To all employees of MHPS-TS ( d ) Digital Engineering has been newly started for handling IT
Engineering tool such as Engineering platform, 3D etc.
Wishing you all a Happy New Year. I hope you all had an enjoyable celebration together
with your families. I also would like to wish a Happy New Year for all the MHPS-TS staffs who ( 4 ) Not only Power engineering, but also Chemical engineering got ISO
had celebrated the New Year on business trip abroad. 9001 (2015 version) certification from TUV-SUD. It means that we had
At the start of 2019, I would like to send "President’s message" to all members of MHPS-TS. completed our base which shall be grown and be improved for our
future.
First, looking back to our activities in 2018, I am pleased to introduce to you the following
( 5 ) Through QMS action with Annual Action Plan (both company level,
achievements in various aspects of our accomplishments.
division level), Monthly Management Review meeting (QMS monthly
( 1 ) We had achieved 25th anniversary of business operation in February last year. It
meeting) and Management Review, self-monitoring and self-
means that we are entering new era of 2Q of the century operation, which is 26th
evaluation of our process, our weak point is observed. At the start of
year operation of MTS. The next 25 years would be totally different from the first
this year, I expect that all groups will include their unique activities in
one, which is much brighter but could be more challenging one.
AAP.
( 2 ) Our employees were increased to 950 engineers (regular employees: 700, subcon ( 6 ) In Corporate scope, we started new evaluation system and dialogue,
tractors: 250), and recorded a highest billable man-hour in MHPS-TS history. and I believe that evaluation of Filipino by Filipino will be made proper
( 3 ) We have conducted big organizational change for our future (2020) even in the ly within a few years.
highest workload and busiest time. Of course we cannot see the result of this ( 7 ) In the expansion to new scope of work and new partners. Last year, we
change in short period. However, I believe that this change will give good result have got some new scope and new partners . We must know that job
for us to survive in the severe global engineering market. will not come to us naturally. We must get our job strategically and
( a ) Merging Power center and Chemical center for the purpose of making aggressively.
them stronger in each functional scope, such as Layout piping, Electrical, ( 8 ) In 2018 Factory-1 (DCS factory) recorded an achievement of 1,500 pan
Instrument & Control and Civil. More synergetic effect shall be expected els' delivery which is 1.5 times higher compared to year 2017.
to be generated.
Taking a look on our circumstances, our market surrounding MHI and MHPS
( b ) Machinery Division became bigger household by merging with ST/GT
groups are changing dramatically and rapidly. Especially, in the field of In-
3D engineers for creating and finding our capability. dustrial and Engineering, a key word “5D” has been observed. 5D consists of
( c ) Service Department have been newly started for the environment change in “Decentralization (Globalization), Decarbonization, Digitalization, Depopula-
tion (economizing on manpower) and Deregulation.
MHI/MHPS groups, which is shifting to Service business (after service)
2 Communique January 2019
As for Decentralization, each company of MHI groups is seeking to encourage ( 1 ) Health, safety, and compliance should be a priority by fol
the overseas development of these market and global engineering scheme lowing the Code of Conduct as a member of MHI/MHPS
with good engineering force (Quality, Cost and Delivery). In MHI-AP, they groups. These are origin of our activity.
started MHI total package business using MHI machinery products with the ( 2 ) Always, to ask yourself, "What does MHI/MHPS and/or End
energy solution tool. In Chemical and Transportation business, MHI Engineer- -customers require?" "Do we play a role in MHI and MHPS
ing Company has been established last year aiming for the advancement of
groups?"
EPC performance and globalization. Group companies having the design tool
( 3 ) Always, to ask yourself, "Quality & Speed of our engineer
such as a design platform become stronger in the world.
ing" is enough or not? and evaluate your works (drawing,
As for Decarbonization, in MHPS, in the adverse circumstances in the flow of report, list etc.) whether or not it is enough to show your
the low-carbon society, there are still power plant markets even in coal fired.
intention as Engineering to your customers.
The more MHPS-TS would expand our scope and improve our engineering
( 4 ) To keep in mind that you must have "why?" in Engineering.
force (Quality, Cost and Delivery) in our engineering, the more MHPS can get
fossil power plant PJs. Don't copy without confirming of engineering philosophy.
( 5 ) To keep in mind that any drawings and documents created
In addition to the present Fossil power plant business, the power and energy
by you shall be explained by yourself since drawings and
solution business using IoT and AI have just been started. Furthermore, Ser-
vice business will be in the spotlight. documents are products of our company. Especially, when
you give a presentation using PPT, your explanation and
We, MTS, have started the work of motor current measurement in Mt. Apo,
and 3D measurement to 3D model engineering in addition to dispatching to PPT to outside your groups shall be easily and understand-
GSC as monitoring engineers. able enough for your brother and sister to be able to un-
As for Digitalization and Depopulation, MTS had started our Digital Engineer- derstand.
ing Division for handling Engineering platform and Engineering tools includ-
( 6 ) In case you get lost, get back to the basics and starting
ing some development of customizing 3D software and utility program of
point.
modeling. I would like to make “MTS” an Engineering IT center in MHI/MHPS
groups. ( 7 ) All managers, all engineers and all staffs shall imagine your
group's status in 3-5years later, and share with your col
Among the circumstances mentioned above, our position and responsibility in
leagues.
MHI and MHPS groups are becoming more important and the expectation to
( 8 ) As for young engineers and staffs, let's get the chance to
us is getting bigger, not only as design engineers but also field engineers and
work at site to become experienced engineers/staffs.
other functional engineers (IT, Procurement Expeditors, Field service engi-
neers). ( 9 ) Let's show more "the presence of MTS, existence of power
of MHPS-TS and untapped potential" to MHI and MHPS
However, it is real that jobs will not come to us naturally and automatically,
groups.
we must aggressively try to get it with our attractiveness and competitiveness.
( 10 ) Straight communication and speak out your thought and
In other words, if we would not be attractive, we cannot get any jobs.
idea.
In the view point mentioned above, I would like to act on the following items ( 11 ) Have someone whom you respect or want to surpass.
in 2019 to level up our capability and ability on the basis which was men-
Also, be the one that your staffs would respect and your
tioned above in items (2)(3)(5)(6) and (7) that were created last year.
colleagues want to surpass.
( a ) In improving our Engineering force (Quality, Cost and Delivery)based ( 12 ) Lastly, you are still young and your possibilities are end
on the present functional level, visualization of individual engineer’s less. Let’s find your “Ikigai”. (As for Ikigai, please refer to
capability & ability and establishment of internal education system will MHPS-TS COMMUNIQUE October 2017).
be accomplished.
( b ) Start new business and opportunities, such as service business in MHI
Let’s make “our rookie year of second quarter in a century op-
Asia Pacific area, including expansion of field service engineers in new
eration of MHPS-TS” more powerful and brighter one. I will also
fields. make effort together with you as “One MTS family”.
( c ) Development and strengthening of IT Engineering environment. In the
ideal engineering market, one of our strong points is good & speedy
handling of engineering tool. We would like to continue our process to Thank you.
sharing and visualization of engineering data in the same Engineering
platform.
( d ) Continuous improvement with integration of AAP and ISO9001 QMS
activity into each process. Not only following the rule or guideline, let’s
make use of ISO9001 requirement and AAP. We can definitely save Masahiko Mishiro
more time (speed up), can eliminate some waste process and simplify President of MHPS-TS
our process (quality up). For that, \each person must have cool eyes
which can express “why?” for your process and for your input, and then
let’s speak out your proposal without hesitation.
I would like to give my message in 2019. Though almost all are same as last
year, the following 12 items are important as the fundamental attitude and
thinking way for all employees of MHPS-TS.
Please, keep the following in your mind in the start of New Year.
3 Communique January 2019
02 PRESIDENT’S MESSAGE
Contents 05 EDITORIAL
“Living our 2019 with Good Habits”
06 VOICE FROM ABROAD
Volume V, No. 1
“Trust and confidence Built through the Years”
Mitsubishi Hitachi Power Systems
09 QMS CORNER
Technical Services Corporation
“Continuous Improvement”
11 ICT CORNER
Communique “Social Networking Risks”
13 “MHPS-TS Christmas Party 2018”
16 “Newly Appointed Section Managers and Regular Employees”
17 “2018 Attendance Awardees”
19 GALLERY
23 “Employees Wish for MTS in 2019”
24 “How to move MTS Forward”
Hazel Renegado . Kenneth Johnson Libres . Beatriz M. Pitallano . Jeffrey Jospeh Fernandez . Antero Bagon
“TO WRITE Jonalyn Turla . Jhon Jeric Sevilla . Mike John Merano. Paul Dy . Arnold Zaide . Kim James Austria
means more than putting
PRETTY WORDS
on a page;
THE ACT OF WRITING
Contributors
is to share MASAHIKO MISHIRO MTS President
A PART OF YOUR SOUL
CATYLEEN MANUEL Turbine Department, Machinery Divison
with the World”
ALEXIE FRUVHIK REYES Duct Engineering Section, Boiler Engineering Division
and how they will spend their holidays travelling to these vari- Philippines but still, it is better if we experience dining in au-
ous places. Some may think about the four seasons in Japan thentic Japanese restaurants. For my several stays in Japan, I
really loved their noodles particularly ramen, champon and
which is far different from what we have here in the Philip-
sara udon (crispy fried noodles). These are really good espe-
pines. Others may think about technology as Japan is very
cially during the cold season. I also enjoyed their rice menu
outstanding when it comes to development and innovations.
and bento, as their serving always includes meat and vegeta-
Besides all these things, we should never forget the main pur-
bles for a balance diet.
pose of our travel. That is to do our best in every task where
6 Communique January 2019
Not a good point in staying in Japan is the language barrier. life in Japan. I am also very thankful to my wife and
This is one of my biggest frustrations that although I have been daughter for they are really my inspirations as I perform
in Japan for several times, I was not able to speak and under- the duties assigned to me while temporarily staying away
stand Nihongo. I only understand basic expressions and greetings from them. By having daily conversation with my family
and counting numbers only. But, the most difficult part for me through video call, loneliness and the feeling of home sick
staying in Japan is the feeling of loneliness. This is the first time were reduced.
that I was assigned to work abroad having now my own family
During the golden week, I decided to invite my family to
(wife and daughter). The feeling seems to be so different than
visit me in Japan. This is the best time to have a break
when I am still single. I really missed my family and the times we
from a very tiring work and at the same time give my fami-
spent together especially during special occasions. I feel bad
ly a vacation outside the Philippines. We visited several
every time my wife, daughter or any family member got sick be-
sightseeing destinations in Tokyo and Nagasaki. I was very
cause I was not able to be on their side to take care of them.
happy that at her young age, my daughter appreciated the
Every time I am not in a good condition, I always feel sad be-
places we have been. Although my wife and daughter
cause I don’t want my family to worry so much about me espe-
stayed in Japan only for two weeks, we really enjoyed the
cially that we are far apart. But I am very thankful to God for
moments of being together again and sharing the happiness
continuously giving me strength and guiding me in my everyday
as one family.
not harder--in order to be more efficient and profitable. The Organizations implement continuous improvement in various ways and to
most successful companies are always innovating and develop- various degrees. It takes a large commitment to embed the methodology
ing new ways to deliver top-notch quality to their customers. into the foundation of an organization, but it doesn’t have to be used at
a large scale in order to be beneficial. It can begin on a small scale, with
one team or in one department, and then expand from there into other
What is Continuous improvement? areas of the organization. Everyone can include continuous improvement
in their day-to-day practices or hold “rapid improvement events” once
Continuous improvement is a technique used for improving the every few months to work on specific areas of focus. Regardless of the
efficiency of the process by eliminating waste and non-value degree in which continuous improvement is practiced, the results will show
adding activities. This was practiced through various Japanese up incrementally over time. The key is to start somewhere-- pick an area in
concepts like Lean, Kaizen, 5S, etc. Continuous improvement is a group that needs refinements and see how the methodology works.
an ongoing effort used in developing products, services or pro- Remember, the process is a cycle. If the test fails, repeat the entire process.
cesses If it works, monitor results and start over again with a new plan to promote
additional improvements. The work of continuous improvement is never-
ending.
Customer satisfaction
Decreased cost
Most of us are very much familiar when we hear about Facebook, Twitter, Limit the information you
Viber, Instagram and WeChat. These applications or apps for short, com- put in the social net-
monly called social media or social networking technology is a collection of working sites. Infor-
online platforms and tools that people use to share profiles, opinions, expe- mation susch as
riences, insights, profiles and media itself, facilitating conversations and in- birthdate, middle name,
teractions online between groups of people. birthplace is use to verify
ATM/Credit cards to
Social networking drastically and became the most popular activity in today’
transfer cash or purchase
s Internet World, with billions of people across the world using this media to
online.
meet friends, making new friends, discuss ideas, collect and share infor-
mation sharing or keeping in touch with your old friends. Do not post publicly so
as to seen by other peo-
While being popular, social networking has several disadvantages associated
with it and could cause a serious threat and privacy risks. Most of the social ple in a public your per-
media sites collecting sensitive personal information and maybe posted pub- sonal information like
licly like your name, birthday, your location, address or email address. These your family details, ad-
sites can be used as a trapped by hackers or scammers leading to identity dresses, personal photo-
theft, gaining confidential information of the users and risks like, make fake graphs, etc. You may set
profiles with false information of yours, set malicious applications, generate
media option to choose/
spam (junk emails), and fake links which leads to phishing (a fraudulent at-
deny whom you allow to
tempt to obtain sensitive information such as username, password and any
see your information.
for form of credit details) and other forms of attacks.
It was indeed one of the most remarkable nights of MHPS-TS as of Christmas Party. Employees, External Guest and Japanese Expatri-
ates, all gathered in the festively decorated Isla Ballroom of Shangri-La Hotel at Mandaluyong City four days prior to Christmas of
2018. The gathering didn’t only highlighted MHPS-TS accomplishments throughout the year; it also reminded us that Christmas sea-
son is a celebration of Love, Sharing, Appreciation and Joyfulness. Scan through to reminisce at how we spent this event of gratifi-
cation and full of surprises with lively spirit.
With proper recognition to Christmas Party committee, the night was officially started by a toss initiated by MHPS-TS President, Mr.
Masahiko Mishiro with hopes of more success, having amazing year ahead including good health to everyone.
He Later on presented the Attendance Awards among employees. The Bronze, the Silver and the Gold Attendance Awardees
received certificates and corresponding amount of P10, 000.00, P15, 000.00 and P20, 000.00 respectively.
The attendance Award was topped by Mr. J. Byrone Natividad of I&C / C&E Engineering who spent just a total of 4 Vacation
Leave within the covered year. That leaves us in awe!
Not so long since the party started, attendees filled up their plate with mouth-watering dishes and sweets of their choices. While
the guest band played numerous Christmas songs that entertained everyone to their beat.
One of the most anticipated parts of the gathering was the raffle draw wherein total of 30 raffle prizes was given away. Major 3
prizes were received by the following lucky employees:
Of course, this annual gathering wouldn’t be entertaining as it should be without group presentations, right? With that, few selected
members prepared for their performances in accordance to Philippine Festival theme. It includes: (1) Paru-Paro Festival performed
by Administration/QMS/SES; (2) Maskara Festival performed by LPED/ Digital who took the 1 st Place Award; (3) Kadayawan Festival
shown by Machinery/PPEE; (4) Dinagyang Festival performed by I&C/C&E who took home the 2 nd Place Award and (5) Panagben-
ga Festival performed by Civil/Boiler who received the 3rd Place Award.
The following teams from MBT season 14 were awarded with trophies and cash. Among the 8 played teams LPED MIXED took the 1 st
place; Administration got the 2ndplace while Boiler placed 3rd. It was Mr. Ronald Divina of Layout & Piping Engineering who got the
Finals MVP while King Jimeth Reyes of Administration was chosen as Seasons MVP.
Remember these lines: “We’ve been together through ups and down. I can’t
wait to spend my life with you. Will you spend the rest of your life with me?”
“Will you marry me?” Cyruss Neil Ereso from Administration expressed those
words. We were blown away as much as her girlfriend Joy Angeline Benino
from Administration was. And with that, a surprise wedding proposal was
made before our eyes, in time of celebrating the season of Love.
Lastly, we hope that everyone enjoyed this annual gathering nearly to Christmas day. Take these memories in your heart and mind
to always be grateful to either the simple or grandeur blessings throughout the year that in return we remember to share the good-
ness we received.
Mr. Antonio Pollicar (Division Manager - Digital Engineering) with his newly appointed Section Manager for Project Control, Mr.
Alex Estorninos. Mr. Jaime Felicia (Division Manager - PPEED) along with Ms. Gertrude Jacinto, new Section Manager for Process
Engineering Section. Mr. Leandro Caburian, the new appointed Section Manager for Civil 3D Engineering 2 with Ms. Lily Rose Mar-
molejo (Department Manager of Civil Engineering).
Lastly, Mr. Francisco Cabrera, new Section Manager of Marine Turbo Engineering along with his Managers, Mr. Rene Golveo
(Division Manager of Machinery Engineering and Mr. Ezechiel Arcilla, Department Manager for Equipment Engineering.
Also, we have 2 new regularized employees under Digital Engineering - System Engineering Section: Mr. Miguele Medrano and Mr.
Joseph Sarmiento as an Assistant Programmer. They were both part of Software Engineering Team.
1. Natividad, J.Byrone B.
Engineering 3
Erick Sarabosing Rae Mabel Fernandez Merichar Ivy Zoleta Andrea Camille Oconer
Machinery Engineering Division Machinery Engineering Division Layout and Piping Engineering Division
Moises Tasi
MHPS-TS VISION
January 1, 2015
Phone: 794-0220
Fax: 794-0202
E-mail: www.mts.mhps.com