and Gantry Tower drawing checking 9:00 6:00 9:00