You are on page 1of 35

CHRISTIAN MEL DV.

DUEÑAS
Project Description
FLOOR PLANS
GROUND FLOOR SLAB AREA/VOLUME

50m2
18m2

68m2 8.5m3
SECOND FLOOR SLAB AREA/VOLUME
SECOND FLOOR SLAB AREA/VOLUME
SECOND FLOOR SLAB AREA/VOLUME

46.25m2

4.625m3
GROUND FLOOR CEILING AREA
SECOND FLOOR CEILING AREA
ELEVATION
DOOR AND WINDOW SCHEDULE

2.52m2

1.68m2

1.5m2

1.2m2

3m2

0.16m2
WALL LENGTH - GROUND FLOOR

34m

11.4m

8.6m

39.1m
WALL LENGTH - SECOND FLOOR

34m

14.5m

10m

10m
WALL LENGTH - SECOND FLOOR

16.5m

29m
SUMMARY OF QUANTITIES
SUMMARY OF QUANTITIES
COST PER LABOR

₱ ₱ ₱
CONCRETE SLAB COST - GROUND FLOOR

₱ 38,250.00
CONCRETE SLAB COST - SECOND FLOOR

₱ 20,812.50
WALL PAINT COST - GROUND FLOOR

₱ 14,938.80
WALL PAINT COST - SECOND FLOOR

₱ 18,854.40
FLOOR FINISH COST - GROUND FLOOR

₱ 61,200.00
FLOOR FINISH COST - SECOND FLOOR

₱ 41,625.00
SUMMARY OF COSTS

₱ ₱

₱ ₱