DUEÑAS
Project Description
FLOOR PLANS
GROUND FLOOR SLAB AREA/VOLUME
50m2
18m2
68m2 8.5m3
SECOND FLOOR SLAB AREA/VOLUME
SECOND FLOOR SLAB AREA/VOLUME
SECOND FLOOR SLAB AREA/VOLUME
46.25m2
4.625m3
GROUND FLOOR CEILING AREA
SECOND FLOOR CEILING AREA
ELEVATION
DOOR AND WINDOW SCHEDULE
2.52m2
1.68m2
1.5m2
1.2m2
3m2
0.16m2
WALL LENGTH - GROUND FLOOR
34m
11.4m
8.6m
39.1m
WALL LENGTH - SECOND FLOOR
34m
14.5m
10m
10m
WALL LENGTH - SECOND FLOOR
16.5m
29m
SUMMARY OF QUANTITIES
SUMMARY OF QUANTITIES
COST PER LABOR
₱ ₱ ₱
CONCRETE SLAB COST - GROUND FLOOR
₱ 38,250.00
CONCRETE SLAB COST - SECOND FLOOR
₱ 20,812.50
WALL PAINT COST - GROUND FLOOR
₱ 14,938.80
WALL PAINT COST - SECOND FLOOR
₱ 18,854.40
FLOOR FINISH COST - GROUND FLOOR
₱ 61,200.00
FLOOR FINISH COST - SECOND FLOOR
₱ 41,625.00
SUMMARY OF COSTS
₱ ₱
₱ ₱
₱