You are on page 1of 3

DAILY PRODUCTION REPORT

Monday, June 08, 2020 PT. GUNUNG SAMUDERA INTERNATIONAL

Avail. Contract
Operating Time (OT) Operating Delays (OD)
Maintenance Delays (MD)
Calendar Nordgold Mech. Avail. Phys. Avail. Util. of Avail.
Equip. ID
Break Down Planned Other Down Production Work Delay Production Standby Time (CT) Delays (%) (%) (%)
(BDN) (PLM) (ODN) Time (PT) (WD) Delay (PD) (STB)

DT 060 - - - 10.0 - 14.0 - 24 - 100% 100% 42% 85%


DT 062 - - - 3.0 - 21.0 - 24 - 100% 100% 13% 85%
DT 063 - - - 9.5 - 14.5 - 24 - 100% 100% 40% 85%
DT 064 - - - 24.0 - 24 - 100% 100% 0% 85%
DT 065 - - - 1.0 - 23.0 - 24 - 100% 100% 4% 85%
DT 066 - - - 8.0 - 16.0 - 24 - 100% 100% 33% 85%
DT 067 - - - - - 24.0 - 24 - 100% 100% 0% 85%
DT 068 - - - - - 24.0 - 24 - 100% 100% 0% 85%
DT 069 - - - 2.0 - 22.0 - 24 - 100% 100% 8% 85%
DT 070 - - - 12.0 - 12.0 - 24 - 100% 100% 50% 85%
DT 071 - - - 14.5 - 9.5 - 24 - 100% 100% 60% 85%
DT 072 - - - 10.5 - 13.5 - 24 - 100% 100% 44% 85%
- - - 70.5 - 217.5 - 288.0 - 100% 100% 24% 85%
EX.302 - - - 6.0 - 18.0 - 24 - 100% 100% 25% 85%
EX 308 - - - - - 24.0 - 24 - 100% 100% 0% 85%
EX 201 - - - 6.1 - 17.9 - 24 - 100% 100% 25% 85%
EX.206 - - - - - 24.0 - 24 - 0% 100% 0% 85%
EX.211 - - - 14.2 - 9.8 - 24 - 100% 100% 59% 85%
EX 219 - - - 8.0 - 16.0 - 24 - 100% 100% 33% 85%
EX 231 - - - 17.0 - 7.0 - 24 - 100% 100% 71% 85%
EX 213 - - - 6.0 - 18.0 - 24 - 100% 100% 25% 85%
EX 214 - - - 9.0 - 15.0 - 24 - 100% 100% 38% 85%
EXCA - - - 60.3 - 18.0 - 192 - 41% 41% 77% 85%
BD 603 - - - 5.5 - 18.5 - 24 - 100% 100% 23% 85%
BD 604 - - - 13.9 - 10.1 - 24 100% 100% 58% 85%
DOZER - - - 5.5 - 18.0 - 24 - 98% 98% 23% 85%
VB 102 - - - - - 24.0 - 24 - 100% 100% 0% 85%
VIBRO - - - - - 18.0 - 24 - 75% 75% 0% 85%
Today - Maintenance
Equip. ID Current
Planned/ Breakdowns
Status
DT 060 2
Trucks Availability
DT 062 2
DT 063 2
DT 064 2

100%

100%

100%
100%

100%

100%

100%
100%

100%

100%

100%
100%

100%

100%
85% DT 065 2
DT 066 2
DT 067 2
6 DT 067 DT 068 DT 069 DT 070 DT 071 DT 072 DT 068 2
DT 069 2
DT 070 2
%) Phys. Avail. (%) Avail. Contract DT 071 2
DT 072 2
tors Availability 0 6/8
EX 308 2
EX 201 2
EX.206 2
EX.211 2
100% 100% 100% 100% 100% 100% 100% 100% EX 219 1
EX 231 1
41% 41%
EX 213 1
EX 219 EX 231 EX 213 EX 214 EXCA EX 214 1
EXCA 7/7
Phys. Avail. (%) Avail. Contract BD 603 1
BD 604 1
DOZER 1/1
VB 102 1
VIBRO 1/1

98% 98%

DOZER

ntract

You might also like