UPGRADING OF KAPCHORWA - SUAM ROAD

(73 Km.) TO PAVED (BITUMINOUS) STANDARD

STRUCTURE DRAWINGS
FOR ATTARI BRIDGE KM 2+370

CLIENT:
UGANDA NATIONAL ROADS AUTHORITY
PLOT NO.3-5, NEW PORTBELL ROAD
NAKAWA UAP BUSINESS PARK
P.O. BOX 27187
KAMPALA, UGANDA

DESIGN CONSULTANT :
LEA International Ltd., in Joint Venture with LEA
Associates South Asia Pvt. Ltd.,and in association with
KOM Consulting Ltd.

CONTRACTOR :
CHINE STATE CONSTRUCTION ENGINEERING
CORPORATION LIMITED (CSCEC)
LIST OF DRAWINGS

SL. NO. LIST OF DRAWINGS DRAWING NO. REVISION SHEET

DESIGN SUB CONSULTANT: APPROVED BY CLIENT : PROJECT : CONTRACTOR : DRAWING TITLE : DRAWING NUMBER : DATE:
DRAWN: DURBA
JULY 2019
UGANDA NATIONAL ROADS AUTHORITY
DESIGNED: MANGAL PLOT NO.3-5, NEW PORTBELL ROAD 80034\LASA\STR\KS\FD\MNBR-01\TC-01 REV. R2
R2 12.07.19 REVISED AS PER UNRA LETTER No. DUBBA NAKAWA UAP BUSINESS PARK
UPGRADING OF KAPCHORWA - SUAM ROAD TABLE OF CONTENT FOR SCALE:
UNRA/SRVCS/15-16/ 0090 DT. 26th MAY '19.
P.O. BOX 27187 (73 Km.) TO PAVED (BITUMINOUS) STANDARD ATTARI BRIDGE KM 2+370
CHECKED: R.BHATTACHARYA LEA International Ltd., in Joint Venture with
R1 10.06.19 REVISED AS PER UNRA LETTERS DT. 14th MAY '19. DUBBA LEA Associates South Asia Pvt. Ltd.,and in
KAMPALA, UGANDA PRELIMINARY DESIGN PD FINAL DESIGN FD AS SHOWN
association with CHINE STATE CONSTRUCTION
No. DATE DESCRIPTIONS BY ENGINEERING CORPORATION RELEASED FOR CONSTRUCTION RFC AS BUILT AB
APPROVED: UMASIS BOSE KOM Consulting Ltd.
R E V I S I O N LIMITED (CSCEC) COPYRIGHT RESERVED SHEET SIZE A3
(A) GENERAL
(E) CONSTRUCTION JOINTS

(B) MATERIAL SPECIFICATIONS

(F) INSTALLATION OF EXPANSION JOINTS

(G) WORKMANSHIP/DETAILING

(C) REINFORCMENT
TO KAPCHORWA TO SUAM TO KAPCHORWA TO SUAM

TO SUAM
TO KAPCHORWA A2

NOTES :-

DESIGN SUB CONSULTANT: APPROVED BY CLIENT : PROJECT : CONTRACTOR : DRAWING TITLE : DRAWING NUMBER : DATE:
DRAWN: DURBA
MARCH 2019
UGANDA NATIONAL ROADS AUTHORITY
DESIGNED: MANGAL PLOT NO.3-5, NEW PORTBELL ROAD 80034\LASA\STR\KS\FD\MNBR-01\GA-01 REV. R2
R2 12.07.19 REVISED AS PER UNRA LETTER No. DUBBA NAKAWA UAP BUSINESS PARK
UPGRADING OF KAPCHORWA - SUAM ROAD GENERAL ARRANGEMENT DRAWINGS FOR SCALE:
UNRA/SRVCS/15-16/ 0090 DT. 26th MAY '19.
P.O. BOX 27187 (73 Km.) TO PAVED (BITUMINOUS) STANDARD ATTARI BRIDGE KM 2+370 (SHEET 1 OF 2)
CHECKED: R.BHATTACHARYA LEA International Ltd., in Joint Venture with
R1 10.06.19 REVISED AS PER UNRA LETTERS DT. 14th MAY '19. DUBBA LEA Associates South Asia Pvt. Ltd.,and in KAMPALA, UGANDA PRELIMINARY DESIGN PD FINAL DESIGN FD AS SHOWN
association with CHINE STATE CONSTRUCTION
No. DATE DESCRIPTIONS BY ENGINEERING CORPORATION RELEASED FOR CONSTRUCTION RFC AS BUILT AB
APPROVED: UMASIS BOSE KOM Consulting Ltd.
R E V I S I O N LIMITED (CSCEC) COPYRIGHT RESERVED SHEET SIZE A3
NOTES :-

DESIGN SUB CONSULTANT: APPROVED BY CLIENT : PROJECT : CONTRACTOR : DRAWING TITLE : DRAWING NUMBER : DATE:
DRAWN: DURBA
MARCH 2019
UGANDA NATIONAL ROADS AUTHORITY
DESIGNED: MANGAL PLOT NO.3-5, NEW PORTBELL ROAD 80034\LASA\STR\KS\FD\MNBR-01\GA-01 REV. R2
R2 12.07.19 REVISED AS PER UNRA LETTER No. DUBBA NAKAWA UAP BUSINESS PARK
UPGRADING OF KAPCHORWA - SUAM ROAD GENERAL ARRANGEMENT DRAWINGS FOR SCALE:
UNRA/SRVCS/15-16/ 0090 DT. 26th MAY '19.
P.O. BOX 27187 (73 Km.) TO PAVED (BITUMINOUS) STANDARD ATTARI BRIDGE KM 2+370 (SHEET 2 OF 2)
CHECKED: R.BHATTACHARYA LEA International Ltd., in Joint Venture with
R1 10.06.19 REVISED AS PER UNRA LETTERS DT. 14th MAY '19. DUBBA LEA Associates South Asia Pvt. Ltd.,and in KAMPALA, UGANDA PRELIMINARY DESIGN PD FINAL DESIGN FD AS SHOWN
association with CHINE STATE CONSTRUCTION
No. DATE DESCRIPTIONS BY ENGINEERING CORPORATION RELEASED FOR CONSTRUCTION RFC AS BUILT AB
APPROVED: UMASIS BOSE KOM Consulting Ltd.
R E V I S I O N LIMITED (CSCEC) COPYRIGHT RESERVED SHEET SIZE A3
A1
A1

SECTION A-A (WITH RETURN WALL)


SECTION A-A (ONLY ABUTMENT)

A A1

FRONT ELEVATION

DRAINAGE DETAIL

NOTES :-
DETAIL A

DESIGN SUB CONSULTANT: APPROVED BY CLIENT : PROJECT : CONTRACTOR : DRAWING TITLE : DRAWING NUMBER : DATE:
DRAWN: MOHAN
JULY 2019
UGANDA NATIONAL ROADS AUTHORITY
DESIGNED: MANGAL PLOT NO.3-5, NEW PORTBELL ROAD 80034\LASA\STR\KS\FD\MNBR-01\SUB-01 REV. R2
R2 12.07.19 REVISED AS PER UNRA LETTER No. DUBBA NAKAWA UAP BUSINESS PARK
UPGRADING OF KAPCHORWA - SUAM ROAD DIMENSION DETAILS OF ABUTMENT SCALE:
UNRA/SRVCS/15-16/ 0090 DT. 26th MAY '19.
P.O. BOX 27187 (73 Km.) TO PAVED (BITUMINOUS) STANDARD FOR ATTARI BRIDGE KM 2+370
CHECKED: R.BHATTACHARYA LEA International Ltd., in Joint Venture with
R1 10.06.19 REVISED AS PER UNRA LETTERS DT. 14th MAY '19. DUBBA LEA Associates South Asia Pvt. Ltd.,and in
KAMPALA, UGANDA PRELIMINARY DESIGN PD FINAL DESIGN FD AS SHOWN
association with CHINE STATE CONSTRUCTION
No. DATE DESCRIPTIONS BY ENGINEERING CORPORATION RELEASED FOR CONSTRUCTION RFC AS BUILT AB
APPROVED: UMASIS BOSE KOM Consulting Ltd.
R E V I S I O N LIMITED (CSCEC) COPYRIGHT RESERVED SHEET SIZE A3
REINFORCEMENT DETAILS OF FOUNDATION

LEGEND :

NOTES :-

SCHEDULE OF REINFORCEMENT

DETAIL X
A
A1

C C

JUNCTION DETAILS OF RCC


ABUTMENT AND RETURN WALL

ABUTMENT REINFORCEMENT

DETAIL OF STIRRUPS HOOK

NOTES :-
NOTES :-

DESIGN SUB CONSULTANT: APPROVED BY CLIENT : PROJECT : CONTRACTOR : DRAWING TITLE : DRAWING NUMBER : DATE:
DRAWN: MOHAN
JULY 2019
UGANDA NATIONAL ROADS AUTHORITY
DESIGNED: NANGAL PLOT NO.3-5, NEW PORTBELL ROAD 80034\LASA\STR\KS\FD\MNBR-01\SS-01 REV. R2
R2 12.07.19 REVISED AS PER UNRA LETTER No. DUBBA NAKAWA UAP BUSINESS PARK
UPGRADING OF KAPCHORWA - SUAM ROAD DIMENSION DETAILS DRAWINGS FOR SCALE:
UNRA/SRVCS/15-16/ 0090 DT. 26th MAY '19.
P.O. BOX 27187 (73 Km.) TO PAVED (BITUMINOUS) STANDARD SUPERSTRUCTURE OF ATTARI BRIDGE KM 2+370
CHECKED: R.BHATTACHARYA LEA International Ltd., in Joint Venture with
R1 10.06.19 REVISED AS PER UNRA LETTERS DT. 14th MAY '19. DUBBA LEA Associates South Asia Pvt. Ltd.,and in
KAMPALA, UGANDA PRELIMINARY DESIGN PD FINAL DESIGN FD AS SHOWN
association with CHINE STATE CONSTRUCTION
No. DATE DESCRIPTIONS BY ENGINEERING CORPORATION RELEASED FOR CONSTRUCTION RFC AS BUILT AB
APPROVED: UMASIS BOSE KOM Consulting Ltd.
R E V I S I O N LIMITED (CSCEC) COPYRIGHT RESERVED SHEET SIZE A3
SPECIAL NOTES:

DESIGN SUB CONSULTANT: APPROVED BY CLIENT : PROJECT : CONTRACTOR : DRAWING TITLE : DRAWING NUMBER : DATE:
DRAWN: MOHAN
JULY 2019
UGANDA NATIONAL ROADS AUTHORITY
DESIGNED: NANGAL PLOT NO.3-5, NEW PORTBELL ROAD 80034\LASA\STR\KS\FD\MNBR-01\SS-02 REV. R2
R2 12.07.19 REVISED AS PER UNRA LETTER No. DUBBA NAKAWA UAP BUSINESS PARK
UPGRADING OF KAPCHORWA - SUAM ROAD REINFORCEMENT DETAILS FOR LONGITUDINAL RCC SCALE:
UNRA/SRVCS/15-16/ 0090 DT. 26th MAY '19.
P.O. BOX 27187 (73 Km.) TO PAVED (BITUMINOUS) STANDARD T-GIRDER OF ATTARI BRIDGE KM 2+370
CHECKED: R.BHATTACHARYA LEA International Ltd., in Joint Venture with
R1 10.06.19 REVISED AS PER UNRA LETTERS DT. 14th MAY '19. DUBBA LEA Associates South Asia Pvt. Ltd.,and in
KAMPALA, UGANDA PRELIMINARY DESIGN PD FINAL DESIGN FD AS SHOWN
association with CHINE STATE CONSTRUCTION
No. DATE DESCRIPTIONS BY ENGINEERING CORPORATION RELEASED FOR CONSTRUCTION RFC AS BUILT AB
APPROVED: UMASIS BOSE KOM Consulting Ltd.
R E V I S I O N LIMITED (CSCEC) COPYRIGHT RESERVED SHEET SIZE A3
R1 10.06.19 REVISED AS PER UNRA LETTERS DT. 14th MAY '19. DUBBA
SCHEDULE OF REINFORCEMENT

PLAN SHOWING DECK REINFORCEMENT DETAILS


(PLAN AT DECK TOP ONLY SHOWN)
X

ISOMETRIC VIEW OF ELASTOMERIC BEARING (TYP.)


PLAN
TYPICAL CROSS SECTION

NOTES :-

SECTION A - A

DETAIL-X

SECTION B - B
SECTION A - A

SECTION THROUGH APPROACH SLAB FOR BRIDGE

DETAIL-Y

DESIGN SUB CONSULTANT: APPROVED BY CLIENT : PROJECT : CONTRACTOR : DRAWING TITLE : DRAWING NUMBER : DATE:
DRAWN: DURBA
JULY 2019
UGANDA NATIONAL ROADS AUTHORITY
DESIGNED: MANGAL PLOT NO.3-5, NEW PORTBELL ROAD 80034\LASA\STR\KS\FD\MNBR-01\MISC-02 REV. R2
R2 12.07.19 REVISED AS PER UNRA LETTER No. DUBBA NAKAWA UAP BUSINESS PARK
UPGRADING OF KAPCHORWA - SUAM ROAD TYPICAL DETAILS OF APPROACH SLAB FOR SCALE:
UNRA/SRVCS/15-16/ 0090 DT. 26th MAY '19.
P.O. BOX 27187 (73 Km.) TO PAVED (BITUMINOUS) STANDARD ATTARI BRIDGE KM 2+370
CHECKED: R.BHATTACHARYA LEA International Ltd., in Joint Venture with
R1 10.06.19 REVISED AS PER UNRA LETTERS DT. 14th MAY '19. DUBBA LEA Associates South Asia Pvt. Ltd.,and in
KAMPALA, UGANDA PRELIMINARY DESIGN PD FINAL DESIGN FD AS SHOWN
association with CHINE STATE CONSTRUCTION
No. DATE DESCRIPTIONS BY ENGINEERING CORPORATION RELEASED FOR CONSTRUCTION RFC AS BUILT AB
APPROVED: UMASIS BOSE KOM Consulting Ltd.
R E V I S I O N LIMITED (CSCEC) COPYRIGHT RESERVED SHEET SIZE A3