You are on page 1of 43

ENGINEERING CONSULTANCY

SERVICES IN MALAYSIA –
CHALLENGES & STRATEGIES
By : Ir. Dr. Gue See Sew
Date: 6 July 2011

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

CONTENTS
A. CHALLENGES
• Engineering Consultancy Firms
™ Stagnant / Decline in size
• Brain Drain / Talent Lost
• Quality of Graduates
• Lack of Support Staff

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
CONTENTS
B. STRATEGIES
• Grooming of Engineering Consultancy Firms
• Talentcorp Malaysia
• Overhaul of Higher Education
• Harmonisation of Human Resource and
Education

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

The Story
• Capacity of large Engineering Consultancy
Firms (ECF) in Malaysia has been stagnant
for the last 25 years

• One of the main issues is


SUSTAINABILITY frequently
affected by retirement or
decease of Directors

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
Large ACEM Panel Firms
No. Name of Firm Total No. of Staff
1990 2000 2010

1 Sepakat Setia Perunding (M) Sdn Bhd 400 373 503

2 Minconsult Sdn Bhd 509 473 450

3 Ranhill Bersekutu Sdn Bhd 290 450 450

4 HSS Integrated Sdn Bhd - 330 370

5 SMHB Sdn Bhd - 304 300

6 G&P Professionals Sdn Bhd - 20 220

7 Kumarasivan Tan & Ariffin Sdn Bhd 193 341 205

8 Jurutera Konsultant (SEA) Sdn Bhd 262 - -

NOTE: Some disappeared from ACEM Directory

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

Top Engineering Consultancy Firm


in Netherlands

Population of Netherlands: 16.7 Million


Arcadis: 16,000 staff
World Rank: Top 10

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
Reasons
1. Mismatch

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

Reasons
2. Brain Drain

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
Reasons
3. Cyclical Market

2008

1998
1986

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

Lessons
learned

Knowledge
Experience

Don’t you want to retain these ?


G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)
Do’s & Don’ts
Planning
Checklists
Quality
Engineering
Architecture
Methods of
…………
………
control
designs
constructions
………
…….……
……………
…….……
……………
…………..
………..
…………….
…………….
…………..

and many more………..


G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)

Challenging Issues On The Quality


Of Graduates

• Attitude

• Command of English

• Adequacy of Fundamentals

• Creativity/Innovations

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
“…it is
disappointed
about the quality
of Malaysian
engineers.”

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

Challenging Issues On The Quality


Of Graduates

• Poor command of English and


communication skills

REASONS:
• Old Policies on Education
• Teachers & Lecturers
• Usage

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
Challenging Issues On The Quality
Of Graduates
• Lack fundamental knowledge

REASONS:
• Too much political influence
• Compromise on recruitment
– Lecturers lack passion
– Support staff
• Lenient in setting exams and giving grades
• Accept students below par

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

Challenging Issues On Technical


Support Staff

• Technologists/TAs

• Technicians

• Draftpersons

SERIOUS SHORTAGE!

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
STRATEGIES

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

Do you want to groom Malaysian


Engineering Consultancy Firms to
deliver Quality Service and to double
their capacity or size in 3-5 years
without extra budget to the
Government?

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
Potential Growth of ECF

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

How to do it?
• Government or government-linked
companies to align the projects to
SUSTAINABLE firms with capability and
capacity

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
Construction Sector Outlook
• CIDB expects RM70b of construction &
infrastructure projects to be
implemented in 2011 with 3.7% annual
growth until 2015

Source:
YB Dato’ Shaziman Abu Mansor, Minister of Works
Malaysia, The Construction Sector at the Onset of
the 10th Malaysia Plan, The 7th Malaysia
Construction Sector Review and Outlook Seminar, 3
Aug 2010
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)

What defines a SUSTAINABLE firm?


1. Ownership structure that encourage
sharing or grooming of engineers to be
partners

2. Proper QA/QC system e.g. ISO9001

3. Comprehensive Training and Knowledge


Management system

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
What about those smaller
companies?
• Solution – to merge

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

G&P PROFESSIONALS
(Consulting Group)

PROJECT MECHANICAL
GEOTECHNICS STRUCTURES MANAGEMENT & ELECTRICAL INFRA WATER

CLAIMS &
MARITIME CONTRACTS ZED - G&P
NGI - G&P HIGHWAYS &
TRANSPORTATION
DAMS &
WATER

R&D WATER G&P R INT. G&P-AA


SARAWAK SABAH (SINGAPORE) (CAMBODIA) (Hanoi, Vietnam)

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
Macro Implementation Plan

1. Enlist of service
providers
2. Grooming
3. Export of Services

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

Enlisting of ECF with capacity points

Company Level
• SUSTAINABILITY elements

Individual Level
• Capacity and capability of professional staffs
in different fields of engineering such as
Highway & Transportation, Geotechnical,
Drainage, etc.
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)
Company Level Points

3 main SUSTAINABILITY elements are:

• Ownership (60 points)


• QA/QC System (15 points)
• Training & Knowledge Management (25
points)

Recommended minimum of 60 points


G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)

Ownership Structure
Percentage of Profit Share by Points
total professional staff

<10% 0
10% to <15% 10
15% to <20% 20
20% to <25% 30
25% to <30% 40
30% to <35% 50
>35% 60
Note : Staff strength must be > 20 people.
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)
QA/QC System
Description Points

ECF without ISO9001:2000 up to 10


Certification

ECF that maintain certification of 15


ISO9001:2000

Note : For companies without ISO9001, the points


are to be based on the quality of the existing system.
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)

Training Programme
Number of Technical Training Events Points
Per Year
<12 0
12 to 24 10
25 to 36 15
37 to 48 20
>49 25
Note: Technical Training includes in-house or
external engineering talks, presentation, colloquium,
conference, seminar on engineering aspects of works
(including KM)
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)
Individual Level Points

3 main components are:

• Experience of Professional Staff


• Professional Qualification
• Additional Professional Recognition

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

Experience of Professional Staff

Points (N) 1 point for every full year of relevant


work experience up to a maximum of
15 points

Note: The total professional staff shall include all


engineering graduates as well as graduates in
related specialist skills area such as geologist and
hydrologist.
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)
Professional Qualification
Basic Professional Multiplying Factor
Recognition (M)
Engineer without P. Eng. and 1.0
other professional staff
Engineer with P. Eng (with 2.0
“Ir.”)
Note: Professional staff who are non-engineers but
hold a degree in the relevant fields such as geologist,
hydrologist, environmental scientist may be
considered.
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)

Additional Professional Recognition


Additional Professional Recognition & Value Added (V)
Bumiputra Participation to Multiplying
Factor
BEM Accredited Checkers 0.2
Professionally registered with regional or 0.1 each up to a
international engineering organisations maximum of 0.2
Peer Recognition eg presentation, lecture or
technical papers
xIf nos. >5 but ื 10 0.1
xIf nos. >10 but ื 15 0.2
xIf nos. >15 0.3
Bumiputra staff 0.1
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)
Grooming of Sustainable ECF
To groom a firm with 500 to 1,000 staff

• Cost for extra 500 persons per year


= 500 x 6,000 x 12 x1.1 = RM40m

• This is < 3.5% of


yearly allocation
based on 3% fees on
$40b of projects
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)

Matching
• Capability
– Experience
– Field of specialisation

• Capacity
– Number of key staff required

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
How Sustainability Points System
Work?
• Company size to have at least 1.5x number
of staff required

Total Sustainability Points


= Company Points x  Individual Points
100

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

Example of Project
Project Jabatan Kerja Raya, Cawangan Jalan
Proponent
Project Brief Construct a 10-km two-lane dual carriageway through hilly terrain

Project Stage Detailed Design


1 no. Project Director with minimum 10 years of experience in
Road Construction
Team of Designers (each consists of 1 Senior Engineer with at least
Estimated Man- 5 years experience and 2 Engineers ):
power Required
x2 teams of Road Works and Drainage Designer (6 nos.)
from Designer
x2 teams of Geotechnical Designer (6 nos.) Company to
have at least 24
x1 team of Bridge Designer (3 nos.) staff for capacity
Hence total number of professional staff required is = 16 nos.
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)
Companies bidding for project
Company A
• large multi-disciplinary design consultant with 100 professional staff
• Profit shared by 15% to <20% of total professional staff strength
• ISO 9001 certified
• Company arranged more than 49 events of technical training a year

Company B
• medium-sized specialist firm dealing with road works with 30 professional
staff
• Profit shared by 25% to <30% of total professional staff strength
• ISO 9001 certified
• Company arranged 25 to 36 events of technical training a year

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

Companies bidding for project


Company C
• large multi-disciplinary design consultant with 100 professional staff
• Profit shared by <10% of total professional staff strength
• ISO 9001 certified
• Company arranged more than 49 events of technical training a year

Company D
• small to medium-sized specialist firm dealing with road works with
20 professional staff Company not qualified as its capacity is < 24 staff
• Profit shared by 30% to <35% of total professional staff strength
• ISO 9001 certified
• Company arranged 12 to 24 events of technical training a year

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
Company Level Assessment
Criteria Company Points Allocated
Company A Company B Company C

Sustainable 20 40 0
Ownership
Programme
QA/QC System 15 15 15
Training and 25 15 25
Company to have at
Knowledge least 60 Company
Management Level Points

Total 60 70 40
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)

Individual Level Assessment


Staff Detail Individual Points Allocated
Years of Multiplying Value added to Multiplying Factor, V M+V Sub-
Experience Factor, M Accredited Recog- Papers Bumiputra total
Checker nition

Project 15 2 - 0.1 0.1 0.1 2.3 34.5


Director

Road Works
1
13 2 - 0.2 0.2 0.1 2.5 32.5
Senior
6 2 - - 0.1 - 2.1 12.6
Engineer
Engineer 1 1 - - - - 1.0 1.0

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
Total Sustainability Points
Criteria Company Points Allocated
Company A Company B
Company Level Points 60 70

Individual Level Points 271.5 254

Final Sustainability Points 60 x 271.5 = 162.9 70 x 254 = 177.8


100 100
Company B will
be awarded the
contract
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)

Key Benefits
• Building up expertise, capabilities and quality
of local Engineering Consultancy Firms

• Improve earning potential through increased


capacity, productivity and export of services

• Better positioned to navigate through regional


economic cycles
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)
• It is possible to groom Malaysian ECF to
deliver quality service and to double their
capacity in 3-5 years

• This can be done without extra budget to the


Government by aligning <3.5% of yearly
allocation

• Grooming of SUSTAINABLE firms can bring


great benefits to the country
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)

Brain Drain vs. Brain Gain

• Pluge Brain Drain

• Brain Gain : Talentcorp Malaysia

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
Success Attributes On Brain Gain
• Improve Working Environment
– Chief/Leadership
• Remuneration Package
– Part 1 – Basic – Similar to IEM’s Survey
– Park 2 – 45% Net Profit e.g. G&P
• Reward the Chief and Team

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

G&P Professionals
G&P Professionals Sdn BhdSdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)
G&P Professionals
G&P Professionals Sdn BhdSdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)

PART 2
e.g. In G&P Geotechnics Sdn Bhd

• 45% of net profit for directors/partners

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
Strategies
Improve English and communication skills
• Teachers
– recruit good retired teachers (template)
• Lecturers
– Improve recruitment strategies
– Structured training to existing lecturers
– Improved usage
• Drama, debating clubs, toastmaster club
– Raise the entry bar

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

Strategies
Improve Fundamentals
• Recruit lecturers with passion
– Template
– Recruit practitioners as lecturers
• Raise entry qualifications
– Increase Diploma/certificate courses
• Review LAN subjects
• Develop lecture modules
– IEM input

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
UNDERGRADUATE
TRAINING

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

UNDERGRADUATE TRAINING

Review and update the undergraduate


syllabus to meet industry needs
Assisted by active & experienced
practitioners
Pooling resources from universities &
practitioners

Knowledge sharing between lecturers and


practitioners through workshops and forums
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)
UNDERGRADUATE EDUCATION

Structured
Strengthen Modules/Lectures
Fundamentals (Uni/IEM/ACEM)

Improvement to
Undergraduate
Education

Lecturers
P.Eng With
Practice Exposure

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

Strategies

Creative / Innovation

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
CURRENT STATUS OF R&D
• Malaysia lagging far behind countries
such as US, Japan, China, India,
Singapore and Brazil.

3.6 times>M’sia
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my) (After MASTIC, 2006)

CURRENT STATUS OF R&D


• GERD/GDP Ratio

1996 2004 2010


0.22% 0.63% 0.7%
???

Behind the country’s target of 1.5% by 2010

More needs to be DONE!!!


G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)
BENEFITS OF R&D
• Reduction in delivery time &
construction costs Ÿ Increased
Profit
• Increased competitiveness without
compromising HSE
• Improve safety
• Better quality of life

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
Courtesy of Judin Abdul Karim (2006)
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)

• American Inventor
OCCUPIED

American Inventor
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)
Challenge The Norm Thru
Innovation To Excel
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)

THE WAY FORWARD

Roles of Stakeholders

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
R&D RELEVANT TO INDUSTRY NEEDS
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)

Current Issues
• No significant licensing revenues for the
universities (after Hii HH, 2003)

• No R&D output from universities has been


commercialized yet on a national scale (after Hii HH,
2003)

Example of Successful R&D:


™University of Strathclyde, UK - £42 million in
royalty income (www.strath.ac.uk/research)
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)
PUBLIC-PRIVATE SECTOR LINKAGES
• Private companies should form strategic
alliances with research institutions

• Research institutions should actively seek


partners from the industry

• Strong relationship between universities and


industry – alumni, adjunct professors from
industry

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

CULTURE OF EXCELLENCE
• System for sharing of information

• Environment which encourages


creativity and innovation

• Allocation of time for R&D

• R&D incentives and reward


scheme
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)
R&D BY CONSULTANT

Case History

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

R&D CULTURE
• R&D Wish List / Suggestion Box

• Policy of minimum 1 hour/day for R&D

• Internal colloquium

• Yearly R&D Achievement Award

• R&D Committee to monitor wish list and output

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
R&D Wish List
Research & Development (R&D)
Subsurface Investigation

Wish-lists / Issues R&D Topics


1.Could percussion method of advancing casing be used for 1.The effect of percussion method of advancing boreholes the
normal SI for SPT test and collect undisturbed samples for results of SI?
consolidation and triaxial tests?
1.Is foam drilling a must for failure investigation on landslide 2. The effects of foam or new stabilising method for drilling.
sites?
1.What is the correlation between Su and results of Jabatan 3. Correlation between Su and results of Jabatan Kerja Raya
Kerja Raya (JKR) probe for marine deposits of different (JKR) probe for marine deposits of different composition.
composition?
1.Do we have DOs and DON’Ts on subsurface investigation (SI) 4. DOs and DON’Ts and Checklists on SI
- Borehole - Borehole
- Piezocone - Piezocone
- Consolidation test - Consolidation test
- CIU test - CIU test
1.What are the new developments on SI? 5. Review on the development of SI.
1.Does Malaysia have calcareous sand? 6. Properties of calcareous sand in Malaysia.
1.How to de-air porous stone for piezocone and maintain the 1.Method to ensure full saturation of porous stone for piezocone.
saturation of porous stone for piezocone?

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
2500 Ton Silo
on Very Soft Marine Deposits

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

OUTCOME
• Development of Software

• Original PIGLET software


– Limited pile numbers and pile of
equal length

• Development of PIGEON software


– Unlimited pile numbers and pile of
unequal length

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
KNOWLEDGE MANAGEMENT SYSTEM

• Transfer of knowledge
Shareholders
Structured Training
Leadership / Commitment Value to
Shareholders
Directors
Partners R&D
Value to
Industry

On the job training Sharing of


Engineers knowledge through
Coaching
Geologists colloquium Industry
Spreadsheet,
Support Staff software, operating
procedures, etc.

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
STRUCTURED
TRAINING FOR
PRACTITIONERS

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

STRUCTURED TRAINING FOR


PRACTITIONERS

Adopt Continuing Professional Development


(CPD) Scheme (by BEM)
Collaborate with IEM, technical agencies,
academia, local governments, private industry,
NGOs, etc
Implement certification and accreditation
system to update competency of stakeholders

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
STRUCTURED TRAINING FOR
PRACTITIONERS
Review Training Direction
Approval of Knowledge
Training Implementation Transfer
Target Certification &
Projects by Stakeholders (Internal &
Steering External) Accreditation To Local Policy
Committee Authority Implementation
CKC/SEA
Local To
Training Policy
Authority KPIs Government
Topic Implementation
Agencies
Government Workshops
Agencies Interviews To Consultants
Available
/ Specialist Improve
Expertise Universities / Contractor Practice
Institutions Drills
Conferences
Available Consultants To Universities Capacity
/ Specialist Exam Building
Facilities / Institutions
Contractors
Courses
To Property Public
Budget Property Owner Awareness
Owner
Panel Insurance Seminars To Insurance Improve
Reviewer Institution Institution Confidence

Emergency Service Improve


To Emergency
Agency Rescue
Service Agency
Operation
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)

MAJOR OVERHAUL IS NEEDED


ON HIGHER EDUCATION

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
Harmonisation Of HR/Education

• HR Need
– Study of need of Technologists, TAs and
Technicians
– Direct 30% STPM/SPM students to Diploma and
Certificate Courses

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)

G&P Professionals Sdn Bhd (www.gnpgroup.com.my)


www.gnpgroup.com.my)
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
www.gnpgroup.com.my)

You might also like