Project Estimation Tool

Estimation Calculator Number of Days

Planning & BRD 10


INPUT

Wire framing 20
Database Designing & API Structuring 8
Estimated working Days 200

Single Man Development Cat 1 developer


Planning Phase 38
Design Phase 30
OUTPUT

Single Man days development 200


Testing 60
Project Implementation & integration 40
Possible Sprints Required 20
Possible Milestones required 10
Total Man days Required 368
Total Months Required 18.4
mation Tool
Count

# Pages Need UI Design 20


# Pages Need HTML Conversion 20

# of Cat 1 Developers 3 Master Data (dont Edit)


# of Cat 2 Developers 0 Standard Sprint Development time
# of Car 3 Developers 0 Standard Sprint testing Time
# of Testers required 1 Standard Implementation time
Standard days in months
Parallel Development Standard per page design
Planning Phase 38 Standard per page HTML Conversion
Design Phase 30 AVG sprint / milestone
Parallel Development 67
Testing 21 * per day productivity will be 6Hrs for calculation
Project Implementation & integration 14 * 2 popup will consider as 1 page for design
Possible Sprints Required 7 * per day 5 page wireframe can be done
Possible Milestones required 4
Total working Days Required 170
Total Months Required 8.5
Days
10
3
4
20
1
0.5
2

Hrs for calculation


ge for design