You are on page 1of 473

Federal Emergency Management Agency FEMA 24 1 September 1991

Emergency Management Agency FEMA2241 September 1991


Federal

Seismic Vulnerabilityand
Impact of Disruption of
Lifelines in the
Conterminous United States

Issued in Furtherance of the Decade


for Natural Disaster Reduction

EarthquakeHazard Reduction Series 58


ATC-25
Seismic Vulnerabilityand Impact of
Disruption of Lifelines in the
Conterminous United States

by
APPLIED TECHNOLOGY COUNCIL
555 Twin Dolphin Drive, Suite 270
Redwood City, California 94065

Funded by the Federal Emergency Management Agency


Washington, D.C.

Prepared for ATC by


EQE, INC.
Charles Scawthorn, Principal-In-Charge
Mahmoud Khater, Principal Research Engineer
San Francisco, California

Principal Investigator
Christopher Rojahn

Expert Technical Advisory Group


Lloyd Cluff Le Val Lund
James D. Cooper Peter McDonough
Holly Cornell Dennis K. Ostrom
John W. Foss Gerard Pardoen*
James H. Gates Michael Reichle
Neal Hardman Anshel J. Schiff
Jeremy Isenberg J. Carl Stepp
Anne S. Kiremidjian Domenic Zigant

*ATC Board Representative


Preface

In September 1988 Applied Technology Council assessment of other lifeline systems are also
(ATC), was awarded a contract by the Federal planned.
Emergency Management Agency to assess the
seismic vulnerability and impact of disruption of EQE Inc., a structural and earthquake
lifeline systemsnationwide. The purpose of the engineering firm with experience in the seismic
project is to develop a better understanding of evaluation of lifeline systems, served as the
the impact of disruption of lifelines from project subcontractor and prepared this report.
earthquakes and to assist in the identification The research and engineering work was
and prioritization of hazard mitigation measures performed by Charles Scawthorn, Principal-in-
and policies. In addition, FEMA plans to utilize Charge, Mahmoud Khater, Principal Research
results from the project to promote national Engineer, and other EQE staff. Marvin
awarenessof the importance of protecting Feldman of Resource Decisions served as
lifeline systems from earthquakes, and assuring consultant on the indirect economic loss
reliability and continued serviceability of methodology and data.
lifelines.
The ATC-25 Expert Technical Advisory Group
The project is being conducted in several (ETAG), comprised primarily of individuals
phases. Phase I, reported on herein, provides a drawn from the technical committees of the
national overview of lifeline seismic American Society of Civil Engineers (ASCE)
vulnerability and impact of disruption. Lifelines Technical Council for Lifeline Earthquake
considered include electric systems, water Engineering (TCLEE), provided overall review
systems, transportation systems, gas and liquid and guidance for the project. Members were:
fuel supply systems, and emergency service Lloyd Cluff, James D. Cooper, Holly Cornell,
facilities. The vulnerability estimates and John W. Foss, James H. Gates, Neal Hardman,
impacts developed are presented in terms of Jeremy Isenberg, Anne S. Kiremidjian, Le Val
estimated direct damage losses and indirect Lund, Peter McDonough, Dennis K Ostrom,
economic losses. These losses are considered to Gerard Pardoen (ATC Board Representative),
representa first approximationbecause of the Michael Reichle, Anshel J. Schiff, J. Carl Stepp,
assumptions and methodology utilized, because and Domenic Zigant. The affiliations and
several lifelines are not included, and because, addresses of these individuals are provided in
in some case, the available lifeline inventory Appendix A.
data lack critical capacity information.
Applied Technology Council gratefully
Phase II, reported on in the ATC-25-1 Report, acknowledges the valuable assistance, support
provides a practical model methodology for the and cooperation provided by Kenneth Sullivan,
detailed assessment of seismic vulnerability and FEMA Project Officer, and Arthur J. Zeizel and
impact of disruption of water transmission and Kupussammy Thirumalai, prior Project Officers.
distribution systems. Subsequent phases to
develop model methodologies for the seismic Christopher Rojahn
Executive Director

Preface
ATC-25
ATC-25 Preface i
Preface;. , v
Executive Summary. ............

1. Introduction
1.1 Background and Purpose ....
Table of Contents

..................................................... .... ............................................

1
Number
Page

xiii

..... 1

1.2 Importance of the Lifeline Earthquake .Risk ............................. ..................................... 1


1.3 Project Approach .......... 3
1.4 Limitations and Constraints. .................. 3
1.5 Organization of the Report..................... . , 3
2. National Lifeline Inventory .................... 7
2.1 Introduction ........... 7
2.2 National Lifeline Inventory Data--Overview ............... , , ..f 7..............
2.3 Transportation Data .............. ,, 8
2.4 Energy and Fuel Data ............. . , 9
2.5 Emergency Service Facility Data ........................ ,...,....9
2.6 Water Supply Data ....................... 22
2.7 PC-Compatible Electronic Database ....................... 22
3. Development
ofLifelineVulnerabilityFunctions............ ............. ...... e. .25....
3.1 Introduction ....... -.. 25
3.2 General Approach for Characterizing Earthquake Performance . . .25
3.3 Method for Obtaining Lifeline Direct Damage and Residual Capacity Functions
26
3.4 Example Direct Damage and Residual Capacity Computations . .30
3.5 Sample Lifeline Vulnerability Function ............ 31
3...........1........
3.5.1 Ports/Cargo Handling Equipment ............... , 31
4. Seismic Hazard ......... . -. ., , ,.,,...,... 35
4.1 Introduction.................. ................................................. I...............................35
4.2 Magnitude and Intensity.. 35
4.3 Earthquake Hazards ............ .... 35
4.4 Seisniicity...........................37
4.5 Regional Representative Earthquakes ............ 54..............
54
4.6 Estimation of Seismic Intensities and Choice of Scenario Earthquakes for this
Project .. ... . , 54
5. Estimates of Direct Damage .................. . . .67
5.1 Introduction
. <.................... 1.... ... ... . ....... I......I. 67
5.2 General Analytical Approach for Estimating Direct Damage .... 67
5.3 Direct Damage Estimates for Site-Specific Lifelines ......................... ... 69
5.3.1 Airports.......................-.......................................69
5.3.2 Ports and Harbors ...................... ,.,, , .. 69
5.33 Medical Care Facilities ....................... ,.., , 69
5.3.4 Police and Fire Stations ....................... .,,, . .,. . 74
5.3.5 Broadcast Stations ......................................... ... 74
5.4 Direct Damage Estimates for Extended Lifeline Networks . .74
5.4.1 Railroad System ........... 78
5.4.2 Highway System .......... .. 78
5.4.3 Electric System ........... . . .. ,87
5.4.4 Water System .. .87
5.4.5 Crude Oil System .97

ATC-25 Table cl Contents Iil


5.4.6 Refined Oil System ................................ 97
5.4.7 Natural Gas System 97
5.5 Dollar Loss Resulting from Direct Damage.....................................................97...................7
5.6 Comparison with Previous Studies ...................................................... 120
6. Estimates of Indirect Economic Losses ....................................................... 125
6.1 Introduction ........................... ..... 125
6.2 General Analytical Approach for Estimating Lifeline Interruption ... 125
6.3 Residual Capacity Analysis of Site-Specific Systems . . . 126
6.3.1 Airports .................. ,....... 126
6.3.2 Ports ... . . . . .. 128
6.3.3 Medical Care Centers . . ... . 128
6.3.4 Fire Stations ......... ......... 128
128.........,,
6.3.5 Police Stations . 128
6.3.6 Broadcast Stations .12..........8
6.4 Residual Capacity Analysis of Extended Regional Networks . . .128
6.4.1 Railroad System .136
6.4.2 Highway System .136
6.4.3 Electric System ............ 136
6.4.4 Water System.136
6.4.5 Crude Oil System..136
6.4.6 Refined Oil System ............ 139
6.4.7 Natural Gas System ............. . , 139
,,,
6.4.8 Distribution Systems............. , 139
6.5- General Analytical Approach for Estimating Indirect Economic Losses....................... 141
6.5.1 General Assumptions ............................... ........ ,., ... 141
6.5.2 Data Sources and Methodology ................................... , 142
,
6.6 Indirect Economic Loss Estimates . . .148
7. Combined Economic Losses, Deaths, and Injuries . . .171
7.1 Introduction ...................... 171
7.2 Human Death and Injury ...................... 171
7.21 Casualties Due to Lifeline Functional Curtailment .171
7.2.2 Casualties Resulting From Lifeline Direct Damage .............................................172
7.3 Combined Direct and Indirect Economic Losses .............. i........................ 172
8. Hazard Mitigation Measures and Benefits...........5...................................... 175
8.1 Introduction......................................................1........................................................................ 175
8.2 Identification of Critical Lifelines .175
8.3 Measures for Reducing Vulnerability of Lifeline Systems.175
8.4 Estimated Overall Benefits of Implementing Hazard Reduction Measures .176
9. Recommendations for Further Work . . .183
9.1 Introduction.183
9.2 Lifeline Inventory .183
9.3 Lifeline Component Vulnerability .183
9.4 Seismic Hazard Data .183
9.5 Economic Analysis and Impacts Data and Methodology .183
10. References 185
Appendix A: ATC-25 Project Participants.....................................................................................................193
Appendix B: Lifeline Vulnerability Functions .. 195
Appendix C: Residual Capacity Plots for Each Lifeline and Scenario Earthuake .305
Appendix D: Economic Analysis Data ........................... 407
Appendix E: Applied Technology Council Projects and Report Information .433

iv Table of Contents ATC-25


List of Figures
Pimrp Mirmhr TWtlO I
nfl',,,

Figure 1-1 Flow chart showing main steps in project approach .................................. 4

Figure 2-1 State and Federal H1ighways ..... 10


State
andFederal
Hihway Bridges......................................................................
..............
Figure 2-2 Stateand!FederalHighwayB3ridges
.............. 1
Figure 2-3 Railroad system . ................................................ ..............................................
......................... 12

Figure 2-4
Portsand
rbor
h.............................................
Airports ............................
1 .... 13

....
Figure 2-5 Ports and harbors . . . . . .._14

Figure 2-6 Electric transmission system ..... 15


Crmde
pipelines....................................................................................................1
oil
Figure 2-7 Crude oil pipelines..... 16

Figure 2-8 Refined oil pipelines . ..... . 17

Figure 2-9 Natural gas pipelines ................. 18

Figure2-0 Refineries ............................ 19

Figure 2-11 EniergencyEmergency


broadcast stations
broadcast ..................................................................................................
stationls.0... 20~~~~~~~~
Medica
carecente s...............................................................................................................
2
Figure 2-12 M~edical care centers ...... 21

Figure 2-13 Water aqueducts and supplies .23


Seismic M ap Areas~ ~~~~~~~~~~~..................................................................................
NEIIRP
Figure 3-1 NEHRP Seismic Map Areas .... 27

Figure 3-2 Comparison of ATC-13 Appendix C data versus regression curve ....................................29

Figure 3-3 Comparison of ATC-13 Table 9.1 data versus regression curve .........................................29

Figure 3-4 Damage percent by intensity for ports/cargo handling equipment .....................................33

Figure 3-5 Residual capacity for ports/cargo handling equipment (NEHRP map area) ....................34

Figure 3-6 Residual capacity for ports/cargo handling equipment (all other areas) ......... ..................
34

Figure 4-1 Earthquakes with maximum Modified Mercalli Intensities of V or abolve


in the United States and Puerto Rico through 1989 ..... .38

Figure 4-2 Regional scheme used for the discussion of the seismicity of the
conterminousUnited States ..... 39
Figure 4-3 Seismicityof the northeastern region of the United States and Eastern
Canada for the period 1534-1959. . .................................................... 40

AT-5TbeofCnet
ATC-25 Table of Contents V
Figure 4-4 Seismicity of the Southeastern region, 1754-1970 ........................................................... 42

Figure 4-5 Effects in the epicentral area of the 1886 Charleston, South Carolina, earthquake ........43

Figure 4-6 Isoseismal map of the 1886 Charleston, South Carolina, earthquake ..................................44

Figure 4-7 Seismicity of the Central Region, 1811-1976........................................................... 45

Figure 4-8 Isoseismal map of the December 16, 1811, earthquake ......... ................................. 46

Figure 4-9 Seismicity of the Western Mountain Region .......................................... 47

Figure 4-10 Seismicity of Oregon and Washington, 1859-1975 ........................................ 49

Figure 4-11 Seismicity of Western Nevada and California, 1811-1976. . 51


.........................................

Figure 4-12 Faults with historic displacements in California and Nevada . 52


................................

Figure 4-13 Isoseismal map for the January 9, 1857, earthquake on the San
Andreas Fault near Fort Tejon ................................................ 53

Figure 4-14 Map of conterminous United States showing ground condition units ................................56

Figure 4-15 Predicted intensity map for Cape Ann (Magnitude 7)................................................ 58

Figure 4-16 Predicted intensity map for Charleston (Magnitude 7.5) ................................................ 59

Figure 4-17 Predicted intensity map for New Madrid (Magnitude 8)........................ ........................60

Figure 4-18 Predicted intensity map for New Madrid (Magnitude 7)................................................ 61

Figure 4-19 Predicted intensity map for Wasatch Front (Magnitude 7.5)...............................................62

Figure 4-20 ;.63


Predicted intensity map for Puget Sound (Magnitude 7.5).................................................

Figure 4-21 Predicted intensity map for Fort Tejon (Magnitude 8)................................................ 64

Figure 4-22 65
Predicted intensity map for Hayward Fault (Magnitude 7.5) ................................................

Figure 5-1 Damage to railroad system following Cape Ann event (M=7.0) ........................................79

Figure 5-2 Damage to railroad system following Charleston event (M=7.5) .......................................80

Figure 5-3 Damage to railroad system following Fort Tejon event (M=8.0) .......................................81

Figure 5-4 Damage to railroad system following Hayward event (M=7.5) ...........................................82

Figure 5-5 Damage to railroad system following New Madrid event (M=8.0) ....................................83

Figure 5-6 Damage to railroad system following New Madrid event (M=7.0) .....................................84

Figure 5-7 Damage to railroad system following Puget Sound event (M=7.5) ....................................85

Figure 5-8 Damage to railroad system following Wasatch Front event (M=7.5) ................................86

Vi Table of Contents ATC-25


Figure 5-9 Damage to highways following Cape Ann event (=7.0) ..................................................89

Figure 5-10 Damage to highways following Charleston event (M=7.5) .................................................90

Figure 5-11 Damage to highways following Fort Tejon event M=8.0) .... ............................................
91

Figure 5-12 Damage to highways following Hayward event (M=7.5) ................................................... 92

Figure 5-13 Damage to highways.following New Madrid event (M=8.0) ..............................................93

Figure 5-14 Damage to highways following New Madrid event (M=7) ... 94

Figure 5-15 Damage to highways following Puget Sound event ,(M=7.5)..............................................95

Figure 5-16 Damage to highways following Wasatch Front event (M=7.5) ...........................................96

Figure 5-17 Damage to electric power transmission lines following Cape Ann event
(M4=7.0).................................................... 99

Figure 5-18 Damage to electric power transmission lines following Charleston event
(=7.5) ................................................. 100

Figure 5-19 Damage to electric power transmission lines following Fort Tejon event
(M=..0) .... 101

Figure 5-20 Damage to electric power transmission lines following Hayward event
(M=7.5) .... 102

Figure 5-21 Damage to electric power transmission lines following New Madrid event
(M=8.00..............................................
....... i103
Figure 5-22 Damage to electric power transmission lines following New Madrid event
(M=7.0 .................................................... 104

Figure 5-23 Damage to electric power transmission lines following Puget Sound event
(M=7.5) ................................................. 105

Figure 5-24 Damage to electric power transmission lines following Wasatch Front event
i(M I= 7.5,) .............................................................. .............................. 1,0

Figure 5-25 Damage to water aqueduct system following Fort Tejon event (M=8.0) ......... ..............
107

Figure 5-26 Damage to water aqueduct system following Hayward event (M=7.5) ............................107

Figure 5-27 Damage to crude oil system following Fort Tejon event (M:=8.0)...................................109

Figure 5-28 Damage to crude oil system following New Madrid event (4=8.0) ................................110

Figure 5-29 Damage to crude oil system following New Madrid event (4=7.0) ................................ 111

Figure 5-30 Damage to refined oil system following New Madrid event (M=8.0). ........... ,,,,,,,,,,, 112

Figure 5-31 Damage to refined oil system following New Madrid event (M=7.0) ........ 113
.....................

Figure 5-32 Damage to' natural gas system folLowingFort Tejon event (M=8. ...............................
114

vil
ATC-25 Table of Contents
ATC-25 Table of iContents vii
Figure 5-33 Damage to natural gas system following Hayward event (M=7.5) ................................. 115

Figure 5-34 Damage to natural gas system following New Madrid event (M=8.0) ..................... .......116

Figure 5-35 Damage to natural gas system following New Madrid event (M=7.0) ............................ 117

Figure 5-36 Damage to natural gas system following Puget Sound event (M=7.5) . 118

Figure 5-37 Damage to natural gas system following Wasatch Front event .119

Figure 6-1 Analysis example illustrating residual capacity calculation algorithm for point
source systems........................................................................................1.................................. 127

Figure 6-2 Residual capacity of Arkansas air transportation following New Madrid
event (M=8.0) .129

Figure 6-3 Residual capacity of South Carolina ports following Charleston event
(M=7.5).. 129
Figure 6-4 Residual capacity of Arkansas medical care centers following New Madrid
event (M=8.0) .130

Figure 6-5 Residual capacity of South Carolina fire stations following Charleston event
(M=7.5)...... 130

Figure 6-6 Residual capacity of Mississippi police stations following New Madrid event
(M=8.0) .131

Figure 6-7 Residual capacity of South Carolina broadcast stations following Charleston
event (M=7.5) .131

Figure 6-8 Flow network to illustrate minimum-cut-maximum flow Theorem .133

Figure 6-9 Analysis example illustrating residual capacity calculation for crude oil
pipeline network...................................................................................................................... 134

Figure 6-10 Analysis example illustrating residual capacity calculation for highway
networks..................................................................................................................................... 135

Figure 6-11 Residual capacity of San Francisco Bay area railroad system following
Hayward event (M=7.5) .137

Figure 6-12 Residual capacity of epicentral region highways following New Madrid event
(8.O).137
Figure 6-13 Residual capacity of Mississippi electric system following New Madrid event
(=8.0).138
Figure 6-14 Residual capacity of epicentral region water system following Fort Tejon
event (M=8.0) .138

Figure 6-15 Residual capacity of crude oil delivery system from Texas to Northern
California following Fort Tejon event (M=8.0) .139

Viii Table of Contents ATC-25


Figure 6-16 Residual refined oil delivery from Texas to Chicago following New Madrid
event(=M.0).......................................................... 140
Figure 6-17 Residual capacity of natural gas delivery from Texas to Northern California
following Fort Tejon event (M=.0) .......................................................... 140

Figure 6-18 Residual Value Added as a function of crude oil lifeline residual capacity .....................147

.Figure 6-19 Analysis Example Illustrating Economic Loss Calculation for Crude OiLPipeline
Network .. 149
_

Figure 6-20 Analysis Example Illustrating Economic Loss Calculation for Electric System
in State of Utah for the Wasatch Front Scenario Event ..........................I.........................150

Figure 6-21 Percent indirect economic loss by state (monthly GNP) resulting from damage to
various lifelines, Cape Ann event (M=7.0) .......................................................... 162

Figure 6-22 Percent indirect economic loss by state (monthly GNP) resulting from
damage to various lifelines, Charleston event (M=7.5) .....................................................163

Figure 6-23 Percent indirect economic loss in Southern California (monthly G-NP)
resulting from damage to various lifelines, Fort Tejon event (M=8.0) ...........................164

, Figure 6-24 Percen.t indirect economic loss in Northern California (monthly GNP)
resulting from damage to various lifelines, Hayward event .(M=7.5) ............................... 165

Figure 6-25 Percent indirect economic loss by state (monthly CNP) resulting from,
damage to various lifelines, New Madrid event (M=80 .... 166

Figure 6-26 Percent indirect economic loss by state (monthly C-NP) resulting from
damage to various lifelines, New Madrid event (M=7.0) ..................................................167

Figure 6-27 Percent indirect economic loss in state of Washington (monthly 0NP)
resulting from damage to various lifelines, Puget Sound event (M =7.5) ........... 18
1.6...........

Figure 6-28 Percent indirect economic loss in state of Utah (monthly GNP) resulting
front damage to various lifelines, Wasatch Front event (M=7-53 ....................................169

ATC-2 Tal ofCnet


Table of Conlents
ATC-25
List of Tables
Table Number Title Page

Table 2-1 National Lifeline Inventory Electronic Database ...... .24

Table 3-1 Typical ATC-13 Damage Probability Matrix ............................. 26

Table 3-2 Weighting Factors Used to Determine Percent of Social Function and
Facility Classes Contributing to Ports/Cargo Handling Equipment ....... .................... 30

Table 4-1 Modified Mercalli Intensity Scale.......I...................................................................................


36

Table 4-2 Representative Earthquakes for Lifeline Loss Estimation . 54

Table 4-3 Geologic and Ground Condition Units, Conterminous United States .55

Table 4-4 Scenario Earthquakes ............. ..........................................................................57

Table S-la Damage Percent for Air Transportation Terminal for Each Scenario
Earthquake (Percent of Airports in State) . ........................... . . 70
Table 5-lb Damage Percent for Air Transportation Runways for Each Scenario
Earthquake '(Percent of Airports in State) ........................... 71

Table 5-2 Damage Percent for Ports for Selected Scenario Barthquakes (Percent of
Ports in State)..........................................................................................................................72

Table 5-3 Damage Percent for Medical Care Facilities for Each Scenario
Earthquake (Percent of Facilitiesin State).7........................... .
Table 5-4 Damage Percent for Fire Stations for Each Scenario Earthquake
(Percent of Stations in State)...................5........................................................ ............... 75

Table 5-5 Damage Percent for Police Stations for Each Scenario Earthquake
(Percent of Stations in State)................................................................7...............6...................
6
Table 5-6 Damage Percent for Broadcast Stations for Each Scenario Earthquake
(Percent of Stations in State) .......................... ... 77
Table 5-7 Damage to Railroad System............................7.........................................8.............
.................78
Table 5-S Damage to Freeway/Highway System.............................................................I.......................
87
Table 5-9 Damage Percent for Highway Bridges for Each Scenario Earthquake
(Percent of Bridges in State...........................................8........8..........................8. ....... 8

Table 5-10 Damage to Electric Transmission Lines.................................................................................


97

Table 5-11 Damage Percent for Electric Transmission Substations. for Each Scenario
Earthquake (Percent of Substations in State)......9......8............. 9

AT-5Tbeo otns1
ATC-2 5 Table of Contents xi
'Table 5-12 Damage to Water Aqueduct System................................................. 107

Table 5-13 Cost Estimates for Lifeline Components .................................................. 107


-

Table 5-14 121


Direct Damage Losses.............................................................................................................

Table 5-15 Direct Losses Due to Damage to Distribution Systems.....................................................122

Table 6-1 Relative Importance of Industry Sections--U. S. and Santa Clara County,
California........................................... ...................................................................................... 143

Table 6-2 Importance Weights of Various Lifeline Systems on Economic Sectors .144

Table 6-3 Percent Value-Added Lost Due to Specified Percent Loss of Oil Supply
Lifeline........ ................. 145
L ~~~~~...........................................................................................................................
Table 6-4 Residual Value-Added After Loss of Capacity of Oil Supply Lifeline ... 146

Table 6-5 Indirect Economic Loss Due to Damage to the Air Transportation
Lifeline.................................................................................................................................... 152

Table 6-6 Indirect Economic Loss Due to Damage to the Water Transportation
Lifeline.....................1.5............................................................................................................. 153

Table 6-7 Indirect Economic Loss Due to Damage to the Oil System............................................. 154

Table 6-8 Indirect. Economic Loss Due to Damage to the Natural Gas System.............................. 155

Table 6-9 Indirect Economic Loss Due to Damage to the Railroad Lifeline .156

Table 6-10 Indirect Economic Loss Due to Damage to the Electric System.157

Table 6-11 Indirect Economic Loss Due to Damage to the Highway System.159

Table 6-12 Indirect Economic Losses Due to Damage to Lifeline Transmission


Systems.............................................................................................................................. 160

Table 6-13 Indirect Economic Losses Due to Damage to Lifeline Distribution


Systems ..........
.........-........... . ............................................................. . ........... .. 161......................
161

Table 7-1 Total Direct Plus Indirect Dollar Losses for Each Scenario Earthquake
and Lifeline............................................................................................................................... 173

Table 8-1 Damage Percent for Existing Electric Transmission Substations for Each
Scenario Earthquake (Percent of Substations in State) ....................................................178

Table 8-2 Damage Percent for Upgraded Electric Transmission Substations for Each
Scenario Earthquake (Percent of Substations in State) .................................................. 179

Table 8-3 Indirect Economic Loss Due to Damage to the Existing Electric System (Percent
Monthly GNP). . .... 180
.. ..........................................................................................

Table 8-4 Indirect Economic Loss Due to Damage to the upgraded Electric System
(Percent Monthly GNP)................ 182

ATC-25
zil
xli oi Contents
Table of
Table Contents ATC-25
Executive Summary
1. Introduction of disruption of water transmissionand
distribution systems ATC, in preparation).
Lifeline is an earthquake engineering term
denoting those systems necessary for human life In this initial study, lifelines of critical
and urban function, without which large urban importance at the U.S. national level have been
regions cannot exist. Lifelines basically convey analyzed to estimate overall seismic vulnerability
food, water, fuel, energy, information, and other and to identify those lifelines having the greatest
materials necessary for human existence from economic impact, given large, credible U. S.
the production areas to the consumingurban earthquakes. The lifelines examined include
areas. Prolonged disruption of lifelines such as electric systems; water, gas, and oil pipelines;
the water supply or electric power for a city or highways and bridges; airports; railroads; ports;
urbanized region would inevitably lead to major and emergency service facilities. The
economic losses, deteriorated public health, and vulnerability estimates and impacts developed
eventually population migration. Earthquakes are presented in terms of estimated direct
are probably the most likely natural disaster that damage losses and indirect economic losses.
would lead to major lifeline disruption. With the These lossesare considered to representafirst
advent of more and more advanced technology, approximationbecause of the assumptions and
the United States has increasinglybecome methodology utilized, because several lifelines
dependent on the reliable provision of lifeline- are not included, and because, in some cases,
related commodities, such as electric power, the available lifeline inventory data lack critical
fuel, and water. A natural question is: What is capacity information.
the potential for major disruptionto these
lifelines, especially at the regional level? Project Approach. As summarized in the
project technical-approach flow chart (Figure
The initiation of this study by the Federal I), four basic steps were followed to estimate
Emergency Management Agency (FEMA) is lifeline damage and subsequent economic
based in part on a need to better understand the disruption for given earthquake scenarios.
impact of disruption of lifelines, from
earthquakes and to assist in the identification 1. Development of a national lifeline inventory
and prioritization of hazard mitigation measures database.
and policies. In addition, the report is intended
to improve national awareness of the 2. Development of seismic vulnerability
importance of protecting lifeline systems from functions for each lifeline
earthquakes, and of assuring lifeline reliability component/system,
and continued serviceability.
3. Characterization and quantification of the
Thespecific contractual requirements of this seismic hazard nationwide, and
project and report are:
4. Development of direct damage estimates
* To assess the extent and distribution of and indirect economic loss estimates for
existing U.S. lifelines, and their associated each scenario earthquake.
seismic risk; and
Limitations and Constraints. During
* To identify the most critical lifelines, and development of this report and its supporting
develop a prioritized series of steps for data, severalproblemswere encountered that
reduction of lifeline seismic vulnerability, could not be resolved because of technical
based on overall benefit. difficulties and lack of available data. For
example, telecommunication, systems, nuclear
FEMA is also sponsoring a companion study to and fossil-fuel power plants, dams, and certain
develop and demonstrate a model methodology water, electric, and transportation facility types
for assessing the seismic vulnerability and impact at the regional transmission level were excluded
from considerationin this project because of the

Executive Summary xiii


ATC-25.
ATC-25 Executive Summary xiii
ATC 25
Phase I

IV
FEMA
ATC _TA_
Technical Consultant (EQE)

l l
II
Lifeline Inventory: I Vulnerability Functions Seismic Hazard:
- Water systems - Review Existing Models - Review Existing Models
1-
- Electric power systems - Develop on the basis of - Soil Database
- Transportation Expert opinion: - Define Scenarios:
- Oil and natural gas - ATC 13 - NewMadrid. (M=7 & 8)
- Charleston, (M- 7.5)
- Emergency facilities - ETAG - CapeAnn (M- 7.0)
- WasatchFront (M- 7.5)
- EQE
Sources: - Paget Sound. (M- 7.5)

FEMA's database Air Transp. Terminal - FortTejon (M- 8.0)


- Hayward. (M= 7.5)
- National Petroleum
Council (NPC) >1
.,1
-EQE 0

'-4

CrudeOil
System Elapsed Time in Days

AnalJysis:
I
- Direct Damage
Economic Model
Most Critical Lifeline: - Residual Capacity
- Economic Loss
- Upgrade

Notation: ATC-1 3: ATC-1 3 Report, Earthquake Damage Evaluation Data for California (ATC, 1985)
ETAG: Expert Technical Advisory Group (project advisory panel)
EQE: EQE Engineering (project subcontractor)

Figure 1 Flow chart showing main steps in project approach.

ATC-25
Executive Summary ATC-25
xlv
Xiv Execulive Summary
unavailability of inventory data or the need for consist of digitized U.S. Geological Survey
more in-depth studies. (USGS) topographical maps and/or the
National Atlas (Gerlach, no date), performed by
Interaction effects between lifelines, secondary the U.S. Geological Survey in support of
economic effects (the impact of a reduced national census requirements. With the
capacityof one economicsector on a dependent exception of oil and gas pipeline data provided
sector), and damage resulting from landslide by the National Petroleum Council, the
(due to lack of inventory data nationwide) were inventory data generally date from about 1966,
also not considered in developing this report. unlesslater updated by FEMA. A number of
These limitations and others described in other sources were employed in various ways,
Chapters 2,4, and 5 tend to underestimate the which are further discussed below.
losses presented herein; and other factors, as
described elsewhere in this report, tend to The network inventory contained in the
overestimate the losses. Lack of capacity database is generally at the higher transmission
information for most lifelines was also a definite levels, as opposed to lower distribution levels.
limitation. In the aggregate, due primarily to the That is, inventories were generally only
exclusion of certain systems (e.g., dams and compiled for networks at the bulk and/or
telecommunication systems), we believe the regional level, as opposed to lifelines at the
estimates of losses presented in this report are, user-level (i.e., distribution level) within an area.
in fact, quite conservative. To use an analogy, the inventory contains only
the national arterial level, and neglects the
We also emphasize that this report is a distribution or capillary system. For example, all
macroscopic investigation at the national level federal and state highways are inventoried
and the results should not be used for (Figure 2), but county and local roads are not.
microscopic interpretations. The results, for The major reason for focusing on the
example,are not intended to be used to transmission level is that at lower levels the
evaluate any particular regional utility or systems only support local facilities. Thus, a
lifeline, and no specific information on such disruption of a local activity could not be used to
specific facilities has been included. identify the overall regional importance of the
lifeline. However, disruptions at the
2. National Lifeline Inventory transmission level impact large regions. and are
therefore important for understanding the
Development of the ATC-25 inventory, for all seismic vulnerability and importance of lifelines
major lifelines in the United States,. was a major to the United States.
task. The project scope required that lifelines be
inventoried in sufficient detail for conducting Inventory Overview. The inventory data
lifeline seismic vulnerability assessments and (Chapter 2) have been compiled into an
impact of disruption at the national level This in electronic database, which generally consists of
turn required that the inventorybe compiled (i) digitized location and type of facility for
electronically in digital form and dictated that single-site lifeline facilities, and (ii) digitized
inclusion of lifelines at the transmission level, as right-of-way, and very limited information on
defined below, was of primary importance. facility attributes for network lifelines. The
inventory is only a partial inventory, in that
Initially, a number of government, utility, trade important information on a number of facility
and professional organizations, and individuals attributes (e.g., number or length of spans for
were contacted in an effort to identify highway bridges) was unavailable from FEMA
nationwide databases, especially electronic
databases. In most cases, these organizations or The inventorydata include information for the
individuals referred the project back to FEMLA, conterminous United States only. Lifeline data
since they had either previouslyfurnished the for Alaska, Hawaii, and U. S. territories, such as
information to FEMA, or knew that the data Puerto Rico, have been excluded because
had been furnished to FEMA by others. As a lifelines in these regions would not be affected
result, FEMA's database (FEMA, 1987) became by the scenario earthquakes (see Chapter 4)
a major source of data for several of the considered in this study.
lifelines.A significantportion of these data

Executive Summary xv
ATC-25
ATC-25 Executive Summary xv
-n,
ci.
C
K3

C,)

CD

Q-

CD
:3-

zr~
wi

NC. -
The specific lifelines that have been inventoried Also excluded from the inventory, but included
for the conterminous United States are: in the analysis, are distribution systems at the
local level (water, highway, and electrical
Transportation systems) and police and fire stations.. For these
* Highways (489,892 km of highway facility types, the number of facilities in each 25-
(Figure 2); 144,785 bridges) km by 25-km grid cell, which is the grid size for
the seismic hazard analysis, is estimated on the
* Railroads (270,611 km of right-of-way) basis of proxy by population (see Chapter 2).
* Airports (17,161 civil and general
aviation airports) PC-Compatible Electronic Database. Because
the data could also serve as a valuable
* Ports (2,177ports) framework (or starting point) for researchers
who wish to investigate lifelines at the regional
Energy or local level, including applications. unrelated to
* Electric Power Transmission (4,551 seismicrisk, the data have been formatted for
substations; 441,981 km of transmission use on IBM-PC compatible microcomputers.
lines)
The data are unrestricted and willbe made
available by ATC on 18, 1.2-megabyte, floppy
* Gas and Liquid Fuel Transmission diskettes, together with a simple executable
(77,109 km of crude oil pipelines; 85,461 computer program for reading and displaying
km of refined oil pipelines; 67,898 km of the maps on a computer screen.
natural gas pipelines.)
3. Lifeline Vulnerability Functions
Emergency Service Facilities
* Emergency Broadcast Facilities (29,586 The second step in the project was the
development of lifeline vulnerability functions,
stations)
which describe the expected or assumed
Hospitals ( 6,973 medical care earthquake performance characteristics of each
centers) lifeline as well as the time required to restore
damaged facilities to their pre-earthquake
Water Aqueducts and Supply (3,575 km of capacity, or usability. Vulnerability functions
aqueduct; excludes aqueducts in Utah, were developed for each lifeline inventoried, for
which were unavailable) lifelines estimated by proxy, and for other
important lifelines not available for inclusion in
An important lifeline, telecommunication the inventory.The components.of each
systems, which would be severely impact by vulnerability function and how they were
earthquake-induced ground shaking, was developed are described in Chapter 3; the
excluded because of the unavailability of data, as functions themselves, too lengthy to include in
are certain regional transmission network the main body of the report text, are providedin
facility types (e.g., railway terminals, bridges, Appendix B.
and tunnels; certain aqueducts; major
freeway/highway bridges; fossil-fuel power The vulnerability functions developed for each
plants; and aqueduct pumping stations). In lifeline consist of the following components:
addition, data on nuclear reactors and dams are
excluded because it was believed that such General information, which consists of
facilities should be the subject of special studies, (1) a descriptionof the structure and its
particularly because of the existing regulations main components, (2) typical seismic
relating to seismic safety in many regions and damage in qualitative terms, and (3)
the expected complexity of the performance and seismically rsistant design characteristics
impact of these facility types. As.a result, the for the facility and its components in
losses provided by this study will be particular. This information has been
underestimated to the extent that these facility included to define the assumed
types are not included. characteristics and expected
performance of each facility and to
make the functions more widely

xvii
Executive Summary
ATC-25
ATC:-25, ExecutiveS=mary xvi
applicable (i.e., applicable for other developed on the basis of expert opinion in the
investigations by other researchers). ATC-13 project (EarthquakeDamage
EvaluationData for California,ATC 1985).
* Direct damage information, which Because the ATC-13 data and methodology are
consists of (1) a description of its basis in applicable for California structures only,
terms of structure type and quality of however, the data were revised and reformatted
construction (degree of seismic to reflect differences in seismic design and
resistance), (2) default estimates of the construction practices nationwide and to meet
quality of construction for present the technical needs of the project. All
conditions and corresponding motion- assumptions operative in ATC-13, such as
damage curves, (3) default estimates of unlimited resources for repair and restoration,
the quality of construction for upgraded also apply to these results.
conditions, and (4) restoration curves.
The motion-damagecurvesdeveloped under this
These functions reflect the general consensus project define estimated lifeline direct damage
among practicing structural engineers that, with as a function of seismic intensity (in this case,
few exceptions, only California and portions of Modified Mercalli Intensity); direct damage is
Alaska and the Puget Sound region have had estimated in terms of repair costs expressed as a
seismicrequirements incorporated into the fraction or percentage of value. Curves are
design of local facilities for any significant provided for each region defined above. An
period of time. For all other areas of the United example set of motion-damage curves for
States, present facilities are assumed to have ports/cargo handling equipment is provided in
seismic resistance less than or equal to Figure 4.
(depending on the specificfacility)that of
equivalent facilities in California NEHRP Map The restoration curves developed for this project
Area 7 (Figure 3). Three regions, representing define the fraction of initial capacity of the
these differences in seismic design practices, are lifeline (restored or remaining) as a function of
defined for the United States: elapsed time since the earthquake. Again curves
are defined for each region. A sample set is
a. California NEHRP Map Area 7, which we provided in Figures 5 and 6.
take to be the only region of the United
States with a significant history of lifeline 4. Seismic Hazard
seismic design for great earthquakes,
Seismic hazard, as used in this study, is the
b. California NEHRP Map Areas 3-6, Non- expectation of earthquake effects. It is usually
California Map Area 7 (parts of Alaska, defined in terms of ground shaking parameters
Nevada, Idaho, Montana, and Wyoming), (e.g., peak ground acceleration, Modified
and Puget Sound NEHRP Map Area 5, Mercalli Intensity, peak ground velocity) but,
which we take to be the only regions of the broadly speaking, can include or be defined in
United States with a significant history of terms of fault rupture, ground failure
lifeline seismic design for major (as opposed (landslides,liquefaction),or other phenomena
to great) earthquakes, and (earthquake-induced fire) resulting from an
earthquake. Seismic hazard is a function of the
c. All other parts of the United States, which size, or magnitude of an earthquake, distance
we assume have not had a significant history from the earthquake, local soils, and other
of lifeline seismic design for major factors, and is independent of the buildings or
earthquakes. other items of value that could be damaged.

The two key quantitative vulnerability-function The technical approach for evaluating the
relationships developed under this project-- seismic hazard of lifeline structures in this
motion-damage curves and restoration curves-- project (see Chapter 4) involved identifying (1)
define expected lifeline performance for each of the most appropriate means (parameter(s)) for
these regions and form the heart of the describing the seismic hazard, (2) regions of
quantitative vulnerability analysis. The curves high seismic activity, (3) representative
are based on the data and methodology potentially damaging, or catastrophic,

Summary ATC-26
xviii
Xriii
Executive Summary
EXecutive ATC-25
Legend
Map Area Coeff. A.

M 7 ~0.40
fl 6 0.30
§ 5 0.20
M 4 0.1S
n 3 0.10
2 01.05
1: 0.05

Figure 3 NEHRP Selsmic Map Areas ATC 1978; BSSC, 1988.

Executive Summary xix


ATC-25
ATC-25 Executive Summary Xix
Part/Cargo Handling Equipment
D=100V

:8

a
0,
cu D=58Y:
E
cus

VI VII VIII Ix x
Modified Mercalli Intensity (MMI)

Figure 4 Damage percent by intensity for ports/cargo handling equipment.


5
Port/Cargo Handling Equipment
R=10x-
77 28a
2b
0.60 63
0.40
0.60-
53 0.40

M"I a b
6 0.311 0.118
1 7 0.306 8.058
8 - 0.286 8.O2Z
I
i 9 0.248 0.81.3
0II to 0.168 0.807
rai
I
C R- Sax
i H = b * day: 3;+ a
-0i
i

Figure 5
o_-
n a..
Ut.
V.
DAYS: 3
'
68
sr I
California 7, Non-California
.
90
r
128
,
150 188
Elapsed Time in Days
218
f
240 Z70

Residual capacity for ports/cargo handling equipment (NEHRPMap Area: California 3-5,
7, and Puget Sound 5).
i f
3,
300 338
i
36
365
V z X

ATC-25
Executive Summary
xxx ExecutiveSummary ATC-25
Fort/Cargo Handling Equipment
R=185x a,? Ca CA R
53 .48

Il 1 ,
6 E.306
7 8.286 8.E
0.81
8.88?
8.243 8. 013
9 8.168 0 .0BS
l8 -8.87-5
Fl= 5o
R * days + a

R=
.,
A,/
i,.
lI l
I l l
I J

DAYS: 38 68 98 128 158 188 218 248 27 3 338 366


Elapsed Time in Days

Figure 6 Residual capacity for ports/cargo handling equipment aUlother areas)

earthquakes within each of these regions that Seismicity Overview of the United States. For
could be used as scenario events for the the purpose of characterizing seismicity in the
investigation of lifeline loss estimation and conterminous United States, several regions
disruption, and (4) a model for estimating the maybe identified Algermissen, 1983):
seismic hazard for each of these scenario events.
1. Northeastern Region, which includes New
Descriptor of Seismic Hazard for this Study. England, New York, and part of eastern
Following a review of available parameters, for Canada;
characterizing seismic hazard, we elected to use
the Modified Mercalli Intensity (MMI) Scale 2. Southeastern Region, including the central
(Wood and Neumann, 1931) a commonly used Appalachian seismic region activity and the
measure of seismic intensity (effects at a area near Charleston, South Carolina;
particular location or site). The scale Consistsof
12 categories of ground motion intensity, from I 3. Central Region, which consists of the area
(not felt, except by a few people) to XII (total between the regions just described and the
damage). Structural damage generally is Rocky Mountains;
initiated at about MMI V for poor structures,
and about MMI VII for good structures. MMI 4. Western Mountain Region, which includes
XI and XII are extremelyrare. The MII scale is, all remaining states except those on the
subjective; it is dependent on personal Pacific coast;
interpretations and is affected, to some extent,
by the quality of construction in the affected 5. Northwestern Region, including
area. Even though it has these limitations, it is Washington and Oregon; and
still useful as a general description of damage,
especially at the regional level, and for this 6. California and Western Nevada.
reason was used in this study as the descriptor of
seismic hazard.

xxi
ATC-25 Executive Summary
ATC-25 Executive Summary xxi
The historical record indicates that each region Table 1 Representative Earthquakes for
appears to have significant historic precedent Lifeline Loss Estimation
for a damaging earthquake of potentially
catastrophic dimensions. For purposes of Region Event
examining this potential, the earthquakes Northeastern Cape Ann, 1755
indicated in Table 1 are representative events
Southeastern Charleston, 1886
for the investigation of lifeline loss estimation
and disruption. Central New Madrid, 181 1-
1812
Evernden et al. (1981) estimates that these Western Mountain Wasatch Front, no date
events represent almost the maximum
Northwestern Puget Sound, 1949
earthquake expected in each area. Review of
Algermissen et al. (1982) indicates general Southern California Fort Tejon, 1857
agreement. Northern California Hayward, 1868

Choice of a Model for Estimating the


Distribution and Intensity of Shaking for magnitudes are interpreted as maximum
ScenarioEarthquakes.In order to estimate the credible for these locations.
seismic hazard (i.e., deterministic intensity) of
the scenario events over the affected area The choice of a scenario event on the Hayward
associated with each event, a model of fault for the San Francisco Bay Area, rather
earthquake magnitude, attenuation, and local than the 1906 San Francisco event, is based on
site effects is required. For the conterminous the perceived high likelihood of a magnitude 7.0
United States, two general models were event (USGS, 1990) as well as the potential for
considered: Evernden and Thomson (1985), and major damage and lifeline disruption, should
Algermissen et al. (1990). such an event occur (CDMG, 1987). Since most
lifelines approach San Francisco Bay from the
Selection of one model over the other was east, more of them cross the Hayward Fault
difficult,but the Evernden model offered the than cross the San Andreas Fault. So the
following advantages for this study: (i) Hayward event would appear to represent as
verification via comparison with historical disruptive an event, and potentially more so,
events, (ii) incorporation of local soil effects and than the 1906 event, which is presently
ready availability of a nationwide geologic perceived to be of low likelihood in the near
database, and (iii) ready availability of closed- future.
form attenuation relations. An important
additional attribute for this project was that the The Evernden model was employed to generate
Everden model would estimate the distribution expected seismic intensity distribution in the
and intensity of seismic shaking in terms of conterminous United States for the eight
MMI, the shaking characterization used in the scenario events. Shown in Figure 8 is an
ATC-13 study and the basic parameter for the example intensity distribution for the New
ATC-25 lifeline vulnerability functions. Madrid magnitude-8.0 scenario event.

Scenario Earthquakes. Based on the Table 2 Scenario Earthquakes


representative earthquakes identified in Table
1, which are considered representative of all Region Event Magnitude
major regions of the conterminous United
Northeastern Cape Ann 7
States, eight scenario events were selected for
this investigation. The eight events are indicated Southeastern Charleston 7.5
in Table 2. With the exception of the Cape Ann, Central New Madrid 7 and 8
Charleston, and Hayward events, all magnitudes
are reflective of the representative earthquake Western Mounta rin Wasatch Front 7.5
for the region (as specified in Table 1). The Northwestern Puget Sound 7.5
scenario events for Cape Ann, Charleston, and Fort Tejon 8
Southern Califor iia
Hayward have magnitudes one-half unit higher
than the representative event. These Northern Califorinia Hayward 7.5

xxii Executive Summary ATC-25


C4
rn

'N

Q
"0

N
tyl
VI

5n.

CD
II

(D
m
0 z
CD

tn 0t
~1
0-

£2
(D
oe
5. Estimates of Direct Damage lifeline component in each grid cell, using the
motion-damage curves provided in Appendix B.
The analysis of seismic vulnerability of lifeline The procedure for utilizing the motion-damage
systems and the economic impact of disruption curves varied slightly by facility type, depending
is based on an assessment of three factors: on whether the lifeline was a site specific facility,
or a regional transmission (extended) network.
- 0_,1011111L, llalall,
Site-Specific Lifelines. Direct damage to site-
* Lifeline inventory, and specific lifelines, i.e., lifelines that consist of
individual sited or point facilities (e.g.,
* Vulnerability functions. hospitals), were estimated using the
- methodology specified above. For airports, ports
In this investigation these factors are used to and harbors, medical care facilities (hospitals),
quantify vulnerability and impact of disruption and broadcast stations, the inventory data
in terms of (1) direct damage and (2) economic summarized in Chapter 2 were used to define
losses resulting from direct damage and loss of the number and distribution of facilities. For fire
function of damaged facilities. Estimates of and police stations, locations were assumed to
direct damage to lifelines, expressed in terms of be lumped at the center of the Standard
percent replacement value and dollar loss, are Metropolitan Statistical Areas, and number of
discussed in Chapter 5. Indirect economic losses facilities affected were estimated by proxy,
are discussed in Chapter 6. assuming certain established relationships
between population and number of facilities.
Direct damage is defined as damage resulting
directly from ground shaking or other collateral For summary and comparative purposes, four
loss causes such as-liquefaction. For each damage states are considered in this study:
facility, it is expressed in terms of cost of repair
divided by replacement cost and varies from 0 to * Light damage (1-10% replacement value);
1.0 (0% to 100%). In this project it is estimated
using (1) estimates of ground shaking intensity * Moderate damage (10-30% replacement
provided by the seismic hazard model (from value);
Chapter 4), (2) inventory data specifying the
location and type of facilities affected (from * Heavy damage (30-60% replacement value);
Chapter 2), and (3) vulnerability functions that and
relate seismic intensity and site conditions to
expected damage (from Chapter 3 and * Major to destroyed (60-100% replacement
Appendix B). value).

The analysis approach to estimate direct damage The total number of affected facilities and the
considers both damage resulting from ground percentage of facilities in each damage state are
shaking as well as damage resulting from summarized for each lifeline and scenario
liquefaction. Damage due to other collateral earthquake (see Chapter 5, Tables 5-1 through
loss causes, such as landslide and fire following 5-6). Following is a discussion of the direct
earthquake, are not included because of the damage impact on an example lifeline--ports
unavailability of inventory information and the and harbors.
lack of available models for estimating these
losses nationwide. Ports and Harbors. Since ports and harbors are
located in the coastal regions, only those
The analysis approach for computing direct scenario earthquakes affecting these regions will
damage due to ground shaking proceeded as negatively impact this facility type. As indicated
follows. For each earthquake scenario, MMI in Table 3, the most severe damages to ports
levels were assigned to each 25-km grid cell in and harbors are expected for the Charleston and
the affected region, using the Everden MMI Puget Sound events. For example,one hundred
model, assigned magnitude, and assigned fault percent, or 20 ports and harbors, in South
rupture location (from Chapter 4). Damage Carolina can be expected to sustain heavy
states were then estimated for each affected damage (30 to 60%), and 73%, or approximately

Executive Summary ATC-25


xxiv Executive Summary
Table 3 Darnage Percent for Ports and Harbors for Selected Scenario Earthquakes (Percent of
Ports and Harbors in State)

CAPEANN (=70)
Massachuse ts Connecticut Delaware Rhode Isfand New Hampshire
.34 22 10 22 9

100% O% 0% 0%

0% 0% 0% 0%/ 0%

0% 0% 0% 0% '0%

0% 0% 0% 0% 0%

CHARLESTON(M=75)

South Carolina North Carolina Georgia


Total Number 20 16 so

light Damage
1-10 % 0% 0% f0%
Moderate
10O% 0% '0% 0%
Heavy
30-60 % 100% 0% 73%
Major to Destructive
60-100 % 0%1f 0% 0$

HA YWARD FORT TEJONPUGETSOUND


Ta
bM=7N (14=8.0) (M4=75)

California California Washington


Total Nunxber 125 125 77

Light Damage
1-10 % 4% 0% 25%
Moderate
10-30% 22%/6 34% 26%
Heavy
30-60 % 0% 0% 14%S
Major to Destructive
60-100 % 0% 0%. 0%

ATC-25 Executive Summary


ATC-25 Executive Summary xxv
22 such facilities would be similarly affected in Crude Oil. Direct damage to the crude oil
Georgia. In Washington, 14% of the ports system as a result of the magnitude-S New
(approximately 11) would be similarly affected. Madrid event, estimated using damage curves
Numerous ports and harbors in these states for transmission pipelines and the special
would also sustain moderate damage (10 to probabilistic model for pipelines, is plotted in
30%) as would approximately 22 such facilities Figure 9. This figure indicates that three
in California for the Hayward magnitude-7.5 pipeline sections would be damaged due to the
event. The primary cause of such damage, of magnitude-8.0 New Madrid event and suggests
course, is poor ground. that crude oil flowto the north-central section
of the United States would be disrupted.
Extended Lifeline Networks. With the Pipelines would also be damaged as a result of
exception of pipeline systems, direct damage to the magnitude-7 New Madrid and magnitude-S
extended network lifelines, such as highways, Fort Tejon earthquake scenarios.
railroads and other networks at the bulk and/or
regional level, was estimated using the Dollar Loss Estimates. Summaries of dollar loss
methodology specified above. For pipelines estimates for direct damage to site-specific
direct damage was estimated using an analytical systems and extended regional lifeline networks
model that estimates the probability of breaks during the eight scenario earthquakes are
occurring within given lengths of pipe subjected provided in Tables Sa and Sb. Estimated dollar
to given earthquake shaking intensities (Khater losses due to direct damage to local electric,
et al., 1989). water, and highway distribution systems are
provided in Table 6.
Results are presented in terms of (1) the same
four damage states used for site-specific The estimates provided in Tables 5ab and 6 are
lifelines, and (2) maps indicating the damaged based on the available inventory data, cost per
portions of each extended network for the facility assumptions, and other models and
various scenario earthquakes (see Chapter 5). assumptionsdescribed throughout the report.
Example results for two extended lifeline As a result, the accuracy of these estimates may
networks follow. vary from lifeline to lifeline. Estimates for
electric systems, in particular, are believed to be
Railroad System. The railroad system is a highly more sensitive to the lack of capacity
redundant system, and damage to the system informationthan are the other lifelines.
due to the selected events was found to be By combining the data from Tables 5a,b and 6,
relatively localized to the epicentral area. Direct we estimate the total direct damage dollar losses
damage estimates for the railroad system are (in billions of U. S. dollars) for the eight
based on damage curves for track/roadbed and scenario earthquakes as follows:
exclude damage to related facility types not
included in the project inventory--railway Direct
terminals, railway bridges and tunnels. Dollar Loss
Earthquake ( Billions, 1991$1
The direct damage data (Chapter 5, Table 5-7) Cape Ann $4.2
suggest that the magnitude-8 New Madrid, Fort
Tejon, and Hayward events would cause the Charleston $4.9
most extensive damage, with 2,265 km, 872 km, Fort Tejon $4.9
and 585 km of roadbed, respectively, sustaining
damage in the 30 to 100% range. Damage in the Hayward $4.6
Charleston, Puget Sound, and magnitude-7.0 New Madrid, M = 8.0 $11.8
New Madrid events would also be severe, with
980,650, and 640 km of roadbed, respectively, New Madrid, M = 7.0 $3.4
sustaining heavy damage (30-to-60 %). A map Puget Sound $4.4
showing the distribution of damage to the
railroad system for the magnitude-S New Wasatch Front $1.5
Madrid earthquake scenario is shown in Figure
8.

-~~~~~~~xctieSmayAC2 ATC-25
Executive Summary
)m
CD
#-I co

9
tD
CD

0
i:

i3
Oq
In
CD
t'2
N A1

-'

0 0
(A nq
eQ

9
Di
I
EL
0:

Di'
10
a nCT,

km

aI
R

o.~

o oQ
O q
0

$rb
00

(D
: C

-I SD
Ei

I R

(b

P-
a-D
Table 5a Direct Damage Losses to Site-Specific Lifelines ($ Millions)

Scenario Broadcast Fire


Earthquake ALrports Ports Hospitals Stations Stations
Cape Ann $91 $53 $490 $19 $6
Charleston 142 380 565 9
68
Fort Tejon 148 170 1,431 48
26
Hayward 37 115 1,297 17 .7
New Madrid (M=8) 411 0 1,297 91 13
New Madrid (M= 7) 145 0 396 34 3
Puget Sound 210 196 507 49 13
Wasatch Front 29 0 205 44 2
-~~~~

Table 5b Direct Damage Losses to Regional Network Lifelines $ Millions)

Scenario Natural Refined Crude


Earthquake Highways Electric Railroads Cas Oil Oil Water
Cape Ann $382 $1,312 $9 $0 $0 $0 $0
Charleston 773 1,264 156 0 O 0 0
Fort Tejon 470 .886 158 11 0 28 140
Hayward 208 1,310 115 6 0 0 91
New Madrid (M=8) 2,216 2,786 458 56 28 47 0
New Madrid (M= 7) 204 1,077 108 19 9 19 0
Puget Sound 496 1,834 96 6 0 0 18
Wasatch Front 323 90 31 6 0 0 0

Table 6 Direct Damage Losses to Local Distribution Systems

Electric Water Highways


Event $ Billion $ Billion S Billion
Cape Ann $0.89 $0.30 $0.60
Charleston 0.74 0.31 0.50
Fort Tejon 0.91 0.23 04.23
Hayward 0.90 0.20 0.25
New Madrid (M=8.0) 2.017 '0.88 1.40
New Madrid (M=7.0) 0.65 0.28 0.44
Puget Sound 0.58 0.09 0.28
Wasatch Front 0.38 0.13 0.26

ATC-25 Executive Summary xxix


ATC-25 Executive Summary xxix
6. Estimation of Indirect Economic Connectivity analyses measure post-earthquake
Effects completeness, "connectedness," or "cuteness" of
links and nodes in a network. Connectivity
Earthquakes produce both direct and indirect analyses ignore system capacities and seek only
economic effects. The direct effects, such as to determine whether, or with what probability,
dollar loss due to fires and collapsed structures, a path remains operational between given
are obvious and dramatic. However, the indirect sources and given destinations.
effects that these disruptions have on the ability
of otherwise undamaged enterprises to conduct Serviceability analyses seek an additional
business may be quite significant. Although the valuable item of information: If a path or paths
concept of seismic disturbances and their effect connect selected nodes following an earthquake,
on lifelines has been investigated for at least two what is the remaining, or residual, capacity
decades, there is very little literature on indirect between these nodes? The residual capacity is
economic losses. found mathematically by convolving lifeline
element capacities with lifeline completeness.
This study provides a first approximation of the
indirect economic effects of lifeline interruption A complete serviceability analysis of the nation's
due to earthquakes. To accomplishthis the various lifeline systems, incorporating
relevant literature was surveyed. Then a earthquake effects, was beyond the scope of this
methodology was developed to relate lifeline project. Additionally, capacity information was
interruption estimates to economiceffects of generallynot availablefor a number of the
lifeline interruption in each economic sector. lifelines (e.g, for the highway system, routes
This required a two-step process: were available,but not number of lanes).
Rather, for this project, a limited serviceability
1. Development of estimates of interruption of analysis has been performed, based on a set of
lifelines as a result of direct damage simplifying assumptions.

2. Development of estimates of economic loss The fundamental assumption has been that, on
as a result of lifeline interruption average, all links and nodes of a lifeline have
equal capacities,so that residualcapacityhas
Estimates of Lifeline Interruption. Lifeline beendeterminedas the ratio of the number of
interruption resulting from direct damage is serviceable(ie., surviving)links and nodes to the
quantified in this investigation in residual originalnumberof serviceablelinks and nodes,
capacity plots that define percent of function for a given source/destinationpair, or acrosssome
restored as a function of time. The curves are appropriateboundary.For example, if the state
estimated for each lifeline type and scenario of South Carolina has 100 airports, and 30 of
earthquake using (1) the time-to-restoration these are determined to be unserviceable at
curves discussed in Chapter 3 and provided in some point in time following a major
Appendix B, (2) estimates of ground shaking earthquake, then the air transport lifeline
intensity provided by the seismic hazard model residual capacity is determined to be 70% of the
(from Chapter 4), and (3) inventory data initial capacity.
specifying the location and type of facilities
affected (from Chapter 2). An example illustrating the residual capacity
plots for one lifeline and their implication is
For site-specific systems (i.e., lifelines consisting discussed below. Included in Chapter 6 are
of individual sited or point facilities, such as example residual capacity plots for all lifelines
airports or hospitals) the time-to-restoration considered. Appendix C contains all residual
curves are used directly whereas for extended capacity plots developed under this project (for
regional networks, special analysis procedures the various lifelines and scenario earthquakes).
are used. These procedures consist of:
Ports. An example residual capacity plot for
* connectivity analyses, and South Carolina, the worst-case situation, is
provided in Figure 10. In this example, the initial
* serviceability analyses. loss is nearly 100 percent of capacity, and full

Executive Summary ATC-25


xx:
m Executive Summary
C_1
C
0
cc
0
0,
01

)
Elapsed Time in Days

Figure10 Residual capacityof South CarolinaportsfollowingCharlestonevent (M=75).


capacity is not restored until about day 200. for all lifelines in Appendix D.) Values are
Georgia would also experience similarly high shown for each decile of lifeline interruption
losses due to the Charleston event. and are assumed to pertain to monthly Gross
Massachusetts and Rhode Island would National Product (GNP).
experience the largest losses due to the Cape
Ann event. Indirect Economic Loss Results. Indirect
economic losses were estimated for each lifeline
Estimates of Indirect Economic Losses. system and scenario event using the residual
Economic activity within each industrial sector capacity plots provided in Appendix C and the
was measured in terms of value added. Value economic tables described above. The cal-
added refers to the value of shipments culation procedure are described in Chapter 6.
(products) less the cost of materials, supplies,
contract work and fuels used in the manufacture Summaries of the total indirect economic losses
or cultivation of the product. The United States resulting from damage to site-specific systems.
Bureau of Economic Analysis publishes annual and extended regional networks, based on 1986
data for value added for each industrial sector. GNP data, are provided in Table 8 Total
For simplicity, data from the 99 sectors were indirect economic losses resulting from damage
collapsed into 36 sectors. Data for 1983 were to local distribution systems are presented in
the latest available (published by BEA, 1989), Table 9. We note that Table contains total loss
and were used in this study. amounts expressed in terms of lower bound,
upper bound, and best estimate. The lower
Reduction in Value Added Due to Lifeline bound represents economic loss caused by the
Interruption. Table 7 presents the percent singular lifeline system causing the greatest loss;
reduction in value added for each sector the upper bound is the sum of losses caused by
resulting from increasingly severe crude oil all systems; and the best estimate is the square
lifeline interruptions. (Similar tables are shown root of the sum of the squares (SRSS) of losses

ATC-25 Executive Summary


ATC-25 Executive Summary xixd
Table 7 Percent Value-Added Lost Due to Specified Percent Loss of Oil Supply
Lifeline

U.S.Econ.
30% 40% 50% 60% 70% 80% 90% 100%
Lit Capacity Loss--> Value Added 10% 20%
(Percent)

1 Livestock 0.45% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% I19.47% 44.74% 50.00%
2 Agr. Prod. 1.06% 4.21% 12.63% 21.05% 29.4 7% 37.89% 46.32% 54.74% 63.16% 71.58% 80.00%
12.63% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58% 80,00%
3 AgServ For. Fish 0.11% 4.21%
4 Mining 3.89% 4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61.58% 71.05% 80.53% 90.00%
5 Construction 5.52%/s 4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61.58% A71.05% 80.53% 90.00%
6 Food Tobacco 2.41% 2.63% 7.89% 13.16%- 18.42% 23.68% 28.95% 34.21% I 39.47/ 44.74% 50.00%
7 Tektile Goods 0.37% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% I 39.47%/ 44.74% 50.00%
8 Misc Text. Prod. 0.73% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% I39.47% 44.74% 50.00%
9 Lumber & Wood 0.52% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% II39.47% 44.74% 50.00%
10 Furniture 0.34% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47/% 44.74% 50.00%
11 Pulp & Paper 0.87% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
12 Print & Publish 1.31% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
13 Chemical Drugs 1.40% 2.63% 7.89% 13.16% 18.42% 23.68%- 28.95% 34.21% 39.47% 44.74% 50.00%
14 Petrol. Relining 0.96% 5.26% 15.79% 26.32% 36.84% 47.37% 57.89% 68.42%/e 78.95% 89.47% 100.00%
7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
15 Rubber & Plastic 1.03% 2.63%
16 Leather Prods. 0.12% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
17 Glass Stone Clay 0.62% 2.63%
18 Prim. Metal Prod. 1.04% 4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61.58% 71.05% 80.53% 90.00%
2.63% 7,89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
19 Fab. Metal Prod. 1.64%
20 Mach. Exc. Elec. 1.56% 2.63% 7.89% 13.16% 18.42%/ 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
21 Elec. & Electron 2.52% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
22 Transport Eq. 2.62% 4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61.58% 71.05% 80.53% 90.00%
23 Instruments 0.68% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
24 Misc. Manufact. 0.69% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
25 Transp & Whse. 3.46% 4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61 .58% 71.05% 80.53% 90.00%
26 Utilities 5.89% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
27 Wholesale Trade 5.63% 2.63% 7.89% 13. 16% 18.42% 23.68% 28.95% 34.21% 39.47%/ 44.74% 50.00/o
28 Retail Trade 5.63% 4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61.58% 71.05% 80.53% 90.00%
29 F.I;R.E. 16.64% 3.16% 9.47% 15.79% 22.11% 28.42% 34.74% 4 1.05% 47.37% 53.68% 60.00%
30 Pers./Prof.Serv. 8.03% 3.16% 9.47% 15.79% 22.11% 28.42% 34.74% 41.05% 47.37% 53.68% 60.00%
31 Eating Drinking 2.12% 4.21% 12.63% 2 1.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58% 80.00%
32 Auto Serv. 1.09% 4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61.58% 71.05% 80.53% 90.00%
33 Amuse & Rec. 0.70% 4.74% 14.21% 23.68% 3.3,16% 42.63% 52.11% 61.58% 71.05% 80.53% 90.00%
34 Health Ed. Soc. 6,30/e 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
35 Govt & Govt Ind. 11.79% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
36 Households 0.25% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%

TOTAL 100.00% 3.25% 9.74% 16.23% 22.72% 29.21% 35.71/o 42.19% 48.68% 55.18% 61.67%
Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Total V.A
Pct. V.A.
:DI
4'
9

5
9
Di

Di

m
C
0.
D<

9
CD
tyl r.
ID Q
0
EL
El
CD Op
th ED
a_ A,
Si:
CZ
tb'-D

Z3

L. k
km
-
- -

-n
5 OCD

o o9
5CD

En

xVA
r 0
CD

c
C.
(CD

-to
CD

CD
el

ED
0 C'D
caused by each lifeline. We note also that the for each scenario earthquake were also
SRSS procedure was used to estimate total developed An exampleplot for the magnitude-
indirect economic losses resulting from damage 3 New Madrid scenario event is provided in
to local distribution networks (Table 9). Figure 11. We note that estimates of indirect
economic losses,for each state are sensitive to
By combining like system data from Tables 8 the assumed location of the source zone for
and 9 in a least squares (SRSS) fashion, we large-magnitude events (e.g., had the assumed
estimate the total indirect economic losses for source zone for the magnitude-S New Madrid
the eight scenario earthquakes as follows: event been located further north, estimates of
direct damage in Missouri would have been
Indirect substantially larger).
Loss
Earthquake (in Billions, 1991$) The data provided in Figure 11 suggests
Cape Ann $9.1
Mississippi and Arkansas would experience the
highest indirect losses due to the magnitude-S.0
Charleston $10.2 New Madrid event. Similar plots for the other
Fort Tejon $11.7 scenario earthquakes (Chapter 6) indicate that
Massachusetts would experience the highest
Hayward $11.1 indirect losses due to the Cape Ann event with
New Madrid, M = 8.0 $14.6 the electric system contributing the highest
portion; and South Carolina, Utah, Washington,
New Madrid,M = 7.0 $4.9 Northern and Southern California would
Puget Sound $6.1
experience the highest indirect losses due to the
Charleston, Utah, Seattle, Hayward, and Fort
Wasatch Front $3.9 Tejon events, respectively. The electric system
contributes the highest indirect losses, among all
Bar charts showing the indirect losses caused by systems, for most of the events.
transmission lines (upper bound data) by state

90

80

70

LO 60
,0
- 50
C) A
0 4G

X- 30

20

Air Trans. Crude Oil M Refined Oil


E3
electric Railroad Highway

Figure 1 Percent indirecteconomic loss by state (monthlyGNP)resultingfrom damage to various


lifelines, New Madrid event (M=8.O).Note that the relatively low losses for Missouri
reflectthe assumed location of the scenarioearthquakesource zone and the estimated
distribution of intensity (see Figure7).

Executive Summary rcxv


ATC-25
ATC-25 Executive Summary Xx
7. Combined Economic Losses, * Gas and Liquid Fuels. Gas and liquid
Deaths and Injuries fuel systems are probably the most
critical of all lifelines, yet capacity is very
Human Death and Injury. It is generally felt elastic, and only short-term shortages
that lifeline performance and continuity of are expected. Fuel for heating in the
operation is vital to human survival in the Northeast in the winter can be
modem, urban, world. Most observers believe conserved if necessary by clustering
that damage to lifelines would result in human people in school gymnasia, national
death and injury. Analogous to direct damage guard armories, and so on.
to property and indirect economic losses, human
death and injury resulting from lifeline damage * Rail, Air, and Highway Transportation.
can be categorized as follows: Transportation lifelines are highly
redundant and thus very elastic;
1. Human death and injury caused by emergency food and medicines would be
lifeline functional curtailment, where expected to be deliverable regardlessof
persons suffer as a result of deprivation earthquake damage.
of vital services; and
Casualties Resulting From Lifeline Direct
2. Human death and injury resulting from Damaze. Casualties can result from direct
direct damage to lifelines (e.g., occupant damage, especially catastrophic collapse, of
injuries resulting from the collapse of an lifeline components. Although few deaths
air terminal building). occurred directly as a result of lifeline damage in
U. S. earthquakes prior to 1989, life-loss due to
Casualties Due to Lifeline Functional lifeline failure was tragically demonstrated
Curtailment. Without the benefit of hard data it during the October 17, 1989, Loma Prieta,
is difficult to estimate with high confidence the California, earthquake. Approximately two
number of casualties that will result from thirds of the 62 deaths from this earthquake
curtailment of lifeline function. Our preliminary resulted from the failure of a lifeline
assessment is that human death and injury due component--partial collapse of the Cypress
to functional curtailment of lifelines can structure, a double-decked highway viaduct in
generally be expected to be very low. This is a Oakland approximately 100 km from the
fundamental assumption of this study, and will earthquake source zone.
probably cause some debate. Each lifeline was
considered, and this conclusion was found to Although it can be argued that the deaths and
hold, based on the following assumptions: (1) injuries caused by lifeline failure in the Loma
most vital installations that normally require a Prieta earthquake were the exception, not the
lifeline service have back-up emergency rule, the vulnerability functions developed for
supplies, and (2) most lifelines have this project suggest that substantial life-loss
considerable elasticity in demand, and the level from lifeline component failure should be
of service necessary for life maintenance is very anticipated. Lifeline failures that could cause
low. Examples follow: substantial life loss or injury include bridge
failure, railroad derailment, and pipeline failure.
* Electricity. Persons can survive without
power, even in the Northeast in the Unfortunately, data necessary for estimating life
winter. Most hospitals and similar loss associated with these component failures
installations have emergency generators. are not readily available, precluding
Those that lack emergency generators development of reliable casualty estimation
can transfer patients to other sites. methodology and data for lifeline structures.

* Water. Water for human survival is very Combined Direct and Indirect Economic
minimal. Humans can survive without Losses. Summaries of total dollar losses from
water for 48 or more hours, and water direct damage and indirect economic losses are
for human survival can be imported if combined and summarized for each scenario
necessary. earthquake and lifeline in Table 10. The total

xxv xctv SmayAC2


YXXVi Executive Summary ATC-25
0

Table 10 Total Direct Plis Indirect Dollar Losses for Each Scenario Earthquake and
Lifeline (Billions of Dollars)

m
r
Medical Natural Crude Refined Broadcasting Fire
- Scenario Electric Highways Water Care Ports Railroads Airport Gas oil Oil Stations Stations Total
-4

(tn
Cape Ann $11.24 $2.06 $0.91 $0.49 $0.50 $0,03 $0.58 $0.00 $0.00 $0.00 $0.02 $0.01 $13.25
Charleston $10.82 $2.05 $0,94 $0.57 $5.30 $0.18 $0.59 $0.00 $0.00 $0.00 $0.07 $0.01 $15.11
Fort Tejon $9.68 $5.18 $5.27 $1.43 $2.65 $0.41 $1.57 $1.68 $4.38 $0.00 $0.03 $0.05 $16.58
Hayward $12.21 $2.52 $4.88 $1.30 $1.46 , $0.22 $0.44 $0.09 $0.00 $0.00 $0.02 $0.01 $15.68
New Madrid 8 $15.68 $13.19 $2.68 $1.30 $0.00 $0.71 $1.22 $0.34 $0.46 $0.23 $0.09 $0.01 $26.37
Now Madrid 7 $5.17 $4.12 $0.85 $0.40 $0.00 $0.15 $0.31 $0.18 $0.13 $0.16 $0.03 $0.00 $8.29
Puget Sound $8.29 $1.95 $0.90 $0.51 $0.73 $0.21 $0.62 $0.21 $0.00 $0.00 $0.05 $0.01 $10.48
Wasatch Front $2.21 $3.85 $0,40 $0.20 $0.00 $0.05 $0.11 $0.04 $0.00 $0.00 $0.04 $0.00 $5.41

R-
iosses for each scenario earthquake are as Measures for Reducing Vulnerability of
follows: Lifeline Systems. The seismic vulnerability of
lifeline systems, from the point of view of
Direct Plus fulfillingfunction,can be reduced through three
Indirect Losses primary approaches:
Earthquake (in Billions, 1991$)
1. Damage reduction measures. In this
Cape Ann $13.3 approach reliability of function is enhanced
by reducing damage. This approach may
Charleston $15.1
take the form of:
Fort Tejon $16.6
* Strengthening a building, bracing
Hayward $15.7 equipment, or performing other
New Madrid, t'A = 8.0 $26.4 corrective retrofit measures to mitigate
shaking effects;
New Madrid, M = 7.0 $8.3
Puget Sound $10.5 * Densifying the soil beneath a structure,
or placing a structure on piles, or using
Wasatch Front $5.4
other techniques to mitigate hazardous
geotechnical conditions, e.g.,
8. Hazard Mitigation of Critical liquefaction potential,
Lifelines
* Other component improvements,
Identification of Critical Lifelines. Based on depending on the component and
the combined direct and indirect economic potential earthquake impacts, e.g.,
losses presented above and with due replacement of vulnerable
consideration of the assumptions and limitations systems/components with new
expressed throughout this report, we offer the systems/components that will provide
following relative ranking of the criticality of improved seismic resistance.
different lifelines in terms of the estimated
impact of damage and disruption: 2. Provision for system redundancy. In this
approach, reliability of function is enhanced
Rank Lifeline Event/Location
by providing additional and alternative links
1. Electric System New Madrid (e.g., new highways, pipelines, other
(M=8.0) transmission or distribution links). Because
earthquake damage is fundamentally a
Hayward random phenomena, addition of system links
Cape Ann, will tend to increase system reliability.
Charleston,
Fort Tejon 3. Operational improvements. In this approach
reliability of function is enhanced by
2. Highways New Madrid providing emergency response planning and
(M=8.0) the capability to rapidly and effectively
Fort Tejon repair damage, redirect functions, or
otherwise mitigate earthquake damage
Hayward, impacts on system operations and thereby
New Madrid re-establish system function.
(M=7.0)
3. Water System* Fort Tejon Of these measures, the most common are
component strengthening/retrofit measures,
4. Ports Charleston which are discussed at length in Appendix B of
5. Crude Oil Fort Tejon this report. The proposed measures (Appendix
*The ranking for the water system may be B) include generic solutions, such as designing
underestimated because critical components such as structures to meet current seismic design or
pumping stations and dams were not included in the retrofit standards of the local community,or
study. anchoring equipment. In addition, there are

ATC-25
mviii Executive Summary
Executive Summary ATC-25
xxxviii
numerous specific measures that relate to * Compressor,metering and pressure
unique systems or components within each reduction stations
lifeline. Special attention should be directed to
those systems and conditions that are of greatest 4. Conduct cost-benefit studies to determine the
concern, such as porcelain components in most cost effective measures. We note that, in
electric substations. some cases, retrofit measures may not be very
cost effective. In regions where the return
Following are recommended steps when period for large earthquakes is quite long, for
implementing a program to reduce seismic example, replacement over the life cycle of the
hazards of existing lifelines: facility or component may be a reasonable
approach.
1. Review existing descriptions of seismic
performance and rehabilitation measures for the 5. Implement the selected hazard reduction
lifeline(s) of concern, i.e., familiarize yourself measures.
and your organization with the overall problem.
Sources include Appendix B and Chapter 10 9. Recommendations for Further Work
(References) of this report.
The ATC-25project has raised a number of
2. Conduct an investigation of the seismic questions and indicated areas in which
vulnerability and impact of disruption for the knowledge is inadequate or nonexistent with
lifeline(s) and region(s) of concern. Lifeline respect to the impact of lifeline disruption due
seismic evaluation methodologies and other to earthquake. Following are recommendations
potential resources for this purpose have been for further research and other efforts. This list
developed by the ASCE Technical Council for is not meant to be all inclusive but rather an
Lifeline Earthquake Engineering (see overviewof some of the more important issues
references, Chapter 10), the Applied Techno- that should be pursued.
logy Council (ATC, in preparation) and others.
Lifeline Inventory. Organizations such as the
3. Focus first on the most vulnerable lifelines, Federal Emergency Management Agency,
components, and conditions (e.g., liquefaction Department of Transportation. and American
or landslide potential). Vulnerable components Society of Civil Engineers Technical Council of
include: LifelineEarthquake Engineering are
encouraged to build on the work performed in
For electric systems: this project, develop standards for complete
Substations lifeline inventories, and coordinate the
* Power stations acquisitionof the needed additional and
updated data from various lifeline owners.
For water systems:
* Pumping stations Lifeline Component Vulnerability. We
* Tanks and reservoirs recommend a major effort to acquire data on
* Treatment plants lifeline seismic performance and damage, and
Transmissions aqueducts conduct analysis towards the development of
improved component vulnerability functions.
For highway systems This effort should also investigate lifeline
* Bridges recovery data, and incorporate the extensive
* Tunnels experience realized during the 17 October 1989
* Roadbeds Loma Prieta, California, earthquake, as well as
from other damaging earthquakes.
For water transportation systems:
* Port/cargo handling equipment Seismic Hazard Data We suggest that the U. S.
* Inland waterways Geological Survey develop, or coordinate
through the various states' Office of Geologists,
For gas and liquid fuels: a series of digitized soils/geologic databases.
* Distribution storage tanks
* Transmission pipelines

Execuiive Summary xxxix


ATC-25
ATC:-25 Executive Summary sXXfX
Economic Analysis and Impacts Data and * Inter-regional impacts, and
Methodology. We recommend further research,
especially in economic areas such as: * So-called "benefits," such as increased
economic activity associated with repair,
* Economic impacts associated with or replacement of older equipment with
lifeline disruption, new technology.

* Second-order economic effects (e.g., Lastly, we note that this study did not address
interaction between lifelines), environmental consequences associated with
lifeline disruption, especially the potential for
* Elasticitiesof demand, or substitution of oil spills from broken pipelines in the nation's
a lesser disrupted lifeline for a more waterways following a New Madrid event.
disrupted lifeline, Investigation of this issue is critically important.

XI Executive Summary ATC-25


Introduction
1.
1.1 Background and Purpose for assessing the seismic vulnerability and impact
of disruption of water transmission and
Lifeline is an earthquake engineering term distribution systems (ATC, in preparation).
denoting those systems necessary for human life
and urban function, without which large urban In this. study, lifelines of critical importance at
regions cannot exist. Lifelines basically convey the U.S. national level have been analyzed to
food, water, fuel, energy, information, and other estimate overall seismic vulnerability and to
materials necessary for human existence from identify those lifelines having the greatest
the production areas to the consumingurban economic impact, given large, credible U. S.
areas. Prolonged disruption of lifelines such as, earthquakes. The lifelines examined include
the water supply or electric power for a city or electric systems; water, gas, and oil pipelines.;
urbanized region would inevitably lead to major highways and bridges; airports; railroads; ports;
economic losses, deteriorated public health, and and emergency service facilities. The
eventually population migration. Earthquakes vulnerability estimates and impacts developed
are probably the most likely natural disaster that are presented in terms of estimated direct
would lead to major lifeline disruption. With the damage losses and indirect economic losses.
advent of more and more advanced technology, These lossesare considered to representa first
the United States has increasingly become approximationbecause of the assumptionsand
dependent on the reliable provision of lifeline- methodoogy utilized, because several lifelines
related commodities, such as electric power, are not included, and because, in some cases,
fuel, and water. A natural question is: What is the available lifeline inventory data lack critical
the potential for major disruptionto these capacity information.
lifelines, especially at the regional level?
1.2 Importance of the Lifeline
The initiation of this study by the Federal Earthquake Risk Problem
Emergency Management Agency (FEMA) is
based in part on a need to better understand the The critical importance and earthquake
impact of disruption of lifelines from vulnerability of lifelines were probably first
earthquakes and to assist in the identification strongly emphasized in the earthquake and
and prioritization of hazard mitigation measures ensuing fires in San Francisco in 1906. The
and policies. In addition, the report is intended disaster in San Francisco, which was the worst
to improve national awarenessof the urban fire in history to that time, and which
importance of protecting lifeline systems from continues today to be the worst earthquake
earthquakes, and of assuring lifeline reliability disaster in U.S. history, was in large part
and continued serviceability. attributable to the failure of several lifelines,
including:
The specific contractual requirements of this
project and report are: * Breakage of gas distribution and service
lines, leading to numerous outbreaks of fire.
d To assess the extent and distribution of
existing U.S. lifelines, and their associated DDamage to fire stations, resulting in
seismic risk; and inoperable apparatus and injured fire
fighters. The single worst example of this
* To identify the most critical lifelines, and was the fatal injury of San Francisco Fire
develop a prioritized series of steps for Chief Dennis Sullivan, effectively
reduction of lifeline seismic vulnerability, "decapitating"the fire department at the
based on overall benefit. worst possible moment.
FEMA is also sponsoring a companion study to * Worst of all, literally hundreds of breaks to
develop and demonstrate a model methodology the water distribution system within San

AT- : inrduto
ATC-25 1: Introduction I
Francisco, resulting in total loss of water for * Major damage to a telephone central
fire-fighting purposes. switching office, and loss of telephone
service due to this damage as well as
After that disaster and in recognition of the saturation;
absolute necessity of water following an
earthquake, the San Francisco Fire Department * Near-collapse of a major dam;
built and today still operates the Auxiliary
Water Supply System (AWSS), a unique high- * Numerous breaks in the gas distribution
pressure water system separate and redundant system, resulting in large burning gas flares
from the domestic drinking water supply. at several intersections;

Following 1906, major earthquakes in the U.S. * Collapse of major freeway overcrossings,
and elsewhere continued to illustrate the prime resulting in fatalities and major disruption of
importance of lifelines in earthquakes. In the traffic; and
1933 Long Beach Earthquake, for example,
numerous authorities at the time cited the * Major damage to emergency facilities,
prompt shutdownof the municipallyoperated including collapse and major loss of life at a
gas system with the prevention of major fires hospital, and major damage or partial
(e.g., NBFU, 1933; Smethurst, 1933; Binder, collapse at several other hospitals, including
1952): very modern structures at one hospital.

Instructions had been issued and signs had Since the 1971 San Fernando Earthquake,
been posted near the control valvesof the significant research into lifelines has been
gas and light public utility control stations to conducted, too extensive to summarize herein
the effect that, in the event of an (see the following references for major
earthquake, these switches must be pulled compilations: Kubo and Jennings, 1976; ASCE-
or valves closed, and this was the reason that TCLEE, 1977; Kubo and Shinozuka, 1981;
the gas lights were shut off in less than four ASCE-TCLEE, 1981; Smith, 1981; Ariman,
minutes after the earthquake had occurred 1983; Cooper, 1984; Scawthorn, 1985; Eguchi,
(Smethurst, 1933). 1986; BSSC, 1987). Additionally, several design
guidelines have resulted from this research
Broken gas services and devices caused 7 of (ASCE-TCLEE, 1983; GLFC, 1984; ATC-6,
the 19 fires reported in Long Beach during 1981; ATC-6-2, 1983), which should result in
the night of 10 March 1933. Prompt closing improved future lifeline design and
of valves, together with a major break in a performance.
high pressure main, undoubtedly prevented
fires in numerous locations in the business Based on these efforts, it is fair to say that
district. Preparedness for disturbance is of substantial lifeline earthquake engineering
very great importance in connection with knowledge, data, and experience are presently
gas service (NBFU, 1933). available today, for the purpose of designing or
retrofitting lifelines to withstand the effects of
The 1971 San Fernando Earthquake illustrated earthquakes. However, because much of the
more than any other event the essential U.S. national infrastructure was constructed
interaction of lifelines and earthquakes. prior to the research and guideline development
Examples of lifeline effects in that relatively of the 1970s and 1980s, the United States is still
modest earthquake included: faced with the problem of existing lifelines that
are seismically vulnerable and that, if disrupted,
* Major damage to electrical substations, would result in major economic displacements,
including overturning of extra high voltage and probable environmental damage and human
(EHV) transformers; injury.

* Literally hundreds of breaks in the water This last point was tragically demonstrated on
distribution system; October 17, 1989, when the magnitude 7.1
Loma Prieta Earthquake struck the San
Francisco Bay Area, resulting in 62 deaths, more

ATC-25
1: Introduction ATC-25
22 1: Introduction
than 3,700 injuries, and leaving more than encountered that could not be resolved because
12,000 persons homeless. Approximately two- of technical difficulties and lack of available
thirds of the fatalities in this event were due to data. For example, telecommunication systems,
the failure of a lifeline--the collapse of the nuclear and fossil-fuel power plants, dams,
Cypress double-decked highway structure in and certain water, electric, and transportation
Oakland. Lifeline damage and disruption were facility types at the regional transmission level
one of the most significantfeatures of this were excluded from consideration in this project
earthquake, the most damagingto strike the because of the unavailability of inventory data
conterminous United States since 1906. One of or the need for more in-depth studies.
the world's major bridges, the San Francisco-
Oakland Bay Bridge, was closed for a month due Interaction effects between lifelines, secondary
to structural failure. Power was disrupted over a economic effects (the impact of a reduced
widespread area, water systems failed in several capacityof one economicsector on a dependent
communities, and other lifeline problems sector), and damage resulting from landslide
contributed to major disruptions. (due to lack of inventory data nationwide) were
also not considered in developing this report.
1.3 Project Approach These limitations and others described in
Chapters 2, 4, and 5 tend to underestimate the
This study is concerned with the seismic risk to lossespresented herein; and other factors, as
lifelines and provides a first approximation of described elsewhere in this report, tend to
the indirect economic effects of lifeline overestimate the losses. Lack of capacity
interruption due to earthquakes. The analysisis information for most lifelines was also a definite
first order in that uncertainties in vulnerability limitation. In the aggregate, due primarily to the
functions, seismic hazard, and all other factors exclusion of certain systems (e.g., dams and
were not considered. The overall objective of telecommunication systems), we believe the
the study is to quantify the extent and estimates of losses presented in this report are,
distribution of lifelines in the lower 48 States, to in fact, quite conservative.
identify the most critical lifelines in terms of
their vulnerability and impact on the national We aso emphasize that this report is a
economy, and to develop a prioritized series of macroscopic investigation at the national level
steps for reducing seismic risk to these lifelines. and the results should not be used for
microscopic interpretations. The results, for
Figure 1-1 summarizes the main steps of the example, are not intended to be used to
approach used to develop this report. Four basic evaluate any particular regional utilit or
steps were followed to estimate lifeline damage lifeline, and no specific information on such
and subsequent economic disruption for given specific facilities has been included.
earthquake scenarios.
1.5 Organization of the Report
1. Development of a national lifeline inventory
database. The organization and contents of this report
have been dictated in large part by the project
2. Development of seismic vulnerability approach. Following this introduction is Chapter
functions for each lifeline system, 2, which contains a description of the inventory
data developed for and utilized in this project.
3. Characterization and quantification of the Seismic vulnerability functions, in the form of
seismic hazard nationwide, and damage curves and restoration curves for all
lifelines considered, are developed and
4. Development of direct damage estimates described in Chapter 3. In Chapter 4 we discuss
and indirect economic loss estimates for the the seismic hazard nationwide, identify available
various scenario earthquakes. seismic hazard models that could have been
used in the analysis stages of this project,
1.4 Limitations and Constraints indicate the model that was selected and
describe its advantages and disadvantages, and
During development of this report and its define the eight earthquake scenarios that
supporting data, several problems were provide the basic framework for all damage and

ATC-25 1: introduction
ATC-25 1: Introduction 3
ATC 25 |
Phase I

, ,~~~~~
FEMA
ATC 1 j-ETAG
Technical Consultant (EQE) I
I
I I

. .
Lifeline Inventory: Vulnerability Functions Seismic Hazard:
- Water systems - Review Existing Models - Review Existing Models
- Electric power systems - Develop on the basis of - Soil Database
- Transportation Expert opinion: - Define Scenarios:
- NewMadrid (M=7 &8)
- Oil and natural gas - ATC 13 - Charleston. (M- 7.5)
- Emergencyfacilities - ETAG - CapeAnn (M- 7.0)
-WasatchFront (M- 7.5)
-EQE - PagetSound. (M- 7.5)
Sources: - FortTejon (M=8.0)
- FEMA's database
Air Transp. Terminal
- Hayward. (M. 7.5)
- National Petroleum .

>9
Council (NPC) '4

- EQE .0

co

co

CrudeOil
System Elapsed Time in Days

I
V
I
Analysis: I - i
I
- Direct Damage i i
Economic Mode I
Most Critical Ufeline: I - Residual Capacity I
- Economic Loss
- Upgrade A

Notation: ATC-13: ATC-13 Report,Earthquake Damage Evaluation Data for California (ATC, 1985)
ETAG: Expert Technical Advisory Group (project advisory panel)
EQE: EQE Engineering, Inc. (project subcontractor)

Figure1-1 Flowchart showing main steps in project approach.

4 1: Introduction ATC-25.
loss estimates presented in this report. Direct Chapter 9 provides brief remarks about
damage estimates and estimates of indirect additionally needed research and other efforts.
economic loss are developed in Chapters 5 and References are provided in Chapter 10. The
6. The direct damage and indirect economic loss report concludes with a series of appendices
estimates are combined, summarized, and containing names and affiliations of project
discussed in Chapter 7 In Chapter 8 we identify participants and substantial amounts of lifeline
the most critical lifelines, identify hazard vulnerability assessment data too voluminous to
mitigation strategies, and discuss the potential include in the main body of the report.
benefits of implementing such strategies.

ATC-25 1: Introduction
ATC-25, 1: Introduction S
National Lifeline Inventory
-

2.1 Introduction federal and state highwaysare inventoried, but


county and local roads are not. The major
Development of the ATC-25 inventory, for all reason for focusing on the transmission level is
major lifelines in the United States, was a major that at lower levels the systems. only support
task. The project scope required that lifelines be local facilities. Thus, a disruption of a local
inventoried in sufficient detail for conducting activitycould not be used to identify the overall
lifeline seismic vulnerability assessments and regional importance of the lifeline. However,
impact of disruption at the national level. This in disruptions at the transmission level impact
turn required that the inventory be compiled large regions and are therefore important for
electronically in digital form and dictated that understanding the seismic vulnerability and
inclusion of lifelines at the transmission level, as importance of lifelines to the United States. For
defined below, was,of primary importance. At some lifelines, such as highways and railroads,
the same time, the level of effort that could be an additional reason for focusing on the
devoted to this task was constrained by the transmission level is the increasing redundancy
budget available. that contributes to system reliability as one
descends in the lifeline hierarchy. Lastly, even at
Initially, a number of government, utility, trade the transmission level, the inventory effort alone
and professional organizations, and individuals is considerable.
were contacted in an effort to identify
nationwide databases, especially electronic The inventory data have been compiled into an
databases. In most cases, these organizations or electronic database, which generally consists of
individuals referred the project back to FEMA, (i) digitized location and type of facility for
since they had either previously furnished the single-site lifeline facilities, and (ii),digitized
information to FEMA, or knew that the data right-of-way, and very limited information on
had been furnished to FEMA by others. As a facilityattributes for network lifelines.The
result, FEMA's database (FEA, 1987) became inventory is only a partial inventory, in that
a major source of data for several of the important information on a number of facility
lifelines.A significantportion of these data attributes (e.g., number or length of spans for
consist of digitized U.S. Geological Survey highway bridges) was unavailable from FEMA.
(USGS) topographical maps and/or the
National Atlas (Gerlach, no date), performed by 2.2 National Lifeline Inventory Data--
the U.S. Geological Survey in support of Overview
national census requirements. With the
exception of oil and gas pipeline data provided The inventory data include information for the
by the National Petroleum Council, the conterminous United States only. Lifeline data
inventory data generally date from about 1966, for Alaska, Hawaii, and U. S. territories, such as
unless later updated by FEMA. A number of Puerto Rico, have been excluded because
other sources were employed in various ways, lifelines in these regions would not be affected
which are further discussed below. by the scenario earthquakes (see Chapter 4)
considered in this study.
The network inventory contained in the
database is generally at the higher transmission The specific lifelines that have been inventoried
levels, as opposed to lower distribution levels. for the conterminous United States are:
That is, inventories were generally only
compiledfor networks.at the bulk and/or Transportation
regional level, as opposed to lifelines at the o Highways
user-level (i.e., distribution level) within an area. e Railroads
To use an analogy, the inventory contains only Airports
the national arterial evel, and neglects.the * Ports and Harbors
distribution or capillary system. For example, all

Lifeline Inventory 7
ATC-25 2: National
ATC-25, 2: National Lifeline Inventory 7
Energy program named LLEQE* (LifeLine
* Electric Power Transmission EarthQuake Engineering). Two operations were
* Gas and Liquid Fuel Transmission required: (1) reduction in the number of links
Pipelines by a factor of about ten to reduce the size of the
database to a manageable size for analysis (i.e.,
Emergency Service Facilities minor curvatures at the local level have been
* Emergency Broadcast Facilities eliminated), and (2) continuity corrections so
* Hospitals that transmission lines between separately
digitized sections (e.g., across state boundaries)
Water Aqueducts and Supply would be continuous. The reduction effort was
substantial and utilized a significant portion of
An important lifeline, telecommunication the financial resources allocated to the
systems, which would be severely impact by inventory task.
earthquake-induced ground shaking, was
excluded because of the unavailability of data, as The inventory was generally compiled in terms
are certain-regional distribution network facility of nodes, links, and descriptive attributes, if
types (e.g., railway terminals, bridges, and available. These attributes are:
tunnels; certain aqueducts; major
freeway/highway bridges; fossil-fuel power 1. Measures of lifeline inventory, appropriate
plants; and aqueduct pumping stations). In to the lifeline. These are, for example:
addition, data on nuclear reactors and dams are * Miles of oil pipeline, by diameter;
excluded because it was believed that such
facilities should be the subject of special studies, * Number of electric substations;
particularly because of the existing regulations v Miles of water pipeline; and
relating. to seismic safety in many regions and
the expected complexity of the performance and * Number of emergency facilities, such as
impact of these facility types. As a result, the hospitals, fire stations.
losses provided by this study will be
underestimated to the extent that these facility 2. Additionally, where available, measures of
types are not included. function and redundancy have been
compiled on this database. For transmission
Also excluded from the inventory, but included line links, these include:
in the analysis, are distribution systems at the * The capacity of the lifeline and/or the
local level (water, highway, and electrical population served;
systems) and police and fire stations. For these
facility types, the number of facilities in each 25- * The end points of the nodes; and
km by 25-km grid cell, which is the grid size for • Whether the nodes are served by other
the seismic hazard analysis (see Chapter 4), is links.
estimated on the basis of proxy by population.
Each of the inventoried lifelines, as well as those
Each of the above-specified lifelines has been estimated by proxy, are discussed below.
inventoried in terms of its nodes and/or links.
Nodes are points on the lifeline, connected by 2.3 Transportation Data
links. Examples of nodes are highway
intersections and electric substations. Links State and Federal Highway System. A
would be sections of highway, sections of comprehensivenational digitizeddata set on the
pipeline, or electric transmission lines. highway system was obtained from FEMA, as
Intermediate points between links have been shown in Figure 2-1. The system includes state
introduced in some lifelines to provide better and federal highways, but excludes county and
location information on the path of a lifeline local roads. It consists of 27,761 links (about
(i.e., to capture path curvature between nodes). 489,892 km of highways). Right-of-way

The data were compiled and reduced on a


graphical interactive lifelines seismic risk Copyright 1989 EQE Engineering, Inc.
analysis/database management computer

ATC-25
88 2: National
2: Lifeline Inventory
National Lifeline Inventory ATC-25
alignment is indicated, but capacity (i.e., number format. It was assumed,therefore, that the
of lanes) is not person-to-unit-length ratio for electrical
distribution systems.was the same as that for
Local Highway Distribution. Detailed highway highways. In other words, there is approximately
networks at the local level were not readily 1 mile of electrical distribution line for every 300
available in an electronic format. Based on persons. This would correspond to
statistics provided by the California Department approximately 15 feet of electric line per person.
of Transportation, we have determined that
there is approximately 1 mile of local roadway Gas and Liquid Fuel Transmission Pipelines.
for every 300 persons. This would correspond to The National Petroleum Council (NPC, 1989)
approximately 15 feet of local roadway per furnished relatively comprehensive national
person. digitized data on oil and gas pipelines, including
size and material of piping. Figures 2-7, 2-8, and
Federal and State Highway Bridges. Figure 2-2 2-9 picture the crude oil, refined oil, and
shows 144,785 bridges, which have been natural-gas pipelines, respectively. The crude oil
obtained from FEMA's database. Bridges system includes about 77,109 Ionof pipelines.
included are those for state and federal The refined oil system consists of about 85,461
highways. Number of spans and structure types km of pipelines and natural gas system has about
were not available. 67,898 km of pipelines. The database had been
developed as part of a major study on the
Railroad System. This system shown in Figure transportation and capacities for this inmportant
2-3 consists of about 11,340 links (about 270,611 sector of the economy, and potential
kin). The railroad system was provided by catastrophic disruptions. (NPC 1989; it is
FEMA in digitized form; only right-of-way was interesting to note that 'earthquakewas not
indicated. considered as a possible source of disruption in
this study).
Airports. Locations of 17,161 civil and general
aviation airports were provided by FEMA, as Refineries. Figure 2-10 shows 19 refineries
shown in Figure 2-4. nationwide having capacities of 80,000 barrels or
more per day (the size considered in this study).
Ports and Harbors. Location information only Locations of these refineries have been digitized
for about 2,177 ports was provided by FEMA, as from the National Atlas (Geriach, no date).
shown in Figure 2-5.
2.5 Emergency Service Facility Data
2.4 Energy and Fuel Data
Emergency Broadcast Facilities. The locations
Electric Power Generation and Transmission. of 29,586stations were obtained from FEMA
The electric system provided by FEMA included and are shown in Figure 2-11.
230 kV and above and some 115 kV systems
(Figure 2-6). Theinventory contains 4,551 Medical Care Centers. Locations of about 6,973
substations, and 27,372 links, including links centers were obtained from FEMA's database
used to define path curvature between nodes and are shown in Figure 2-12. Structural types
(about 441,981 km of transmission lines). The were not available.
number of circuits, and their voltage or capacity,
however, are not included in the database. Police and Fire Stations. Detailed information
While the lack of capacity information has not was not available for these facilities. They were
been a serious limitation for this study, as estimated as,follows:
discussed elsewhere, we recommend that users
of this inventory data seek to add capacity Fire Stations. Detailed nationwide fire
information before using the data to conduct station inventory data were not readily
regional or local studies. available in an electronic format. Data for
the San Francisco and Los Angeles region
Local Electrical System Distribution. Detailed fire stations were available (AIRAC, 1987)
electrical distribution networks at the local level and were correlated with jurisdictional
were not readily available in an electronic population to determine a relation, which

9
ATC-25
ATC-25 2: National Lifeline Inventow
2: National LifeIine Inventory 9
0 C
-t-
CD
a

In

(A
83

(D

0-
Di

mi
CD
~1<1
a5..
:
UI

r
(D

:3
(D
.-4
C
0

'4
9
i'13
n
IC
c-,n
Nr

Q
CD
Pb
.

!i' tDi

"C
0u

CL

a
0
k.
n
rtI
2.
CD

,-_
-I

o,

t1i

VI
0

to a

Ca-

(D

a
R

en
_.

0
0
t4

r-4

0
.:I
-n
I-I NW
9i en
2o
It4
Axl

Lb
0
-B
Pt

3
ra

:.
ID
rR

I-I
co)
s-a -I,

U,1

0-
0-

ha

0
9
t-

CD

e0

I0

nl
-ri

(T,

r
t:3

al ~1.
In
~i
In

E3

a
r
CD

-1
CD

0S

C--a
3- -M

I'
08

~0

-C3

z
Ra
0
r
5.
i-4

(D
a
CD

en
'-3 &
OD

CD
Q
No
00

p
CD
-a
0 -u
tD

D
co

Pi,

r
(D

(D
Li4
aj

&-A
'-3
-n
CD

I'D

CD

N (n

a.

r
t-

_.
(D

DoI
A
N)
cn
n Hi

(tc
mp
M1
10
m

.
a

0P0

4
w
N -n
ci @~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Q
8j
--

rD

. N --
| . i -,. .-,.,..,. i~~~~s n /,rr

N
. .

X .-
....
.. ~~~~~~~~~~~~~~~~~~.

~
.jf.~ ~~~~.

CD

a
0

I9

it'.
q
0
2
VI
'-3
c(b
0 6Si
M:
C,'
--4
Nj
K

CD

-. /
!,0@^ , ¢rl"1

ZA~~~~~~~~

M
EL

0
, ;.3 1 j S- i

k~~~~~~~-
1.
I-.

(D
1- .1.l tNX ...*zzlS .. , . , .
(P

(P
0
~

t'3j
I-J
permits population to be used as the proxy 2.6 Water Supply Data
measure of the number of fire stations. The
data exhibit a trend that makes population Water Transmission. Detailed information
appear to be a good basis for estimating the nationwide, on water storage, transmission, and
number of fire stations in an area. Intuition treatment was not readily available. A variety of
tells us that this would not be a linear sources were employed to digitize reservoir
function, since at the lower end of the locations and long-line transmission lines for
population scale (a very small town), there large urban areas, of which only a few exceed
would be at least one station (perhaps a tens of miles in length, that is, exceed our grid
volunteer unit) in most towns or areas. In size (e.g., San Francisco, Los Angeles, New
rural forest areas, there may be few or no York). The inventory includes approximately
people residing in an area, but it might have 3,575 km of aqueduct, as shown in Figure 2-13.
several forest fire fighting crews available. A Excluded from the inventory are aqueducts in
bilinear curve was deemed to be simple Utah, which were not available for inclusion in
enough to be usable in a nationwide this study. It is also possible that other
inventory, yet more capable of capturing the significant water transmission lines are
higher presence of fire stations in the less inadvertently omitted from this study, as the
dense areas. The relationship developed is project team had neither time nor funding to
that there is one fire station per every contact all potential sources of data.
13,000 people in a municipality of less than
100,000 people. For municipalities of more Water Distribution. Detailed water distribution
than 100,000 people, there are 9 fire stations network inventory data were not readily
plus one more for every 36,000 additional available in an electronic format. Data from a
people. survey of the largest water districts were
available (AWWA report no. 20212 "1984
Police Stations. Detailed nationwide police Water Utility Operating Data") and were used
station inventory data were not readily to correlate the quantity of piping with
available in an electronic format. Data from population. The data exhibit an apparent
a limited survey of municipalities with relationship between the population served by
different attendant populations were the water district and the total number of miles
obtained and correlated with the of piping in the distribution network. The values
jurisdictional populations in an attempt to vary between different municipalities,
determine a relation, which permits apparently according to population density. New
population to be used as a proxy measure of York City is one of the most densely populated
the number of police stations.The data did municipalities in the United States, and the
not exhibit a strong correlation between the water distribution data reflect this. Overall, the
number of police stations and the average figure, which reflects the relationship
jurisdictional population. There appears to between quantity of piping and populations for
be only one police or law enforcement almosthalf the population of the United States,
station per municipality--cities with more should be a reasonable figure to apply
than one police station are few, except for nationwide. The relationship we developed is
the largest cities. More than one police that there is approximately 1 mile of distribution
station in a municipality appears to be a relic piping for every 330 persons. This would
of older days, with slower travel and correspond to approximately 16 feet of
communications. The data do make possible distribution piping per person.
a stronger correlation to geography (such as
the presence of a municipality)than directly 2.7 PC-Compatible Electronic
to population, but intuition would say that Database
the existence of law enforcement stations in
rural areas, where the station size would be The data discussed above, developed as part of
approximately uniform (one or two officers), this project, form a very significant nationwide
would follow along population bounds. The database on infrastructure at the regional level.
relationship developed is that there is Because the data could also serve as a valuable
approximately one police station per every framework (or starting point) for researchers
60,000 people. who wish to investigate lifelines at the regional

22 2: National Lifeline Inventory ATC-25


'-

CD
(A K
'4
A

to
EL

r CD

Cl)
Q
Co
::
CD
CW
N

rm

0-4

1
L)
or local level, including applications unrelated to the maps on a computer screen. The disks
seismic risk, the data have been formatted for contain 25 files, as shown in Table 2-1. For many
use on IBM-PC compatible microcomputers. of the networks, two files are presented, a .DAT
The data are unrestricted and willbe made file representing an ASCII file of latitude and
available by ATC on 18, 1.2-megabyte, floppy longitude coordinates, and a .DEM file
diskettes, together with a simple executable representing an x/y coordinate file for screen
computer program for reading and displaying plotting purposes, in binary.

Table 2-1 National Lifeline Inventory Electronic Database

File No. File Name Contents

1. DEMO.EXE
2. HW.DEM (the highway network in x/y coordinates)
3. HW.DAT (the highway network in longitude/latitude coordinates)
4. RAILR.DEM (the railroad network in x/y coordinates)
5. RAI LR.DAT (the railroad network in longitude/latitude coordinates)
6. ELECTRIC. D EM (the electric network in x/y coordinates)
7. ELECTRIC.DAT (the electric network in longitude/latitude coordinates)
8. CRUDE.DEM (the crude oil network in x/y coordinates)
9. CRUDE.DAT (the crude oil network in longitude/latitude coordinates)
10. REFINED.DEM (the refined oil network in x/y coordinates)
11. REFINED.DAT (the refined oil network in longitude/latitude coordinates)
12. NGAS.DEM (the natural gas network in x/y coordinates)
13. NGAS.DAT (the natural gas network in longitude/latitude coordinates)
14. BRIDGES.DEM (the bridges in x/y coordinates)
15. BRIDGES.DAT (the bridges in longitude/latitude coordinates)
16. Al RPORTS.DEM (the airports in x/y coordinates)
17. Al RPORTS.DAT (the airports in longitude/latitude coordinates)
18. PORTS.DEM (the ports in x/y coordinates)
19. PORTS.DAT (the ports in longitude/latitude coordinates)
20. BRDSTNS.DEM (the broadcast sta. in xly coordinates)
21. BRDSTNS.DAT (the broadcast sta. in longitude/latitude coordinates)
. 22. MEDCARE.DEM (the hospitals in x/y coordinates)
23. MEDCARE.DAT (the hospitals in longitude/latitude coordinates)
24. WATER.DEM (the water system in x/y coordinates)
IAIATrr nAT (the water system in longitude/latitude coordinates)
ZZ). V Vt% I R.9%.I.Om I

0 A 13- W<ir~v~v'1 Tifgeline Tnvoninrv ATC-25


I Aft
Development of Lifeline Vulnerability
3. Functions
3.1 Introduction vulnerability function (Direct Damage versus
Modified Mercalli intensity and Residual
Vulnerability functions are used to describe the Capacity versus Modified Mercalli ntensity).
expected or assumed earthquake performance Example computations are provided. In
characteristics of each lifeline as well as the time addition, a sample of a complete vulnerability
required to restore damaged facilities to their function generalinformationplus directdamage
pre-earthquake capacity, or usability. Functions information) is included as an illustrative
have been developed for each lifeline example.
inventoried for this project, or estimated by
proxy (see Chapter 2). The components of each 3.2 General Approach for
vulnerability function and how they were CharacterizingEarthquake
developed are described herein in Chapter 3. Performance
The functions themselves, too lengthy to include
in this chapter, are provided in Appendix B. The lifeline facility vulnerability functions used
for this project are based on those developed on
The vulnerability function for each lifeline the basis of expert opinion in the ATC-13
consists of the following components: project (EarthquakeDamageEvaluation Data
for Califomia, ATC 1985). The ATC-13 direct
• General information, which consists of damage data, presented in the form of Damage
(1) a descriptionof the structure and its Probability Matrices I(DPIs, Table 3-1), are
main components, (2) typical seismic applicablefor Standard construction in
damage in qualitative terms, and (3) California, as defined below, and may be
seismically resistant design characteristics modified per procedures. outlined in ATC-13,
for the facility and its components in which shifts the curves. one-to-two intensity
particular. This information has been units down for Special construction, as defined
included to define the assumed below (i.e., - or -2), and one to two intensity
characteristics and expected units up for Nonstandard construction, as
performance of each facility and to defined below (i.e., +1 or +2). Standard
make the functionsmore widely construction is defined (in ATC-13) to include
applicable (i.e., applicable for other all facilities except those designated as,Special
investigations by other researchers). or Nonstandard. Special constriuction refers to
facilities that have special earthquake damage
* Direct damageinformation, which control features. Nonstandard refers to facilities
consists of (1) a description of its,basis in that are more susceptible to earthquake damage
terms, of structure type and quality of than those of Standard construction. Older
construction (degree of seismic facilities designed prior to modern design code
resistance), (2) default estimates of the seismic requirements or those facilities designed
quality of construction for present after the introduction of modern code seismic
conditions, and corresponding motion- requirements but without their benefit can be
damage curves, (3) default estimates of assumed to be Nonstandard. In exceptional
the quality of construction for upgraded cases, older facilities may have had special
conditions, and (4) restoration curves. As -attention paid to seismic forces and may qualify
described below, these curves are based as Standard construction. While Special is
on data developed under the ATC-13 defined in ATC-13 to refer to facilities that have
project (ATC, 1985). special earthquake damage control features, in
this study we take this to include, in some cases,
In the following sections we describe the general facilities designed according to the most modern
approach and specific methodology utilized to design code seismic requirements. Standard is
develop the quantitative relationships for each assumed to represent existing California

ATC-25 3: Development of Lifeline Vulnerability Functions 25


Table 3-1 Typical ATC-1 3 Damage Probability Matrix (ATC, 1985)
(Example for LiquidStorage Tanks, on ground)

Central
&,f"r1;r10r1 Alfor'r-_111ilntpmitv
Damage ..#->U#{CU I .. ........X
.....
- lX-SI4 Xi xi/
Factor VI VI ViII

0.00 94.0 2.5 0.4


0.50 6.0 92.9 30.6 2.1
25.7 2.5 0.2
5.00 4.6 69.0 94.6
20.00 3.3 69.3 58.1 27.4

:******** *
45.00 5.0 39.1 69.4

80.00 0.3 3.0

100.00
***Very small probability

facilities (i.e., a composite of older non- c. All other parts of the United States, which
seismically designed facilities, more recent we assume have not had a significant history
facilities designed to the seismicrequirements of of lifeline seismic design for major
their day, and modern facilities designedto earthquakes.
current seismicrequirements).
As an example, examine on-ground liquid
With regard to regional U.S. seismic design storage tanks (ATC-13 Facility Class 43, Table
practice, the general consensus appears to be 3-1), for which ATC-13 indicates mean damage
that, with few exceptions, only California and from ground shaking of Modified Mercalli
portions of Alaska and the Puget Sound region Intensity (MMI) IX to be 4.6% of replacement
have had seismic requirements incorporated value for Standard construction. If the
into the design of local facilities for any construction is modern and judged to be Special
significantperiod of time. For all other areas of construction, then the mean damage is indicated
the United States, present facilitiesare assumed to be 0.5% (corresponding to MMI VII) for the
to have seismic resistance less than or equal to same intensity of ground shaking. Alternatively,
(depending on the specific facility)that of if the construction is judged to be Nonstandard
equivalent facilities in California NEHRP Map (e.g., predating seismic design), then the mean
Area 7 (Figure 3-1) (ATC, 1978; BSSC, 1988). damage is indicated to be 27.9% (corresponding
In this regard, we have broken the United States to MMI XI) for the same intensity of ground
into three regions: shaking.

a. California NEHRP Map Area 7 (the 3.3 Method for Obtaining Lifeline
general focus of ATC-13), which we take to Direct Damage and Residual
be the only region of the United States with Capacity Functions
a significant history of lifeline seismic design
for great earthquakes, This section presents the calculational
algorithms employed in obtaining the
b. California NEHRP Map Areas 3-6, Non- quantitative lifeline component vulnerability
California Map Area 7 (parts of Alaska, functions for use in the ATC-25 project. Two
Nevada, Idaho, Montana, and Wyoming), vulnerability functions are determined: (1)
and Puget Sound NEHRP Map Area 5, direct damage to a lifeline component, in terms
which we take to be the only regions of the of repair costs expressed as a fraction or
United States with a significant history of percentage of value, and (2) fraction of initial
lifeline seismic design for major (as opposed capacity (restored or remaining) as a function of
to great) earthquakes, and elapsed time since the earthquake, for a given

3: Development of Lifeline Vulnerability Functions ATC-25


26
Legend
Map Area Coeff. A,

E 7 0.40
in 6 0.30
99 5 0.20
IM 4 0.15
00 3
2
0.10
0.05
F-I 1 0.05

Figure 3-7 NEHRPSeismic Map Areas (ATC, 1978; BSSC, 988).

AT,C-25 3: Development of Lfeline Vulnerability Functions 27


MMI, herein termed restoration curves. All TR= 3 = exp(cl) DMG
assumptions operative in ATC-13, such as
TR0 6 = exp(c2) DMGd2
unlimited resources for repair and restoration, TR=1.0 = exp(c3) DMGd3
apply to these results.
Figure 3-3 shows the form of the regression
Three main steps are involved in obtaining the curves we obtained.
vulnerability functions for each component.
Each of these steps is described below. STEP 3

STEP 1 The regressions obtained from the previous two


steps are used to arrive at the restoration curves.
In order to obtain a continuous relation The restoration curve for each lifeline
between seismic damage (DMG) and intensity component, for each intensity (MMI), is
(MMI), a regression of the form obtained by fitting a straight line through the
three points corresponding to 30%, 60%, and
DMG = exp(a) MMP (3.1) 100% restoration time. The regression line has
the following form:
is performed on the damage data points in
R = f + (g) (TR) (3.3)
Appendix G of ATC-13. The regression
coefficients a and b are obtained for each
Facility Class (FC) corresponding to a lifeline where:
component. A damage curve of the form shown
in Figure 3-2 is thus obtained for each Facility R = % restored
Class in ATC-13. TR = restoration time, in days
f, g = regression coefficients
STEP 2
The three points used to fit a straight line by the
Data on time-to-restoration for different Social above regression are obtained in the manner
Function (SF) classes, which are facility types described below:
defined in terms of the four-digit Standard
Industrial Classifications of the U. S. For a given lifeline component, the damage
Department of Commerce, (provided in Table corresponding to a particular MMI is assumed
9.11 of ATC-13), are used to perform the to have a lognormal distribution. The time to
following regression, which gives a continuous restoration is then obtained numerically as the
relation between the damage state and the weighted average of the restoration time (given
corresponding restoration time for each social by Equation 3.2) taken over equal intervals of
function class: the lognormal distribution of the damage. The
weightfactors are the areas of,the equal
TR = exp(c) DMGd (3.2) intervals of the lognormal distribution, i. e., the
probabilities of the corresponding damage. For
where: example,

TR = restoration time, in days TR(3 0% R, MMI) =


DMG = Central Damage Factor (CDF)
for each damage state (DS) N d
c, d = regression coefficients N (pix exp(cl)x DMGj(MM1)d ) (3.4)
1=1
Regressions of the above form are performed
for each of the social function classes using the where TR( 3 0 % R, MMI)) is the restoration
data in ATC-13 on restoration times for 30%, time to 30% restoration for a given MMI, pi is
60%, and 100% restoration. the probabilitythat the damage = DMGi, i.e.,
the area of the interval, i, on the lognormal
Thus, distribution of the damage, and N is the number
of intervals of the lognormal distribution.

28 3: Development of Lifeline Vulnerability Functions ATC-25


O.B

0.7

0.8

wU

Q 0.4

0.1

:0
4 a 10 12
MMI

Figure 3-2 Comparison of ATC-13 Appendix G data (Statistics of Expert Responses for Motion-
Damage Relationships) versus regression curve.

Soo

400
n

S0o
z
0
ro
I--
200

icc

0
0 0.2 0.4 0. O.S. I
DAMAGE

Figure 3-3 Comparison of ATC-73 Table 9.7 data (Weighted Statistics for Loss of Function Restoration
Time of Social Function Classifications)versus regression curve.

ATC-25 3: Development of Lifeline lnerability Functions 29


Similar calculations are also carried out for 60% Table 3-2 Weighting Factors Used to
R and for 100% R. Determine Percent of Social
Function and Facility Classes
Next, the weighted average of TR(30%R, MMI) Contributing to Ports/Cargo
for the different social function classes Handling Equipment
corresponding to the lifelinecomponent is
obtained. This serves as one of the three points Social Function Facility
for fitting the restoration curve.The other two Class Factor Class Factor
points are obtained by repeating the process for
28a 0.6 63 0.6
60% and 100% restoration time. The regression
line given by Equation 3.3, obtained using these 28b 0.4 53 0.4
three data points, is the restoration curve for the
lifeline component. An example to illustrate the
method of obtaining Class 53 (Cranes). The values for the damage
are listed below, together with the ATC-13 data
(1) the direct damage curve and (from ATC-13, Appendix G, weighted mean of
best estimate of damage factor):
(2) the restoration curves, for the
Ports/Cargo Handling Equipment MMI DMC ATC-13) Regr (DMC)
component of the Sea/Water 6 0.004 0.005
Transportation lifeline 7 0.014 0.015
8 0.055 0.041
9 0.11 7 0.096
is provided below. 0.253 0.205
10
11 0.406 0.410
3.4 Example Direct Damage and 12 0.535 0.771
Residual Capacity Computations
The following example illustrates the method of The damage curve for the component as a
obtaining (1) the direct damage curve, and (2) whole is obtained by calculating, for each MMI,
the restoration curves, for the Ports/Cargo the weightedaverage of the damage for each of
HandlingEquipment component of the the facilityclassescorresponding to the
Sea/Water Transportation lifeline. Ports/Cargo component.
Handling Equipment are typically container or
general cargo cranes on piers. This component DMG = ealMMIbl x factor(1) +
is taken to be composed of two ATC-13 Social ea2 MMIb2 x factor(2)
Function Classes: 28a (Ports) and 28b (Cargo = 0.101x 0.6 + 0.096x 0.4
Handling Equipment), and of two Facility = 0.099 for MMI = IX
Classes: 63 (Waterfront Structures) and 53
(Cranes), weighted by the factors indicated in STEP 2
Table 3-2.
Regression coefficients for restoration time are
STEP 1 computed from Equation 3.2 as follows:
Regression Coefficients
Regression coefficients for seismic damage are ' -- D:
* ocial Social
Social
computed from Equation 3.1 for each Facility Function 28a Function 28b
Class (FC) as follows: Restor-
ation % c d c d
Facility Class Rearession Coeffcient 4.8240 1.2514
a b 30% 6.4575 2.7162
Class Factor 60% 5.4769 1.1671 5.6373 1.1880
63 0.6 -20.0847 8.0976 100% 6.1996 1.0445 5.8890 0.8725
53 0.4 -18.2783 7.2508
The values for the time to 30% restoration, for
the Social Function Class 28b are listed below,
The damage regression curve obtained in this together with the ATC-13 data from Table 9.11:
manner is illustrated in Figure 3-2 for Facility

ATC-25
3: Development of Lifeline Vulnerability Functions ATC-25
30
Regression a function of time. From the above equation we
DM0 ATC-13 Values see that PortslCargo HandlingEquipment
0.005 ;0.2 0.1643 subjected to MMI XI will be restored to
0.05 2.3 2.93 approximately 18% of pre-earthquake capacity
0.2 13.3 16.61 after 30 days, and to 48% approximately 90 days
0.45 44.4 45.82 after the earthquake.
0.8 127.0 94.14
1.0 * 125.46
*No statistics provided. 3.5 Sample Lifeline VuInerability
Function
Figure 3-3 shows the curves obtained by the
above regressions, as well as the ATC-13 mean Following is a sample of a complete lifeline
data points. vulnerability function for ports/cargo handling
equipment. Complete vulnerability functions for
STEP 3 all lifelines are given in Appendix B.

-Meanrestoration times for each FacilityClass 3.5.1 PoTsCargoHandlingEqupment


(FC) are obtained from Equation 3.4 as follows:
1. General
Mean Restoration time =
Description: In general, ports/cargo
N handling equipment comprise buildings
E [pI exp(c) DMGId] (predominantly warehouses), waterfront
i=1 structures, cargo, handling equipment, paved
aprons, conveyors, scales, tanks, silos,
where c and d are given above for 30%, 60%, pipelines, railroad terminals, and support
and 100% restoration. services. Building type varies, with steel
frame being a common construction type.
For MMI = XI, for example, mean restoration Waterfront structures include quay walls,
times are computed as follows: sheet-pile bulkheads, and pile-supported
piers. Quay walls are essentially waterfront
T=0.6 masonry or caisson walls with earth fills
FC = 2a 79.73 behind them. Piers are commonly wood or
93.20 211.23
FC = 28b 45.45 1107.66 177.27 concrete construction and often include
batter piles to resist lateral transverse loads.
Cargo handling equipment for loading and
Mean TR 66.02* 98.98 197.65 unloading ships includes cranes for
containers, bulk loaders for bulk goods, and
*e.g., Mean TR = 79.73 x 0.6 + 45.45 x 0.4
pumps for fuels. Additional handling
= 66.02 equipment is used for transporting goods
(Note: P is N where N is the number of
intervals used to divide the lognormal
throughout port areas.
distribution of the damage; N= 100 in this
Typical Seismic Damage: By far the most
example and DMGi is the corresponding
significant source of earthquake-induced
damage value for each interval, i.)
damage to port and harbor facilities has
The final restoration curve for MMv = XI is the been pore-water pressure buildup in the
saturated cohesionless soils that prevail at
best-fit straight line using Equation 3.3 through
these facilities. This pressure buildup can
the 3 points corresponding to restoration times
lead to application f excessive lateral
66.02, 98.98, and 197.65 days. n this case, the
pressures to quay walls by backfill materials,
regression equation is as follows:
liquefaction, and massive submarine slidliniz.
Buildings in port areas are subject to generic
R = 0.026 + 0.005 (TR) damage due to shaking, as well as damage
caused by loss of bearing or lateral
Determination of these relations permits
movement of foundation soils Past
calculation of residual capacity of the lifeline as
earthquakes have caused substantial lateral

ATC-25 3: Development of Lifeline Vulnerability Functions 31


sliding, deformation, and tilting of quay walls horizontal berthing and live loads, and
and sheet-pile bulkheads. Block-type quay because they are not subject to the lateral
walls are vulnerable to earthquake-induced soil pressures of the type applied to quay
sliding between layers of blocks. This walls and bulkheads. However, effects on
damage has often been accompanied by bearing capacity and lateral resistance of
extensive settlement and cracking of paved piles due to liquefaction and induced slope
aprons. The principal failure mode of sheet- instability should also be considered.
pile bulkheads has been insufficient anchor
resistance, primarily because the anchors 2. Direct Damage
were installed at shallow depths, where
backfill is most susceptible to a loss of Basis: Damage curves for ports/cargo
strength due to pore-water pressure buildup handling equipment in the sea/water
and liquefaction. Insufficient distance transportation system are based on ATC-13
between the anchor and the bulkhead wall data for Facility Class 53, cranes, and
can also lead to failure. Pile-supported Facility Class 63, waterfront structures.
docks typically perform well, unless soil Ports/cargo handling equipment are
failures such as major submarine landslides assumed to be a combination of 60%
occur. In such cases, piers have undergone waterfront structures and 40% cranes.
extensive sliding and buckling and yielding
of pile supports. Batter piles have damaged Standard construction is assumed to
pier pile caps and decking because of their represent typical California ports/cargo
large lateral stiffness. Cranes can be derailed handlingequipment under present
or overturned by shaking or soil failures. conditions (i.e., a composite of older and
Toppling cranes can damage adjacent more modern ports/cargo handling
structures or other facilities.Misaligned equipment). Only minimal regional variation
crane rails can damage wheel assemblies and in construction quality is assumed, as seismic
immobilize cranes. Tanks containing fuel design is performed only for selected port
can rupture and spill their contents into the structures, and soil performance is the most
water, presenting fire hazards. Pipelines critical determinant in port performance.
from storage tanks to docks can be ruptured
where they cross areas of structurally poor Present Conditions: In the absence of data
ground in the vicinity of docks. Failure of on the type of material, age, etc., the
access roads and railway tracks can severely following factors were used to modify the
limit port operations. Port facilities, mean curve for the two facility classes listed
especially on the West Coast, are also above, under present conditions:
subject to tsunami hazard.
MMI
Intensity
Seismically Resistant Design: At locations Shift
where earthquakes occur relatively NEHRP Map Area FC53 FC63
frequently the current design practice is to
California 7 o 0
use seismic factors included in local building 0 0
California 3-6
codes for the design of port structures. Non-California 7 0 0
However, past earthquakes have indicated Puget Sound 5 o 0+
that the seismic coefficients used for design All other areas +1 +1
are of secondary importance when
compared to the potential for liquefaction The modified motion-damage curves for
of the site soil materials. Quay wall and ports/cargo handling facilities are shown in
sheet-pile bulkhead performance could be Figure 3-4.
enhanced by replacing weak soils with dense
soils, or designing these structures to Upgraded Conditions: For areas where it
withstand the combination of earthquake- appears cost-effective to improve facilities,
induced dynamic water pressures and assume on a preliminary basis that upgrades
pressures due to liquefied fills. Pier behavior result in a beneficial intensity shift of one
in earthquakes has been good primarily unit (i.e., -1), relative to the above present
because they are designed for large conditions.

__C-_
32 3: Development of Lifeline Vulnerability Functions ATC-25
Time-to-restoration: The time-to- combination of 60% ports and 40% cargo
restoration data assigned to Social Function handling facilities. By combining these data
(SF) 28a, ports, and SF 28b, cargo handling with the damage curves derived using the
equipment, were assumed to apply to all data for FC 53 and 63, the time-to-
ports/cargo handling equipment. Ports/cargo restoration curves shown in Figures 3-5 and
handling facilities were assumed to be a 3-6 were derived.

Fort/Cargo
D=182x
53 RA.4

Other.

D=x
VI lII U111 Ix x
Modlfied Mercalli ntensity (MMI)

Figure 3-4 Damage percent by intensity for port/cargo handling equipment

ATC-25 3: Development oI Lifeline Vulnerability Functions 33


5
Port/Cargo Handling Equipment
11=100 r0a 2.60 b O.Wb
2Bb 0.40 53 0.40

MM a b
6 0.311 0.118
7 0.306 0. 5B
- 0.286 0.0 Z
9 0.240 0.813
0~
Cu
le 0.168 .00?
-o
O R= S0z
R =b *das a
'E
.

* , , , , , * , * I

R= e. L I I I I I I I .

s:
DAYS 30 68 90 120 158 180 218 240 278 300 330 365
Elapsed Time in Days

3-5,
Figure 3-5 Residual capacity for ports/cargo handling equipment (NEHRP Map Area: California
California 7, Non-California 7, and Puget Sound 5).

Port/Cargo Handling Equipment


130- a La C.5 ra4
R=1tex
.

V48 53 8.40

liHI a b
6 0.306 8.858
7 8.286 0.822
8 0.248 8.813
9 0.168 0.007
10 0.826 0.005

H = b * days 4a

ax r
l l
I I I I I
l
I 1l I 1 I
38 68 90 120 158 180 218 240 270 3 330 365
DAYS:
Elapsed Time in Days

Figure 3-6 Residual capacity for ports/cargo handling equipment (all other areas).

.~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~AC2
3: Development of Lifeline Vulnerability Functions ATC-25
34
4. Seismic Hazard
4.1 Introduction best-known scale is that developed by C. F.
Richter (Richter, 1958); and relationships
Seismic hazard, as used in this study, is the between the Richter scale and other scales have
expectation of earthquake effects. It is usually been established. Magnitude scales are intended
defined in terms of ground shaking parameters to be objective, instrumentally determined
(e.g., peak ground acceleration, Modified measures of the size of an earthquake, and a
Mercalli Intensity, peak ground velocity) but, number of magnitude scales have been
broadly speaking, can include or be defined in developed since Richter's (Aki and Richards,
terms of fault rupture, ground failure, or other 1980). The most recent widely used scale is
phenomena resulting from an earthquake. moment magnitude, M, (Hanks and Kanimori,
Seismic hazard is a function of the size, or 1979). An increment in magnitude of one unit
magnitude of an earthquake, distance from the (i.e., from magnitude 5.0 to 6.0), represents an
earthquake, local soils, and other factors, and is increase of approximately 32 times the amount
independent of the buildingsor other itemsof of energy released. Unless otherwise noted,
value that could be damaged. Estimation of earthquake magnitude as used in this study
seismic hazard can be performed on a refers to surface wave magnitude, M..
deterministic (e.g., Evernden et al., 1981) or
probabilistic (Cornell, 1968; McGuire, 1974; While magnitude describes the size of an
Scawthorn et al., 1978; Algermissen and Perkins, earthquake, intensity describes its effects at a
1976; Algermissen, and Perkins, 1982) basis, particular location or site. Intensity at a site is
depending on the needs of the users. In either governed by the magnitude of an earthquake,
case, the methodology follows a process the distance from the site to the earthquake
beginning with the definition of seismic sources, epicenter or rupture surface, and local geologic
based in part on historic seismicity. conditions. A small or moderate earthquake may
generate strong ground shaking but the areal
The historical record of earthquakes in the extent of this shaking will be substantially less
United States is relatively short--the only data than that generated by a major earthquake. The
available for earthquakes prior to about 1900 1931 Modified Mercalli Intensity (MMID,Scale
are historical accounts of earthquake effects (Wood and Neumann, 1931, Table 4-1) is a
(Coffman et al., 1982), which have been used to commonly used measure of intensity. The scale
estimate the distribution of intensities, and the consists of 12 categories of ground motion
locations and magnitudes of earthquakes. The intensity, from I (not felt, except by a few
record of large earthquakes in the 19th century people) to XII (total damage). Structural
is reasonably well documented for the eastern damage generally is initiated at about MM[ VI
United States but not for other parts of the for poor structures, and about MM I VIII for
country. The large 1857 Ft. Tejon event, for good structures. MMI XI and XII are extremely
example, is not well documented, when rare. The MMI scale is subjective; it is
compared with the documentation for the 1886 dependent on personal interpretations and is
Charles ton, South Carolina event (Dutton, affected, to some extent, by the quality of
1887). Instrumental data from stations in the construction in the affected area. Even though it
United States were not available until after 1887 has these limitations, it is still useful as a general
(Poppe, 1979) when the first seismograph description of damage, especially at the regional
stations in the country were established at level, and for this reason will be used in this
Berkeley and MtLHamilton (Lick Observatory). study, as the descriptor of seismic hazard.

4.2 Magnitude and Intensity 4.3 Earthquake Hazards

The earthquake magnitude scale is a well-known Physical damage to structures and ifelines
but typically misunderstood means of describing during and after an earthquake can be produced
the energy released during an earthquake. The by ground shaking, fault rupture, landslides,

4: Seismic Hazard 35
ATC-25
ATFC-25 4: Seismic Hazard 35
Table 4-1 Modified Mercalli Intensity Scale

I. Not felt. Marginal and long-period effects of large earthquakes.


II. Felt by persons at rest, on upper floors, or favorably placed.
Ill. Felt indoors. Hanging objects swing. Vibration like passing of light trucks. Duration estimated. May not be
recognized as an earthquake.
IV. Hanging objects swing. Vibration like passing of heavy trucks; or sensation of a jolt like a ball striking the
walls. standing motor cars rock. Windows, dishes, doors rattle. Glasses clink. Crockery clashes. In the upper
range of IV wooden walls and frames creak.
V. Felt outdoors; direction estimated. Sleepers wakened. Liquids disturbed, some spilled. Small unstable
objects displaced or upset. Doors swing, close, open. Shutters, pictures move. Pendulum clocks stop, start,
change rate.
VI. Felt by all. Many frightened and run outdoors. Persons walk unsteadily. Windows, dishes, glassware broken,
knickknacks, books, etc., off shelves. Pictures off walls. Furniture moved or overturned. Weak plaster and
masonry D cracked. Small bells ring (church, school). Trees, bushes shaken (visible, or heard to rustle).
VII. Difficult to stand. Noticed by drivers of motor cars. Hanging objects quiver. Furniture broken. Damage to
masonry D, including cracks. Weak chimneys broken at roof line. Fall of plaster, loose bricks, stones, tiles,
cornices (also unbraced parapets and architectural ornaments). Some cracks in masonry C. Waves on
ponds; water turbid with mud. Small slides and caving in along sand or gravel banks. Large bells ring.
Concrete irrigation ditches damaged..
Vil. Steering of motor cars affected. Damage to masonry C; partial collapse. Some damage to masonry B; none
to masonry A. Fall of stucco and some masonry walls. Twisting, fall of chimneys, factory stacks, monuments,
towers, elevated tanks. Frame houses moved on foundations if not bolted down; loose panel walls thrown
out. Decayed piling broken off. Branches broken from trees. Changes in flow or temperature of springs and
wells. Cracks in wet ground and on steep slopes.
IX. General panic. Masonry D destroyed; masonry B seriously damaged. (General damage to foundations.)
Frame structures, if not bolted, shifted off foundations. Frames racked. Serious damage to reservoirs.
Underground pipes broken. Conspicuous cracks in ground. In alluviated areas sand and mud ejected,
earthquake fountains, sand craters.
X. Most masonry and frame structures destroyed with their foundations. Some well-built wooden structures
and bridges destroyed. Serious damage to dams, dikes, embankments. Large landslides. Water thrown on
banks to canals, rivers, lakes, etc. Sand and mud shifted horizontally on beaches and flat land. Rails bent
slightly.
Xl. Rails bent greatly. Underground pipelines completely out of service.
XII. Damage nearly total. Large rock masses displaced. Lines of sight and level distorted. Objects thrown into
the air.

Source: Richter, C.F., 1957, Elementary Seismology, W. H. Freeman Co., San Francisco, Calif.
Note: To avoid ambiguity, the quality of masonry, brick, or other material is specified by the following lettering
system. (This has no connection with the conventional classesA, B, and C construction.)
Masonry A. Good workmanship, mortar, and design; reinforced, especially laterally, and bound together by using
steel, concrete, etc.; designed to resist lateral forces.
Masonry B. Good workmanship and mortar; reinforced, but not designed to resist lateral forces.
Masonry C. Ordinary workmanship and mortar; no extreme weaknesses, like failing to tie in at corners, but
neither reinforced nor designed to resist horizontal forces.
Masonry D. Weak materials, such as adobe; poor mortar; low standards of workmanship; weak horizontally.

36 4: Seismic Hazard ATC-25~~~~~~~~


4: Seismic Hazard ATC-25
36
liquefaction, and earthquake-induced fire. can trigger landslides in areas that are already
Ground shaking is the primary and best-known landslide prone. Slope gradient is often a clue to
hazard associated with earthquakes. It produces stability. Landslides are most common on slopes
scattered but widespread damage. Ground of more than 150 and can generally be
shaking includes both horizontal and vertical anticipated along the edges of mesas and on
motions, can last up to several minutes during slopes adjacent to drainage courses.
major earthquakes, and can be destructive at
distances of even hundreds of kilometers, 4.4 Seismicity
depending on soil conditions. It is estimated that
such shaking causes over 90% of earthquake- Seismicity is the space-time occurrence of
related damage to buildings. earthquakes. The historical seismicity of the
United States is shown in Figure 4-1, which
Ground or fault rupture produces local depicts the spatial distribution of earthquakes
concentration of structural damage. Afault is a with maximum MMIs of V or greater, known to
fracture in the crust of the earth along which have occurred through 1976. For the purpose of
blocks have moved or been displaced in relation characterizing seismicity in the conterminous
to each other. This displacement can be in United States, several regions may be identified
either a horizontal, a vertical, or an oblique (Algermissen, 1983), as shown in Figure 4-2:
direction. Near fault lines, fault displacements
produce forces so great that the best method of 1. Northeastern Region, which includes New
limiting damage to structures is to avoid building England, New York, and part of eastern
in areas close to ground traces of active faults. Canada;
Secondary seismic hazards are those related to 2. Southeastern Region, including the central
soil instabilities. Liquefacion is the sudden loss Appalachian seismic region activity and the
of shear strength that can occur when saturated, area near Charleston, South Carolina;
soils that lack cohesion (sands and silts) are
strongly and repetitively vibrated. Liquefaction 3. Central Region, which consists of the area
typically occurs in loose sand deposits where between the regions just described and the
there is subsurface groundwater above a depth Rocky Mountains;
of about 20 feet. Shallow groundwater and loose
soil are usually localized conditions, resulting 4. Western Mountain Region, which includes
either from natural or human-made causes. As a all remaining states except those on the
result, site-specific data generally are necessary Pacific coast;
to accurately determine if liquefaction may
occur at a locationa It usually severely damages 5. Northwestern Region, including
civil engineering works and low-rise buildings. Washington and Oregon; and
Mid- and high-rise buildings in these soils will
tend to have pile foundations, which mitigate 6. California and Western Nevada.
the structural effects of liquefaction, or reduce
liquefaction potential, but may not completely We discuss each of these regions briefly largely
eliminate the threat. using information from Algerinnissen(1983) and
Coffman et al. (1982). These references can
Settlement or compaction of loose soils and provide a more detailed discussion.
poorly consolidated alluvium can occur as a
result of strong seismic shaking, causing uniform Northeastern Region. The Northeastern Region
or differentialsettlement of building contains zones of relatively high seismic activity-
foundations. Buildings supported on deep (pile) -earthquakes of at least magnitude 7.0 have
foundations are more resistant to such occurred in New England and the St. Lawrence
settlements. Substantial compaction can occur River Valley in Canada (Algermissen, 1983).
in broad flat valley areas recently depleted of The historic seismicity of this region is shown in
groundwater. Figure 4-3.

Landslide is the downslope movement of masses One of the largest earthquakes to have affected
of earth under the force of gravity.Earthquakes this area was,the November IS, 1755,

Hazard 37
ATC-25 4: Seismic
ATCG25 4: Seismic Hazccrd 37
0
0

Figure 4-1 Earthquakes with maximum Modified Mercalli Intensities of V or above in the United
States and Puerto Rico through 1989 (Algermissen, 1983, with some modifications).

ATC-25
38 Seismic Hazard
4: Seismic
4: Hazard ATC-25
I L

-1 300

I I I I
110c 1000 900 80O

Figure4-2 Regionalscheme used for the discussionof the seismicityof the conterminous United
States.

4: Seismic Hazard 39
ATC-25
ATC-25 4: Seismic Hazard 39
Figure 4-3 The seismicity of the northeastern region of the United States and Eastern Canada for the
period 1534-1959 (from Algermissen, 1983). The solid circles are principally
instrumentally determined epicenters, while the open circles represent earthquakes
located in using intensity data. The hachured and named areas represent concentrations
of seismicity grouped together only for the purpose of discussion in the text. The dashed
line represents the strike of the New England (Kelvin) sea mount chain offshore. Onshore,
the line has been extended to show the northwest-southwest alignment of seismicity
known as Boston-Ottawa trend.

40 4: Seismic Hazard ATC-25


earthquake east of Cape Ann, with an epicenter effects from these shocks have not been equaled
located at about 42.5 N and 70.0 W, with by any other earthquake in the conterminous
magnitude 60 (magnitude and epicenter United States.
location estimated on the basis of seismic
intensity data). The shock was felt from The seismicity of this region is shown in Figure
Chesapeake Bay to Annapolis, River, Nova 4-7. Earthquakes of small magnitude (less than
Scotia; and from Lake George, New York, to a 5.0) are scattered throughout the region, and
point at sea 200 miles east of Cape Ann, an area the major seismicity is associated with the rift
of about 300,000square miles. structure identified in the New Madrid area.
Since the 1811-1812 sequence, nine events of
Southeastern Region. The seismicity of this estimated magnitude greater than 5.0 have
region is shown in Figure 4-4. With the occurred through 1980, only one of which is
exception of the Charleston, South Carolina, estimated to have been greater than magnitude
earthquake, this region has a moderate level of 6.0 (mb 6.2, in 1895) (Algermissen, 1983).
earthquake activity. The largest and by far the
most destructive earthquakes in this region The New Madrid Seismic Zone lies within a 40-
occurred on August 31, 1886, with their mile-wide,120-mile-longportion of the
epicenter about 15 miles northwest of northern Mississippi embayment--a south-
Charleston, South Carolina (32_9 N, 80.0 W). plunging trough of sedimentary rocks. The
The first shock was at 21:51, the second about 8 boundaries of this zone are at present somewhat
minutes later. An area with a radius of 800 miles. uncertain. The zone may extend farther to the
was affected; the strongly shaken portion south than presently recognized.The epicenter
extended to 100 miles. pattern in the New Madrid area shows well-
defined lineations: a northeast-striking zone
The bending of rails and lateral displacementof that extends about 60 milesifrom near Marked
tracks due to ground displacements were very Tree, Arkansas (approximately 40 miles
evident in the epicentral region, though not at northwest of Memphis), to near Caruthersville,
Charleston. There were severe bends of the Missouri; a north-northwest-striking zone from
track in places and sudden and sharp southeast of Ridgely, Tennessee, to west of New
depressions of the roadbed. At one place, there Madrid; and another northeast-striking zone
was a sharp S-curve. At a number of locations, extending from west of New Madrid to near
the effect on culverts and other structures Charleston, Missouri The first zone is less
demonstrated strong vertical force in action at active, but earthquakes along it have relatively
the time of the earthquake. Figure 4-5 shows. higher magnitudes. The third zone includes
the effects in the epicentral area, and Figure 4-6 frequent eventsof small magnitude.Note that
shows the isoseismal map for the event no identifiable surface faults or offset landforms
(Bollinger, 1977). or drainage features have been identified.

Central Region- Compared to the interior of Because seismic attenuation through frictional
other continents, the centralregion of North damping, or dissipation of earthquake energy
America, especially the Upper Mississippi with distance, is less in the eastern and central
embayment, is one of relatively frequent small- United States than in the west, earthquakes in
to-moderate size earthquakes and infrequent this area have the potential or producing strong
large events. In fact, three of the largest ground shaking over comparatively wide areas.
earthquakes in North American history The isoseismal map of the December 16, 1811,
occurred there (Hopper, 1985).These latter New Madrid earthquake (Nuttli, 1981) is shown
events occurred in 1811-1812, near the present in Figure 4-8- Algermissen and Hopper (1985)
town of New Madrid, Missouri. They were have developed maps of hypothetical intensities
powerful enough to alter the course of the for the region, based on enveloping effects that
Mississippi River. Although masonry and stone would result from an earthquake occurring
structures were damaged to distances of 250 "anywhere from the northern to southern end of
kilometers, and chimneys destroyed to distances the seismic zone."
of 400 kilometers, the sparse settlement of the
area prevented grave damage. The extent and Western Mountain Region. Important
severity of ground failure and topographic earthquake activity in this region has, occurred in

Hazard 41
ATC-25 4: Seismic
ATC-25 4: Seismic Hazard 41
I

85- 8o' LEGEND


Fell Reports 0
11-111 0
IV-V 0
o so " ibs VI VII 0
LV-IX
SCALE:
o so 00 kU.omdtf

x W
Two or mm x
eorthquakes

: Figure4-4 Seismicity of the Southeastern region, 1754-1970 (from Bollinger, 1977).

ATC-25
42 4: Seismic Hazard
4: Seismic Hazard ATC-25
330

ScO

Figure 4-5 Effects in the epicentral area of the 1886 Charleston, South Carolina, Earthquake (from
Algermissen, 19,83).

Hazard 43
ATC-25 4: Seismic
ATC-25 4: Seismic Hazard 43
a) Broad map, based on detailed map
(below)

b) Detailed map of seismic intensity.

Figure 4-6 Isoseismal map of the 1886 Charleston, South Carolina, Earthquake (from Bollinger,
1977).

44 4: Seismic Hazard ATC-25~~~~~~~~~~


44 4: Saismi.c Hazard ATC-25
Figure 4-7 Seismicity of the Central Region, 1877-7976. The data are taken principally from
Algermissen(983) with minor changesand additions. Thestars represent earthquakes
with maximum MMfs of IX or greater, triangles represent earthquakes with maximum
intensitiesof VI-Vffi;squaresrepresentearthquakeswith maximum intensitiesof V-:VI.-

ATC-25 4: Seismic Hazard 45


350

300

Figure 4-8 Isoseismal map of the December 16, 1811, earthquake (from Nuttli, 1979). The Arabic
numbers give the Modified Mercalli intensities at each data point.

ATC-25
4: Seismic Hazard
4: Seismic Hazard ATC-25
46
Figure4-91 Seisnicity of the Western Mountain Region(Algermissen, 983). Starsrepresent
earthquakeswith maximum intensitiesof X or greater;trianglesrepresent earthquakes
with maximum intensitiesof i-VIIf; and squares represent earthquakeswith maximum
intensities of V-Vt.

47
ATC-25 Seismic Hazard
4: Seismic
4: Hazard 47
th e ' e l o ws mn ar - e g n L i r a wilth mmnmuiin mtemsifir
of;lbolut' NI VIot
x esbern . to ita:na .in e icinki o ihe' t h Foes. Damage has benm Iylmtdto uracked
Idaho o der, and'& oradicdhlbaboqngthe waitsand chimneys, and brokevn wi~ndaw, Since
Wasatc[a Front., asshown in Fiig ire 4-S.. Maijoir theire hasbeen very litle nmomble
196011,
earth'quakes oc usrred in He~ena,' Montana,:i~n ,earthquake atiki bit~n'the Utah allej~
P925 (Ms '6.),at HegemInL' er,'I i~iota:na.'n , Ho11eVir, researchhas shiownthat miany Large
1959 i5
M7.1)' nd ait Borah. Peak, Id aho [in1983 sevm v evenits (Ma naiti es .6 to 7-5)h
Lakenpla e along the WamsaitchFrontdurirq the
past IOQ00 years rS wianet al 9 0.
Priobalbllythe most selrious risk iiinithe Western
er, ,eidstsalong the
.iitaiaisnIReg~osn,,.howec~
lh asaxboh From :regioin of o h n uta t h Wa' hington and Oregoin is slhow in Figuire

5La
r
'This area, is domin'ated hy tihe "Wasat lhFault, a 4- 10.. lo3sito. the earthquali[a ctrvi as
:220-mil-lng, noirth-s'ouith-itrending zoan~e 'o urred in the ~wixjutyof'Plu et Sound
'exvtending from Ouinnisocn,Utah, n the souith to Alrthough ai few, geologicai' recent flaults
Mala Ciyj Idhionthie Fuorth, and idirectly thioug$tt t be potenitial[Iy antivie have been
threatening 'th S alitLike City area.. In this located in wesiternand central'Washington, nio
zone, young :Rnountain'blocks haive ibeen upfif ted hisitoiiseismic acit,6ty has been associated wi th
'to foirm t e p r mi n'e t fa i n ( he thi n .1Isie i , sitireior'ded sesmi i
dtviijimT
'Wsatch.F oant'j,whiliarons the seastiern Waslhingitoin] hasbeen atu ibuted ito, the
da cif L[.e 5' it Lake an Uitah 'va'e' i
bou subductilon of the offishoireJuan dieFuca crustal
.Included in ithis zoine is the active Easit Cache plate beneath itle'Noirth American cointinental
IFaulit Sysitem lociated on thie eastern side oil .Plate.-
'aCLalehe. ~ t h e r el it f a l s 'ste m 'o:
linterest is th a'e'ZalyIah it one, located ;Suhdu ition zoines oc uir at o ins w ee
:north 'of the G ewt Salt'ILak :neasrthe boirdeir undertibe influence or ite toni- pIta momenmenit,
wilth Idaho..lithas b esen ithe mosit acivle f' wi in one, pilese o t .ecearith's crust is foirced beneath
the sit'tefor I'irger-sjizbeeenits (A. aba z ans another.. Subductnionzones have been associated
Smith, 179). wi Y large
vwery earthiqualkes incl uding the 1985
9hth
do'i
Nen fly ,NtS81) and 11964.Ala1ka(M 8.3)
Histioric records 'ofeairthiq uake aciviiry in Utah 'events.. Subduction zoines are freiquenit~
date back tso 1853., slhiortly after th e:regjioin was associbated with 'volicaioikaictiiv yas well as
,setitleid Ipe:rnai'entkiy. Sinceithattime. over 1,100 lear [aqu'iles~..'The resence'of thie'voicanically
felt evtents Ih.aWM occufredion a riegalr basis. Tme, a live C'asc.aderan~e s'uplpio:rtsthe eviden e lIbir
searlists~entres srded thathIa s been sstimnaited *anas tve Jua' n ilse.F rasiubs act~:ioin:z'one,.
uc
ito hasve -a maggmitude oil 6.0 ior greaiter was the Furither su~or~n ~ einclud es the
IBecir'Lalke Vall~leyEartlhqualke in 1884 mouintains on the 'Olympic peniinsula hic
(es timated magnitude '6.1 'Thie :1909 'event in11 appecir to have Ibeen formed b debiris scra ed
lHansel Valkey'was assigpied a matirnam init'&isity off t he Juan de Fuca 'plaiteby'h ov ridng
of' .1111and a maagnitude sof 6.0, 'i nd resulted in Noirth Aneri'can plate.u
itheraiway'causcv;yait
'svecir
waveS lbcingssent
the:noirtlh 'end sofithe Great Salt Lake and Available goliogic infoirraaton idicates tait
'windows Ibiin brokein as fr awaeyas SaklitLake ,ith magpiitu'des in'ess' of
,gieait 'earthquakzes"
Ciii%.'Thielairgest earth; iqahkse ' o date in Utah., 8J.we oomiurred on thieJuande Fuaa
'the :1934 Hansell ' ('l'4
ally 'evremnt 6 ) sev e mf sub' actilonz.me at ILea' ei.gLbt times in ithe last
d araged biric lb1ualdings in Kos miD jprodacesd2- 5000 years,.The [asitsuch eVent is ithoug~bt toD
foot s arp i n thbe grow dsuarfaccs,, .6 espitlyalteired havsieoccurred abonit 300 years ago..Evidence for
grousndmaiterfisow paitteirns, and caused Su&hanearthquakein l d s g'lgia yrecnit
nsonsitructurahl damage 'to buiikliiig in Sajlt.Lak iergedi ;
sulb mn hl ns a o s il o e t l n
City. It occurred in a spi rset p'opuLated area, ithe sIingt'on ciasiiii'. It is believe' thalt
''Wa

'otherwise greait 'daimageccould have resulted. Portion'sof the shingtoin~on'st: ,ubsii'sed'by as


imush as 3 ect in tiai event.
Hi'stori 'earthqakedanmagec tio th e Utah V alley
areahass thus fair Ibeend ue to locallearithqalkes En;adtioin: ito the! 6emit eiarthquaak'es ides iribed
'ith rraginitudes'of appro.innately' '5.0 'or le: s., abouvqe x 'ens lye buit moOe rioderaite es naicitj

A'. C2'5
4:: Seismic Hazard
-48
'4B 4:::Seksm1c:Mavard ATC-25
120v

Figure4-10 Seismicityof Oregon and Washington, 1859-1975. The star represents an earthquake with
maximum Modified Mercalliintensity of Ix; trianglesrepresent earthquakes with maximum
intensities of VII-VIII;
and small squares representearthquakeswith maximum intensitiesof
V-VI (Algermissen, 1983).

49
Hazard
Seismic Hazard
4: Seismic
ATC-25
ATC-25 -4: 49'
has been associated with the same subduction conterminous United States. The majority of
zone, deep beneath the Puget Sound trough these shocks occur at relatively shallow focal
between Seattle and Olympia. In this area, depths of 10 to 15 miles and along known
termed the Puget Trough Intercrustal Zone, tf rupture zones or faults. Figure 4-11 shows the
friction between the underlying Juan de Fuca seismicity of this region, while Figure 4-12 shows
plate and overriding North American plate has faults with historic displacements in this region.
resulted in many mid-size events with occasion;
strong damaging shocks. Typically these events While this area is the most seismically active
occur at depths from 20 to 30 miles below the region of the conterminous United States, only
surface and are therefore less damaging than three events with magnitudes greater than Ms
events of similar size in California, which occui 8.0 have occurred in historical times. Two of
at shallower depths. Two of the largest record Id these events occurred on the principal fault in
earthquakes in the Pacific Northwest have this area, the San Andreas, which extends over
occurred in this zone. A Ms 7.1 event in 1949, 600 miles through California, from near the
located near Olympia, caused extensive damag,e Salton Sea in Southern California northwest to
in Seattle, Tacoma, and Olympia. A 1965 (Ms Cape Mendocino. The most famous of these
6.5) event, centered near the Seattle-Tacoma San Andreas events was the April 18, 1906, San
airport, caused MMI VII and VIII damage in Francisco Earthquake (Ms 8.3), caused by a
both Seattle and Tacoma.A mean return pericid rupture of approximately 270 miles in length,
of approximately 30 years has been calculated from San Juan Bautista to off Cape Mendocino.
for events of this size. Great earthquakes of Devastation was extremely widespread, with
magnitude 7.5 or larger are believed credible. enormous losses in San Francisco caused by the
ensuing conflagration (Lawson et al., 1908). The
An earthquake in the northern Cascades in 18 72 other of these events, the Ft. Tejon Earthquake,
had an estimated magnitude of 7.3 and a occurred on January 9, 1857, on a segment of
maximum intensity of MMI IX. Earthquake the San Andreas Fault between Cholame and
intensities of MMI VII were experienced on th e south of Cajon Pass. It may be regarded as a
Olympic peninsula in 1891 and again in 1904. Southern Californiacounterpart of the 1906
Two moderate earthquakes in 1932 and 1945 event. The isoseismal maps for these events are
shook the central Cascades with maximum MTV RI shown in Figure 4-13. In addition to these two
VII. great earthquakes, a number of large,
potentially damaging earthquakes have occurred
The Vancouver-Victoria area, located in the on the San Andreas Fault, including events in
northern portion of Puget Sound,has had a 1838, 1865, and, most recently, the October 17,
relatively large number of smaller earthquakes. 1989, Loma Prieta Earthquake (Ms 7.1). This
However, the maximum magnitudes last event resulted in very significant disruption
experienced have been much lower than those to almost all lifelines, especially the highway and
in the southern portion of Puget Sound.Only electric power networks (Khater et al., 1990).
three earthquakes as large as magnitude 5.5
have occurred in the Vancouver-Victoria area. The third of the great historic California
The corresponding maximum intensities were earthquakes is the 1872 Owens Valley event,
on the order of MMI VII. The estimated resulting from approximately 150 kilometers of
maximum magnitude for the Vancouver- faulting. The area was relatively sparsely
Victoria area is about 6.5. populated but still resulted in about 10%
fatalities in Lone Pine, because of the
Further north on Vancouver Island, over 200 predominantly adobe construction.
miles from Seattle, two earthquakes of
magnitudes 7.0 and 7.4 occurred in 1918 and Another very important fault in Northern
1946, respectively. These events produced California is the Hayward Fault, located on the
maximum intensities of MMI VIII but did not eastern side of San Francisco Bay and extending
cause significant damage in Washington. approximately 55 miles from San Jose
northwesterly to San Pablo (Figure 4-12). The
California and Western Nevada. Earthquakes in Hayward Fault is one of the major active
California and Western Nevada represent a hipgh branches of the San Andreas Fault System, and
percentage of the seismicactivityof the is particularly significant because it passes

so 4: Seismic Hazard ATC-25


Figure 4-1 Seismicity of Western Nevada and California, 1811-1976 (Algermissen, 1983). Stars
represent earthquakeswith Modified Mercalhintensitiesof IX or greater, triangles
represent shocks with maximumintensitiesof VII-VIII;and small squares represent shocks
wih maximum intensitiesof V.

ATC-25 4: Seismic Hazard 51


I. ........ O REGO N IDAHO
t,1, - r~~~- - - - IOAHO.

/ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~I

I FL.EASANT VALLEY

Ij- ",AULTSCARP

UTAH
I

IZONA

LOS ANG

S.N

- SURFACE RUPTURE

TWdORECORDEDRUPTURES

0 150 KILOMETERS
I I

I
120° 116°

Figure 4-12 Faults with historic displacements in California and Nevada. The year of occurrence for
selected large earthquakes is shown (Algermissen, 1983).

4: Seismic Hazard ATC-25


52 4: Seismic Hazard
-ELT LIMITS, 1906

400

te

350'

120' 1150

Figure4-13 Isoseismal map for the January 9, 1857, earthquake on the San Andreas Fault near Fort
Tejon Agermissen, 1983). Also shown, for comparison, are the felt limits for the 1906
San Francisco Earthquake.

__-2 4:SimcHzr
ATC-25 4: Seismic Hazard
53
directly through the heavily populated cities Table 4-2 Representative Earthquakes for
such as Hayward, San Leandro, Oakland, and Lifeline Loss Estimation
Berkeley. It was the source of the Hayward
Earthquake of 1836 (estimated Ms 6.8), in Region Event
which fissures opened along the fault from San Northeastern Cape Ann,1 755
Pablo to Mission San Jose, and ground shaking
Southeastern Charleston, 1886
caused havoc in the settlements of San Jose and
Monterey. In 1868 an earthquake (estimated M. Central New Madrid, 1811 -
6.8) ruptured the fault the fault for 20 miles and 1812
severely damaged every building in the village of Western Mountain Wasatch Front, no date
Hayward. More recent damaging earthquakes
Northwestern Puget Sound, 1949
occurred in 1915, 1933, and 1937. The Hayward
Fault is believed capable of producing Southern California Fort Tejon, 1857
earthquakes as large as magnitude 7.5, and is Northern California Hayward, 1868
presently judged highly likely to rupture with a
magnitude of about 7.0 in the near future
[United States Geological Survey (USGS), earthquake expected in each area. Review of
1990]; this judgment is based, among other Algermissen et al. (1982) indicates general
evidence, on the pairing of San agreement.
Andreas/Hayward events in 1838/1836 and
1865/1868. A large earthquake on this fault is of 4.6 Estimation of Seismic Intensities
potentially catastrophic proportions and Choice of Scenario
(Steinbrugge et al., 1987). Earthquakes for this Project

Similar to the Hayward Fault situation in the Choice of a Model. In order to estimate the
San Francisco Bay Area, the Los Angeles region seismic hazard (i.e., deterministic intensity) of
is threatened by a number of additional faults, the scenario events over the affected area
including the Newport-Inglewood, Santa- associated with each event, a model of
Monica Raymond, Elsinore, Norwalk, and other earthquake magnitude, attenuation, and local
faults and fault zones. Significant events have site effects is required. For the conterminous
included the 1933 Long Beach event (Ms 6.3) Urifted States, two general models were
on the Newport-Inglewood Fault (NBFU, 1933; considered: Evernden and Thomson (1985), and
Binder, 1952), the 1971 San Fernando event Algermissen et al. (1990).
(MS 6.4, San Fernando Fault), and the 1987
Whittier (M. 5.9) event. Both models are applicable for the entire
conterminous United States, and each offers
Other significant events in California have many advantages but addresses two
included the 1940 El Centro (Ms 7.1), the 1952 fundamentally different users. The Algermissen
Kern County (Ms 7.7), and the 1983 Coalinga model is oriented toward probabilistic mapping
(Ms 6.5) events. of seismic hazard, while the Evernden model is
oriented toward exploration of the effects of
4.5 Regional Representative deterministic events. Both models were
Earthquakes considered for use in this investigation.
Selection of one over the other was difficult,but
Based on the foregoing review of conterminous the Evernden model offered the following
U.S. regional seismicity, each region appears to advantages for this study: (1)verification via
have significant historic precedent for a comparison with historical events,
damaging earthquake of potentially catastrophic (ii) incorporation of local soil effects and ready
dimensions. For purposes of examining this availability of a nationwide geologic database,
potential, the earthquakes indicated in Table 4- and (iii) ready availability of closed-form
2 are representative events for the investigation attenuation relations. While determination of
of lifeline loss estimation and disruption. seismic intensities is fundamental to the results
of this investigation,the choice of one of these
Evernden et al. (1981) estimates that these models over the other was not felt to be crucial
events represent almost the maximum to this study, because (i) the primary purpose of

ATC-25
54 4: Seismic Hazard
4: Seismic Hazard ATC-25
this study is not the investigation of seismic
hazards in the conterminous United States, or Table 4-3 Geologic and Ground Condition
comparison of these two models,but rather the Units, Conterminous United States
performance of selected lifelines; and (ii) both (per Evernden et al., 1981)
models probably provide similar results, in the
Ground
mean (it should be noted, however, that the two Condbton Relative
models have not been systematically compared, Units of Geologic Map Unit Intensity
to the author's knowledge).
Sedimentary rocks
Quaternary A 0.00
Use of the Evernden Model.Attenuation of Upper Tertiary B -1.00
ground motion away from the epicenter has Lower Tertiary C -1.50,
been estimated by employing Evernden's model Cretaceous D -2.00
(Evernden et al., 1981). The model contains Jurassic and Triassic E -2.25
several parameters whose evaluations are based Upper Paleozoic F -2.50
on empirical data. Only three factors in the vMiddlePaleozoic G -2.75
model are regionally dependent: the local Lower Paleozoic H -2.75
Younger Precambrian I -2.75
attenuation factor, the length of rupture, and a Older Precambrian i -3.00
parameter related to depth of earthquake focus.
The local attenuation factor changes Volcanic rocks
significantly across different regions. Its value is Quaternary and Tertiary
volcanic rocks K -3.00
about 175 in coastal California, 1.5 in eastern
California and the Mountain States, 1.25 in the Intrusive rocks.
area of the Gulf and Atlantic Coastal plains All ages L -3.00
including the Mississippi Embayment, and 1.0 in
the rest of the eastern United States. Rupture Table 4-3 indicates, the ground condition unit
length and energy released are related by an and relative intensity that correspond to the
empirical relation, which leads to the geologic units of the geologic map. Figure 4-14
observation that all major earthquakes of the shows the conterminous United States mapped
Eastern United States have fault lengths of 10- in terms of these seismic units.
to-40 kilometers maximum. With the local
attenuation factor and rupture length Scenario Earthquakes. Based on the
established, peak intensity at the epicenter earthquakes discussedabove, representative of
serves to establish the depth of focus. all major regions of the conterminous United
States, eight scenario events were selected for
The geologicalmap of the United States this investigation. The eight events are indicated
publishedin the NationalAtlas of the United in Table 4-4. With the exception of the Cape
States ofAmerica (Gerlich, no date ) was used Ann, Charleston, and Hayward events, all
for the complementary geologic base, digitized magnitudesare reflective of the representative
on a 25- by 25-kilometer grid. earthquake for the region (as specified in Table
4-2). The scenario events for Cape Ann,
As noted by Evernden et al. (1981), digitization Charleston, and Hayward have magnitudes one-
at this resolution generally results in saturated half unit higher than the representative event
poor ground not constituting the dominant These magnitudes are interpreted as maximum
ground condition in any particular grid element. credible for these locations.
Therefore, the resulting intensities should
generally be interpreted as those on bedrock, The choice of a scenario event on the Hayward
per Evemrden. This study generally concurs with fault for the San Francisco Bay Area, rather
this point, noting however that even the 25- by than the 1906 San Francisco event, is based on
25-kilometer digitization captures poor ground the perceived high likelihood of a magnitude 7.0
conditions in certain important locations, event (USGS, 1990) as well as the potential for
especially in the Mississippi Valley and along the majordamage and lifeline disruption, should
eastern seaboard. As a generalization, such an event occur (CDMG, 1987). Since most
intensities estimated by the Evernden model can lifelines approach San Francisco Bay from the
be considered to provide lower bounds on site east, more of them cross the Hayward Fault
intensities. than cross the San Andreas Fault. So the

55
ATC-25 4: SelsmTh Hazard
ATC-25 4: Seismic Hazard 55
0
rD
421

CA
-1 0
D~
:ox
Cr

9i.
CoL
4~0
o
n

N
Q XD

X 1
03
Pen
CD

0
CD

CD
Table 4-4 Scenario Earthquakes perceived to be of low likelihood in the near
future.
Region Event Magnide
Northeastern Cape Ann 7 Intensity Distributions. The Evernden model
Southeastern Charleston 7.5
was employed to generate expected seismic
intensity distribution in the conterminous
Central New Madrid 7 and 8 United States for the eight scenario events.
Western Mountain Wasatch Front 7.5 These intensity distributions are presented in
Northwestern Figures 4-15 through 4-22.
Puget Sound 7.5
Southern California Fort Tejon 8 The intensity patterns for these events are seen
Northern California Hayward 7.5
to be basically circular, centered at the
earthquake's epicenter. Deviations from the
circular shape are due to local geologic
Hayward event would appear to represent as conditions. Comparison of estimated intensities
disruptive an event, and potentially more so, with historic event isoseismals indicates general
than the 1906 event, which is presently agreement, though historical events are in some
cases smaller than the scenario event.

ATC-25 4: Seismic Hazard


ATC-25 4: Seismic Hazard 57
CO' -(

A,
(D

Q
OQ
X)
(d
a'

Cn
D

i ~1
'4)

Ka
(I. ~3
VP
I'
90
Q_
D
cn O

a.

N
4

3--1

uJ
6I,

CD

-1
_.

CD
-

-0
S,

2:
en
CD

a Di

. -
0
N
Q
FL CD
-'
I9

-
-
(DO

S
T
U7'
(A~ eN.

CD
C0.

0 Ln
CD
at
':2
E.
,D
,'

B-
-M

I'

I'D

f-.
I

0
CD~

n
S
6*1

'A

C) I
(D

(A1

cQ

:
I3 f~~~~C

4
(D
0j
C
-t
C-
.w
g
I- fo-

t
iD

I
-r
0 Q
O

Q
0

N
rI it
CD-

N
UI
0. -o

CD
a

-. 4

ID

CD

-n
0
Ca
En
0 a.
en
0

N
0

(D

C:'
-n

"I
0 T
. -- ~~~~~~-
- - - - -- .;

Q
. .
rD
(D
0-
*t
(* 7: ,,,. ,, ,:

-Iz

201~~~~~7:! I 7711!.!:.

P..

-ON

En \~~~~~~~~~~~I it:i.iiii, Iz

-o
2C
\~~~~~~~~~~~~~~~~: N, !!V!!!!

N 0~
n
CD
-IX
X ~ ~~~~~~~~~11111111111111

N
Lr'
v2 | ~~~~~~~~I.
.
X ii' 'i~~~l
j.:- j:j jjj-
-VI

km

0o
c"
Estimates of Direct Damage
5.
5.1 Introduction knowledge of seismic design procedures and
criteria. Thus, component vulnerability data for
The analysis of seismic vulnerability of lifeline this study is essentially empirically based, rather
systemsand the economic impact of disruption than resulting from detailed analyses of each
is based on an assessment of three factors.: lifeline component.
* Seismic hazard, The analysisapproach to estimate direct damage
considers both damage resulting from ground
Lifeline inventory, and shaking as well as damage resulting from
liquefaction. Damage due to other collateral
* Vulnerability functions. loss causes, such as landslide and fire following
earthquake, are not included because of the
In this investigation these factors are used to unavailabilityof inventory information and the
quantify vulnerability and impact of disruption lack of available models for estimating these
in terms of (1) direct damage and (2) economic losses nationwide.
losses resulting from direct damage and loss of
function of damaged facilities. Estimates of The analysisapproach for computing direct
direct damage to lifelines, expressed in terms of damage due to ground shaking proceeded as
percent replacement value and dollar loss, are follows. For each earthquake scenario, MMI
discussed in this chapter. Indirect economic levels were assigned to each 25-km grid cell in
losses are discussed in Chapter 6. the affected region, using the Everden MIMI
model, assigned magnitude, and assigned fault
Direct damage is defined as damage resulting rupture location (from Chapter 4). Damage
directly from ground shaking or other collateral states were then estimated for each affected
loss causes such as liquefaction. For each lifeline component (node or link) in each grid
facility, it is expressed in terms of cost of repair cell, using the motion-damage curves provided
divided by replacement cost and varies from 0 to in Appendix B. As described in the following
1.0 (0% to 100%). In this project it is estimated sections, the procedure for utilizing the motion-
using (1) estimates of ground shaking intensity -damagecurves varied slightly by facility type,
provided by the seismic hazard model (from depending on whether the lifeline was a site
Chapter 4), (2) inventory data specifying the specific facility, or a regional transmission
location and type of facilities affected (from (extended) network.
Chapter 2), and (3) vulnerability functions that
relate seismic intensity and site conditions to Damage due to liquefaction was estimated using
expected damage (from Appendix B). -atwo-step method, also taken from ATC-13
(ATC, 1985).First, the probability of ground
5.2 General Analytical Approach for failure in each grid cell was calculated on the
Estimating Direct Damage basis of the soil condition and associated
liquefaction probability assessments provided in
The earthquake survivalof lifelinesdepends on Table 8.4 of the ATC-13 report (p. 230). Only
their seismic performance characteristics. As one soil unit (as defined by Everden) was
described in Chapter 3 and summarized in assumed to be liquefiable: Unit A, which was
Appendix B, the seismicperformance of lifeline assumed to be alluviumwith water table less
components has been characterized in this study than 3-meters deep. Direct damage due to
using data developed from the database of liquefaction in each Unit A grid cell was then
expert opinion elicited in the ATC-13 project estimated as follows:
(ATC, 1985). This expert opinion was based in
part on observations of lifeline components DMG(PG) = DMG(S) x p(GFI) x 5
performance in previous earthquakes as well as (for surface facilities)
estimates of expected performance based on (5.1)
and

5: Estimates ci DIrect Damage 67


ATC-25
ATC-25 5: Estimates of Direct Damage .67
DMG(PG) = DMG(S) x p(GFI) x 10 Valley was more closely spaced and more severe
(for buried facilities) (5.2) due to ground rupture and to other significant
ground distortions associated with nearby fault
whtert- movement; at least some experts who provided
opinions probably considered the fact that
DMG(S) = Mean damage caused by higher MMI is associated with such effects and
shaking incorporated it in their response despite
instructions to consider only ground shaking. In
DMG(PG) = Mean damage caused by this case, also, it is reasonable to speak of
poor ground average damage. Thus, damage due to ground
distortion can, at least in some cases, also be
p(GFI) = Probability of a given presented as uniform or average throughout a
ground failure intensity, given MMI zone. Damage statistics prepared in
taken directly, this way are best applied in situations where not
noncumulatively, from only the hazard (ground shaking and ground
Table 8.4 (ATC-13) for a distortions) but also the structures of interest
given shaking intensity (pipelines, highway bridges, electrical
substations) are distributed somewhat
After damages due to ground shaking and uniformly.It is significantthat most of the
liquefaction were established for each facilityin pipeline damage statistics from San Fernando
each affected grid cell, the total direct damage and from other earthquakes are derived from
for each facility was calculated. As suggested in distribution and transmission networks, which
ATC-13, the total direct damage, DMG(T), was are relatively dense within the MMI zones
simply the sum of damage due to shaking plus considered. The conditions that shaped ATC-13
damage due to liquefaction, with the sum always expert opinion are most nearly approximated in
equal to or less than 1.0 (100 %): such cases (for example, a dense network of
transmission and distribution pipelines); it is
DMG(T) = DMG(S) + DMG(PG) (5.3) reasonable to use ATC-13 damage factors for
these situations.
Cautionary Note Regarding Analysis
Approach.In the scenario earthquakes it is However, to the extent that structures occur
assumed that the damage factor is uniquely sparsely in a grid cell or MMI zone, conditions
related to the MMI zone in the manner differ from those on which many expert opinions
prescribed in ATC-13 (ATC, 1985). There may are based. This is because fewer lifeline
be one or more MMI zones within each 25 km components willbe damaged at all if there are
grid cell, depending on spatial attenuation. In fewer components to coincide with damaging
either case, lifeline damage is assumed to be ground conditions. In the extreme case of a
uniform within each MMI zone. Experts who single lifeline structure in a 25-km grid cell, it
supplied data to the ATC-13 project may may be misleading to apply statistics derived
question application of their opinions to cases from regions with a dense array of structures. In
where lifeline damage does not occur uniformly at least some regions of the scenario
within a grid cell or MMI zone. In the ATC-13 earthquakes, there appear to be only a few
Questionnaiie, on which the damage factors and lifeline components passing through the MMI
loss of function statistics are based, the damage zones or 25-km grid cells. In instances where
factor is defined as damage due to ground trunk and transmission lines are sparse in a
shaking only (see ATC-13, p. 175). This MMI zone or grid.cell,application of ATC-13
approach probably led ATC-13 experts to statistics may be misleading because structure
provide an adequate picture of lifeline damage and hazard coincide much less frequently than is
in many cases. For example, damage to pipelines assumed. This possibility introduces an
in southern San Fernando Valley as a result of additional type of uncertainty that affects the
the 1971earthquake was primarilydue to average damage factors used in this study.
ground shaking, and was geographically
distributed in a way that it is reasonable to speak The foregoing discussion is based on intuition,
of average damage within a given MMI zone. not on rigorous analytical modeling. However, if
Damage to pipelines in northern San Fernando this discussion is valid, the effect of applying

Damage ATC-25
15: Estimates of Direct
Estimates of Direct Damage. ATC-25
68
ATC-13 statistics in this study may result in sustain major to destructive damage (60 to
overestimates of damage. 100%) (Table 5-la). ThePuget Sound
magnitude-7.5 scenario event would seriously
5.3 Direct Damage Estimates for Site- affect an even larger number of airport
Specific Lifelines terminals, with 12% or approximately 43
airports expected to sustain damage in this same
Direct damage to site-specificlifelines,ie., range (60 to 100%). In the case of the Cape
lifelines that consist of individualsited or point Ann and Charleston events, direct damage to
facilities (e.g., hospitals), were estimated using terminals is also significant Direct damage to
the methodology specified above. For airports, runways,(Table 5-lb), on the other hand, is
ports and harbors, medical care facilities relatively low for most scenario events; if
(hospitals), and broadcast stations, the inventory damage does occur, it is,usually less than 30%.
data summarized in Chapter 2 were used to
define the number and distribution of facilities. The reason for the relatively high impact on
For fire and police stations, locations were airports in the Puget Sound event is assumed to
assumed to be lumped at the center of the be due to the high concentration of airports
Standard Metropolitan Statistical Areas, and near the source zone and poor ground, i.e.,
number of facilities affected were estimated by liquefiable sites. For the New Madrid event, the
proxy, assuming the previously established cause appears to be due to a combination of
relationships,between population and number poor ground, low ground-motion attenuation
of facilities. with distance, and lack of seismically resistant
design construction features.
For summary and comparative purposes, four
damage states are considered in this study: 5.3.2 Ports and Harbors
* Light damage (1-10% replacementvalue); Since ports and harbors are located in the
coastal regions, only those scenario earthquakes
Moderate damage (10-30%replacement affecting these regions will negatively impact
value); this facility type. As indicated in Table 5-2, the
most severe damages to ports and harbors are
* Heavy damage (30-60% replacement value); expected for the Charleston and Puget Sound
and events. For example,one hundred percent, or
20 ports and harbors, in South Carolina can be
* Major to destroyed (60-100% replacement expected to sustain heavy damage (30 to 60%),
value). and 73%, or approximately 22 such facilities
would be similarly affected in Georgia. In
The total number of affected facilities and the Washington, 14% of the ports (approximately
percentage of facilities in each damage state are 11) would be similarly affected. Numerous ports
summarized for each scenario earthquake in and harbors in these states would also sustain
Tables 5-1 through 5-6. Following is a discussion moderate damage (10 to 30%), as would
of the direct damage impact on each site-specific approximately 22 such facilities in California for
lifeline considered. the Hayward magnitude-7.5 event. The primary
cause of such damage, of course, is poor ground.
5.3.1 Airports
5.3.3 Medical CareFacilities
Direct damage summaries for civil and general
aviation airports for the various scenario Direct damage summaries for medical care
earthquakes (Tables 5-la and 5-1b) indicate that facilities (hospitals) for the various scenario
damage to terminals is expected to be earthquakes (Table 5-3) suggest that damage to
particularly high in the magnitude-8.0 New this facility type will be relatively high for the
Madrid and Puget Sound earthquake scenarios. Puget Sound, Charleston, New Madrid, Fort
For example, for the New Madrid magnitude-8.0 Tejon, and Hayward scenario events. For
event, 13% of the airports in Arkansas (23-in example,damage data for the Puget Sound and
total), 6% of the airports in Missouri (25 in Charleston events indicate that 15% of the
total), and 2% in Tennessee (4 in total) would hospitals in Washington (15 in total) and 13% of

of Direct Damage 69
ATC-25
ATC-25 5: Estimates
5: Estimates of Dizect Damage 69
04

Table 5-1a Damage Percent for Air Transportation Terminals for Each Scenario
Earthquake (Percent of Airports in State)

CHARLESTON (M=7.5)
NEWMADRID (M=8.0)
South Carolina North Carolina Georgia
Missouri Arkansas Tennessee Kentucky Mississippi
* Illinois 147 309 343
Total Number 425 177 196 149 193
547

Light Damage 64% 33% 24% 28%


11% 5% 17% 18% 26%
1-10%
Moderate 20% 1% 1%
21% 13% 3% 19%
10-30 % < 1% 0%
Heavy 0% 0% 0%
5% 0% 0% 0%
30-60 % 0% 0%
gn Major to Destructive 4% 0% 2%
13% 2% 0% 0%
60-100 % 0% 6%
en

ua
(D WASATCH FRONT (M=7.5)
CAPEANN (M=70)
w
0 Utah
Massachusetts Connecticut Delaware Rhode IslandNew Hampshire
63 107
Total Number 149 115 37 55

Light Damage 56% 15%


77% 57% 65% 55%
1-10 %
Moderate 0% 23%
<11% 0% 0% 0%
10-30 %
Heavy 0% 0%
0% 0% 0% 0%
30-60 %
Major to Destructive I 0% 0% 0%
60- 00 % 4% 0% 0%

HA YWARD FORT TEJON PUGETSOUND


(M=8.0) (M=7.5) NEW MADRID (M=70)
(M= 7.5) Mississippi
0 Illinois Missouri Arkansas Tennessee Kentucky Mississippi
Cialifornia California Washington 149 193
547 425 177 196
CDi Total Number 869 869 364

Light Damage 31% 19% 7% 32%


9% 12% 15% < 1% < 1%
1-10 %
Moderate 12% <1% 0% 0%
2% 14% 6% 0% 2%
10-30 %
Heavy 0% 0% 0% 0%
0% <1% 6% 0% 0%
30-60 %
Major to Destructive 1% 2% 0% 0%
Cn
0% 0% 12% 0% 3%
60-100 %
Table 51 b Damage Percent for Air Transportation Runways for Each Scenario Earthquake
(10 (percent of Airports in State)

NEWMADRID (M=8.0) CHARLESTON (M=7.5)

Illinois Missouri Arkansas Tennessee Kentucky Mississippi South Carolina North Carolina Georgia
Total Number 547 425 177 196 149 193 147 309 343

Light Damage
1-10% <1% < 1% 20% 3% < 1% 17% 2% 1% 1%
Moderate
10-30 % 0% 5% 15% < 1% 0% 0% 3% 0% 2%
Heavy
30-60 % 0% 1% 0% 2% 0% 0% 1% 0% 0%
01 Major to Destructive
60-10 % 0% 6% 0% 0% 0% 0% 0% 0% 0%

CAPE ANN (M-7.0) WASATCH FRONT (M=7.5)


in Massachusetts Connecticut Delaware Rhode Island New Hampshire Utal
CD Tdtal Number 149 115 37 55 63 107

Light Damage
1-10 % <1% 0% 0% 0% 0% 5%
Moderate
0 10-30 % 4% 0% 0% 0%
0% 0%
Heavy
30-60 % 0% 0% 0% 0% 0% 0%
Major to Destructive
60-100 % 0% 0% 0% 0% 0% 0%

HA YWARD FORT TEJON PUGETSOUND


(M= 7.5) (M=8,0) (M=7.S) NEW MADRID (M=7.0)

California California Washington Illinois Missouri Arkansas Tennessee Kentucky Mississippi


Total Number 869 869 364 547 425 177 196 149 193

Light Damage
1-10 % 4% 7% 6% 0% 2% 12% < 1% 0% 2%
Moderate
10-30% 2% 14% 16% 0% 3% 1% < 2% 0% 0%
Heavy
30-60 % 0% < 1% 0% 0% 0% 0% 0% 0% 0%
Major to Destructive
60-100 % 0% 0% 0% 0% 0% 0% 0% 0% 0%
Table 5-2 Damage Percent for Ports for Selected Scenario Earthquakes (Percent of Ports
in State)

CHARLESTON (M=7.5) CAPE ANN (M=70)

Georgia Massachusetts Connecticut Delaware Rhode Island New Hampshire


South Carolina North Carolina
34 22 10 22 9
Total Number 20 16 30

Light Damage 0% 0%
0% 0% 10% 100% 0% 86%
1-10 %
Moderate
0% 0% 0% 0% 0% 0% 00%
10-30 % 0%
Heavy 0%
100% 0% 73% 0% 0% 0% 0%
30-60 %
Major to Destructive
0% 0% 0% 0% 0% 0% 00%
60-100 % 0%

HA YWARD FORT TEJON PUGETSOUND


(M=7.5) (M=8.0) (M=7.5)

California California Washington


Total Number 125 125 77

Light Damage
1-10 % 4% 0% 25%
Moderate
10-30 % 22% 34% 26%
Heavy
30-60 % 0% 0% 14%
Majorto Destructive
60-100% 0% 0% 0%

0
n:
Table 5-3 Damage Percent for Medical Care Facilities for Each Scenario Earthquake
(Percent of Facilities in State)

01

NEW MADRID (M=8.0) CHARLESTON (M=7.5)

South North
Illinois Missouri Arkansas Tennessee Kentucky Indiana Mississippi Carolina Carolina Georgia
Total Number 249 171 99 167 125 102 127 91 161 207

Light Damage
1-10 % 22% 6% 16% 18% 20% 7% 62% 30% 15% 32%
Moderate
10-30 % 0% 0% 29% 14% <1% 0% 17% 7% 2% 1%
Heavy
30-60 % 0% 0% 3% 0% 0% 0% 0% 10% 0% 0%
Major to Destructive
60-100 % 0% 3% 7% <1/0 0% 0% 0% 3% 0% 1%

CAPE ANN (M-70) WASATCH FRONT (M=7.5)

Massachusetts Connecticut Delaware Rhode Island New Hampshire Utah


Total Number 167 66 13 22 40 53

Light Damage
1-10 % 90% 50% 46% 82% 48% 17%
Moderate
10-30 % 0% 0% 0% 0% 0% 51%
Heavy
30-60 % 0% 0% 0% 0% 0% 0%
Major to Destructive
60-100 % 2% 0% 0% 0% 0% 0%

HA YWARD FORT TEJON PUGET SOUND


(M=Z5) (M=8.0) (M=7.5)

California California Washington


Total Number 478 478 102

Light Damage
1-10% 12% 16% 7%
Moderate
10-30% 16% 20% 18%
Heavy
30-60 % 9% 10% 5%
Major to Destructive
60-100 % 0% 0% 10%
the hospitals in South Carolina (12 in total) events and slightly less for the Wasatch Front
would sustain heavy or major-to-destructive and Fort Tejon events. Data for the New
damage (30 to 100%). In the New Madrid. Madrid magnitude-8.0 earthquake scenario
magnitude-8.0 event, 10% of the hospitals in indicate that 17% of the broadcast stations in
Arkansas (10 in total) and 3% of the hospitals in Arkansas (approximately 78 in total) would
Missouri (5 in total) would sustain similar sustain heavy damage or major-to-destructive
damage. In California, 10% and 9%, or 48 and damage (30 to 100%). For the Charleston event,
43 hospitals, respectively, would sustain heavy 23% or 87 broadcast stations would be similarly
damage (30-to-60%) in the Fort Tejon and affected, and for the Puget Sound event, 14%
Hayward scenarios. It is worth noting that (122 in total) would be similarly affected.
results from a separate study by Applied Percentages for the Wasatch Front and Fort
Technology Council (ATC, 1991) appear to be Tejon equal approximately 5%, representing 54
comparable for the magnitude-7.5Hayward damaged broadcast stations in Utah and 77 or
fault scenario. fewer in California.

As in the case of airports, the reason for severe 5.4 Direct Damage Estimates for
damage to hospital facilitiesin the Puget Sound, Extended Lifeline Networks
New Madrid, and Charleston events is assumed
to be strongly correlated with poor ground This section presents direct damage estimates
conditions and construction practices. for extended network lifelines, such as highways,
railroads and other networks at the bulk and/or
5.3.4 Policeand FireStations regional level. The inventory data provided in
Chapter 2 were used to define the location of all
As in the case of medical care facilities, direct npdes and links. For all systems except pipelines,
damage data for police and fire stations (Tables direct damage is estimated using the
5-4 and 5-5) suggest that damage to this facility methodology specified above. Results are
type willbe more severe for the New Madrid, presented in terms of (1) the same four damage
Charleston, and Puget Sound events than for states used for site-specific lifelines, and (2)
the California, Wasatch Front, and Cape Ann maps indicatingthe damaged portions of each
events. For example, data for the New Madrid extended network for the various scenario
magnitude-8.0event indicate that 9% of the fire earthquakes.
stations and 8% of the police stations in
Arkansas would sustain heavy or major-to- For pipelines, direct damage is estimated (1)
destructive damage (30 to 100%). Thirteen and using the damage curves specified in Appendix
twelve percent, respectively, of fire and police B (in terms of breaks per kilometer), (2) a
stations in South Carolina would be similarly model that estimates the probability of breaks
damaged in the Charleston scenario event, and occurring within given lengths of pipe subjected
15% and 8%, respectively, would be similarly to given earthquake shaking intensities (Khater,
affected by the Puget Sound magnitude-7.5 M., et al., 1989), and (3) a special procedure for
scenario event. estimating damage due to liquefaction. Breaks
are assumed to occur according to a
The reason for severe damage to fire and police nonhomogeneous Poisson process. The
stations in the Puget Sound, New Madrid, and probabilityPf of having at least one break in a
Charleston events is assumed to be strongly line with length L is given by
correlated with poor ground conditions and
construction practices. N
Pf (L, MMI(x)) = 1- II Ps(lkyMMIk) (5.4)
5.3.5 Broadcast Stations k=1

Direct damage to broadcast stations for the where


eight scenario earthquakes follows a slightly
different pattern than for the other site-specific Ps(lk, MMIk) = exp(- Xkx1k) k=1,...,N (5.5)
lifelines. As indicated in Table 5-6, direct
damage is relatively high for the magnitude-8 in which 11is the multiplier operator; N is the
New Madrid, Charleston, and Puget Sound number of grid cells through which the pipeline

Damage ATC-25
74 5:
5: Estimates of Direct
Estimates of Direct Damage ATC-25
Table 5-4 Damage Percent for Fire Stations for Each Scenario Earthquake (Percent of
Stations in State)
h
(A
NEWMADRID tM=8.0) CHARLESTON (M=75)

South North
Illinois Missouri Arkansas Tennessee Kentucky Mississippi Carolina Carolina Georgia
Total Number 923 41 185 378 285 200 275 570 490

Light Damage
1-10 % 4% 2% 15% 18% 6% 14% 18% 2% 14%
Moderate
10-30 % 2% 1% 1 S/9 5% 0% 10% 1% 0% 1%
Heavy
30-60 % 0% 2% 9% 0% 0% 0% 13% 0% 1%
Major to Destructive
60-100 % 0% <1% 0% * 1% 0% 0% 0% 0% 0%

(A
HA YWARD FORT TEJONPUGET SOUND NEW MADRID
th (M=7.5) (M=8.0) (M=7.5) (M=7.0)
(n
0 California California Washington Missouri Arkansas Tennessee Kentucky Mississippi
I-%J
Total Number 2230 2230 361 410 185 378 285 200
0-
Light Damage
1-10 % 7% 15% 3% 0% 15% 10% < 1% 5%
Moderate
10-30 % 3% 27% 18% 8% 0% 0% 0%
R Heavy 1%
30-60 % 0% 0% 15% 1% 0% <1% 0% 0%
Major to Destructive
60-100 % 0% <1% 0% Q% 0% 0% 0% 0%

CAPE ANN WASATCH FRONT


(M7.0) (M=7.5)

Rhodc
Massachusetts IslanoI Utah
Total Number 459 69 140

Light Damage
1-10% S7% 5% 51%
Moderate
10-30% 0% 0% 11%
Heavy
30-60 % 2% 0/u 0%
Major to Destructive
01
60-100 % 0% 0% 0%
Table 5-5 Damage Percent for Police Stations for Each Scenario Earthquake (Percent of
Stations in State)

NEW MADRID (M=8.0) CHARLESTON (M=7.5)

Tennessee Kentucky Mississippi South Carolina North Carolina Georgia


Iin ois Missouri Arkansas
132 126
Total Number 12 102 48 98 74 52 70

Light Damage 2% 13%


4% 2% 14% 10% 5% 13% 16%
1-10 %
Moderate 0% 1%
2% 1% 10% 5% 0% 9% 1%
10-30 %
(n Heavy 0% 1%
0% 2% 8% 0% 0% 0% 12%
30-60 %
ta Major to Destructive 0%; 0%
60-100 % 0% <1% 0% <1% 0% 0% 0%

CD
0
0
(A WASATCH FORT PUGET
0 FRONT HAYWARD TEJON SOUND
rIDIA, A ,A flflnf t
(M=/.Z5)
n

CAPEANN (M=7.0) (M=7.5) (M=75) (M=8.0) NtW:VwwwIJfu (=f.U)


a
Rhode
Utah California California Washington Missouri Arkansas Tennessee Kentucky Mississippi
Massachusetts Island
118 18 34 580 580 94 102 48 98 74 52
Total Number.

Light Damage 5%
26% 5% 22% 6% 14% 3% 0% 14% 9% <1%
1-10 %
Moderate 0%
0% 0% 10% 3% 8% 16% 1% 7% 0% 0%
10-30 %
Heavy 0%
2% 0% 0% 0% 0% 8% 1% 0% <1% 0%
30-60 %
0
*Q Major to Destructive
<1% 0% 0% 0% 0% 0% 0%
60-100% 0% 0% 0% 0%

:0i
en
Table 5-6 Damage Percent for BroadcastStations for Each scenario Earthquake (Percent
of Stations in State)
0
(A
NEWMADRID (M=8.0) CHARLESTON (M-75)

South North
Illinois Missouri Arkansas Tennessee Kentucky Indiana Mississippi Carolina Carolina Georgia
Total Number 600 524 456 587 474 407 416 377 697 604

Light Damage
1-10 % 8% 6% 16% - 6% 16% 4% 51% 15% 17% 23%
Moderate
10-30 % < 1% 0% 14% 20% 7% 0% 16% 240/a 4% 16%
Heavy
30-60 % 0% 0% 12% 4% <1% 0% 12% 5% 1% 1%
Major to Destructive
60-100 % 0% 4% 5% 1% 1% 0% 0% 18% 0% 2%

CAPE ANN (M= 7.0) WASATCH FRONT M=7.5)

Massachusetts Connecticut Delaware Rhode IslandNew Hampshire Utah


Total Number 274 155 42 53 112 900

Light Damage
1-10 % 38% 50% 74% 70% 40% 10%
Moderate
10-30 % 35% 0% 0% 26% 0% 27%
Heavy
30.60 % 0% 0% 0% 0% 0% 5%
Major to Destructive
60-100 % 1% 0% 0% 0% 0% 0%

HA YWARD FORT TEJON PUGET SOUND NEW MADRID


(M7.5) (M=8.0) (M=7.5) (M=.0)
California California Washington Illinois Missouri Arkansas Tennessee Kentucky Mississippi
Total Number 1,528 1,538 872 600 524 456 587 474 416

Light Damage
1-10 % 4% 16% 2% 0% 1% 12% 13% 6% 15%
Moderate
10-30 % 8% 4% 8% <1% 0% 15% 11% 2% 3%
Heavy
30-60 % 1% 4% 5% 0% 1% 4% < 1% 1% 0%
Major to Destructive
60-100 % 0% < 1% 9% 0% 2% 0% 1% 0% 0%
Table 5-7 Damage to Railroad System (Length of Roadbed, Kin)

Light Major to
Damage Moderate Heavy Destructive
Events 1-10% 10-30% 30-60% 60-100%
Cape Ann 0 0 63 0

Charleston 890 85 980 0

Fort Tejon 640 340 825 47


Hayward 988 47 445 140
New Madrid (M=8.0) 3,000 670 1,780 485
New Madrid (M=7.0) 1,198 0 640 0

Puget Sound 340 0 650 0

Wasatch Front 770 300 0 0

Total System Length = 270,611 km

passes; k and MMIk are the length of the events would also be severe, with 980, 650, and
lifeline element and the Modified Mercalli 640 km of roadbed, respectively, sustaining
Intensity, respectively, within grid cell k; and X k heavy damage (30-to-60 %). Maps showing the
is the mean break rate (taken from Appendix distribution of damage to the railroad system for
B). each of the 8 events are provided in Figures 5-1
to 5-8.
Maps are provided showing sections of pipeline
for which the probability of failure exceeds 60% 5.4.2 Highway System
for the various scenario earthquakes. For soil
conditions where liquefaction is possible, a The highway system is also a highly redundant
break is assumed at each location where the system, consisting of freeways/highways and
pipeline crosses into a liquefiable zone. bridges. As is in the case of the railroad system,
damage to the highway system for each scenario
5.4.1 Railroad System event was found to be localized to the epicentral
area. Direct damage to freeways/highways,
The railroad system is'a highly redundant expressed in terms of km of roadway in the
system, and damage to the system due to the various damage states, are summarized in Table
selected events was found to be relatively 5-8 and plotted on Figures 5-9 to 5-16 for the
localized to the epicentral area. Direct damage eight scenario earthquakes. Bridge damage,
to the railroad system for each scenario event is expressed in terms of the percent of bridges in
summarized in Table 5-7, which lists the length each damage state, is summarized in Table 5-9.
(km) of damaged railroad right-of-way within The roadway and bridge damage data are based,
each damage state. The damage estimates are respectively, on damage curves for
based on damage curves for track/roadbed and freeways/highways and for conventional bridges;
exclude damage to related facility types not the estimates exclude damage to tunnels, which
included in the project inventory--railway are not included in the project inventory. We
terminals, railway bridges and tunnels. note also that all bridges are assumed to be
conventional bridges because of (1) lack of
The direct damage data suggest that the capacity/size information in the project
magnitude-8 New Madrid, Fort Tejon, and inventory and (2) the very small percentage of
Hayward events would cause the most extensive major bridges in the overall national database.
damage, with 2,265 km, 872 km, and 585 km of
roadbed, respectively, sustaining damage in the Tables 5-8 and 5-9 indicate that direct damage is
30 to 100% range. Damage in the Charleston, not expected to be as severe for
Puget Sound, and magnitude-7.0 New Madrid freeways/highways as it is for bridges. For

78 5: Estimates (3f Direct Damage ATC-25


-n
:p,
H
n CD
U,
-4

An
N
ol Di

I
a
rb

.. D'
_.
CD

a CD
S
El me
0
S.
ti *1
Am
K.
9
CD

a
ci
.S :I
N3
0

'4
0o -nl
-i
cD
U,

- C~~~~~~~-
OQ
CD

tyl Co
(A
p.'
M
CD
0
a , -' '_5>__+_ N ' B_

~'1
EP
CD i3
to
Oq
(A
6.

64

.
3 30-
CD
0II
a1
5,
Ml

Q -G0s

4Sk
1 -1 0
L\ {P> r >t~~~f
sOt( m 1 1 O- -- --------
-n

N N,
CD
.
CM

Q
~2
Di
9Q

01 (iw
0

,
0)
CD
(D
es.
on
a.
(a

a D
i'
(D
M
U,
0 4
I-4.

a 0Q

11
co

00
-A4
1

~3
CD

0
CD

E3
02
0
CA
tn.

.-
ow
-a
0-
0 tA

P4
nD
a
CA

t) (D

II

:11

0
Q'
I-!

9 (b
OF
PD--
P

C2
0
io

cn
in
El
B-

a t
C

(I) Q
21:I,
rD
(D I
E3
a
R
1.
CD
I
CD LC

U .duu

km
IN
-I,

C.
Lu

8'

Yl

. w
N _,
-

.
S I

I.
iN
N,
, -0

%/
.

I
-' --,~ I I

I IIt k
-'N I
iI'

I
-

I W's-
-
I-$
J

I,
,

I
,f e

I
.
a- -

...
v -

- .

I 'ra*e - - -_

S
0

0~
L_ - - N f ^ I
'N
I
Co cn
3
"C
J fI Ns
CD
Il '4
o0

.1
U-
I
I
Q-
z I-
I
ta nCD
S
Q Dli

\~~~
I.
I

_ Tl
,-0

CD N - It :N
/ it.
. 'Daia ge
N -

3
:

!t I
- N1
I /
_\30-30- I> 5j

3:0
I I -I

:''~~ f'"'"r----
lS

K~~~~~~~~~~~
-

% (
J
%
1
s

ke
;S ' - - -
o , -- --
,,~~~~~~~~~~~~~~- Ip

Ie 1 = -
N I , d

0 100
km
Q
enI
(A m
1Ln
4

(D
w
N
(bCi

I
CD

Ol
X
U'

a I

0 /~~~~~~~~ I /
C? t

U
-I /~~~~~~~~
(D
a On - ,, t

t ~ ~~
-

(D
en,, _: - ,. , 1It
, II- F
C 1}a rawakge-
11
k

3 - 60 --
en4

-, I
10-30 1.

0-1% -----
I

- I
-I
I

03
alr
-n
0
c
-

&
o0
CD

D
'

0~

.n0
In

a.
CD
tv} C4
E.
WI a
NC
CA
0
.N

Qg -n
0
OC
AD

(a I
:D
D
a.
,,
a
11.
.

n
tt)
CP
Table 5-8 Damage to Freeway/Highway System (Length of Highway, Km)

Light Major to
Damage Moderate Heaq Destructive
Event 10-30% 30-60% 60-100%
Cape Ann 74 182 0 0
Charleston 2,182 999 0
Fort Tejon 0
2,174 1,557 0
Hayward 0
1,567 476 0
New Madrid (M=8.0) 0
4,967 2,753 0D 01
New Madrid (M=7.0) 0
1,800 720
0
Puget Sound 0
665 769 0
Wasatch Front 01
1,392 0 0
Total System Length = 489,892 km

example, direct damage to freeways/highways is transmission lines for the eight scenario
not expected to exceed 30% at any location for earthquakes.
any scenario earthquake. Data for bridges
(Table 5-9), however, suggest that direct Damage data for transmission lines (Table 5-10
damage will range from 30-to-00 % for various and Figures 5-17 through 5-24), indicate that
locations affected by the Charleston, New damage to this facility type is expected to be
Madrid (magnitude-8.0), Puget Sound, and greatest for the New Madrid (magnitude 8.0)
Wasatch Front events. Bridges in Utah appear and Fort Tejon events, in which 800 km and
to be at the greatest risk, with 25 percent of the 1370 km, respectively, would sustain damage
bridges (approximately 287 bridges), expected to ranging from 10-to-30 %
sustain damage in the 30-to-1io % range.
Eighteen percent of the bridges in Arkansas Direct damage data for transmission substations,
(approximately 423), 16 % in Washington summarized in Table 5-11, indicate that this
(approximately 305), and eleven percent in facility type would be severely impacted in all
Tennessee (approximately 407) would sustain scenario events. The impacts are most severe in
similar levels of damage. The difference in the Puget Sound, magnitude-8.0 New Madrid,
expected performance between highways and Wasatch Front, Charleston, and Hayward
bridges results from the difference in damage events. For these scenario earthquakes, 46 % of
curves for these two structure types. the transmission substations in Washington, 39
Y in Arkansas, 30 % in South Carolina, 30 % in
5.4.3 Electric System Utah and 27 % in California would sustain
damage in the 30-to-100 % range.
Direct damage estimates for the electric system
are based on curves for transmission lines and 5.4.4 Water System
transmission substations and exclude damage to
related facility types not included in the project Direct damage to those water transmission
inventory--nuclear and fossil-fuel power plants, systems for which inventory data are available
and hydroelectric power plants (dams). Damage are summarized in Tables 5-12 and 5-13- These
data for each scenario earthquake are estimates are based on damage curves for
summarized in Tables 5-10 and 5-11, which aqueducts and exclude damage to pumping
provide the length of transmissions lines and stations and dams, which are not included in the
percent of substations, respectively, in each project inventory. The data indicate that 38 and
damage state. Maps provided in Figures 5-17 20 km of the aqueduct system (Table 5-12),
through 5-24 show plots of damage to respectively, would sustain moderate to heavy
damage (10-to-60 %) in the Fort Tejon and

ATC-25 5: Estimates of Direct Darnag'e


ATC-25 5: Estimates of Direct Damage 87
Table 5-9 Damage Percent for Highway Bridges for Each Scenario Earthquake (Percent
of Bridges in State)

NEW MADRID (M=8.0) ChJARLESTON (M=7.5)

South North
Mississippi Carolina Carolina Georgia
Illinois Missouri Arkansas Tennessee Kentucky Indiana
2,134 3,120 4,193
Total Number 4,674 4,496 2,353 3,698 2,797 3,326 3,096

Light Damage 9% 17%


16% 8% 16% 2% 56% 15%
1-10 % 10% 6%
Moderate 15% 1% 17%
1% 0% 12% 9% 3% 0% 16%
10-30 %
(to Heavy 6% <1% <1%
CD 0% 0% 5% 4% 0% 0% 0%
30-60 %
Major to Destructive 1% <1% 2%
<1% 0% 13% 7% 3% 0% 8%
60-100 %

Vt
0
9:,
WASATCH FRONT (M=7.5)
CAPE ANN (M=70)

Connecticut Delaware Rhode Island New Hampshire Utah


Massachusetts
1,020 1,149
Total Number 2,013 1,878 297 283

Light Damage 7%
1-10% 46% 45% 21% 76% 53%
Moderate
37% 0% 0% 15% 1% 11%
(D 10-30 %
Heavy
0% 0% 0% 0% 0% 10%
30-60 %
Major to Destructive
0% 0% 0%/0 0% 0% 15%
60-100 %

HA YWARD FORT TEJON PUGET SOUND


(M=7.5) (M=8.0) (M=7.5)

California California Washington


Total Number 7,948 7,948 1,908

Light Damage
1'10 % 4% 22% 8%
n Moderate
I 10-30 % 2% <1% 12%
I
Heavy
30-60 % 0% 0% 3%
Major to Destructive
60-100 % 0% 0% 13%,
:ON
-n
U'
't,

-r ---- - s-
Darnage
=
- - -

i'
I
AD
-s--
I
I - - - - -
e

:30-60E B

,*'t
-'CC 4
* ':;-t - ?''
rI -- 10-S0s
1-1%s;
cn
M
:-r'-r S
I,

- - - '- -
N

- N
- - - - - -- L
; -

.4a-'
0 -isn
en -
o~~-r
X8 a s N*

OW
09-
In

p1)
I
a Q

0
(Q
(D 9N
3k

0 100
km

*0
1*
0
Un
0 A; s

0
-

.
cn
El
CA

ED
0 On

0
.
pq
(D CDL

'
C
.

U,

X,
X,0 100 1- 1o
~~~ iN ~~~~~~~km

n
0~
-I,

-4
--4

Z - I.I I
, N1
0
e -. - - -I

I % - -. 'A9,

~~N 11-1I ~~ N _ I r N.,

C2 .954
% 9I
2--
I -N-- II \
4J
,:~'

k4>-.(<

\9- 8
(9 9i t . - '{' fC r-
zi- '¾ -> F. I9 / 1¼
cn
.
ti(A
.4. i

a A;9' '-' -( - V - 'rnX


0 .9>'c' - , - f\ / s , r 0 /
0 0
@~~~~~~~~~~~~~/ .9 /~
0

CD

I! . / >; >.<
ec A o ~ ~ r^
Dam
tx age
9'-
- -

30-60%
1O-30s
1-Ion
O- ,:
_,. ... . _ , .. ,,. __ , , *, 9'
........ .

- h -

I-4
ho -n
C5
PN-
CD

NJ
. - I - II
I ., % -s c$1 I
- e~N
I -. S ~~~~~~~~~~~~~~~
--
p: I~

r
1, Ij Nt
-
/
ti
CD
S -
-c -I.-' '4
N

"N-
'-4- I,
0 ---
- r -
x
-r -r--s j.a' 4
/
//
C

on F / 1
A-
'.wt
- -.
,----- 1
--
-.. - -- .- I, t -
0 i - /
*- --ri ' .1 I \1
- I
N, -4-s

N I
-- ) 1
. i NJ- A '.

N
a
CD Al,0 XX

(D
a
CD
S.
S

1
5--f D~~~~~~~d
a ge
ar I , A, ,.
Da rrs a geX w, - X ^ - ^-At~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-
W I -- \,-A
''r......-.. L
-
-
N

30-G0z ~.n 4--- 1


N

' o-3on '- A'

1-1 us -- N
N
N '
/ --

a I,--- --
0 -AL
V -.
C. /

:I
0
C"
-n
PDi mqOIW - I 1, .
10

It)

(DJ

a
U. 0)~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~I
i-

CD
Co
0
15.
00~~~~~~~~~~~~

'S~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~k

a. ~~~ ~ ~ ~ ~ ~ ~ ~ ~ . ,

40

U 100

km

La
Cn

.-

in

0a

ll~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
.o . >,2'2 * ~| X sw - - , § yg t _ - gi4 ~1- Ir
_ ~~9r X| # :

c;_Frq A - -
k9oze~

: ; - ?~-ct--~.^/*110
:

AfX, I s;E, Mt t-%LI-<-L~ijYl,,; ,J cy S-- O-1 0 &;

:p
.<

:S~~~~~~~~~~~~~~~~A I' I

Q6 km
W
ocn

t1
-A
ue

m 2)

to

a
:T

CD
to1

S | 1> --S j D~~~tr~iiagel


L 0/ , 30-6 0%-c
Lid A

Co
%O -n
C
~~~g - , .
, 1. I
-- I~ ~ ~ ~ ~ ~ -
e
, r
I
r-
.I
~ -
I
Val I If U% I tmwi__ -- I I I 11 - I I - - I
(3I-4 I
A ~~~ I , -C - , - -,(, ' I .1~~~~~~~~~~~~~~~~~~~C
. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
I , % . s~ -

I I %.% .~~~~~~~~~~~~~~~~~/. i

Su
eQ

F~~~~~I
- - -S_<S_ ' "L

zr
0
C'
Ng, * - -S s* / S,

cn
-I.

0*:

,
a. -n
0
Inf Di

s0
-- I~~~-I .-
VD
0:
: n
Zr 4
D -I w I
.I) t I I - - A.

:
Da r a ge
~1
30-60 4000.
.10- 30%
1 -1 0-
O~~~~~---7,-
II.

0 100
1Ii
km
0'
Table 5-10 Damage to Electric Transmission Lines (Length of Line, Kn)

Light Major to
Damage Moderate Heavy Destructive
Event a-10% 10-30% 30-60% 60-100%
'Cape Ann 275 0 0 0
Charleston 4,840 27 0 0
Fort Tejon 6,645 1,370 0 0
Hayward 6,320 0 0 0
'0
New Madrid (M=8.0) 6,840 800 0
0
New Madrid (M= 7.0) 2,61 0 0 0
0
Puget Sound 3,860 0 0
10
Wasatch Front 1,370 0 0
Total System Length = 441,981 km

Hayward scenario events, respectively. Maps lightdamage due to the Fort Tejon and Puget
provided in Figures 5-25 and 5-26 show plots of Sound events.
damage to water aqueduct systems for these two
California events. 5.4.7 Natural Gas System
5.4.5 Cue Oil System As in the case of crude and refined oil pipelines,
direct damage to the natural gas system was
Direct damage to the crude oil system, estimated using damage curves, for transmission
estimated using damage curves for transmission pipelines and the special probabilistic model for
pipelines and the special probabilistic model for pipelines described above. Damage to this,
pipelines described above, are plotted in Figures facility type, plotted in Figures 5-32 through 5-
5-27 through 5-29. Data are included for only 37, is expected for six of the eight scenario
those events for which damage to this facility earthquakes; excluded are the Charleston and
type is expected: the two New Madrid events Cape Ann scenario events for which direct
and the Fort Tejon earthquake. Figures 5-27 damage to natural gas pipelines is estimated to
through 5-29 show pipeline section(s) damaged be zero. Broken pipelines shown (Figures 5-32
due to the magnitude-S.0 New Madrid, Fort through 5-37) are node-to-node sections having
Tejon, and magnitude-7.0 New Madrid events. one or more links estimated as damaged with a
probability of 60% or greater.
5.4.6 Refied Oil System
5.5 Dollar Loss Resulting from Direct
Direct damage to the refined oil system, Damage
estimated using damage curves for transmission
pipelines and refineries and the special The total direct damage dollar loss for the
probabilistic model for pipelines described various lifeline systems and scenario
above, are plotted in Figures 5-30 and 5-31. earthquakes were calculated on the basis of the
These plots indicate that one major section of damage statistics summarized above and
pipeline would be damaged, with probability of assumed replacement costs for the lifeline
60% or greater, due to the NewMadrid events. facility types considered (Table 5-13). Assumed
We note also that a major refinery (capacity replacement cost values are based on data
150,000,barrel/day) would sustain light damage collected for various facility sizes and regions,
(1-to-10 %) due the Hayward event, and two which were then weighted to account for the
major refineries with capacities of 420,000 and estimated distribution of facility sizes in the
100,000 barrels/day, respectively, would sustain national database.

of Direct Damage 97
ATC-25
ATC.25 S. EstImates
5: Estimates of Direct Darna. :ge 97
.0
Table 5-11 Damage Percent for Electric Transmission Substations for Each Scenario
Earthquake (Percent of Substations in State) ; z

NEW MADRID (M=8.0) CHARLESTON (M=7.5)

South North
Illinois Missouri Arkansas Tennessee Kentucky Indiana Mississippi Carolina Carolina Georgia
Total Number 108 95 124 70 68 89 93 100 76 86

Light Damage
1-10 % 0% 0% 0% 0% a 0% 0% 0% 0% 0% 0%
Moderate
en 10-30% 14% 8% 22% 16% 24% 2% 63% 43% 20% 33%
Heavy
(n 8% 14% 0% 3%
30-60 % 0% 0% 10% 9% 7% 0%
Major to Destructive
60-100 % 0% 8% 29% 6% 1% 0% 10% 16% 1% 2%
th
a
CD
CA
0 CAPEANN (M=70) WASATCH FRONT(M=7.5)

Massachusetts Connecticut Delaware Rhode Island New Hampshire Utah


O
_q
(D Total Number 153 69 3 22 22 10

Light Damage
1-10% 0% 0% 0% 0% 0% 0%
Moderate
10-30% 82% 42% 33% 100% 45% 30%
Heavy
30-60 % 0% 0% 0% 0% 0% 20%
Major to Destructive
60-100 % 5% 0% 0% ,0% 0% 10%

HA YWARD FORT TEJONPUGETSOUND NEW MADRID


(M7.5) (M=8.0) (M=7.5) (M=7.0)

Califomia California Washington Illinois Missouri Arkansas Tennessee Kentucky Mississippi


Total Number 205 205 155 108 95 124 70 68 93
"0

Light Damage
1-10 % 8% 11% 0% 0% 0% 0% 0% 0% 0%
Moderate
0 10-30 % 13% 6% 12% 0% 2% 21% 16% 16% 14%
to) Heavy
01 30-60 % 14% <1% 3% 0% 0% 16% 0% 0% 2%
Major to Destructive
60-100 % 13% 12% 43% 0% 6% 6% 3% 0% 0%
0 CD

"4
o

~D
U' -

E3
VS
bo C-
CD

a. ED
F-
(D

a -0
Ii-
DI
ID
ED (b
CA

Z3
1
CDn

I
0p
-n

C4

CZ
-D

Cg
Ei

co
0O

A.
0CD

o
C)
-I
CD
ID
cd

tA
El

II
N3
zz,
C

L0

CD

-
ch
C.
_0
U,
a
In
0. 0

I-
O-h

I-t
03

(D 01

0
CD
CD

.I
- -n
0w
~a.

tDj
0
cil
c

i
pI

0
. .n
-I

I,)

-aU,
in
0
Ea
an

1S
Z2i

0~ 10
z
0

En
:0
N
I' -n,

CD
Cl
NJ
I
I

Ei
9
LI)
CD
0CD 0
CD
Fr
C)

tro 0
L
r

ni

ap 0
ti LD
I
El
z
9-
N
v

:
C~D

R
01
I
a n0'
I-a CD I

CL I
I

I
11 I
O

CD'
-I,
:C
C
em
-
'I
*a-c--s - -
r
-y- - -
- -
*
-'-C.-
I -
-

Ni A -
,tj. 9%
*%;
-- - -I i ,/
-r -
/
' ,.4 I
N,
9
- I
-- C - ito ii
IJ
-p

I
7 *
t
d pitt r
I
-N

1
em -'
t ,
I I / N
I - -% /
em N C-

n 'St
'4

- -
1

I A 4t- - - - -
"1 - &- I

In 0 - --
- . -pM
/
N,

-0 ' M-' -- I' \\N / -


I
0 1 *'-
S - N
CI em 'I
N N
N
'><. ¾
-, p 9,
a.
S
-I
I-. I
N,
2 - N
I P44 - -
I)
- -, C'

NS ,. , \I - / .- s Iri

100
-

- r
N,~ ~~~~~~~
~~~ ~~ ~~~~~~~~~~~~~~~~~~~~~~~~V

-- I N~~~~~~~~-
- - e , J 1
~0
o * _ /
-, -- ~-.t.' I
l ._ _ R
tD ar, age
S - ~~-a "y nkyapt O3

. -

i! - ,1 , I ,
'I
.@

I" km
-m
-

toI

CD
OI.
NJ
I-

cn 0

lb
Oa

9
lb
00
0Q
01 t.
lb
Ck
0

up
a rem
Sj
I'4
a 0

n
CA
0
LA
01
(D 1
CD

'C

CD

II'r
(A
U,
P-A -I,
C oxa
0 C
Cm,
Ul
: j

2
:3:
i
!Zi

"I
. (1)

cn
Q m
:SR

In
0
.4.
I'
z
(D 0CD
-9
0

-I

i_
(a

zr

(D
zi

>4 0 100
I I k
0 : ~~~~~~~~~km
M)
cn
DAMAGE

30 - 60%
10 -30%
F

1 -10%
1
- C,
-

Figure5-25 Damage to water aqueduct system following Fort Tejon event (M=8.09.

Figure5-26 Damageto water aqueduct system followingHaywardevent (M=7.5).

ATC-25 5: Estimates of Direct Damacoe .107


Table 5-12 Damage to Water Aqueduct System(Lengthof Aqueduct, Kin)

Light Major to
Damage Moderate Heavy Destructive
Event 1-10% 10-30% 30-60% 60-100%
Fort Tejon 350 36 2 0
.Hayward 240 20 1 0
Puget Sound 60 0 0 0

Table 5-13 Cost Estimates for Lifeline Components

System ComRonent Cost Estimate*

Railway Tracks/Roadbeds $500,000/mile**


Highway Conventional highway bridge $1,200,000
Freeway/Highway $1,400,000/mile**
Local Roads $300,000/mile**
Air Transportation Terminals $4,000,000
Runways/Taxiways $1,000,000/runway
Sea/Water Transportation Ports/Cargo Handling Equipment $20,000,000
Electric Distribution Lines $150,000/mile**
Transmission Lines $500,000/mile**
Transmission Substations $400/person***
Water Supply Transmission Aqueducts $5,000,000/mile**
Natural Gas Transmission Aqueducts $300,000/mile**
Petroleum Fuels Transmission Pipelines $300,000/mile**
Emergency Service Medical Care Facilities $35,000,000
(assumes 85,000 square
foot average size)
Fire Stations $400,000
(assumes 5,000 square
foot average size)
Police Stations $1,000,000
(assumes 11,000 square
foot average size)
*1991 Dollars
1 mile = 1.609 km.
***in service area

108 5: Estimates of Direct Damage ATC-25


a:
CD

Ul
L

o p
J °3
~ 2
0c

oh n
.
0 ,
-.
m
0C

0
0
R
W_.
CD
(D
En 11
0'XP

CD

Co

14

Wi
To
0

i'
SU,
C:

ACD

CA

6.

CD
0

D zCD
R
-o

(Q
(D (D
O V)

C3

U CD

:i

CD
En

0
3
-I,
U'

ow

-S

in
h
(a a
.

U1)

0
I-t

(D
a

(52 CD
(D
'C

-o

t.

b-i fib
ba-
,-
CD

'-

e.n

IM
(CD
U

aCD ~CL
CD
cn
0
'-.
Qr D
oT3
C(D aX
u
CD

:Q
a-
Q
_D
CD CD
* D

CD

ED

01
wrrl
-cp'
N) N

(1
ch
o 4h

(A
N
2:
in

0
0 CD
'C
R

Ac

i
E~
9
vk
Nb
'-4
I.- E
L. rug

-!
CD

CD
P-a

ci~
-M

CD
1.. n

01 '0
9'.
RD C2
On>

II

o3CD
CD 0

a
CL
rD.
Q

0cn
tj3
(Di
u-

io

CA 0i
. .
Cq

-3X
XI- s
a
-4

iI

CE
(D =0

(p R
E?
a_
m

CD

-a
(D

w
I-

0o
-n

U,

_.
n

-O.

Q
(D
0
.I
-I3

zCD
a tD

(D
. za
I
(4 0O

E
(b

a
9 (D

cn
9
N
C:
01

~Oci
hi/
(3

(D
tl7

H
2'
iz
0B
CD
CD
so~~~~'
CD

A l.
X

Pa
10

Ct

(D
3
4g

ai
11

C,
-1
-0

Y1

lo

c3
PA

al
(D
In
0

CD
(D
CI

0
-o'D

CD
0 (CD

01 C

AD
-n

9 -I
CD
U,

-in (A t
o oq
CD

en 00

00
0'-
DJ
to
t to
to
-9 CD
(D
() 0
0 a
U
(D
a
0
0
0
Q -H
-t
0
CD
CD

a
CD

-o
<0
CD
3.
CD
to
CD
to
'-I
a
k
Summaries of dollar loss estimates for direct examined the effect of earthquakes on lifelines
damage to site-specific systems and extended for various regions, including:
regional lifeline networks during the eight
scenario earthquakes are provided in Table 5- * Earthquake Vulnerability Analysisof the
14. Estimated dollar lossesdue to direct damage Charleston, South Carolina Area (Citadel,
to local electric, water, and highway distribution 1988),
systems are provided in Table 5-15.We note
that damage distribution dollar loss estimates for * Earthquake Planning Scenario for a
direct damage to local distribution systems were Magnitude 7.5 Earthquake on the Hayward
estimated using cost data from Table 5-13 and Fault in the San Francisco Bay Area
damage curves from Appendix B for electric (Steinbruggeet al., 1987) (representative of
distribution lines, local roads, and water trunk several studies in California, including
lines. Intensities were estimated at the center of others for the Newport Inglewood Fault
the Standard Metropolitan Statistical Areas, Zone, the San Andreas Fault in northern
assumingthe distribution systemswere lumped and southern portions of California (e.g.,
at these locations. Davis et al., 1982),

The estimates provided in Tables 5-14 and 5-15 * A studyof the Wasatch Front, Utah, water
are based on the available inventory data and and gas systems (Taylor, Wiggins, Harper
other assumptions and models described in this and Ward, 1986), and
report. As a result, the accuracy of these
estimates may vary from lifeline to lifeline. A pilot study on vulnerability of crude oil
Estimates for electric systems,in particular, are transmission systems in the New Madrid
believed to be more sensitive to the lack of area (Ariman, et al., 1990).
capacity information than are the other lifelines.
Compared to the present study, these previous
By combining the data from Tables 5-14 and 5- studies were typically limited in being either
15, we estimate the total direct damage dollar confined to one or a few lifelines, qualitative
losses (in billions of U. S. dollars) for the eight rather than quantitative, and/or geographically
scenario earthquakes as follows: localized.Nevertheless, to the extent possible,
comparison of this study's results with that of
Direct
previous studies is of value, in order to compare
Dollar Loss
each aspect of the methodology. The
Earthquake (in Billions. 1991$) Charleston, South Carolina study is recent,
Cape Ann $4.2 probablythe most comprehensive of the studies
in scope, and provides quantitative results. We
Charleston $4.9 therefore next examine that study and its results,
Fort Tejon $4.9 vis-a-vis this study.
Hayward $4.6 Comparison with a study on the Charleston
New Madrid, M = 8.0 $11.8 event. Researchers at The Citadel, the Military
College of South Carolina, estimated damage to
New Madrid, M = 7.0 $3.4
critical facilitiesand other resources in the
Puget Sound $4.4 epicentral region, assuming a repeat of the 31
August 1886 Charleston event. The study region
Wasatch Front $1.5 comprised three counties of the Charleston,
South Carolina area: Charleston County,
5.6 Comparison with Previous Studies Berkeley County, and Dorchester County. The
Citadel analysis and conclusions appear mAn
The foregoing presents a methodology and Earthquake VulnerabilityAnalysis of the
results for understanding the direct damage Charleston,South Carolina,Area, of July 1988.
impacts of earthquakes on U.S. lifelines. No Their methodology relied significantly upon
previous study has examined lifelines in ATC-13 procedures, so The Citadel study and
comparable breadth or scale, so that the present study take comparable approaches
comparisons are difficult. Several studies have and use similar classifications for structures and

ATC-25~~~~~~~
120 5: Estimates of Direct Damage ATC.25
120 5: Estimates of Direct Damage
0
oh
01

Table 5-14 Direct Damage Losses($ Millions)


01

a
en
Fire Broadcasting Medical Natural Refined Crude
0- Scenario Highways Electric Stations Station Care Ports Airports Railroads Gas Oil Oil Water Total

Cape Ann $382 $1,312 $6 $19 $490


h2 $53 $91 $9 $0 $0 $0 $ 2,362
Charleston $773 $1,264 $9 $68 $565 $380 $142 $156 $0 $0 $0 $ $3,358
Fort Tejon $470 $886 $48 $26 $1,431 $170 $148 $158 $11 $0 $28 $140 3,517
Hayward $208 $1,310 $7 $17 $1,297 $115 $37 $115 $6 $0 $0 $91 3,203
ac New Madrid 8 $2,216 $2,786 $13 $91 $1,297 $0 $411 $458 $56 $28 $47 $ $7,403
0 New Madrid 7 $204 $1,077 $3 $34 $396 $0 $145 $108 $19 $9 $19 $ 2,013
Puget Sound $496 $1,834 $13 $49 $507 $196 $210 $96 $6 $0 $0 $18 3,425
Wasatch Front $323 $90 $2 $44 $205 $0 $29 $31 $6 $0 $0 $ 730

H~
Table 5-1 5 Direct Losses Due to Damage to Distribution Systems
Electric Water Highways
Event $ Billion $ Billion $ Billion
$0.89 $0.30 $0.60
Cape Ann
Charleston 0.74 0.31 0.50

Fort Tejon 0.91 0.23 0.23

Hayward 0.90 -0.20 0.25

New Madrid (M=8.0) 2.07 0.88 1.40

New Madrid (M=7.0) 0.65 0.28 0.44

Puget Sound 0.58 : 0.09 0.28


0.38 0.13 0.26
Wasatch Front

structural damage. The Citadel researchers for the broad map--both maps are presented in
studied direct damage to lifelines, as well as to Figure 4-6). The Evernden Model used in the
housing, schools, and other components of the current study provided estimates of ground
built environment in the three county area, but shaking on a detailed scale similar to that of the
they did not investigate economic impacts as the detailed map by Bollinger. In the Evernden
current study does. model, MMI contours were calculated on a 25
km square basis. These contours agree fairly
The following sections compare the assumptions well with the detailed isoseismal map Bollinger
and conclusions of the current study with those presented. As a consequence of these
of The Citadel researchers. Note that the interpretations of seismic intensity, differing
current study provided aggregate damage for results of The Citadel study tend to reflect the
the whole of South Carolina, and damage is not more conservative (i.e., higher) ground shaking
broken out by county, as it is in The Citadel estimates by generally more severe damage
study. Nonetheless, since the three counties estimates.
enclose the bulk of the damaged South Carolina
lifelines, the results should be comparable. The Estimated Lifeline Damage. Both studies
first section compares the scenario earthquake evaluated direct damage to a number of
assumed by the two studies. The second section common lifeline elements. This section
compares the results of the direct damage compares the two studies' results for direct
analyses for lifelines. damage to hospitals, fire stations, police
stations, railroads, and electric transmission
Scenario Earthquake. The Citadel researchers substations.
employed more severe ground shaking than the
current study's use of the Evernden Model Hospitals. The Citadel researchers
produced for the same event. The Citadel inventoried 11 facilities in the three
posted MMI IX to MMI X ground shaking counties, in which 14% of the entire state
within 25 miles of the epicenter, MMI VII to population lives. They estimated a 43%
MMI VIII ground shaking within a 100 mile probable maximum loss to hospitals, and a
outer radius, and MMI VI or less ground 21% average expected loss. The current
shaking beyond this. This agrees well with a study inventoried 91 health care facilities in
broad regional isoseismal map based on the South Carolina, and estimated 27 facilities
historical record presented by Bollinger (1977). would sustain light damage (damage
This broad map was developed by enveloping a between 1% and 10%), 6 facilities would
detailed map also developed by Bollinger (1977) sustain moderate damage (damage between
(i.e., the broad map was developed by the 10% and 30%), 9 facilities would sustain
maximum MMI within a region taken from the heavy damage (damage between 30% and
detailed map, and using that as the MMI value 60%) and 3 facilities would sustain major to

5: Estimates of DIrect Damage ATC-25


122 5: Estimates of Direct Damage
destructive damage (damage between 60% sustain moderate damage (10% to 30%),
and 100%)- These figures represent an and 8 would sustain heavy damage (30% to
average gross dollar damage of 10%. Note 60%). These figures represent an average
that this 10% figure reflects damage to all 6% damage.
health care facilities in South Carolina. It is
to be expected that statewide average Railroadi The 'Citadel researchers
damage should be significantly less than inventoried 196 miles of track in the three
damage within the epicentral region, which counties. They estimated 1 mile of track
The Citadel's 21% figure reflects- would sustain 1% damage or less, 145 miles
would sustain 1-to-10% damage, and 50
Airports. The Citadel researchers miles of track would sustain 10-to-30%
inventoried 5 facilities in the three counties. damage. These figures would indicate an
They estimated functionality for operational average 9% damage to railroad track in the
pavements such as runways and taxiways, three counties. The current study
and for key operational vertical structures inventoried approximately 1500 miles of
such as control towers and terminals. For track in South Carolina, and estimated 550
runways and taxiways, The Citadel miles of track would sustain light damage
researchers estimated 30% functionality (1% to 10%), 52 miles would sustain
within 1 day, 60% functionality within 3 moderate damage (10-to-30%), and 600
days, and full functionality within 8 days. For miles would sustain heavy damage (30-to-
vertical structures, The Citadel researchers '60%). These figures represent an average
estimated 60% functionality within 2 days, damage of 20% to South Carolina railroad
and full functionality within 2-1/2 weeks. track following a Charleston event. (This is a
The current study inventoried 147 facilities simple measure of track damage and should
in South Carolina, It estimated 59% not be confused with residual capacity
functionality of South Carolina airports, figures, which follow on network analyses
during the first week, 85% functionality (see Chapter 6)). This difference may be
during the second week, and full restoration explained by the significant damage to
during the tenth week. The present study railroad track outside the three counties.
also evaluated damage to airports as
individual units, including structures and * Electric Transmission Substations. The
pavements, finding 49 facilities would Citadel researchers estimated 20% of
sustain light damage, 29 facilities would substations in the three county area would
sustain moderate damage, and 9 facilities sustain light damage, 70% of substations,
would sustain major damage. would sustain moderate damage, and 10% of
substations would sustain heavy damage. If
Fire Stations. The Citadel researchers one defines light damage as an average 5%
inventoried 55 facilities in the three damage, moderate damage as an average
counties. They estimated a 71% probable 20% damage, and heavy damage as an
maximum loss, and a 36% expected loss. The average 45% damage, average expected
current study estimated 275 South Carolina damage to transmission substations for The
facilities; 50 are expected to sustain light Citadel study would be 20%. The present
damage (1% to 10%), 3 are expected to study inventoried 100 substations in South
sustain moderate damage (10% to 30%), Carolina, and estimated 43% sustain
and 36 are expected to sustain heavy moderate damage (10-to-30%),. 14% sustain
damage (30% to 60%). These figures heavy damage (30-to-60%), and 16% sustain
represent an average 7% damage. major damage (60-to-100%). These figures
represent an average 28% damage to South
e Police Stations. The Citadel researchers Carolina transmission substations following
inventoried 10 facilities in the three a Charleston event. The present study
counties. They estimated a 69% probable estimated average damage in excess of that
maximum loss, and a 34% expected loss. The estimated by The Citadel. An explanation
current study estimated 70 South Carolina can be found in that The Citadel study
facilities, and estimated that 10 would considered transmission and distribution
sustain light damage (1% to 10%), 1 would substations, while the present study

123
ATC-25 5: Estimates of Direct Damage
ATC-25, 5: Estimates of Direct Damage 123
considered only transmission substations. moderate damage (damage between 10 and
Transmission substations typically sustain 30%), heavy damage (damage between 30
more damage than distribution substations; and 60%), and major damage (damage
also substations outside the three counties between 60 and 100%). The current study
are significantlydamaged. (Note that the provide an aggregate damage of about 7%
average damage discussed here is a simple for the entire state compared to about 6%
measure of substation damage and should given by the Citadel researchers study for
not be confused with residual capacity the three counties. This difference may be
figures, which rely on network analyses (see explained by the finding that damage to
Chapter 6).) bridges outside the three counties is
expected to be significant.
* Bridges. The Citadel researchers
inventoried 3 major bridges and 216 Conclusion.The present studyestimated
conventional bridges in the three counties. damage between 1/2 and 1/5th of that estimated
They estimated "serious damage" to 10 by The Citadel study in every classification
bridges, "repairable damage" to 24 bridges, except transmission substations, railroads, and
and "settlement damage" to 51 bridges. They bridges. These ratios seem reasonable. The
defined "serious damage" as collapse of at Citadel researchers examined damage in a
least one span. "Repairable damage" means three-county epicentral region alone; while the
that the bridge .could be restored within present study considered South Carolina as a
weeks, and "settlement damage" means whole. One would expect average damage over
damage to abutments. The current study the entire state to be substantiallylower than
inventoried 2134 bridges in South Carolina average damage in the epicentral region. The
and estimated 320, 320, 128, and 20 bridges, exception, transmission substations, railroads,
respectively, would sustain light and bridges, were discussed above.
damage(damage between 1 and 10%),

ATC-25
124 5: Estimates
5: Estimates of Direct Damage
of Direct Damage ATC-25
6 U
Estimates of Indirect Economic Losses
6.1 Introduction curves are estimated for each lifeline type and
scenario earthquake using (1) the time-to-
Earthquakes produce both direct and indirect, restoration curves discussed in Chapter 3 and
economic effects. The direct effects, such as provided in Appendix B, (2) estimates of ground
dollar loss due to fires and collapsed structures, shaking intensity provided by the seismic hazard
are obvious and dramatic. However, the indirect model (from Chapter 4), and (3) inventory data
effects that these disruptions have on the ability specifyingthe location and type of facilities
of otherwise undamaged enterprises to conduct affected (from Chapter 2).
business maybe quite significant. Although the
concept of seismic disturbances and their effect For site-specific systems (i.e., lifelines consisting
on lifelineshas been investigated for at least two of individualsited or point facilities, such as
decades, there is very little literature on indirect airports or hospitals) the time-to-restoration
economic losses (Co chrane, 1975; Rose, in curves are used directlywhereas for extended
ASCE-TCLEE, 1981; Scawthom and Lofting, regional networks, special analysis procedures
1984). are used. These procedures consist of:

This study provides a first approximation of the * connectivity analyses, and


indirect economic effects of lifeline interruption
due to earthquakes. To accomplishthis the * serviceability analyses.
relevant literature was surveyed. Then a
methodology was developed to relate lifeline Connectivity analyses measure post-earthquake
interruption estimates to economic effects of completeness, "connectedness t or "cuteness t of
lifeline interruption in each economic sector. links and nodes in a network. Connectivity
This required a two-step process: analyses ignore system capacities and seek only
to determine whether, or with what probability,
1. Development of estimates of interruption of a path remains operational between given
lifelines as a result of direct damage sources and given destinations.

2. Development of estimates of economic loss Serviceability analyses seek an additional


as a result of lifeline interruption valuableitem of information: If a path or paths
connect selected nodes following, an earthquake,
The general analyticalapproaches used to what is the remaining, or residual, capacity
develop these estimates, are discussed below and between these nodes? The residual capacity is
illustrated with example calculations. Results found mathematically by convolving lifeline
defining lifeline interruption and associated element capacities with lifeline completeness.
economic loss to specific facility types are also
provided, but the bulk of this information is A complete serviceabilityanalysisof the nation's
given in Appendices C and D. Thechapter various lifeline systems, incorporating
concludes with regional summaries of economic earthquake effects, was beyond the scope of this
effects resulting from direct damage to the project. Additionally, capacity information was
various lifelines in the eight scenario generallynot available for a number of the
earthquakes. lifelines (e.g, for the highway svstem, routes
were available,but not number of lanes).
6.2 General Analytical Approach for Rather, for this project, a limited serviceability
EstimatingLifeline Interruption analysishas been performed, based on a set of
sfimplifyiing assumptions.
Lifeline interruption resulting from direct
damage is quantified in this investigation in The fundamental assumption has been that, on
residual capacity plots,that define percent of average, all links and nodes, of a lifeline have
function restored as a function of time. The equal capacities,so that residualcapacityhas

Indirect Economic Losses 125


ATC-25
ALTC-25S
6: Estimates of
6.:Estimates of Indirect Economic Losses 125
serviceable (ie., surviving) links and nodes to the Using the curves provided in Appendix B,
originalnumber of serviceablelinks and nodes, residual capacity was defined in "lifeline
for a given source/destinationpair, or acrosssome interruption plots" that define restoration in
appropriateboundary.For example,if the state one-week-interval step functions. Initially, these
of South Carolina has 100 airports, and 30 of step functions were computed for each facility in
these are determined to be unserviceable at a region, and then averaged over all facilities of
some point in time, following a major the same type in the region using the following
earthquake,. then the air transport lifeline equation:
residual capacity is determined to be 70% of the
initial capacity. N N
R.CJ = E (Ci x Ri) i E Ci (6.1)
This assumption does not consider several i=1 1=1
important factors, including:
where R.C1 is the residual capacity at time step j,
1. All nodes or links do not have the same Ci is the capacity of facility i, and Ri is the
capacities; restoration of facility i at time step j. If all
facilities have the same capacity, Equation 6.1
2. Links and nodes contributing most to the becomes
residual capacity are generally more distant
from the heavily damaged area. Thus, the N
estimated lifeline residual capacity is R.Cj = E Ri/N (6.2)
generally overestimated in the area closest i=l
to the disaster area; and
where N is the number of facilities. This
3. Significant elasticity in capacity is generally calculation is illustrated in Example 6.1 (Figure
available for most lifelines. 6-1).

Factors 2 and 3 tend to offset each other. Following is a discussion of results from the
Further, factor 1 is probably acceptable for the residual capacity analysis of each site-specific
purposes of this project, which aims to describe lifeline facility type considered in this
effects at the regional level. investigation.

The foregoing mode of analysis was employed 6.3.1 Airports


for most of the regional network lifelines. One
exception was the gas and liquid fuel Residual capacities for airports were calculated
transmission pipelines, where capacities were assuming that all airports have the same capacity
available and were employed, thus taking into and the functionality of airports depends 20%
account factor 1 above. on terminals and 80% on runways. The
simplifying assumption that all airports have
6.3 Residual Capacity Analysis of Site- similar capacities is warranted due to the
Specific Systems analysis seeking to determine regional air
transport impacts, an approach that tends to
As indicated above, residual capacities for site average out extremes in airport capacities.
specific lifelines were estimated using the Further rationales for this approach include: (1)
restoration curves from Appendix B. For many the large number of general and civil aviation
of these facilities, only locational information airports, (2) the relatively small difference in
was available (i.e., size or capacity information number of runways between many airports, (3)
was not available). Because of this limitation, many runways have lengths sufficient for large
and because the general goal of this study was to commercial aircraft, (4) under emergency
determine impacts at the transmission or conditions, air traffic control capacity can be
regional level (an approach that tends to rapidly and significantly increased by deploying
average out differences in facility capacities), an specialized military units, (5) airport through-
assumption that all facilities of a particular class put capacity is extremely elastic (under
have the same capacity was often employed. emergency conditions small airport cargo
handling capacity can be significantly increased

Losses ATC-25
126 6: Estimates of
6: Estimates Indirect Economic
of Indirect Economic Losses ATC-25
126
Example 6.1

This example illustrates the residual capacity calculation algorithm for point source systems, using
health care centers in Illinois as an example.
Assume that Illinois, located in "all other areas" of the NEHRP Map has four health care centers. A
scenario earthquake is estimated to result in shakingintensitiesat te four locations of MMI=5, 6, 7,
and 8, respectively. Assume that no liquefaction hazard exists at the four sites. Estimate residual
capacity at 0 days, 7 , 14 21 , 28 , and 196 days (the latter being the point of full restoration).

Procedure. Use the time-to-restore curve (below) for health care facilities (from Appendix B),for "all
other areas" to determine the residual capacity at each health care facility.

Health Care
R:18aO

R= G'.z

R=B/
DRfYS: 3a 68 90 128 158 180 218 24 2 38O 338 365
Elapsed Time in Days
This figure indicates residual capacities as follows:

Elapsed time (days)


MMI 0 7 114 21 28 196
Facility 1 5 100% 1100% 100% 100% -- 100% 1 00%
Facility 2 6 12% 21% 31% 41% 511% 1 00%
Facility 3 7 0% 5% 10% 15% 20% 100%
Facility 4 8 0% 0% 0% 3% 6% 100%
Average 28% 32% 35% 40% 44% 100%
The last row in the table provides the residual capacity of the example health care centers in llinois
-assuming that all facilities have the same capacity (i.e., per equation 6.4).

Figure 6-7: Analysis example illustrating residual capacity calculation agorithm for point source
systems

ATCG25 6: Estimates of Indirect Economic Losses 127


by staging cargo off-site, and apron space Sound event (Figures C-52). Note also the
restrictions can be worked around through initial high loss in capacity for medical care
scheduling and staging aircraft at other facilitiesin Massachusetts for the Cape Ann
airports). event (Figure C-44).

Average residual capacity values over all 6.3.4 FireStations


airports in a given state at each time step were
calculated using Equation 6.2. An example plot Based on the assumption that fire stations have
for Arkansas, one of the worst-case situations, is an average capacity, residual capacities of fire
provided in Figure 6-2. In this example, the stations within the affected states were
initial loss is approximately 31 percent of calculated using Equation 6.2, assuming that all
capacity, and full capacity is not restored until fire stations are lumped at the center of
about day 290. Results for each state are plotted Standard Metropolitan Statistical Areas
in Appendix C for each scenario earthquake (SMSAs). Results are presented in Figures C-58
(Figures C-1 through C-24). These data indicate through C-81.One of the worst case situations,
that, of all the regional scenario events, the which occurs in South Carolina as a result of the
greatest impacts occur in the states of Arkansas, Charleston scenario event, is shown in Figure
Mississippi,and Tennessee as a result of the 6-5.
New Madrid magnitude-8.0 event (Figures C-3,
C-4, C-6). The states of Washington, 6.3.5 PoliceStations
Massachusetts, South Carolina, Utah, and
California would experience the largest impacts Residual capacities of police stations were
due to the Seattle, Cape Ann, Charleston, calculated using Equation 6.2, assuming that all
Utah, and Fort Tejon, scenario events, police stations have the same capacity and that
respectively (Figures C-7, C-10, C-15, C-17, and stations were lumped at the center of the
C-18). SMSAs. Results are presented in Appendix C,
Figures C-82 to C-101, for all states affected by
6.3.2 Ports the scenario events. These plots indicate that, as
in the case of fire stations, one of the worst-case
Residual capacities of Ports for all scenario situations occurs in Mississippi as a result of the
events are presented in Figures C-25 to C-33. New Madrid magnitude-8.0 scenario event
An example plot for South Carolina, the worst- (Figure 6-6).
case situation, is provided in Figure 6-3. In this
example, the initial loss is nearly 100 percent of 6.3.6 BroadcastStations
capacity, and full capacity is not restored until
about day 200. Georgia would also experience Based on the assumptionthat all broadcast
similarly high losses due to the Charleston event stations have the same capacity, residual
(Figure C-27). Massachusetts and Rhode Island capacitieswithin the affected states were
would experience the largest lossesdue to the calculated using Equation 6.2. For this facility
Cape Ann event (Figures C-28 and C-29). type, the worst case situation occurs in South
Carolina as a result of the Charleston event
6.3.3 Medical Care Centers (Figure 6-7). See Appendix C, Figures C-102 to
C-126, for plots of results for all eight scenarios
Residual capacities of medical care centers were and affected states.
calculated using Equation 6.2 and are shown in
Appendix C, Figures C-34 through C-57 for all 6.4 Residual Capacity Analysis of
states affected by all scenario events. All Extended Regional Networks
medical care centers were assumed to have the
same capacity. One of the worst-case situations In this investigation, residual capacity of
would occur in Arkansas for the New Madrid extended regional networks (e.g., crude and
magnitude-8.0 earthquake (Figure 6-4). Similar refined oil pipelines; highways) has been
long-term recovery periods are required in estimated through the followingsequence of
Californiafor the Fort Tejon event (Figure C- operations:
51), South Carolina, for the Charleston event
(Figure C-41), and in Washington, for the.Puget

128 6: Estimates of Indirect Economic Losses ATC-25


1

0
'ID

EFapsed Time in Days

Figure 6-2 Residual capacityofArkansas air transporfationfollowingNewMadrid event (M=8.0).

6A
-0

1'2

T)

0
Elapsed Time in Days

Figure 6-3 Residual capacityof South CarolinaportsfollowingCharlestonevent M= 7.5).

ATC-25 6: Estimates of Indirect Economic Losses 129


1

Cu

a
(n
cr
a)

Elapsed Time in Days

Figure6-4 Residual capacityof Arkansas medicalcare centersfollowing New Madrid event (M=8.0).

0
4-
0u
4-
cjn

Elapsed Time in Days

Figure6-5 Residual capacityof South Carolinafire stationsfollowing Charlestonevent (M= 7.5).

- 130 6: Estimates of Indirect Economic Losses ATC-25


I

0C
el

Elapsed Time in Days

Figure6-6 Residual capacityof Mississippipolice stationsfollowingNew Madrid event (M=8.0).

a
co
h-

tD
:c

, 1
01 14 28
Elapsed Time in Days

Figure6-7 Residual capacityof South Carolinabroadcaststationsfollowing Charlestonevent


(M=7 ).

ATC-25 6: Estimates of Indirect Economic Losses 131


1. Maximum damage for every link in the 100% restored. For natural gas systems, pipeline
network was first estimated using the sections with probabilityof failure equal to or
procedures described in Chapter 5. greater 30% were assumed closed until 100%
restored. Bridges with more than 15% damage
2. Connectivity analyses were then performed were also assumed out of service until fully
to identify nodes and links that are not restored.
connected to the source(s).
Serviceability Analyses. Residual capacities
3. And finally, serviceability analyses were between sources and destinations were
performed to determine residual capacityof estimated using the minimum-cut-maximum-
the network as a whole, considering both flowtheorem (Ford and Fulkerson, 1962;Hu,
damaged and undamaged links and nodes. 1969; and Harary, 1972) which is the central
theorem in network flow theory. This approach
The networks are assumed to consist of sets of was generalized for this project to account for
nodes and sets of links connecting these nodes. multiple-source multiple-destination problems.
If a link has a direction, it is called a directed
link; otherwise it is called an undirected link. A The minimum-cut-maximum-flowtheorem
path is a sequence of nodes and links. The links simply searches for the cut with the minimum
can be directed in either direction (two-way capacity, i. e., the bottleneck, that completely
links) or directed in one direction (one-way separates the sources from the destinations.
links). That is to say, the maximum flow in a network is
alwaysequal to the capacity of the cut that
Following is a flow chart showing the sequence provides the minimum capacity of all cuts
of operations: separating the source(s), S, and the
destination(s), D.

A cut is defined by (Y1,Y2), where Y1 is a


subset of nodes of the network and Y2 is its
complement (i.e., the remainingsubset of
nodes). A cut (Y1,Y2) is a set of links (i-j) with
either the node i Y1 and j Y2 or j Y1 and
i Y2. Therefore, a cut is a set of links the
removal of whichwill disconnect the network. A
cut separating the source, S, and the destination,
D, is a cut (Y1,Y2) with S sY1 and D £Y2.

The capacity of a cut (Y1,Y2), denoted by


C(Y1,Y2), is cij with i Y1 and j C Y2, where
cj is the capacity of the link (i-j). Note that in
- 0 | ~STOP| defining a cut, we count all the arcs that are
between the set Y1 and the set Y2, but in
Connectivity Analyses. Connectivity analyses calculating its capacity we count only the
were performed using a technique called Depth- capacityof links from Y1 to Y2, but not the one
First-Search, or Backtracking (Tarjan, R., 1972). way links from Y2 to Y1. i.e. C(Yl,Y2) not
In this method, a network is connected if for equal C(Y2,Y1). The cut with the minimum
every partitioning of the nodes of the network capacity is called the minimum cut.
into subsets Y1 and Y2, there is either a link (i-
j) or i) between node i E Y1 and node j E Y2, For example,consider the network in Figure 6-
where denotes membership. 8. Assume that all links are two way links, and
that the numbers next to each link represent the
For pipeline systems (crude oil and refined oil capacity of that link. The set Y1 defined above
pipelines), pipeline sections (node-to-node) consists of nodes S and 2, while the set Y2
with probability of failure (i.e., probability of consists of nodes 1 and D. The cut shown in
having at least one break) equal to or greater Figure 6-8 is a minimum cut and has the
than about 60% were assumed to be closed until capacity C(Y1,Y2)= cSl+c2D= 2 + 4 = 6, which

132 6: Estimates of Indirect Economic Losses ATC-25


highway and railroad systems, sources, are
defined to be the outer nodes of all links that
intersect with the smallest boundary around the
epicentral area, such that all intersected links
remain undamaged followingan earthquake.
Destinations are defined to be all nodes inside
the largest boundary around the epicentral area
such that all intersected links are damaged
(intersection is assumed at the center of the
links). For damaged links, restoration of each
link is,estimated at each time step using the
appropriate restoration curve and the maximum
intensity along the link.

Figure 6-8 Flow network to illustrate The residual capacity at a given destination at
minimum-cut-maximum flow any time step, t, is,defined to be the ratio
Theorem. between the maximumavailable flow at the
destination for.the damaged system, Qt to the
is the maximumflowthat can be delivered maximumavailableflow at the destination for
between the source S and the destination D. the undamaged system, 0, i.e.

The maximum flow is a linear programming R.C. = Qt/O (6.6)


problem with the objective function
where Ot and Q0 can be calculated using the
Q = EXi3 (6.3) min-max theorem discussed above, and R.C. is
the residual capacity.
and the constraints
Example Calculations. Two examples are
Xij-Xjk =-Qifj=S provided (Figs 6-9 and 6-10) that demonstrate
residual capacity calculations for pipeline
= Oifj <> SorD (6.4) networks (Example 6.2) and for non-pipeline
networks (Example 6.3).
= Qifj=D,
Software Employed. The calculations of damage
and state, connectivity, and residual capacity were
performed using a proprietary computer
0 c Xi ci for all ij (6.5) program,LLEQE (LifeLine EarthQuake
Engineering).LLEQE employsstate-of-the-art
where Q is the out flow value and X is the flow computer graphicsand was,developed to
in link (i-j). Equation 6.4 expresses conservation perform four tasks: (1) to perform seismic
of flow at every node, and Equation 6.5 states hazard analyses; (2) to generate lifeline damage
that the link flow XiJ is always bounded by link states consistentwith the calculated site-specific
capacity cu. seismic intensities; (3) to perform connectivity
analyses; and (4) to estimate residual capacities
To apply the maximum flow theorem, sources of lifeline components. Its capabilities include
and destinations,have to be defined. For the oil the following components/functions:
systems and the natural gas system, nodes in
Texas,and Louisiana represent the sources, Database. Database capacity can
while nodes, in Illinois, California, Seattle, Utah, accommodate most major lifeline systems at
and Massachusetts represent destinations. the transmissionlevel on the national scale,
Source and destination are more difficultto including: transportation, water, electric
define for the highway and railroad systems. power generation and supply, gas and liquid
These networks are highlyredundant, so fuel supply and emergency service facilities.
damage and losses are confined to the epicentral
regions. In the residual capacity calculations for

ATC:-25 6: Estimates of Indirect Economic Losses 133


Example 6.2

This example illustrates the residual capacity calculation for pipelines systems (e.g., crude oil, refined
oil, or natural gas).

Consider the following crude oil pipeline network:

25 km 25 km

2 pipe #4 D =14" 4 (Destination)

0 / MMI~~~=
0.9 MMI=8.0/
pipe #1 D=8"
pipe #3 =1O'

(Source) 1 pipe#2 D=16 3

Assume that pipe number 4 is subjected to intensity MMI = 8 along 25 km of its length, and MMI = 9
along 25 km of its length. The pipe lies in the non-California 7 portion of the NEHRP map. Assume
the other pipes are unaffected and that there is no liquefaction. Find residual capacity at node 4 at the
end of 7 days

Procedure. Use the damage curves for petroleum fuel transmission pipelines (from Appendix B) to
determine mean break rate by intensity. Using the data on which this figure is based, the 25 km length
of pipe, i1, experiencing MMI = 8 has an expected mean break rate, 1 , of 0.036 breaks/km. The 25
km length of pipe, 12, experiencing MMI = 9 shaking has an expected mean break rate, X2 , of 0.1 79
breaks/km. The probability of having at least one break in this pipe is given by equation 5.4, which is

- 2
Pf = - 11 Ps
i=1
= 1 - (exp(- X 1 x 11) x exp(- 2 x 12))
= 1 - (exp(-0.036 x 25) x exp(-0.1 79 x 25))
= 0.99
The diameter square of each pipe will be taken as a measure of capacity of the pipe. For the
undamaged system using the min-max theory, the maximum flow Q at the destination (i.e., node 4) is
164 (the maximum flow at node 4 equals the capacity of link number 1, i. e. 64, plus the capacity of
link number 3, i.e. 100). Since the probability of failure of pipe number 4 is greater than 60%, this
pipe will assumed to be closed until it will be fully restored. For the damaged system, at the first time
step (i. e., t=O days) pipe 4 will be closed and the maximum flow Q, at node 4 is the capacity of the
remaining system, which is 100. The residual capacity at time step t=O can be estimated using
Equation 6.6 and is given by Q1/QO = 61.0%. Using the time-to-restore curve for petroleum
transmission lines provided in Appendix B, the time to fully restore pipe sustaining MMI = 9 is 10
days. Thus, at the second time step (t = 7 days) the maximum flow at node 4 equals 1 00, and the
residual capacity at the destination is still 61 % (pipe 4 is still closed).

Figure 6-9: Analysis example illustrating residual capacity calculation for crude oil pipeline network.

134 6: Estimates of Indirect Economic Losses ATC-25


Example 6.3

This example illustrates the damage and residual capacity calculation for non-pipeline network systems
(e.g., railroad or highway system). Consider the following highway network (nodes denoted by circles,
links by boxes):

I~~~~~~
D3

The network lies in the "All Other Areas" portion of the NEHRP map; the intensity distribution for a
given scenario earthquake is given below. Assume liquefaction does not occur and that Links 2 and 9
contain bridges. If a bridge experiences damage of 15% or more, it is assumed closed until 100%
restored. Characterize restoration at various time intervals.

Link Number
1 2 3 4 5 6 7 8 9 10

length, km 5 5 5 5 5 3 5 3 5 5
MM 5 6 5 7 8 7 5 a 7 4

Procedure. Using the damage curves provided in Appendix B for highways/freeways, damage to the
highway system is estimated as follows:

Link Number
1 2 3 4 5 6 7 8 91 10

Damage, %o6 0 0 0 1 3 1 0 3 1 0

Using the damage curves for conventional bridges, "other" areas (Appendix B), damage to the bridges
in Links 2 and 9 is estimated to be 10% and 30% damage, respectively.

Due to the assumption that a bridge is closed if damage exceeds 15%, the bridges in Link 9 are closed
until 100% restored, while bridges in Link 2 are not. Restoration of the network links are estimated
from the restoration curves for conventional bridges "all other areas" (Appendix B) as follows (see
following page):

Figure6-10: Analysisexample illustratingthe residualcapacitycalculationfor highway networks.

ATC-25, 6: Estimates of Indirect Economic Losses 135


* Damage State. The LLEQE user can specfify worst case situations, is provided in Figure 6-12.
breaks, generate random breaks, or both. To In this case nearly 95% of the highway system
generate a break in a link the user simply capacity is initially lost, and full restoration of
select "Specify Break" option and points t( the system is not achieved until about day 420.
the link with a mouse. To simulate a seismtic Losses in highway system capacity are similar for
event, random breaks are generated using Utah, as a result of the Wasatch Front scenario.
Monte Carlo simulation and a
nonhomogeneous Poisson process with 6.4.3 Electic System
mean break rate based on data from
previous earthquakes. Residual capacities of the electric systemwere
estimated taking into account nodes only (i.e.,
* Connectivity Analysis. Connectivity analys;is transmission substations). The residual capacity
is performed to identify disconnected for each node was estimated at each time step
regions of damaged systems, tag them withi using the time-to-restore curves for transmission
coded colors, and eliminate them from substations from Appendix B. Averages over all
subsequent system analysis. Optimum pat]I nodes in each state affected by the scenario
and shortest path from source to destinati,on events were calculated using Equation 6.2 and
can also be defined. are plotted in Figures C-143 to C-166. One of
the worst case situations occurs in Mississippi
* Serviceability Analysis. Analysis to estimal following the magnitude-8.0 New Madrid event
the serviceability of lifeline systems under (Figure 6-13). In this case, the initial loss is
seismic or other events. The process approximately 75% of capacity, and full
involves connectivity analysis of the systenI restoration is not achieved until about day 130.
in simulated damage states consistent witl 1 Losses for Arkansas for this same event are
site seismicity and statistical analysis of similar.
residual capacities available in these dama ge
states. It can provide fragility curves to 6.4.4 Water System
estimate the functionality and usabilityof
the system. Residual capacities of the water system (Figures
C-167 to C-169) were estimated using the
Following are summaries of residual capacity minimum-cut-maximum-flow theorem discussed
analytical results for extended regional lifeline above. For the Hayward event the San
networks. Francisco Bay area was assumed to be the
destination and the outside world, the source.
6.4.1 Railroad System For the Fort Tejon event Los Angeles was
assumed to be the destinaton and the Colorado
Residual capacities of the railroad system for, Ill River Aqueduct (1056 hmn'), Cilifornia
scenario earthquakes were estimated using the Aqueduct South Coast (6923 hm ), and Los
minimum-cut-maximum-flow theorem definedi Angeles Aqueduct (574 hm ) were assumed to
above; sources and destinations were also be the sources. The worst case situation occurs
defined as above. Residual capacity plots for t he in Los Angeles as a result of the Fort Tejon
railroad system are provided in Appendix C, event (Figure 6-14).
Figures C-127 through C-134. An example
(typical) plot for the Hayward earthquake 6.4.5 Cnde Oil System
scenario is provided in Figure 6-11.
For the residual capacity calculations for the
6.4.2 Highway System crude oil system, Texas and Louisiana were
assumed to represent the source region, while
Residual capacities of the highway system wer e Chicago,Southern and Northern California
estimated using the minimum-cut-maximum- represented the destinations. Residual
flow theorem and the sources and destination i capacities of the crude oil system were estimated
as defined above. The residual capacities are using the minimum-cut-maximum-flow theorem
shown in Figures C-135 to C-142. An example discussed above. Links with probability of failure
plot for the epicentral regional of the greater than or equal to 60% were assumed
magnitude-8.0 New Madrid event, one of the closed until 100% restored.

Economic Losses ATC-25


136 6: of Indirect
Estimates of
6: Estimales Indirect Economic Losses ATC-25
_ __
don,_
I UUr ;

95T_

85-
80-I

:tC 701
651
70~
-
U
. 551
Is

50-1
0 45-i
40 '

301
251
:20 - --
:-r
I

0o 4 6 8 10, 12 14 16
Elapsed Time In Days

Figure 6-11 Residual capacityofSan FranciscoBa arearairoad system followingHayward event


,(M=75).

0
T-
0
4-
qW,
Cn
C

Elapsed Time in Days

Figure6-12 Residual capacityof eicentral regionhighwaysfollowingNew Madrid event (M=&O).

137
ot Indirect
Estimates of
6: Estimates Economic Losses 137
ATC-25
ATC-25 6: Indirect Economic Losses
100-
95-_
90-1
85-
80- I
75-
C 70
I
I0 65 -
OQ
0 60-
U, 1JIr2r
50-
45-
40-
35-
30-
25-
20- - II
u 1 4c+
e- sdTm
105Ep4 i Da 1n 147
lI Elapsed Time in Days

Figure 6-13 Residual capacity of Mississippi electric system following New Madrid event M=8.0).

90- I

.o-

70-
0
C
0 60-
0
a)
Cc 50-

40-

30- -

1 to 20 30 40 50 60 70

Elapsed Time in Days

Figure 6-14 Residual capacity of epicentral region water system following Fort Tejon event (M=8.0).

Indirect Economic Losses ATC-25


138
138 Estimates of
6: Estimates
6: of In.direct Economic Losses ATC-25
1o-- -

95-
90_
85-
80-
75-
70-
0 65-
60-
55-
50-
C)
45-
40-
35-
30-
25-
2 0 i1
1 5
101
1_
0-V
b; s~~~~
0 5 10 15
Elapsed Time in Days

Figure6-15 Residual capacityof cnmdeoil deliverysystemfrom Texasto Northern Californiafollowing


Fort Tejon event M=8.O).
The residual capacities are shown in Figures C- 64.7 NaturalGasSystem
170 to C-173. One of the wonst-case situations
occurs in California as a result of the Fort Tejon For the residual capacity calculations for the
earthquake scenario (Figure 6-15). In this case natural gas system, Texas and Louisiana were
crude oil delivery capacity from Texas to considered as the sources, and Illinois,
Northern California is initially reduced to less Massachusetts, Utah, Washington, and
than 10 percent, and full restoration of capacity Californiarepresented the destinations.
is not achieved until about day 14. A similar Residual capacities of the natural gas system
situation occurs in this same scenario were estimated using the minimum-cut-
earthquake for crude oil deliveryfrom Texas to maximum-flow theorem discused above. The
Southern California. residual capacities are shown in Figures, C-176
through C-184.An example plot for the
64.6 Refined Oil System Haywardscenario, one of the worst case
situations, is provided in Figure 6-17. In this case
For the residual capacity calculations for the the capacity for natural gas delivery from Texas
refined oil system, Texas was assumed to be the to Northern Californiais reduced to zero for the
source, and Chicago was the destination. first seven daysafter the earthquake; full
Residual capacities were estimated using the capacity is restored at about day 14. Losses in
minimum-cut-maximum-flow theorem discused delivery capacity to Seattle from Texas, as a
above. Links with probability of failure greater result of the Puget Sound scenario, and to
than or equal to 60% were assumed closed until California from Texas, as a result of the Fort
100% restored. The residual capacities,are Tejon event, are similar.
shown in Figures C-174 and C-175. Residual
capacity plots for the two New Madrid events 6.4.8 Distribution Systems
considered are sinilar. The plot for the New
Madrid magnitude-8.0 event is provided in Residual capacities of the electric, water, and
Figure 6-16. highway distribution systems were estimated
using the time-to-restore curves provided in

139
Indirect Economic Losses
ATC-25
ATC-25 Eslimales of
6: EstImates
6: of Indirect Economic Losses 139'
100

95
l l~~~
T~~~~~~~~
. _~ 90 I -
.t
85
U
8C i -

0
7E

7C I

ar,
Wn, I
0 7 14
Elapsed Time in Days

Figure6-16 Residual refinedoil deliveryfrom Texasto Chicagofollowing New Madrid event (M=8.0).
100- i
95-
90-i i
I
85 -n iI
80d
... 75-I
70A
i 65-
_ 60
- 55-i
7501
:2 45
- 40-I
= 35i
- 30H
r- 25-i
- 20-.
15-i
10
5
0- -- .... ............. ......... ......................... ............... .... ............................
.

-5-
0 2 4 6 8 10. 12 14 16
Elapsed1 Time in Days

Figure6-17 Residual capacityof naturalgas deliveryfrom Texasto Northern Californiafollowing Fort


Tejon event (M=8.O).

Losses ATC-25
140
140 6: Estimates of
6: Estimates Indirect Economic
of Indirect Economic Losses ATC-25
Appendix B. Distribution systems were assumed Primary: Emergency response and
to be lumped at the center of the Standard human needs
Metropolitan Statistical Areas (SMSAs), and
intensities were estimated at each SMSAfor Secondary:Industrial needs
every scenario event Residual capacity plots for (Within this class non-
distribution systemshave not been included in interruptible service
this report. Economic losses resulting from customers share the loss in
damage to these systems, however, are included capacity equally)
in the summaries provided later in this chapter.
Tertiary: Interruptible service
6.5 General Analytical Approach for customers
Estimating Indirect Economic
Losses 5. Secondary Impacts. Ignored. The loss of
capacity in one (non-lifeline), industry would
In order to develop the relationship between likely reduce the productivity of other
lifeline interruption and indirect economic industries,that obtain inputs from the first
losses it was necessary to generate a set of industry. These reverberations, which are
simplifying assumptions. The general typicallymeasured using input-output
assumptions that apply to all lifelines are listed analysis, will be ignored for this first
below. approximation.To the extent that these
reverberations are ignored, impacts are
65.1 GeneralAssumptions understated.
1. Duration. The interruption of the lifeline 6. Functional Relationships. Each industrial
element/system that gives rise to the sector of the economy was considered
economic loss is assumed to extend over one separatelywith respect to each lifeline. TIhe
or more consecutive month-long tim e maximum impact, which would be expected
periods. The functionality loss assigned to to result from a prolonged total lifeline
each month is the average for that month. failure was estimated for each lifelinelsector
pair. TIheeffect of less-than-total failure of
2. Independence. Lifeline elements are the lifelinewas estimated using the
assumed to be independent. Interruptions in following assumptions:
elements of one lifeline do not produce
interruptions in other lifeline elements.That * The first 5% interruption could be
is, we ignore lifeline interaction effects, absorbed without economic loss
which are sometimes non-trivial.
Subsequent losses would result in
3. Lifeline Functionality. The quantity under proportionate economic losses. Thus as
examination here is lifeline functionality as lifeline capacity falls from 95 to 0%, the
opposed to lifeline capacity. For example, economic impact is assumed to increase
assume the water supply lifeline sustains a linearly from zero to the maximum
loss of 20 percent of its capacity locally, but,. -effectfor each sector/lifeline pair.
because of redundancy and looping, water
remains fully available. The functionality The
I product of the percent loss of value
loss and consequent indirect economic loss added for each sector was summed over
would both be zero. Conversely, if all water all sectors for each decile and lifeline.
supply and transmission facilities remain This sum represents the value-added
intact, but damage to the distribution system weighted average of the economic
cuts off water to 20 percent of the industries impact of the lifeline for that decile.
served, the functionality loss is 20 percent
7. Lineant. The linearity assumption
4. Distribution of Incidence of Interruption. mentioned above implies that remaining
Lifeline interruptions are assumed to be lifeline capacity could be used productively;
prioritized as follows: limited lifeline damage would not cause a
complete cessation of economic activity in

Economic Losses 141


ATC-25
ATC-25 6: Estimates
6: of Indirect
Estimates of Indirect Econcmic Losses 141
the sector. This assumption may maximum impact estimates by sector and lifeline
unrealisticallyunderestimate the effects of are shown in Table 6-2.
lifeline interruptions in industries (such as
primary metals) that might be unable to Reduction in Value Added Due to Lifeline
scale back operations or to close and restart Interruption.Table 6-3 presents the percent
operations in response to reduction and reduction in value added for each sector
restoration of lifeline capacity. resulting from increasingly severe crude oil
lifeline interruptions. (Similar tables are shown
6.5.2 Data Sourcesand Methodology for all lifelines inAppendix D.) Values are
shown for each decile of lifeline interruption
Value Added Data. Economic activity within and are assumed to pertain to monthly Gross
each industrial sector was measured in terms of National Product (GNP). As noted in the
value added. Value added refers to the value of assumptionscited above, these percentages are
shipments (products) less the cost of materials, linearlyinterpolated between the reduction in
supplies, contract work and fuels used in the value added when the lifeline experiences 5%
manufacture or cultivation of the product. The interruption (for a 5% lifeline interruption,
United States Bureau of Economic Analysis there is no reduction in value added) to the
publishes annual data for value added for each reduction in value added when the lifeline
industrial sector. For simplicity, data from the 99 experiences 100 percent interruption (maximum
sectors were collapsed into 36 sectors. Data for impact).
1983 were the latest available (published by
BEA, 1989), and were used in this study. Table 6-4, also assumed to pertain to monthly
GNP, presents the remainingvalue added of
As a first approximation, data on the national each sector under alternative levels of crude oil
economywere used to assess the relative lifeline interruption. Similar tables are shown
economic importance of each sector. The value for all lifelines in Appendix D. These value
added for each of the 36 sectors of the economic added estimates are calculated by finding the
model is expressed as a percentage of the percent value added of the sector within the
nationwide total. These data are presented in total economy (Table 6-1, right column) and the
Table 6-1. For comparison, comparable data for percentage reductions in value added (e.g.,
the local San Francisco Bay Area economy Table 6-3 for oil supply). The product of these
(which comprises Santa Clara County and parts two variables is subtracted from the
of Alameda County) are shown on the same uninterrupted value-added for each decile. In
table. the case of oil supply and the livestock sector,
the residual valued-added after 10% of loss of
Lifeline Importance Factors. The economic capacity = (0.45%) - ((0.45%) x (2.63%)) =
impact of each lifeline was estimated by (0.45) - (.01) = 0.44% These sums thus
modifying estimates from ATC 13 (ATC, 1985). represent the weighted average of the sectorial
Table 9.8 of ATC 13 presents the lifeline impacts of interruptions to the lifeline.
importance factors for each social function. To
adapt these estimates to the present study, the Figure 6-18 illustrates the value added weighted
"social functions" were assigned to each average economic impacts of crude oil lifeline
industrial sector. The importance weights interruptions (taken from totals at bottom of
provided in ATC-13 distinguish between main Table 6-4). Similar figures are shown for all
and distribution systemsfor each lifeline. For lifelines in Appendix D. The Y-intercept reflects
the present study, the two figures were averaged the estimate of the maximumimpact, due to
to produce an importance weight for the entire total disruption of the lifeline for an extended
lifeline system. Further modification of the period of time.
ATC-13 estimates were made to reflect the
difference between the importance of the FurtherRefinements.As noted at the outset,
lifeline and its impact on the economy if it were this brief study constitutes a first approximation
totally disrupted. These modifications, generally of the economic effects of lifeline interruption.
in the upward direction, constitute first A number of explicit and implicit assumptions
approximationsof economic impacts.The were made in order to simplify the analysis.
Using these assumptions limits the accuracy of

Economic Losses ATC-25


142 6:
6: Estimcrtes oi Indirect
Estimates of Indirect Economic Losses ATC-25
142
-I Table 6-1 Relative Importance of Industry Sections--U. S. and Santa Clara County,
0 California
La

Santa Clara
& Part Alameda U.S. Econ U.S. Econ. U.S. Econ.
Value Added Value Added Value Added Value Added
Sector (Mil $1986) (Mil $1983) Pct. of Tot. Pot. of Tot.

1 Livestock 4 0.01% 15,227 0.45%


2 Agr. Prod. 78 0.13% 35,567 1.06%
0 3 AgServ For. Fish 115 0.20% 3,705 0.11%
4 Mining 92 130,577 3.89%
0.16%/
in 5 Construction 1,973 3.39% 185,326 5.52%
6 Food Tobacco 593 1.02% 80,810 2.41%
7 Textile Goods 10 0.02/6 12,515 0.37%
a 8
9
Misc Text. Prod,
Lumber & Wood
I1
50
0.02% 24,397
17,319
0.73%
0.52%
(n 10 0.09%
Furniture 60 11,378 0.34%
0 0.1(0
11 Pulp & Paper 153 0.26% 29,253 0.87%
12 Print & Publish 413 0.71% 44,053 1.31%
13 Chemical & Drugs 492 0.84% 47,144 1.40%
0 14 Petrol, Refining 3 0.01% 32,332 0.96%
-I
15 Rubber & Plastic 127 0.22% 34,579 1.03%
16 Leather Prods, 1 4,119 0.12%
0.00%
17 Glass Stone Clay 199 0.34% 20,758 0.62%
0 18 Prim. Metal Prod 95 0.16% 34,951 1.04%
0 19 Fab. Metal Prod. 538 0.92% 55,094 1.64%
0 20 Mach. Exo. Elec. 5,789 9.95% 52,384 1.56%
Or 21 Elec. & Electron 5603 9.63% 84,697 2.52%
a 22 Transport Eq. 924 1.59% 87,942 2.62%
0 23 Instruments 1,416 2.43% 22 807 0.68%
24 Misc. Manufact. 113 0.19% 23,080 0.69%
25 Transp & Whse, 533 0.92% 116,193 3.46%
in
(1) 26 Utilities 1,173 2.02% 197,676 5.89%
th 27 Wholesale Trade 4,O34 6.93% 189,178 5.63%
28 Retail Trade 2,567 4.41% 189,178 5.63%
29 F.l.R.E. (Finance, Insurance, Real Estate) 10,250 17.62% 558,851 16.64%
30 Pers./Prof Serv. 8,755 15.05% 269,683 8.03%
31 Eating Drinking 1,556 2.6r/% 71,217 2.12%
32 Auto Serv, 1,137 1.95% 36,761 1.09%
33 Amuse & Rec, 223 0.38% 23,385 0.70%
34 Health Ed. Soc. 4,650 7.99% 211,503 6,30%
35 Govt & Govt Ind. 3,870 6.65% 395,936 11.79%
36 Households 574 0.99% 8,442 0.25%
Inventory & Leak 0.00% 39,135
TOTAL 58,174 100,00% 3,397,151 100.00%

Sources: Santa Clara: Dames & Moore, 1987. Regional Economics Of Water Supply Shortages in the South Bay Contractors' Service
Area U.S.: U.S. Dept. of Comm. Bureau of Econ. Analysis, 1989 Suvey of Current Business. Input Output Accounts of the
U.S. Economy, 1983 Collapsed from 99 to 36 sectors.
Table 6-2 ImportanceWeights of Various Lifeline Systems on Economic Sectors
(Modified ATC-13 Table 9.8 (ATC, 1985))

Natural Air Water


Water Waste Electric Gas Oil Highway Railways Transportation Transportation Phone

1 Livestock 0.45 0.20 0.50 0.10 0.50 0.40 0.40


0.50 0.10 0.20
2 Agr. Prod. 0.70 0.50 0.50 0.30 0.80 0.80 0.40 0.10 0.40 0.20
3 AgServ For. Fish 0.45 0.50 0.50 0.30 0.80 0.80 0.40 0.10 0.40 0.20
4 Mining 0.15 0.10 0.90 0.10 0.90 0.35 0.35 0.10 0.20
o. 0.10
5 Construction 0.50 0.20 0.40 0.00 0.90 0.40 0.05 0.00 0.20 0.10
ti
.. 6 Food Tobacco 0.70 0.70 0.90 0.25 0.50 0.80 0.20 0.20 0.20 0.15
7 Textile Goods 0.70 1.00 0.20 0.50 0.75 0.20 0.20
0.70 0.15
8 Misc Text. Prod. 0.70 0.70 1.00 0.20 0.50 0.75 0.20 0.20
0.20 0.15
(a 9 Lumber& Wood 0.50 0.50 1.00 0.20 0.50 0.20
0.90 0.40 0.20 0.15
10 Furniture 0.50 0.50 1.00 0.20 0.75 0.20
0.50 0.20 0.20 0.20 0.15
11 Pulp & Paper 0.60 0.80 1.00 0.40 0.50 0.80 0.45 0.10 0.30 0.10
0 12 Print & Publish 0.30 0.30 1.00 0.20 0.50 0.75 0.20 0.20 0.20 0.15
cn 13 Chemical & Drugs 0.80 0.80 0.90 0.90 0.50 0.80 0.20 0.20 0.20 0.15
14 Petrol. Refining 0.50 0.50 1.00 0.50 1.00 0.90 0.40 0.00 0.80 0.10
15 Rubber & Plastic 0.50 -0.50 1.00 0.50 0.50 0.75 0.20 0.20 0.20 0.15
16 Leather Prods. 0.50 0.50 1.00 0.20 0.50 0.75 0.20 0.20 0.20
(1 0.15
17 Glass Stone Clay 0.50 0.50 1.00 0.50 0.50 0.75 0.20 0.20 0.20 0.15
0 18 Prim. Metal Prod. 0.90 0.80 0.90 0.50 0.90 0.80 0.50 0.10
0 0.20 0.15
19 Fab. Metal Prod. 0.80 0.80 1.00 0.50 0.50 0.80 0.45 0.10 0.30 0.10
20 Mach. Exo, Elec. 0.60 0.80 1.00 0.50 0.50 0.80 0.45 0.20 0.30
9k 0.10
21 Elec. & Electron 0.90 0.90 1.00 0.50 0.50 0.75 0.20 0.30 0.20 0.15
22 Transport Eq. 0.60 0.80 1.00 0.50 0.90 0.80 0.45 0.30 0.30
0. 0.10
23 Instruments 0.90 0.60 0.75
00 1.00 0.50 0.80 0.05 0.40 0.10 0.30
24 Misc. Manufact. 0.60 0.60
0 1.00 0.S0 0.50 0.75 0.20 0.20 0.20 0.15
25 Transp & Whse. 0.20 0.10 0.30 0.00 0.90 0.80 0.30 0.30 0.30 0.30
26 Utilities 0.40 0.24 0.80 0.40 0.50 0.40 0.00 0.00 0.00 0.30
27 Wholesale Trade 0.20 0.10 0.90 0.10 0.50 0.70 0.15 0.20 0.20 0.50
28 Retail Trade 0.20 0.20 0.90 0.20 0.90 0.55 0.20 0.20 0.00 0.50
29 F.I.R.E. 0.20 0.20 0.90 0.20 0.60 0.45 0.10 0.20 0.00 0.60
30 Pers./ProfServ. 0.20 0.20 0.90 0.20 0.60 0.45 0.10 0.20 0.00 0.40
31 Eating Drinking 0.80 0.80 0.80 0.40 0.80 0.50 0.05 0.40 0.00
:S 32 Auto Serv.
0.40
0.10 0.20 0.90 0.05 0.90 0.55 0.00 0.00 0.00 0.40
33 Amuse & Rec. 0.80 0.80 0.80 0.40 0.90 0.50 0.05 0.40 0.00 0.40
g9 34 HealthEd. Soc. 0.40 0.80 0.80 0.20 0.20 0.55 0.05 0.10 0.00 0.15
35 Govt & Govt Ind. 0.25 0.20 * 0.60 0.20 0.20 0.30 0.10 0.20 0.00 0.20
36 Households 0.40 0.75 * 0.80 0.35 0.50 0.40 0.00 0.00 0.00 0.20
TOTAL 0.51 0.51 0.86 0.32 0.62 0.67 0.22 0.18 0.19 0.22

rn
Table 6-3 Percent Value-Added Lost Due to Specified Percent Loss of Oil Supply
Lifeline

U.S. Econ.
ULLCapacity Loss--> Value Added 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%0
(Percent)

13.16% 18.42% 23.68% 28.95% 34.21% 39.47%S/ 44.74% 50.00%


1 Livestock 0.45% 2.63% 7.89%
29.47% 37.89% 46.32% 54.74% 63.16% 71.58% 80.00%
2 Agr, Prod. 1.06% 4.21% 12.63% 21.05% 80,00%
4.21% 12.o3% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58%
3 AgServ For. Fish 0.11%
33.16% 42.63% 52.11% 61.58% 71.05% 80.53% 90.00 -/0
0r 4 Mining 3.89% 4.74% 14.21% 23,68%
552%/ 4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61.58% 71.05% 80.53% 90.00%
.5 Construction
7,89% 13.16% 18,42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
6 Food Tobacco 2.41% 2,63%
50.00%
2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74%
7 Tektile Goods 0.37%
13.16% 18.42% 23.68% 28.95% 34,21% 39.47% 44.74% 50.00%
8 Misc Text. Prod. 0.73% 2,63% 7.89%
2.63% 7,89% 13.16% 18.42% 23.68% 28.95% 34.2 1% 39,'47%/ 44.74% 50.00%
9 Lumber & Wood 0.52/n 39.47%
(D 10 Furniture 0.34% 2.63% 7.89% 13.16% 1842% 23.68% 28.95% 34.2 1% 4474% 50.00%
In 39.47% 44.74% 50.00%
0 I Pulp & Paper 0.87% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34,21%
13.16% 18.42% 23.68% 28.95% 34.21% 39,47/ 44.74% S0.00%
12 Print & Publish 1.31% 2.63% 7.89%
13.16% 18.42% 23.68% 28.95% 34.21% 39.47%o 44.74% 50.00%
13 Chemical Drugs 1.40% 2.63% 7.89%
4737% 57.89% 68.42% 78,95% 89.47% 100.00%
. 14 Petrol. Refining 0.96% 5,26% 15,79% 26.32% 36.84%
50.00%/
1.03% 2,63% 7,89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74%
15 Rubber & Plastic
(1) 39.47% 44.74% 50.00%
a 16 Leather Prods. 0.12% 2.63%
2.63%
7,89%
7.89%
13.16%
13,16%
18.42%
18.42%
23.68%
23.68%
28.95%
28.95%
34.21%
34.21% 39.47% 44.74% 50.00%
t'I 17 Glass Stone Clay 0.62%
4.74% 14.21% 23.68% 33.16% 42,63% 52.11% 61.58% 71.05% 80.53% 90.00%
18 Prim. Metal Prod. 1.04%
7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
Q 19 Fab. Metal Prod. 1.64% 2.63%
18.42% 23.68% 28.95% 34.21% 39.47% 44,74% 50.00%
0 20 Mach. Exc, Elec. 1.56% 2.63% 7.89% 13,16%
34.21% 39.47% 44,74% 50.00%
. 21 Elec. & Electron 2.52 2.63% 7.89% 13.16% 18.42% 23.68% 28.95%
22 Transport Eq. 2.62% 4.74% 14.21% 23.68% 33.16% 42.63% 52.1 1% 61.58% 71.05% 8053% 90.00%
0 2.63% 7.89% 13.16% 18.42%/o 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
23 Instruments 0.68%
13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
24 Misc. Manufact. 0,69% 2.63% 7.89%
0 25 Transp & Whse, 3.46% 4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61.58%/o 71.05%/6 80.3% 90.00%
in 28.95% 34.21% 39.47 44.74% 50.00%
in 26 Utilities 5.89% 2.63% 7.89% 13.16% 18,42% 23.68%
ID 7.89% 13.16% 18.42% 23.68% 28.95% 34.2 1% 39.47% 44.74% 50.00%
Mn 27 Wholesale Trade 5.63% 2.63%
14.21% 23.68% 33.16% 42.63% 52.11% 61.58% 71.05%/6 8Q.53% 90.00%
28 Retail Trade 5.63% 4.74%
29 F.l.Fl.E. 16.64% 3.16% 9.47% 15.79% 22.11% 28.42% 34.74% 41.05% 47.37% 53.68% 60.00%
30 Pers./Prof. Serv. 8.03% 3.16% 9.47%k 15.79% 22.11% 28.42% 34.74% 41,05% 47.37% 53.68% 60.0%
2.12% 4.21% 12.63% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58% 80.00%
31 Eating Drinking
4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61.58% 71.05% 80,53% 90.00%
32 Auto Serv. 1.09%
33 Amuse & Rec. 0.70%/6 4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61.58% 71.05% 80.53% 90.00%
34 Health Ed. Soc. 6.30%/6 1.05% 3.16% 5.26% 7.37% 9.47%; 11.58% 13.68% 15.79% 17.89% 20.00%
11.79% 1.05% 3.16% 5,26% 7.37% 9.47% 11.S8% 13.68% 15.79% 17.89% 20.0Q0h
35 Govt & Govt Ind.
0.25% 2.63% 7,89% 13.16% 18.42% 23,68% 28.95% 34.21% 39.47° 44.74% 50.0Qh
36 Households
TOTAL 100.00%/a 3.25% 9.74/v 16.23% 22.72% 29.21% 35.70% 42.19% 48.68% 55.18% 61.67%
Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Total V.A
Pot. V.A.
9-

ITable 6-4 Residual Value-Added After Loss of Capacity of Oil Spply Lifeline

0%/ 10% 20% 30% 40% : 50% . 60% 70% 80% 90%1 100%/

0.45% 0.44% 0.42% 0.39% 0.37% 0.35%/ 0.32% 0.30%/ 0.27%h 0.25% 0.23%
1.06% 1 .01% 0.93% 0.84% 0.75% 0.66% 0.57% 0.48% 0,39%h 0.30% 0.21%
0.110% 0.11% 0.10% 0.09% 0.08% 0.07%/ 0.06% 0.05%/ 0.oi%1 0.03% 0.02%
0o
3.89% 3.70%/ 3.34% 2.97% 2.60% 2.23% 1.86%/ 1.49% 1.13%/ 0.76% 0.39%
5.52% 5.26% 4.73% 4.21% 3.69% 3.17%o 2.64% 2.1 2% 1.600°0 1.07% 0.55%
2.41% 2.34% 2.22% 2.,09%/ 1.96% 1.84% 1.71% 1.58% 1.46% 1.33% 1.20%
0.3 7% 0.36% 0.34% 0.32% 0.30% 0.28% 0.26% 0.25% 0.23% 0.21% 0.19%
0.73%1 0.71% 0.67% 0.63% 0.59% 0.55% 0.52% 0.48% 0.44% 0.40% 0.36%
(a 0.52/o 0.50% 0.48% 0.45% 0.42% 0.39% 0.37% 0.34% 0.31% 0.29%/ 0.26%
0.34% 0.33% 0.31 % 0.29% 0.28% 0.26% 0.24% 0.22% 0.21% 0.19% 0.17%/
0 0. 87% 0.8% 0.80% 0.76% 0.71 % 0.66% 0.62% 0.57P/6 0.53% 0.48% 0.44%
1.31% 1.28% 1.21% 1.14% 1.07% 1 00/0 0.93% 0.86% 0.79%. 0.72% 0.66%
P
1.40% 1.37% 1.29% 1.22% 1.15% 1 .000% 0.92% O 50. 0.78% 0.70%
0.96% 0.91% 0.81% 0.71% 0.610% 0.51% 0.41% 0. 30% 0.20%h 0.10% 0.00%
:3 1.03% 1.00% 0.95% 0.,89% 0.84% 0.79% 0.73% 0.68% 0.62%h 0.57% 0.51%
0. 12% 0.12% 0.1 1% 0.11% 0.10% 0.09/0 0.09%/ 0.08% 0.070/6 0.07% 0.06%
0.62%/ 0.60% 0.57% 0.54% 0.50% 0.47% 0.44% 0.41% 0.37P/ 0.34% 0.31%
1.04%/ 0.99% 0.89% 0.79% 0.70% 6.60%/ 0.560/% 0.40%/ 0.300°h 0.20% 0.10%
CL
&q 1.640% 1.60% 1.51% 1.42% 1.34% 1.25% 1. 1 %o 1.08% 0.99% 0.91% 0.82%
1.56% 1.52% 1.44% 1.35% 1.27% 1.19%/ 1.1 1% 1.03% 0.94% 0.86%
0.78%
2.52%/ 2.46% 2.32% 2.19% 2.06% 1.92%/ 1.79% 1.66% 1.53% 1.39%
1.26%
2.6% 2.49% 2.25% 2.00% 1.75% 1.50%/ 1.25% 1.01% 0.76% 0.51%
0.26%
0.68% 0.66% 0.63% 0.59% 0.55% 0.52%/ 0.48% 0.45%/ 0.41% 0.38%
0.69% 0.67% 0.63% 0.60% 0.56% 0.52%0/ 0.49% 0.45% 0.42°h6 0.38% 0.34%
3.46% 3.30%. 2.97% 2.64% 2.31% 1.99% 1.66% 1.33% 1.00°h0 0.67% 0.35%
5.89% 5.73% 5.42% 5.11% 4.80% 4.49% 4.18% 3.87% 3.56%/ 3.25% 2.94%
5.63%: 5.49% 5.19% 4.89% 4.60% 4.30% 4.00%/ 3.71% 3.41% 3.11% 2.82%
5.63% 5.37% 4.83% 4.30% 3.77% 3.23%/ 2.70% 2.16% 1.63% 1 .10% 0.56%
16.64% 16.12% 15.07% 14.01% 12.96% 10.86% 9.81% 8.76% 7:71% 6.66%
8.03% 7.78% 7.27% 6.76% 6.26% 5.75% 5.24% 4.73% 4.23% 3.72% 3.21%
2.12%/ 2.03% 1.85% 1.67% 1.50% 1.32% 1.14% 0.96% 0.78% 0.60% 0.42%
1.09% 1.04% 0.94% 0.84% 0.73% 0.63% 0.52% 0.42% 0.32%h 0.21% 0.11%
0.70%/ 0.66% 0.60% 0.53% -0.47% 0.40%/ 0.33% 0.27% 0.20%h 0.14% 0.07%
6.30% 6.23% 6.10% 5.97% 15.83% 5.70% 5.57/6 5.44% 5.30%/ 5.17% 5.04%
11.719% 11.67% 11.42% 11.17% 10.92% 10.67% 10.43% 10.18% 9.93% 9.68% 9.43%
0.25% 0.24% 0.23% 0.22% 0.21 % 0.19% 0.18% 0 17%/ 0.15% 0.14% 0.13%
100.00%/ 96.94% 90.83% 84.71% 78.60% 72.48% 66.37%o 60.25% 54.14%/ 48.02% 41.91%
P 100% 97% 91% 85% 79% 72% 66% 60% 54% 48% 42%
i
0
t:3
W
Oil Supply Uleline
1

0.9

0.8

0.7
'a
0)
10 0.6
-a
0 0.5
4'
ci
c-
o 0.4

:0.3

0.2

0.1

0
0 20 40 60, 80 100

Percent LifelineAvailibility

Figure 6-18 Residual Value Added as a function of crude oil lifeline residual capacity

the results. However, the model's parameters improved by research into the use of
could be refined to produce more accurate each of the lifeline inputs within each of
results, which might also better represent the economic sectors.
regional and local economic diversity. The
following refinements are suggested: * LineartV Assumption. The economic
impact of lifeline interruption was
• Reaionalization. Data on value added assumed to vary linearly between no
are available on a county-by-county basis impact at 5% interruption, to maximum
for the entire United States. Thisdata impact at 100% interruption. This
could be used in place of the national assumption could be investigated and
data presented here to produce local modified as appropriate. Some
area models of county or multiple- industries, may require uninterrupted use
county areas. Such a localized model of lifelinesin order to operate; they may
would more accurately reflect the be unable to operate under certain
impacts weighted by the local conditions of reduced lifeline capacity.
importance of each of the industrial The linearity assumption ignores these
sectors. possible threshold effects. Furthermore,
many or all industries might respond
* MaximumEconomic Impacts. The non-linearlyto interruptions. Smaller
estimates of the maximum impacts of percentage interruptions might cause a
lifeline disruptions were modified from less than proportional impact on value
the ATC-13 data, based on the judgment added as lower valued functions or
of the authors. These estimates could be product line are cut first, or as other

AT. 56 siae fIdrc cnmcLse 4


ATC-25 6: Estimates of Indirect Economic Losses 147
factors of production are substituted for 3. Sum the products calculated in Step 2 for
the damaged lifeline. At high percent each sector to estimate the total percentage
interruptions, the response might be value added lost for all economic sectors;
more than proportional, as vital multiplythis percentage by the percent of U.
functions cannot be maintained. Further S. population affected and by the monthly
research into industry response to Gross National Product to obtain the total
scarcity might suggest a convex rather indirect economic loss for the lifeline and
than linear response function. earthquake scenario under consideration.

Interindustry Effects. The scarcity of The equation used to calculate indirect


productive factors other than lifelines economic losses (IEL) is as follows:
could have major impacts on a regional
economy. These interactions were N1 N2 N3
ignored in the present study, thus IEL = Z (A) (B) (C) (D) (6.7)
understating impacts of lifeline i= jl1 k=1
interruptions. As noted in Scawthorn
and Lofting (1984), input-output where: IEL = Indirect Economic Loss
economic models could be used to solve N1 = number of affected regions
for these interactions. Building such a N2 = number of economic sectors
model would be difficultbecause the N3 = number of months the lifeline
impacts caused by lifeline disruptions has a loss in capacity
and the non-lifeline scarcity impacts A = percent Value-Added-Lost
would have to be solved simultaneously. per month
However, the basic modeling approach B = percent U. S. Economy Value
proposed in this study is consistent with Added
the type of regional data necessary to C = percent of U. S. population
drive an input-output model. affected
D = monthly Gross National
6.6 Indirect Economic Loss Estimates Product

Indirect economic losseswere estimated for We note that an average value of loss of
each lifeline system and scenario event using the functionalityduring each month of the
residual capacity plots provided in Appendix C restoration period is used when estimating the
and the economic tables described above. The overall indirect economic impact (from Table 6-
calculation procedure was as follows: 3 and similar tables in Appendix D). This aspect
of the computation is illustrated in Example 6.4
1. Determine the monthly loss in capacity for (Figure 6-19), which illustrates the economic
the lifeline and scenario earthquake under loss calculation for a specific lifeline, economic
consideration using the appropriate residual sector, and hypothetical earthquake. Shown in
capacity plot (Appendix C). Example 6.5 (Figure 6-20) is an example
calculation for estimating total indirect dollar
2. Determine Percent-Value-Added Lost for loss in all economic sectors due to damage of
each month and sector of the economy for the electric system in the state of Utah as a
the lifeline under consideration, using the result of the Wasatch Front scenario event.
estimates obtained from Step 1 above and
the Percent-Value-Added Lost Tables We have also calculated values of "Percent of
provided in Appendix D (Table 6-3 is an Monthly Economic Loss" in each economic
example). Sum the percentages for all sector due to interruption to each lifeline system
months in each sector to obtain the total for each scenario earthquake using the
Value-Added-Lost in that sector during the "Residual Capacity Plots" provided in Appendix
time period the lifeline had loss in capacity. C and the "Percent Value Added Lost" tables
Multiply this sum by the percent U. S. provided in Appendix D. These data are
Economic Value Added for that sector. provided in Tables 6-5 through 6-11. Values in
these tables are percentage of the monthly GNP
of each economicsector that is lost due to the

Economic Losses ATC-25


148
148 6: Estimates of Indirect
Estimates of Indirect Economic Losses ATC-25
Example 6.4 by all systems; and the best estimate is the
square root of the sum of the squares (SRSS) of
For the pipeline network described in Example losses caused by each lifeline. We note also that
6.2 and using the residual capacity results the SRSS procedure wasused to estimate total
determined there, determine indirect economic indirect economic losses resulting from damage
losses to the livestock sector for the first month. to local distribution networks (Table 6-13).

Procedure. Immediately following the earthquake, By combining like system data from Tables 6-12
this network experiences a 39% loss of and 6-13 in a least squares (SRSS) fashion, we
functionality. Ten days later the loss of estimate the total indirect economic losses for
functionality is 0%. Thus, the average loss of the eight scenario earthquakes as follows:
functionality during the first 10 days is about 20%,
and for the first month it is 20%o/3,or 7%. From indirect
Table 6-3, which pertains to average loss of Loss
functionality for one month, the Value Added lost Earth uake (in Billions, 1991)
for a 7% loss in functionality for the live stock Cape Ann $9.1
sector of the economy is 1.8%, i.e., 0.7 of 2.63%
corresponding to 10% loss of oil supply lifeline for Charleston $10.2
one month. To determine the economic losses in Fort Tejon $11.7
dollars, this percentage would first need to be
multiplied by the percent U. S. Economy Value Hayward $ 11.1
Added for the livestock sector fP.45%) and then New Madrid, M = 8.0 $14.6
prorated by the percent of the national
population affected. Actual economic losses in New Madrid,M = 7.0 $4.9
this economic sector due to loss of functionality of Puget Sound $6.1
this particular pipeline would then be determined
by multiplying this prorated percentage by the Wasatch Front $3.9
monthly gross national product
Bar charts showing the indirect losses caused by
transmission lines (upper bound data) by state
Figure 6-1 9. Analysis Example Illustrating for each scenario earthquake are provided in
Economic Loss Calculation for Figures 6-21 through 6-28. We note that
Crude Oil Pipeline Network. estimates of indirect economic losses for each
state are sensitive to the assumed location of the
scenario earthquake and resulting lifeline source zone for large-magnitude events (e.g.,
interruption. In Table 6-6, for example, 141% of had the assumedsource zone for the magnitude-
the monthly GNP of livestock is lost as.a result S New Madrid event been located further north,
of damage to water transportation systems estimates of direct damage in Missouri would
during the Charleston earthquake scenario. The have been substantially larger). Estimates of
actual dollar loss would be the product of 1.41 x direct damage (Chapter 6 are similarly affected.
.0045 x monthly national GINP x percent of
national population affected. The data provided in Figures 6-21 through 6-28
suggest that Massachusetts would experience
Summaries of the total indirect economic losses the highestindirect losses,due to the Cape Ann
resulting from damage to site-specific systems event with the electric system contributing the
and extended regional networks, based on 1986 highest portion; Mississippi and Arkansas would
C&NP data, are provided in Table 6-12. Total experience the highest indirect losses due to the
indirect economic losses resulting from damage magnitude-8.0 New Madrid event; and South
to local distribution systems,are presented in Carolina, Utah, Washington, Northern and
Table 6-13. We note that Table 6-12 contains Southern California would experience the
total loss amounts expressed in terms of lower highest indirect losses due to the Charleston,
bound, upper bound, and best estimate. The Utah, Seattle, Hayward, and Fort Tejon events,
lower bound represents economic loss caused by respectively. The electric system contributes the
the singular lifeline system causing the greatest highest indirect losses, among all systems, for
loss; the upper bound is the sum of losses caused most of the events.

of Indirect Economic Losses 149


ATC-25
ATC-25 6: Estimates
6: Estimates of Indirect Economfc Losses 149
Example 6.5

Using the Restoration Capacity Plot shown below for Utah electric power following the scenario
Wasatch Front event, estimate the indirect economic lossesdue to damage of the electric system in
the state of Utah.

A
C
0
to
en
ca)

Elapsed Time in Days

STEP 1: Estimate the average loss for each month, which is as follows:
Month Percent Loss
1 45%
2 25%
3 10%
4 5%

STEP 2: From Table D-2, Percent Value-Added Lost Due to Specified Percent Loss of Electricity
Lifeline, extrapolate percent Value Added Lost for each sector of the economy for each
month and sum the results to obtain the estimated percent of Value Added Lost for the
entire period. For the livestock sector, this calculation is as follows:

(23.68+18.42)/2 + (13.16+7.89)/2 + 2.63 + 2.63/2 =

21.05 + 10.53 + 2.63 + 1.32 = 35.53%

Figure 6-20. Analysis Example Illustrating Economic LossCalculation for Electric System in State of
Utah for the Wasatch Front Scenario Event.

Losses ATC-25
6: Estimates
6: Indizect Economic
of Indirect
Estimates of Economic Losses ATC-25
150
150
- ------
STEP 3: Multiply the sum from Step 2 by the percent of the economy for that sector and sum the
products for all economic sectors to obtain the total Percent-Value-Added lost (for all
arnn rirn
---. -.. -
eatt r eX'

(1) ,(2) (3)


U. S. Utah
Economy Value- Product
Value- Added of
Economic Added Lost (1)x2
Sector percent) (percent) percent)
1 Livestock 0.45 35.53 0.16
2 Agr. Prod. 1.06 35.53 0.38
3 AgServ. For. Fish 0.11 35.53 '0.04
4 Mining 3.89 63.95 2.49
5 Construction 5.52 28.42 1.57
6 Food Tobacco 2.41 63.95 1.54
7 Textile Goods 0.37 71.05 0.26
8 Misc. Text. Prod. 0.73 71 .05 0.52
9 Lumber & Wood 0.52 71.05 0.37
10 Furniture 0.34 71.05 0.24
111 Pulp & Paper 0.87 71.05 0.62
12 Print & Publish 1.31 71.05 '0.93
13 Chemical & Drugs 1.40 63.95 0.90
14 Petrol. Refining 0.98 71.05 0.68
15 Rubber & Plastic 1.03 71.05 0.73
16 Leather Prods. 0.12 71.05 0.09
17 Glass Stone Clay 0.62 71.05 0.44
18 Prim. Metal Prod. 1.04 63.95 0.67
19 Fab. Metal Prod. 1.64 71 .05 1.17
20 Mach. Exc. Elec. 1.56 71 .05 1.11
21 Elec. & Electron 2.52 71.05 1.79
22 Transport Eq. 2.62 71.05 1.86
23 Instruments 0.68 71.05 0.48
24 Misc. Manufact. 0.69 71.05 0.49
25 Transp & Whse. 3.46 21.32 0.74
26 utilities 5.89 56.84 3.35
27 Wholesale Trade 5.63 63.95 3.60
28 Retail Trade 5.63 63.95 3.60
29 F.I.R.E. 16.64 63.95 10.64
30 Pers./Prof. Serv. 8.03 63.95 5.14
31 Eating Drinking 2.12 56.84 1.21
32 Auto Serv. 1.09 63.95 0.70
33 Amuse & Rec. 0.70 56.84 0.40
34 Health Ed. Soc. 6.30 56.84 3.58
35 Govt & Govt Ind. 11.79 42.63 5.03
36 Households 0.25 56.84 0.14
Total 57.63
The total indirect economic loss resulting from damage to the electric system in the state
of Utah is computed as follows:
= 57.63% (Utah population/U.S. population) (U.S. GNP)/12
= 57.63% (1.68/242) ($4,881/12) = $1.63 Billion
where U.S. GNP = $4,881 Billion (1986)'

Figure 6-20 (Continued)

ATC-25 6: Estimates of Indirect Economic Losses 151


Table 6-5 Indirect Economic Loss due to Damage to the Air Transportation Lifeline
(Percent Monthly GNP)

CHARLESTON FORT PUGET NEWMADRID


NEWMADRID (M=8.0) (M=7.5) CAPEANN WASATCH HAYWARD TEJON SOUND (M=70)
U.S. Econ. South
Value Added Arkansas Tennessee Kentucky Mississippi Carolina Georgia Massachusetts Utah California California Washington Arkansas
(Percent) _

. 1
2
Livestock
Agr. Prod.
0.45%
1.06%
4.74%
4.74%
1.58%
1.58%
0.37%
0.37%
3.42%/6
3.42%
2.11%
2.11%
1.05%
1.05%
2.95%
2.95%
1.79%
1.79%
0.53%
0.53%
1.79%
.1.79%
3.16%
3.16%
2.11%
2.11%
3 AgServ For. Fish 0.11% 4.74% 1.58% 0.37% 3.42% 2.11% 1.05% 2.95% 1.79% 0.53% 1.79% 3.16% 2.11%
4 Mining 3.89% 4.74% 1.58% 0.37% 3.42% 2.11% 1.05% 2.95% 1.79% 0.53% 1.79% 3.16% 2.11%
On 5 Construction 5.52% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0
UV 6 Food Tobacco 2.41% 9.47% 3.16% 0.74% 6.84% 4.21% 2.11% 5.89% - 3.58% 1.05% 3.58% 6.32% 4.21%
7 Textile Goods 0.37% 9.47% 3.16% 0.74% 6.84% 4.21% 2.11% 5.89% 3.58% .1.05% 3.58% 6.32% 4.21%
Iri
8 Misc Text. Prod. 0.73% 9.47% 3.16% 0.74% 6.84% 4.21% 2.11% 5.89% 3.58% 1.05% 3.58% 6.32% 4.21%
9 Lumber& Wood 0.52% 9.47% 3.16% 0.74% 6.84% 4.21% 2.11% 5.89% 3.58% 1.05% 3.58% 6.32% 4.21%
10 Furniture 0.34% 9.47% 3.16% 0.74% 6.84% 4.21% 2.11% 5.89% 3.58% 1.05% 3.58% 6.32% 4.21%
11 Pulp Paper 0.87% 4.74% 1.58% 0.37% 3.42% 2.11% 1.05% 2.95% 1.79% 0.53% 1.79% 3.16% 2.11%
0 12 Print & Publish 1.31% 9.47% 3.16% 0.74% 6.84% 4.21% 2.11% 5.89% 3.58% 1.05% 3.58% 6.32% 4.21%
13 Chemical& Drugs 1.40% 9.47% 3.16% 0.74% 6.84% 4.21% 2.11% 5.89% 3.58% 1.05% 3.58% 6.32% 4.21%
14 Petrol. Refining 0.96% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
15 Rubber& Plastic 1.03% 9.47% 3.16% 0.74% 6.84% 4.21% 2.11% 5.89% 3.58% 1.05% 3.58%. 6.32% 4.21%
16 Leather Prods. 0.12% 9.47% 3.16% 0.74% 6.84% 4.21% 2.11% 5.89% 3.58% 1.05% 3.58% 6.32% 4.21%
0 17 GlassStoneClay 0.62% 9.47% 3.16% 0.74% 6.84% 4.21% 2.11% 5.89% 3.58% 1.05% 3.58% 6.32% 4.21%
18 Prim. Metal Prod. 1.04% 4.74% 1.58% 0.37% 3.42% 2.11% 1.05% 2.95% 1.79% 0.53% 1.79% 3.16% 2.11%
19 Fab. Metal Prod. 1.64% 4.74% 1.58% 0.37% 3.42% 2.11%- 1.05% 2.95% 1.79% 0.53% 1.79% . 3.16% 2.11%
20 Mach. Exc. Elec. 1.56% 9.47% 3.16% 0.74% 6.84% 4.21% 2.11% 5.89% 3.58% 1.05% 3.58% 6.32% 4.21%
21 Elec. & Electron 2:52% 14.21% 4.74% 1.11% 10;26% 6.32% 3.16% 8.84% 5.37% 1.58% 5.37% 9.47% 6.32%
In 22 Transport Eq. 2.62% 14.21% 4.74% 1.11% 10.26% 6.32% 3.16% 8.84% 5.37% 1.58% 5.37% 9.47% 6.32%
23 Instruments 0.68% 18.95% 6.32% 1.47% 13.68% 8.42% 4.21% 11.79% 7.16% 2.11% 7.16% 12.63% 8.42%
24 Misc. Manufact. 0.69% 9.47% 3.16% 0.74% 6.84% 4.21% 2.11% 5.89% 3.58% 1.05% 3.58% 6.32% 4.21%
25 Transp & Whse. 3.46% 14.21% 4.74% 1.11% .10.26% 6.32% 3.16% 8.84% 5.37% 1.58% 5.37% 9.47% 6.32%
26 Utilities 5.89% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
27 WholesaleTrade 5.63% 9.47% 3.16% 0.74% 6.84% 4.21% 2.11% 5.89% 3.58% 1.05% 3.58% 6.32% 4.21%
28 Retail Trade 5.63% 9.47% 3.16% 0.74% 6.84% 4.21% 2.11% 5.89% 3.58% 1.05% 3.58% 6.32% 4.21%
29 F.I.R.E. 16.64% 9.47% 3.16% 0.74% 6.84% 4.21% 2.11% 5.89% 3.58% 1.05% 3.58% 6.32% 4.21%
30 Pers./ProfServ. 8.03% 9.47% 3.16% 0.74% 6.84% 4.21% 2.11% 5.89% 3.58% 1.05% 3.58% 6.32% 4.21%
31 Eating Drinking 2.12% 18.95% 6.32% 1.47% 13.68% 8.42% 4.21% 11.79% 7.16% 2.11% 7.16% 12.63% 8.42%
32 Auto Serv. 1.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
33 Amuse&Rec. 0.70% 18.95% 6.32% 1.47% 13.68% 8.42% 4.21% 11.79% 7.16% 2.11% 7.16% 12.63% 8.42%
34 Health Ed. Soc. 6.30% 4.74% 1.58% 0.37% 3.42% 2.11% 1.05% 2.95% 1.79% 0.53% 1.79% 3.16% 2.11%
0 35 Govt&GovtInd. 11.79% 9.47% 3.16% 0.74% 6.84% X 4.21% 2.11% 5.89% 3.58% 1.05% 3.58% 6.32% 4.21%
36 Households 0.25% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Table 6-6 Indirect Economic Loss due to Damage to the Water Transportation
9
N Lifeline (Percent Monthly GNP)
CR

CHARLESTON
C CAPEANN HAYWARD FORT TEJON PU(GET SOUND
U.S. Econ. South North Rholo New
ValueAdded Carolina Carolina Georgia Massaohussous Island Hampshire California Californiia Washington
(Percent)

I Livestock 0.45% 141.05% S.47% 103. 16% 14,74% 12.63% 1.58% 11.58%
M
2 Agr. Prod. 1.06% 141.05% 21.05% 27.37%
5.47%
!i 3 Agserv For. Fish 0.11%
103.16% 14.74% 12.63% 1.58% 21.05% 27.37%
n 4 Mining 3.89%
141.05%
70.53%
5,47% 103.16% 14.74% 12.63% 1.58% 11.58% 21.05% 27.37%
2.74% 51.58% 7.37% 6.32% 0.79% 11,58%
5.79%
5 construction 5.52% 70.53% 10.53% 13.68%
7 2.74% 51.58% 7.37% 6.32% 0.79% 5.79%
6 Food Tobacco 2.41% 70.53% 10.53% 13.68%
2.74% 51.58% 7,37% 6.32% 0,79% 5,79%
&-I 7 Textile Goods 0.37% 70.53% 10.53% 13.68%
2.74% 51.58% 7.37% 6.32% 0.79% 5.79%
8 Misc Text, Prod. 0.73% 70.53% 10.53% 13.68%
2.74% 51.58% 7.37% 6.32% 0.79% 5.79%
9 Lumber & Wood 0.52% 70.53% 10.53% 13.68%
2.74% 51.58% 7.37% 6.32% 0.79%
10 Furniture 0.34% 70.53% 5.79% 10.53% 13.68%
2.74%
a 11 Pulp & Paper 0.87% 4.11%
51.58%
77.37%
7.37% 6.32% 0.79% 5,79% 10.53% 13.68%
12 Print & Publish 10S.79% 1 1.05% 947% 1.18% 8.68% 15.79% 20.S3%
1.31% 2.74% 51.58% 7.37%
El 13 Chemical & Drugs 70.53% 6,32% 0.79% 5,79% 10.53% 13.68%
1.40% 70.53% 2.74% 51.58% 7.37%
14 Petrol. Refining 6,32% 0,79% 5.79% 10.53% 13.68%
a 1S Rubber & Plastic
0,96%
1.03%
282.11%
70.53%
10.95%
2.74%
206.32%
51,58%
29.47%
7.37%
25.26%
6.32%
3.16%
0.79%
23.16% 42.11% 54.74%
16 Leather Prods. 0.12% 70.53% 5.79% 10.53% 13.68%
(a 17 Glass Stone Clay
2.74% 51.58% 7.37% 6.32% 0.79% 5.79% 10.53% 13.68%
0,62% 70.53% 2.74% 51.58% 7.37%
n 18 Prim. Metal Prod, 6.32% 0.79% 5.79% 10.53%
1.04% 70.53% 2.74% 51.58% 7.37%
Nk 19 Fab. Metal Prod. 6.32% 0.79% 5.79% 10.53% 1S.68%
13.68%
00a) 20 Mach. Exc. Elec,
1.64% 10$.79% 4.11% 77.37% i1 .05% 9.47% 1.18% 8.68% 15.79%
0 1.56% 105.79% 4.11% 77.37% 11,05% 9.47%
20.53%
21 Elec. & Electron 2.52% 1.18% 8,68% 15.79% 20.53%
00 70.53% 2.74% 51.58% 7.37% 6,32%
22 Transport Eq. 2.62% 0.79% 5.79% 10.53% 13.68%
105.79% 4.11% 77.37% 11.05% 9.47%
23 Instruments 0.68% 1.18% 8.68% 15.79% 20.53%
35.26% 1.37% 25.79% 3.68% 3.16%
24 Misc. Manufact, 0.69% 0.39% 2.89% 5.26% 6.84%
70.53% 2,74% 51 .58% 7.37% 6.32% 0.79%
25 Transp & Whse. 3.46% 5.79% 10.53% 13.68%
105.79% 4.11% 77.37% 1105% 9.47%
26 Utilities 5.89% 1.18% 8.68% 15.79% 20.53%
0.00% 0.00% 0.00% 0.00% 0.00%
27 Wholesale Trade 5.63% 0.00% 0.00% 0.00%
28 Retail Trade
70.53% 2.74% 51.58% 7.37% 6.32% 0.79% 0.00
5.79% 10.53%
5.63% 0.00% 0.00% 13.68%
29 F.lI.R.E. 0.00% 0.00% 0.00% 0.00% 0,00% 0,00%
16.64% 0.00% 0.00% 0,00%
0.00%
30 Pers./Prof Serv. 0.00% 0.00% 0.00% 0.00% 0.00%
8.03% 0.00% 0.00% 0.00% 0.00% 0.00%
31 Eating Drinking 0.00% 0.00% 0.00% 0.00% 0.00%
2.12% 0.00% 0,00% 0.00%
32 Auto Serv, 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.09% 0.00% 0.00% 0.00%
33 Amuse & Rec. 0.00% 0.00% 0.00% 0,00% 0.00% 0.00%
0,70% 0.00% 0.00% 0.00% 0.00%
34 Health Ed. Soc. 0.00% 0.00% 0.00% 0.00% 0.00%
6.30% 0.00% 0.00% 0,00%
35 Govt & Govt Ind. 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
11.79% 0.00% 0.00% 0.00%
36 Households 0,00% 000% 0.00% 0,00% 0.00% 0.00%
0.25% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
-

WR
Cn

Table 6-7 Indirect Economic Loss due to Damageto the Oil System (Percent
Monthly GNP)

- CRUDE OIL REFINED OIL


New Madrid Fort Tejon New Madrid

U.S. Econ. (M=8.0) (M=7O) (M=8.0) (M=8.0) (M=8.0) (M=7.0)


Value Added South North
(Percent) Chicago Chicago California California Chicago Chicago

1 Livestock 0.45% 2.63% 0.66% 7.89% 8.95% 1.32% 0.92%


2 Agr. Prod. 1.06% 4.21% 1.05% 12.63% 14.32% 2.11% 1.47%
(A 14.32% 2.11% 1.47%
3 AgServ For. Fish 0.11% 4.21% 1.05% 12.63%
0 4 Mining 3.89% 4.74% 1.18% 14.21% 16.11% 2.37% 1.66%
5 Construction 5.52% 4.74% 1.18% 14.21% 16.11% 2.37% 1.66%
6 Food Tobacco 2.41% 2.63% 0.66% 7.89% 8.95% 1.32% 0.92%
7 Textile Goods 0.37% 2.63% 0.66% 7.89% 8;95% 1.32% 0.92%
8 Misc Text. Prod. 0.73% 2.63% 0.66% 7.89% 8.95% 1.32% 0.92%
9 Lumber & Wood 0.52% 2.63% 0.66% 7.89% 8.95% 1.32% 0.92%
0 2.63% 0.66% 7.89% 8.95% 1.32% 0.92%
10 Furniture 0.34%
11 Pulp & Paper 0.87% 2.63% 0.66% 7.89% 8.95% 1.32% 0.92%
12 Print& Publish 1.31% 2.63% 0.66% 7.89% 8.95% 1.32% 0.92%
13 Chemical & Drugs 1.40% 2.63% 0.66% 7.89% 8.95% 1.32% 0.92%
14 Petrol. Refining 0.96% 5.26% 1.32% 15.79% 17.89% 2.63% 1.84%
0 15 Rubber & Plastic 1.03% 2.63% 0.66% 7.89% 8.95% 1.32% 0.92%
16 Leather Prods. 0.12% 2.63% 0.66% 7.89% 8.95% 1.32% 0.92%
(a 17 Glass Stone Clay 0.62% 2.63% 0.66% 7.89% 8.95% 1.32% 0.92%
18 Prim. Metal Prod. 1.04% 4.74% 1.18% 14.21% 16.11% 2.37% 1.66%
19 Fab. Metal Prod. 1.64% 2.63% 0.66% 7.89% 8.95% 1.32% 0.920/0
20 Mach.Exc. Elec, 1.56% 2.63% 0.66% 7.89% 8.95% 1.32% 0.92%
21 Elec. & Electron 2.52% 2.63% 0.66% 7.89% 8.95% 1.32% 0.92%
22 Transport Eq. 2.62% 4.74% 1.18% 14.21% 16.11% 2.37% 1.66%
23 Instruments 0.68% 2.63% 0.66% 7.89% 8.95% 1.32% 0.92%
n- 24 Misc. Manufact. 0.69% 2.63% 0.66% 7.89% 8.95% 1.32% 0.92%
0 25 Transp& Whse. 3.46% 4.74% 1.18% 14.21% 16.11% 2.37% 1.66%
C" 5.89% 2.63% 0.66% 7.89% 8.95% 1.32% 0.92%
26 Utilities
27 Wholesale Trade 5.63% 2.63% 0.66% 7.89% 8.95% 1.32% 0.92%
28 Retail Trade 5.63% 4.74% 1.18% 14.21% 16.11% 2.37% 1.66%
29 F.I.R.E. 16.64% 3.16% 0.79% 9.47% 10.74% 1.58% 1.11%
30 Pers./Prof Serv. 8.03% 3.16% 0.79% 9.47% 10.74% 1.58% 1.11%
31 Eating Drinking 2.12% 4.21% 1.05% 12.63% 14.32% 2.11% 1.47%
32 Auto Serv. 1.09% 4.74% 1.18% 14.21% 16.11% 2.37% 1.66%
33 Amuse & Rec. 0.70% 4.74% 1.18% 14.21% 16.11% 2.37% 1.66%
34 Health Ed. Soc. 6.30% 1.05% 0.26% 3.16% 3.58% 0.53% 0.37%
35 Govt & Govt Ind. 11.79% 1.05% 0.26% 3.16% 3.58% 0.53% 0.37%
36 Households 0.25% 2.63% 0.66% 7.89% 8.95% 1.32% 0.92%
:15I
Table 6-8 Indirect Economic Lossdue to Damage to the Natural Gas System
9 (Percent Monthly GNP)
(Ai

NEW MADRID (M=8.0) WASATCH HAYWARD FORT TEJON NEWM4DRID (Ml=Z0)


U.S. Econ. Texas Louisiana Texas to Texas Texas Texas Texas Louisiana
Value Added to to North to to to to to
(Percent) Chicago Northeast Utah Carolina Washington California Seattle Chicago Northeast
California
0% I Livestock 0.45% 0.26%
o 2 Agr. Prod. 1.06% 0.79%
0.53%
1.58%
0.74%
2.21%
2.11%
6.32%/4 0.37%
2.11% 2.11% 0.21% 0.26%
3 AgServ For. Fish 1.11% 6.32% 6.32% 0.63% 0.79%
,w 0.11% 0.79% 1.58% 2.21% 6.32%
4 Mining 1.11% 6.32%3/ G.32M 0.63% 0.79%
3.89% 0.26% 0.53% 0,74% 2.11%
a, 5 Construction 5.52% 0.00% 0.00% 0.00% 0.00% 0.00%
2.11% 2.11% 0.21% V.26%
6 Food Tobacco 0.00% 0.00% 0.00% 0.00%
2.41% 0.66% 1.32% 1.84% 5.26%
7 Textile Goods 0,92% 5.26% 5.26% 0.53% 0.66%
w 0.37% 0.53% 1,05% 1.47% 4.21%
8 Misc Text, Prod. 0.74% 4.21% 4.21% 0.42% 0.53%
0 0.73% 0.53% 1.05% 1.47%
9 Lumber & Wood 4.21% 0.74% 4.21% 4.21% 0.42% 0.53%
1-4 0.52% 0.53% 1.05% 1.47% 4.21%
10 Furniture 0.74% 4.21% 4.21% 0.42% 0.53%
0.34% 0.53% 1.05% 1.47% 4.21% 0.74% 4.21% 4.21% 0.42% 0.53%
a 11 Pulp & Paper
12 Print & Publish
0.87% 1,05% 2,11% 2.95% 8.42% 1.47% 8.42% 8.42% 0.84% 1.05%
13.1% 0.53% 1.05% 1.47% 4.21%
13 Chemical & Drugs 0.74% 4.21% 4.21% 0.42% 0.53%
1.40% 2.37% 4.74% 6.63% 18.95%
a. 14 Petrol. Refining 3.32% 18.95% 18.95% 1.89% 2.37r/0
0.96% 1.32% 2,63% 3.68% 10.53%
15Rubber & Plastic 1.84% 10.53% 10.53% 1.05%
1,030/ 1.32% 2.63% 3.68% 10.53% 1.32%
1.84% 10.53% 10.53% 1.05% 1.32%
0
0 16 Leather Prods, 0.12% 0.53% 105% 1.47% 4.21% 0.74%
17 Glass Stone Clay 4.21% 4.21% 0,42% 0.53%
0.62% 1,32% 2,63% 3.68%
18 Prim. Metal Prod. 10.53% 1.84% 10.53% 10.53% 1.05% 1.32%
1.04% 1.32% 2.63% 3.68% 10.53%
19 Fab, Metal Prod, 1.84% 10.53% 10.53% 1.05% 1.32%
01 1.64% 1.32% 2.63% 3.68% 10.53%
20 Mach. Exc. Elec. 1.84% 10.53% 10.53% 1.05% 1.32%
1.56% 1.32% 2.63% *3.68% 10.53%
21 Elec, & Electron 1.84% 10.53% 10.53% 1.05% 1.32%
2.52% 1.32% 2,63% 3.68%
0 22 Transport Eq. 10.53% 1.84% 10.53% 10.53% 1.05% 1.32%
2.62% 1.32% 2.63% 3.68%
23 Instruments 10.53% 1.84% 10.53% 10.53% 1.05% 1.32%
0 0.68% 1.97% 3,95% 5.53% 15.79%
hi 24 Misc. Manufact. 2.76% 15.79% 15.79% 1.58% 1.97%
0.69% l.32% 2.63%
25 Transp & Whse. 3.68% 10.53% 1.84% 10.53% 10.53% 1.05% 1.32%
3.46% 0.00% 0.00% 0,00% 0,0%
26 Utilities 0.00% 0.00% 0.00% 0.00% 0.00%
5.89% 1.05% 2.11% 2,95%
27 Wholesale Trade 8.42% 1.47% 8.42% 8.42% 0,84% 1.05%
5.63% 0.26% 0.53% 0.74%
28 Retail Trade 2.11% 0.37% 2.11% 2.11% 0.21% 0.26%
5.63% 0.53% 1.05% 1.47%
29 F.lI.R.E. 4.21% 0.74% 4.21% 4.21% 0.42% 0.53%
16.64% 0.53% 1.05% 1.47%
30 Pers./Prof Serv. 4.21% 0.74% 4.21% 4.21% 0.42% 0,53%
8.03% 0.53% 1.05% 1.47%
31 Eating Drinking 4.21% 0.74% 4.21% 4.21% 0.42% 0.53%
2.12% 1.05% 2.11% 2.95%
;32 Auto Snrv,. 8.42% 1.47% 8.42% 8.42% 0.84% 1.05%
1.09% 0.13% 0.26% 0.37%
33 Amuse & Rec. 1.05% 0.18% 1.05% 1.05% 0.11% 0.13%
0.70% 1.05% 2.11% 2.95% 8.42% 1.47% 8.42% 8.42% 0.84% 1.05%
34 Health Ed. Soc. 6.30% 0.53% 1.05% 1.47% 4.21% 0.74% 4.21% 4.21% 0.42% 0.53%
35 Govt & Govt Ind, 11.79% 0.53% 1.05% 1.47% 4.21% 0.74% 4.21% 4.21% 0.42%
36 Households 0.25% 0.92% 0.53%
1.84% 2.58% 7.37% 1.29% 7.37% 7.37%/a 0.74% 0.92%

0'
Cl,
0.
Table 6-9 Indirect EconomicLossdue to Damage to the Railroad Lifeline (Percent
Monthly GNP)

U.S. Econ.
Value Added (M=8.0) (M7=.OJ
(Percent) New Madrid Charleston Cape Ann Utah Hayward Fort Tejon Seattle : NewMadrid

0. 1 Livestock 0.45% 4.21% 7.58% 7.58% 3.37% 5.47% 7.58% 7.58% 3.37%
7.58% 7.58% 3.37%
'ti 2 Agr. Prod. 1.06% 4.21% 7.58% 7.58% 3.37/
3.37%
5.47%
5.47/ 7.58% 7.58% 3.37%
-.. 3 AgServ For. Fish 0.11% 4.21% 7.58% 7.58%
4 Mining 3.89% 3.68% 6.63% 6.63%: 2.95% 4.79% 6.63% 6.63% 2.95%
5 Construction 5.52% 0.53% 0.95% 0.95% 0.42% 0.68% 0.95% 0.95% 0.42%
6 Food Tobacco 2.41% 2.11% 3.79% 3.79% 1.68% 2.74% 3.79%/6 3.79% 1.68%
(D 7 Textile Goods 0.37% 2.11% 3.79% 3.79% 1.68% 2.74% 3.79% 3.79% 1.68%.
0 8 Misc Text. Prod. 0.73% 2.11% 3.79% 3.79% 1.68% 2.74% 3.79% 3.79% 1.68%
I-% 7.58% 3.37% 5.47% 7.58% 7.58% 3.37%
9 Lumber & Wood 0.52% 4.21% 7.58%
10 Furniture 0.34% 2.11% 3.79% 3.79% 1.68% 2.74% 3.79% 3.79% 1.68%
11 Pulp & Paper 0.87% 4.74% 8.53% 8.53% 3.79% 6.16% 8.53% 8.53% 3.79%
12 Print & Publish 1.31% 2.11% 3.79% 3.79% 1.68% 2.74% 3.79% 3.79% 1.68%
0 3.79% 3.79% 1.68%
0 13 Chemical & Drugs 1.40% 2.11% 3.79% 3.79% 1.68% 2.74%
14 Petrol. Refining 0.96% 4.21% 7.58% 7.58% 3.37% 5.47% 7.58% 7.58% 3.37%
15 Rubber & Plastic 1.68% 2.74% 3.79% 3.79% 1.68%
1.03% 2.11% 3.79% 3.79%
16 Leather Prods. 0.12% 2.11% 3.79% 3.79% 1.68% 2.74% 3.79% 3.79% 1.68%
0 2.74% 3.79% 3.79% 1.68%
17 Glass Stone Clay 0.62% 2.11% 3.79% 3.79% 1.68%
18 Prim. Metal Prod. 1.04% 5.26% 9.47% 9.47% 4.21% 6.84% 9.47% 9.47% 4.21%
19 Fab. Metal Prod. 1.64% 8.53% 8.53% 3.79% 6.16% 8.53% 8.53% 3.79%
In 4.74%
In 20 Mach. Exc. Elec. 1.56% 4.74% 8.53% 8.53% 3.79% 6.16% 8.53% 8.53% 3.79%
to
21 Elec. & Electron 2.520/ 2.11% 3.79% 3.79% 1.68% 2.74% 3.79% 3.79% 1.68%
22 Transport Eq. 2.62% 4.74% 8.53% 8.53% 3.79% 6.16% 8.53% 8.53% 3.79%
23 Instruments 0.68% 0.53% 0.95% 0.95% 0.42% 0.68% 0.95% 0.95% 0.42%
CD 24 Misc. Manufact. 0.69% 2.11% 3.79% 3.79% 1.68% 2.74% 3.79% 3.79% 1.68%
9n 2.53%
25 Transp & Whse. 3.46% 3.16% 5.68% 5.68% 2.53% 4.11% 5.68% 5.68%
26 Utilities 5.89% 0.000/0 0.00% 0.00% 0.00% 0.00%/0 0.00% 0.00% 0.00%
27 Wholesale Trade 5.63% 1.58% 2.84% 2.84% 1.26% 2.05% 2.84% 2.84% 1.26%
28 Retail Trade 5.63% 2.11% 3.79% 3.79% 1.68% 2.74% 3.79% 3.79% 1.68%
29 F.I.R.E. 16.64% 1.05% 1.89% 1.89% 0.84% 1.37% 1.89% 1.89% 0.84%
30 Pers./Prof Serv. 8.03% 1.05% 1.89% 1.89% 0.84% 1.37% 1.89% 1.89% 0.84%
31 Eating Drinking 2.12% 0.53% 0.95% 0.95% 0.42% 0.68% 0.95% 0.95% 0.42%
n 32 Auto Serv. 1.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
33 Amuse & Rec. 0.70% 0.53% 0.95% 0.95% 0.42% 0.68% 0.95% 0.95% 0.42%
34 Health Ed. Soc. 6.30% 0.53% 0.95% 0.95% 0.420/ 0.68% 0.95% 0.95% 0.42%
35 Govt & Govt Ind. 11.79% 1.05% 1.89% 1.89% 0.84% 1.37% 1.89% 1.89% 0.84%
36 Households 0.25% 0.00%/0 0.00% 0.00% 0.000/% 0.00%/0 0.00%/ 0.00% 0.00%
Table 6-10 Indirect Economic Loss due to Damage to the Electric System (Percent
Monthly CNP)

NEW MADRID (M=8.0) CHARLESTON CAPE ANN


CHARLESTON CAPE ANN
US. Econ. South North
Value Added Illinois Missouri Arkansas Tennessee Kentucky Mississippi Carolina Carolina Georgia Massachusetts Connecticut Delaware
(Percent) _

0. 1 Livestock 0.45% 3.95% 6.58% 32.89% 13.16% 13.16% 44.74% 46.05% 7.89- 18.42% 44.74% 15,79% 10,53%
t'2 2 Agr. Prod. 1.06% 3.95% 6.58% 32.89% 13.16% 13.16% 44.74% 46.05% 7.89% 18.42% 44.74% 15.79% 10,53%
3 AgServ For. Fish 0.11% 3.95% 6,58% 32,89% 13.16% 13.16% 44.74% 46.05% 7.89% 18.42% 44.74% 15.79% 10.53%
4 Mining 3.89% 7.11% 11.84% 59.21% 23,68% 23.68% 80.53% 82.89% 14.21% 33.16% 80.53% .28.42% 18.95%
En S Construction 5,52% S316% 5.26% 26.32% 10.53% 10.53% 35.79% 36.84% .6.32% 14.74% 35.79% 12.63% 8,42%
6 Food Tobacco 2.41% 7.11% 11.84% 59.21% 23.68% 23.68% 80.53% 82,89% 14.21% 33.16%
-4, 80.53% 28.42% 18.95%
7 Textile Goods OX37% 7.89% 13.16% 65.79% 26.32% 26,32% 89.47% 92.11% 15.79% 36,84% 89.47% 31.58% 21.05%
8 Misc Text. Prod. 0.78% 7.89% 13.16% 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47%
07 31.58% 21.05%
9 Lumber & Wood 0.52% 7.89% 13.16% 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47/ 311.58% 21.05%
a
p. 10 Furniture 0.34% 7.89% 13.16% 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
i1 Pulp & Paper 0.87% 7.89% 13.16% 65.79% 26.32% 26,32% 89,47% 92.11% 15.79% 36.84% 89.47% 31.58% 21,05%
a 12 Print & Publish 1.31% 7.89% 13.16% 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36,84% 89.47% 31.58% 21.05%
(D 13 Chemical & Drugs 1.40% 7.11% 11.84% 59.21% 23.68% 23.68% 80.53% 82.89% 14.21% 33.16% 80.53% 28.42% 18.95%
14 Petrol. Refining 0.96% 7.89% 13.16% 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
15 Rubber & Plastic 1.03% 7.89% 13.16% 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
16 Leather Prods. 0.12% 7.89% 13.16% 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
a 17 Glass Stone Clay 0.62% 7.89% 13.16% 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
18 Prim. Metal Prod. 1.04% 7.11% 11.84% 59.21% 23.68% 23.68% 80.53% 82.89% 14.21% 33.16% 80.53% 28.42% 18.95%
0 19 Fab, Metal Prod. 1,64% 7.89% 13.16% 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
20 Mach. Exc. Elec, 1.56% 7.89% 13.16% 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
21 Elec. & Electron 2.52% 7.89% 13.16% 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
U' 22 Transport Eq. 2.62% 7.89% 13.16% 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47/ 31.58% 21.05%
C4 23 Instruments 0.68% 7.89% 13.16% 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
to 24 Misc. Manufact. 0.69% 7.89% 13.16% 65,79% 26.32% 26.32% 8947% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
25 Transp & Whse. 3,46% 2.37% 3.95% 19.74% 7.89% 7.89% 26.84% 27.63% 4.74% 11.05% 26.84% 9.47% 6.32%
26 Utilities 5.89% 6.32% 10.53% 52.63% 21.05% 21.05% 71.58% 73.68% 12.63% 29.47% 71.58% 25.26% 16,84%
27 Wholesale Trade 5.63% 7.11% 11.84% 59.21% 23.68% 23.68% 80.53% 82.89% 14.21% 33.16% 80.53% 28.42% 18.95%
28 Retail Trade 5.63% 7.11% 11.84% 59.21% 23.68% 23.68% 80.53% 82.89% 14.21% 33.16% 80.53% 28.42% 18,95%
29 F.I.R.E. 16.64% 7.11% 11.84% 59.21% 23.68% 23.68% 80.53% 82.89% 14.21% 33.16% 80.53% 28.42% 18,95%
30 Pers./Prof Serv. 8.03% 7.11% 11.84% 59.21% 23.68% 23.68% 80.53% 82.89% 14.21% 33.16% 80.53% 28.42% 18.95%
31 Eating Drinking 2.12% 6.32% 10.53% 52.63% 21.05% 21.05% 71.58% 73.68% 12.63% 29.47% 71.58% 25.26% 16.84%
32 Auto Serv. 1.09% 7.11% 11.84% 59.21% 23.68% 23.68% 80.53% 82.89% 14.21% 33.16% 80.53% 28.42% 18.95%
33 Amuse & Rec. 0.70% 6.32% 10.53% 52.63% 21.05% 21.05% 71.58% 73.68% 12.63%- 29.47-/ 71.58% 25.26% 16.84%
34 Health Ed. Soc, 6.30% 6.32% 10.53% 52.63% 21.05% 21.05% 71.58% 7S.68% 12.63% 29,47% 71.58% 25.26% 16.84%
35 Govt & Govt Ind. 11.79% 4.74% 7.89% 39.47% 15.79% 15.79% 53.68% 55.26% 9.47% 22.11% 53.68% 18,95% 12.63%
36 Households 0.25% 6.32% 10.53% 52.63% 21.05% 21.05% 71.58% 73.68% 12.63% 29.47% 71.58% 25.26% 16.84%
-4
0)
NO
C"
am
Table 6-10 Indirect Economic Loss due to Damage to the Electric System (Percent
Monthly GNP) (Continued)

CAPEANN WASATCH CALIFORNIA PUGETSOUND NEW MADRID (M=71)


U.S. Econ.
Value Added Rhode
Island New Hampshire Utah Hayward Fort Tejon Washington Arkansas Tennessee - Kentucky Mississippi
(Percent)
.

35.53% 23.68% 13.16% 47.370% 23.68% 7.89%h 3.95% 3.95%


1 Livestock 0.45% 42.11% 14.47%
23.68% 13.16% 47.37% 23.68% 7.89% 3.95% 3.95%
2 Agr. Prod. 1.06% 42.11% 14.47% 35.53%
23.68% 13.16% 47.37% 23.68% 7.89% 3.95% 3.95%
n 3 AgServ For. Fish 0.11% 42.11% 14.47% 35.53%
42.63% 23.68% 85.26% 42.63% 14.21% 7.11% 7.11%
a 4 Mining 3.89%
5.52%
75.79%
33.68%
26.05%
11.58%
63.95%
28.42% 18.95% 10.53% 37.89% 18.95% 6.32% 3.16% 3.16%
(D 5 Construction 7.11% 7.11%
75.79% 26.05% 63.95% 42.63% 23.68% 85.26% 42.63% 14.21%
6 Food Tobacco 2.41%
0 47.37% 26.32% 94.74% 47.37% 15.79% 7.89% 7.89%
7 Textile Goods 0.37% 84.21% 28.95% 71.05%
47.37% 26.32% 94.74% 47.37%- 15.79% 7.89% . 7.89%
8 Misc Text. Prod. 0.73% 84.21% 28.95% 71.05%
47.37% 26.32% 94.74% 47.37% 15.79% 7.89% 7.89%
9 Lumber& Wood 0.52% 84.21% 28.95% 71.05%
47.37% 26.32% 94.74% 47.37% 15.79% 7.89% 7.89%
10 Furniture 0.34% 84.21% 28.95% 71.05%
47.37% 26.32% 94.74% 47.37% 15.79% 7.89% 7.89%
. 11 Pulp & Paper 0.87% 84.21% 28.95% 71.05%
47.37% 26.32% 94.74% 47.37% 15.79% 7.89% 7.89%
12 Print & Publish 1.31% 84.21% 28.95% 71.05%
42.63% 23.68% 85.26% 42.63% 14.21% 7.11% 7.11%
0
0 13 Chemical& Drugs 1.40% 75.79% 26.05% 63.95%
47.37% 15.79% 7.89% 7.89%
14 Petrol. Refining 0.96% 84.21% 28.95% 71.05% 47.37% 26.32% 94.74%
71.05% 47.37% 26.32% 94.74% 47.37% 15.79% 7.89% 7.89%
15 Rubber& Plastic 1.03% 84.21% 28.95%
47.37% 26.32% 94.74% 47.37% 15.79% 7.89% 7.89%
16 Leather Prods. 0.12% 84.21% 28.95% 71.05%
26.32% 94.74% 47.37% 15.79% 7.89% 7.89%
o0 17 Glass Stone Clay. 0.62% 84.21% 28.95% 71.05% 47.37%
23.68% 85.26% 42.63% 14.21% 7.11% 7.11%
18 Prim. Metal Prod. 1.04% 75.79% 26.05% 63.95% 42.63%
47.37% 26.32% 94.74% 47.37% 15.79% 7.89% 7.89%
19 Fab. Metal Prod. 1.64% 84.21% 28.95% 71.05%
t-0 47.37% 26.32% 94.74% 47.37% 15.79% 7.89% 7.89%
20 Mach. Exc. Elec. 1.56% 84.21% 28.95% 71.05%
47.37% 26.32% 94.74% 47.37% 15.79% 7.89% 7.89%
21 Elec. & Electron 2.52% 84.21% 28.95% 71.05%
(a 71.05% 47.37% 26.32% 94.74% 47.37% 15.79% 7.89% 7.89%
22 Transport Eq. 2.62% 84.21% 28.95%
71.05% 47.37% 26.32% 94.74% 47.37% 15.79% 7.89% 7.89%
23 Instruments 0.68% 84.21% 28.95%
47.37% 26.32% 94.74% 47.37% 15.79% 7.89% 7.89%
24 Misc. Manufact. 0.69% 84.21% 28.95% 71.05%
21.32% 14.21% 7.89% 28.42% 14.21% 4.74% 2.37% 2.37%
25 Transp & Whse. 3.46% 25.26% 8.68%
56.84% 37.89% 21.05% 75.79% 37.89% 12.63% 6.32% 6.320/
26 Utilities 5.89% 67.37% 23.16%
42.63% 23.68% 85.26% 42.63% 14.21% 7.11% 7.11%
27 Wholesale Trade 5.63% 75.79% 26.05% 63.95%
26.05% 63.95% 42.63% 23.68% 85.26% 42.63% 14.21% 7.11% 7.11%
28 Retail Trade 5.63% 75.79%
42.63% 14.21% 7.11% 7.11%
0 29 F.I.R.E. 16.64% 75.79% 26.05% 63.95% 42.63% 23.68% 85.26%
85.26% 42.63% 14.21% 7.11% 7.11%
U) 30 Pers./Prof Serv. 8.03% 75.79% 26.05% 63.95% 42.63% 23.68%
37.89% 21.05% 75.79% 37.89% 12.63% 6.32%h 6.320/
31 Eating Drinking 2.12% 67.37% 23.16% 56.84%
26.05% 63.95% 42.63% 23.68% 85.26% 42.63% 14.21% 7.11% 7.11%
32 Auto Serv. 1.09% 75.79%
56.84% 37.89% 21.05% 75.79% 37.89% 12.63% 6.32% 6.32%
33 Amuse & Rec. 0.70% 67.37% 23.16%
37.89% 21.05% 75.79% 37.89% 12.63% 6.32% 6.32%
34 Health Ed. Soc. 6.30% 67.37% 23.16% 56.84%
42.63% 28.42% 15.79% 56.84% 28.42% 9.47% 4.74% 4.74%
35 Govt & Govt Ind. 11.79% 50.53% 17.37%
37.89% 21.05% 75.79% 37.89% 12.63% 6.320/a 6.32%
C"s 36 Households 0.25% 67.37% 23.16% 56.84%
N-I
Table 6-11 Indirect Economic Loss due to Damage to the Highway System (Percent
(1 Monthly GNP)

US. Econ
Value Added New Madrid Charleston Cape Ann Wasatch Hayward Fon Tejon Puget Sound New Madd
(Percent) (MB.O) (M=7.0)

CF I Livestock 0.45% 85.53% 36.84% 78.95% 83.96% 42.1 1% 52.63% 60.53% 63.16%
2 Agr. Prod, 1.06% 136.84% 58.95% 126.32% 134.34% 67.37% 84.21% 96.84% 101.05%
fn 3 AgServ For. Fish 0.1 1% 136.84% 58.95% 126.32% 134.34% 67.37% 84.21% 96.84% 101.05%
Eil 4 Mining 3.89% 59.87% 25.79% 55.26% 58.77% 29.47% 36.84% 42.37%/6 44.21%
EL 5 Construction 5.52% 68.42% 29,47% 63. 16% 67.17% 33.68% 42.11% 48.42% 50.53%
6 Food Tobacco 2.41% 136.84% 5895% 126.32% 134.34% 67.37% 84.21% 96.84% 101.05%
7 Textile Goods 0.37% 128.29% 55.26% 118.42% 125.94% 63.16% 78.95% 90.79% 94.74%
m
O. 8 Misc Text. Prod. 0.73% 128.29% 55.26% 118.42% 125.94% 63.16% 78.95% 90.79% 94.74%
0 9 Lumber & Wood 0.52% 153.95% 66.32% 142.11% 151.13% 75.79% 94.74% 108.950 11368%
10 Furniture 0.34% 128.29% 55.26% 118.42% 125.94% 63.16% 78.95% 90.79% 94.74%
11 Pulp & Paper 0.87% 136.84% 58.95% 126.32% l34.34% 67.37% 84.21% 96.84% 101.05%
In 12 Print & Publish 1.31% 128.29% 55.26% 118.42% 125.94% 63.16% 78.95% 90.79% 94.74°h
13 Chemical & Drugs 1.40% 136.84% 58.95% 126.32% 134.34% 67.37% 84.21% 96.84% 101.05%
14 Petrol. Refining 0.96% 153.95% 66,32% 142.11% 151.13% 75.79% 94.74% 108.95% 113.68%
(D
I-I.
1S Rubber & Plastic 1.03% 128.29% 55.26% 118.42% 125.94% 63.16% 78.95% 90.79% 94.74%
0 16 Leather Prods, 0.12% 128.29% 55.26% 118.42% 125.94% 63.16% 78.95% 90.79% 94,74%
17 Glass Stone Clay 0,62% 128.29% 55.26% 118.42% 125.94% 63.16% 78.95% 90.79% 94.74%
18 Prim. Metal Prod. 1.04% 136.84% 58.95% 101.05%
a 19 Fab. Metal Prod. 1,64% 136.84% 58.95%
126.32%
126.32%
134.34%
134.34%
67.37%
G7.S7%/
84.21%
84.21%
96.84%/6
96.84% 101.05%
ti 20 Mach. Exa. Elec. 1.56% 136.84% 58.95% 126.32% 134.34% 67.37% 84.21% 96.84% 101.05%
n 21 Eleo. & Electron 2.520%0 128.29% 55.26% 118.42% 125.94% 63.16% 78.95% 90.79% 94.74%
n 22 Transport Eq. 2.62% 136.84% 58.95% 126.32% 134.34% 67.37% 84.21% 96.84% 101.05%
23 Instruments 0.68% 136.84% 58.95% 12632% 134.34% 67.37% 84.21% 96.84% 101.05%
24 Misc. Manufact. 0.69% 128.29% 55.26% 118.42/v 125.94% 63.16% 78.95% 90.79% 94.74%
25 Transp & Whse. 3.46% 136.84% 58.95% 126.32% 134.34% 67.37% 84.21% 96.84% 101.05%
26 Utilities 5.89% 68.42% 29.47% 63.16% 67.17%-o 33.68% 42.11% 48.42% 50.53%
a~ 27 Wholesale Trade 5.63% 119.74% 51.58% 110.53% 117.54% 58.95% 73.6s% 84.74% 88.42%
0l 28 Retail Trade 5.63% 94.08% 40.53% 86.84% 92.36% 46.32% 57.89% 66.58% 69.47°k
0O 29 F.l.R.E. 16.64% 76.97% 33.16% 71.05% 75.56% 37.89% 47.370/a 54.47% 56.84%
6 30 Pers./Prof Serv. 8.03% 76.97% 33.16% 71.05% 75.56% 37.89% 47.37% 54.47% 56.84%
31 Eating Drinking 2.12% 85.53% 36.84% 78.95% 83.96% 42.11% 52.63% 60.53% 63.16%
32 Auto Serv. 1.09% 94.08% 40.53% 86.84% 92.36% 46.32% 57.89% 66.58% 69.47°h
33 Amuse & Roo. 0.70% 85.53% 36.84% 78.95% 83.96% 42.11% 52.63% 60.53% 63.16%
34 Health Ed. Soc. 6.30% 94.08% 40.53% 86.84% 92.36% 46.32% 57.89% 66.58% 69.47%o
35 Govt & Govt Ind. 11.79% 51.32% 22.11% 47.37% 50.38% 25.26% 31.58% 36.32% 37.89%
36 Households 0.25% 68.42% 29.47% 63.16% 67.17% 33.68% 42.11% 48.42% 50.53%
0
Table 6-12 Indirect Economic LossesDue to Damageto Lifeline Transmission
Systems

Scenario
Earthquakes NaturalGas CwdeOil RefinedOil Air Transportation Railroads Ports Electric Water Highways
% $Bil % $Bil % $il % $Bil % $Bil % $Bil % SBd$ % $ Bil % $ Bil

04
tn
CapeAnn $0.00 $0.00 $0.00 0.12 $0.49 0.01 $0.02 0.11 $0A5 2.20 $8.95 N/A N/A 0.16 $0.65
Charleston $0.00 $0.00 $0.00 0.11 $0.45 0.01 $0.02 1.21 $4.92 2.15 $8.75 N/A N/A 0,08 $0.33
FortTejon 0.41 $1.67 1.07 $4.35 $0.00 0.35 $1.A2 0.06 $0.25 0.61 $2.48 1.90 $7.73 1.2 $4.88 1.10 $4.47
O- Hayward 0.22 $0.89 $0.00 $0.00 0.10 $0.41 0.03 $0.11 0.33 $1.34 2.43 $9.88 1 $4.07 0.50 $2.03
0 Madrid,MOM=8 0.07 $0.28 0.10 $0.41 25 $0.20 0.2 $0.81 0.06 $0.25 $0.00 2.55 $10.37 N/A N/A 2.30 $9.36
Madrid,MOM=7 0.04 $0.16 0.03 $0.11 0.14. $0.15 0.04 $0.16 0.01 $0.04 $0.00 0.81 $3.29 N/A N/A 0.84 $3.42
PugetSound 0.05 $0.20 $0.00 $0.00 0.10 $0.41 0.03 $0.11 0.13 $0.53 1.43 $5.82 0.19 $0.77 0.27 $1.10
Wasatch Front 0.01 $0.38 $0.00 $0.00 0.02 $0.08 0.01 $0.02 $0.00 0.40 $1.63 N/A N/A 0.80 $3.25
CD
C'

0:
:
CA ESTIMATED
TOTALECONOMIC
LOSSIEVENT
0
0 Scenario
Earthquakes Lower Upper Best
CD-
t~,0
CA Bound Bound Estimate

0.
CapeAnn $8.95 $10.56 $9.00
Charleston $8.75 $14.46 $10,05
FortTejon $7.73 $27.26 $11.56
Hayward $9.88 $18.73 $11.01
Madrid,
MOM=8 $10.37 $21.69 $14.00
Madrid,
MOM=7 $3.42 $7.33 $4.76
PugetSound $5.82 $8.94 $6.01
WasatchFront $3.25 $5.02 $3.64

I-I
(11

.:
1%,
UP

D.
q

0%

Table 6-13 Indirect Economic Losses Due to Damage to Lifeline Distribution Systems
in
0l
Electric Water Highways
a
Scenario Earthquakes % ~$BiI °/% $ Bil % $ Bil SRSS

I Cape Ann 0.32 $1.3 0.15 $.61 0.21 $0.86 $1.6


Charleston 0.27 $1.1 0.15 $.63 0.17 $0.71 $1.4
0
Fort Tejon 0.34 $1.4 0.11 $.47 0.08 $0.33 $1.5
Hayward 0.37 $1.5 0.10 $.41 0.09 $0.36 $1.6
I
in New Madrid, M=8 0.76 $3.1 0.44 $1.8 0.49 $2.0 $4.1
New Madrid, M=7 0.23 $1.0 0.14 $.57 0.15 $0.63
-4 $1.3
Puget Sound 0.22 $0.9 0.04 $.18 0.10 $0.40 $1.0
Wasatch Front 0.15 $0.6 0.06 $.27 0.09
9n $0.37 $1.25

Fn
100

90

80

70
(A,
I)
60

50

L. 40
Q)
[L
30

20

10

0
Massachusetts Connecticut Delaware Rhode Island New Hampshire

.= Air Trans. E Electric M Ports


_ Railroad m Highway

Figure 6-21 Percent indirect economic loss by state (monthly GNP) resulting from damage to various
lifelines, Cape Ann event (M= 7.0).

Losses ATC-25
162 6: Estimates of
6: Estimates Indirect Economic
of Indirect Economic Losses ATC-25
10 - .zI

,7
100

VI
80 - I'l
-j0
60- 7/
0
a,
40 - 7-
pi ii I i I i i I i i i
7- IRI
20 - .. .1 I I I I I I I I I I I I I

HHHHHHH! I
.
-i ------------
w|w . l ................
1 . 1E!I
. . . . . .I 1 : - ............ .-.z3 .... .. .. 1R 1:1:
r.. . ...I.......
1 1
.I . I I i. . rII
1 1 1 ! '
I I i -.
I ' I S t
i. I . I I-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
I
I
l
.I, I .i, . *I lli
;IIIII
i,. I. i i . I,..l.illlkI.I-111....::11I
IIII ..
ll.I I' lll -
.I .lh- .;1
Il" .I I, llil
I@iifslr 111 I I . . . . 11
li1:1: rl 11 11 11:1:
I I. ' Itn'. .II r |I l
11
...
.
I..4
.
. .....
i 1!i iii i ii
0 -

., I
i
South Carolina North Carolina Georgia

M Air Trans. = Electric


M Rilroadl M Highway

Figure 6-22. Percent indirect economic loss by state (monthly GNP) resulting from damage to various
lifelines, Charleston event fM=7.5j.

ATC-25 6: Estimates of Indirect Economic Losses 163


Cn
C,
0
q-
C
a)
C.)
a)

South. California

EIZ Crude
F>.M~t8A Oil Electric II Natural Gas
Ports _ Railroad m Highway

Figure 6-23 Percent indirect economic loss in Southern California (monthly GNP) resulting from
damage to various lifelines, Fort Tejon event (M=8.0).

164 6: Estimates of Indirect Economic Losses ATC-26


.r A

40 - 7
35 - 7

0
30 - /
c-
25 - /
a)
0
20 - 7
15- /

1 -
7
5- 7
,
0 - 'I.
North. California

Air Trans r Electric w Natural Gas


Ports _ Railroad M Highway

Figure 6-24 Percent ndirect economic loss in Northern California (monthly GNP),resulting from
damage to various lifelines, Hayward event (M=7.5).

ATC-25 *6:Estimates of Indirect Economic Losses 1-65


90

80

70

,, 60
0
'J50

30

20

10

0
* Illinois Missouri Arkansas Tennessee Kentucky Mississippi

= Air Trans. m Crude Oil m Refined Oil


EM Electric _ Railroad Highway

Figure 6-25 Percent indirect economic loss by state (monthly GNP) resulting from damage to various
lifelines, New Madrid event (M=8.0). Note that the relatively low losses for Missouri
reflect the assumed location of the scenario earthquake source zone and the estimated
distribution of intensity (see Figure 4-17).

166 6:Estimates of Indirect Economic Losses ATC-25


50
45
40
35
In
U)
o 30
-J2
725
C-)
(D 20

15

1 0

0
Illinois Missouri Arkansas Tennessee Kentucky Mississippi

W Air Trans. E Crude Oil M Refined Oil


NM Electric = Railroad M Highway

Figure6-26 Percent indirect economic lossby state (monthly CNP resulting from damage to various
lifelines, New Madrid event M=7.0). Note that the relatively low losses for Missouri
reflectthe assumed location of the scenario earthquakesource zone and the estimated
distribution of intensity (see Figure4-78).

Economic Losses 167


ATC-25
ATC-25 6: EstImates
6: of Indirect
Estimates of Indirect Econo.mic Losses 167
1 40

120

100
In

-i80
0

'U 60
L
U,
0-
40

20

0
Washington

M Air Trans. Electric E Natural Gas


M Ports _ Railroad m Highway

Figure 6-27 Percent indirect economic loss in state of Washington (monthly GNP) resulting from
damage to various lifelines, Puget Sound event (M=7.5).

168 6: Estimates of Indirect Economic Losses I . ATC-25


120

100

(A 80
-j0
60
,
an

,n 40

20

0
Utah

AMr Trans. Electric W Natural Gas


Railroad m Highway

Figure 6-28 Percent indirect economic loss in state of Utah (monthly CNP resulting from damage to
various lifelines, Wasatch Front event (M= 7.5).

ATC.26 6: Estimates of Indirect Economic Losses 169


Combined Economic Losses, Deaths, and
7. Injuries
7.1 Introduction for microscopic interpretations. The results are
not intended to be used to evaluate any
In this chapter we provide an overviewof particular regional utility or lifeline and no
combined economic losses, consisting of direct specific information on such specific facilities
and indirect economic losses, and a discussion of has been included.
deaths and injuries.
7.2 Human Death and Injury
At this point it is important to reiterate the
purposes and key limitations of this study. As It is generally felt that lifeline performance and
previously indicated, the overall purpose is to continuity of operation is vital to human survival
provide an overview of the national economic in the modem, urban, world. Most observers
impact resulting from the seismic vulnerability believe that damage to lifelines would result in
of lifelinesand the impact of their disruption. human death and injury. Analogous to direct
The Federal Emergency Management Agency is damage to property and indirect economic
planning to use this report to emphasize the losses, human death and injury resulting from
importance of maintaining functionality of lifeline damage can be categorized as follows:
lifelines after earthquakes and to assist in the
identification and prioritization of hazard 1. Human death and injury caused by
mitigation measures and policies. lifeline functional curtailment, where
persons. suffer as a result of deprivation
Lifelines considered are transportation systems, of vital services; and
energy systems, emergency service facilities, and
water systems. Excluded from consideration 2. Human death and injury resulting from
because of the unavailability of inventory data direct damage to lifelines. (e.g., occupant
or the need for more in-depth studies are injuries resulting from the collapse of an
telecommunication systems, nuclear and fossil- air terminal building).
fuel power plants, dams, and certain highway,
electric, and water facilities at the local Analysisand data on both of these aspects are
distribution level. virtually nonexistent. Following are discussions
of these death and injury causes:
Also excluded from consideration in the results
are interaction effects between lifelines, 7.2.1 CasualtiesDue to Lifeline Functional
secondary economic effects (the impact of a Curtailment
reduced capacity of one economic sector on a
dependent sector), and damage resulting from Without the benefit of hard data it is.difficult to
landslide (due to lack of inventory data estimate with high confidence the number of
nationwide). These limitations and others casualtiesthat will result from curtailment of
described in Chapters 2,4, and 5 tend to lifeline function. Our preliminary assessment is
underestimate losses; other limitations (e.g., that human death and injury due to functional
application of ATC-13 vulnerability functions to curtailment of lifelines can generally be
a relatively few structures) tend to overestimate expected to be very low. This is a fundamental
the losses. Lack of capacity information for assumption of this study, and will probably cause
most lifelines was also a definite limitation. In some debate. Each lifeline was considered, and
the aggregate,due primarilyto the exclusionof this conclusionwas found to hold, based on the
systems (e.g., dams and telecommunication following assumptions: (I) most vital
systems), we believe the estimates presented in installations that normally require a lifeline
this report are, in fact, quite conservative. service have back-up emergency supplies, and
(2) most lifelines have.considerable elasticity in
This report is a macroscopic investigation at the demand, and the level of service necessary for
national level and the results, should not be used life maintenance is very low. Examples follow:

ATC-25 7: Combined Economic Losses, Deaths, and Injuries 171


* Electricity. Persons can survive without Oakland approximately 100 km from the
power, even in the Northeast in the earthquake source zone.
winter. Most hospitals and similar
installations have emergency generators. Although it can be argued that the deaths and
Those that lack emergency generators injuries caused by lifeline failure in the Loma.
can transfer patients to other sites. Prieta earthquake were the exception, not the
rule, the vulnerability functions developed for
* Water. Water for human survival is very this project suggest that substantial life-loss
minimal. Humans can survive without from lifeline component failure should be
water for 48 or more hours, and water anticipated. Lifeline failures that could cause
for human survival can be imported if substantial life loss or injury include bridge
necessary. failure, railroad derailment, and pipeline failure.

* Gas and Liquid Fuels. Gas and liquid Unfortunately, data necessary for estimating life
fuel systems are probably the most loss associated with these component failures
critical of all lifelines, yet capacity is very are not readily available, precluding
elastic, and only short-term shortages development of reliable casualty estimation
are expected. Fuel for heating in the methodology and data for lifeline structures.
Northeast in the winter can be
conserved if necessary by clustering 7.3 Combined Directand Indirect
people in school gymnasia, national Economic Losses
guard armories, and so on.
Total dollar losses from direct damage and
* Rail, Air, and Highwav Transportation. indirect economic losses have been taken from
Transportation lifelines are highly Chapters 5 and 6 and are combined and
redundant and thus very elastic; summarized herein for each scenario
emergency food and medicines would be earthquake and lifeline in Table 7-1. The total
expected to be deliverable regardless of losses for each scenario earthquake are as
earthquake damage. follows:

7.2.2 CasualtiesResultingFromLifeline Direct Direct Plus


Damage Indirect Losses
Earthquake (in Billions, 1991$)
Casualties can result from direct damage, Cape Ann $13.3
especially catastrophic collapse, of lifeline
components. Although few deaths occurred Charleston $15.1
directly as a result of lifeline damage in U. S. Fort Tejon $16.6
earthquakes prior to 1989,life-lossdue to
lifeline failure was tragically demonstrated Hayward $15.7
during the October 17, 1989, Loma Prieta, New Madrid, M = 3.0 $26.4
California, earthquake. Approximately two
thirds of the 62 deaths from this earthquake New Madrid, M = ,7.0 $8.3
resulted from the failure of a lifeline Puget Sound $10.5
component--partial collapse of the Cypress
structure, a double-decked highway viaduct in Wasatch Front $5.4

172 7: Combined Economic Losses, Deaths, and Injuries ATC-25


0
01

8
0
0m

Table 7-1 Total Direct Plus Indirect Dollar Losses for Each Scenario Earthquake and
0 Lifeline (Billions of Dollars)

0 Medical Natural Crude Refined Broadcasting Fire


0 Scenario Electric Highways Water Care Ports Railroads Airport Gas Oil Oil Stations Stations Total

tvI
S Cape Ann $11.24 $2.06 $0.91 $0.49 $0.50 $0.03 $0.58 $0.00 $0.00 $0.00 $0.02 $0.01 $13.25
(n
Charleston $10.82 $2.05 $0.94 $0.57 $5.30 $0.18 $0.59 $0.00 $0.00 $0.00 $0.07 $0.01 $15.11
Fort Tejon $9.66 $5.18 $5.27 $1.43 $2.65 $0.41 $1.57 $1.68 $4.38 $0.00 $0.03 $0.05 $16.58
CA
h Hayward $12.21 $2.52 $4.38 $1,30 $1.46 $0.22 $0.44 $0.09 $0.00 $0.00 $0.02 $0.01 $15.66
New Madrid 8 $15.68 $13.19 $2.68 $1.30 $0.00 $0.71 $1.22 $0.34 $0.46 $0.23 $0.09 $0.01 $26.37
New Madrid 7 $5.17 $4.12 $0.85 $0.40 $0.00 $0.15 $0.31 $0.18 $0.13 $0.16 $0.03 $0.00 $8.29
$0,90 $0.51 $0.73 $0.21 $0.62 $0.21 $0.00 $0.00 $0.05 $0,01 $10.48
0 Puget Sound $8.29 $1.95
$0.00 $0.04 $0.00 $5.41
Wasatch Front $2.21 $3.85 $0.40 $0.20 $0.00 $0.05 $0.11 $0.04 $0.00
UT
a

'-4
,_4
0
Hazard Mitigation Measures and Benefits
8.
81 Introduction pumping stations and dams were not included in the
study.
A primary objective of this study is to identify 8.3 Measures for Reducing
the most critical lifelines and develop a Vulnerability of Lifeline Systems
prioritized series of steps for reduction of
lifeline seismic vulnerability, based on overall The seismic vulnerability of lifeline systems,
benefits. In this chapter we identify the most from the point of view of fulfillingfunction, can
critical lifelines and provide a relative ranking of be reduced through three primary approaches:
the criticality of these different lifelines in terms
of the estimated impact of damage and 1. Damage reduction measures. In this
economic disruption. Also included are approach reliabilityof function is enhanced
recommended key measures for reducing the by reducing damage. This, approach may
earthquake vulnerability of these lifeline take the form of:
systems, and results from analytical
computations to illustrate the reduction in losses * Strengthening a building, bracing
if such hazard mitigation strategies are equipment, or performing other
employed. corrective retrofit measures to mitigate
shaking effects;
8.2 Identification of Critical Lifelines
* Densifyingthe soil beneath a structure,
Based on the combined direct and indirect or placing a structure on piles, or using
economic losses presented in Chapter 7 and other techniques to mitigate hazardous,
with due consideration of the assumptions and geotechnical conditions, e.g.,.
limitations expressed throughout this report, we liquefaction potential,
offer the followingrelative ranking of the
criticalityof different lifelines in terms of the * Other component improvements,
estimated impact of damage and disruption: depending on the component and
potential earthquake impacts, e.g.,
Rank Lifeline Event/Location replacement of vulnerable
systems/components with new
1. Electric System New Madrid systems/components that will provide
(M=8.O) improved seismic resistance.
Hayward
2. Provision for system redundancy. In this
Cape Ann, approach, reliability of function is enhanced
Charleston, by providing additional and alternative links
Fort Tejon (e.g., new highways, pipelines, other
2. Highways New Madrid transmissionor distribution links). Because
(M=8.0) earthquake damage is fundamentally a
random phenomena, addition of system links
Fort Tejon will tend to increase system reliability.
Hayward,
New Madrid 3. Operational improvements. In this
(M=7.O) approach reliabilityof function is enhanced
by providing emergency response planning
3. Water System* Fort Tejon and the capability to rapidly and effectively
4. Ports Charleston repair damage, redirect functions, or
otherwise mitigate earthquake damage
5. Crude Oil Fort Tejon impacts on system operations and thereby
*The ranking for the water system may be re-establish system function.
underestimated because critical components such as

ATC-25 8: Hazard Mitigation Measures and Benefits 175


Of these measures, the most commonare For water transportation systems:
component strengthening/retrofit measures, * Port/cargo handling equipment
which are discussed at length in Appendix B of * Inland waterways
this report. The proposed measures (Appendix
B) include generic, solutions, such as designing For gas and liquid fuels:
structures to meet current seismic design or * Distribution storage tanks
retrofit standards of the local community,or * Transmission pipelines
anchoring equipment. In addition, there are * Compressor, metering and pressure
numerous specific measures that relate to reduction stations
unique systems or components within each
lifeline. Special attention should be directed to 4. Conduct cost-benefit studies to determine the
those systems and conditions that are of greatest most cost effective measures. We note that, in
concern, such as porcelain components in some cases, retrofit measures may not be very
electric substations. cost effective. In regions where the return
period for large earthquakes is quite long, for
Following are recommended steps when example, replacement over the life cycle of the
implementing a program to reduce, seismic facility or component may be a reasonable,
hazards of existing lifelines: approach.

1. Review existing descriptions of seismic 5. Implement the selected hazard reduction


performance and rehabilitation measures for the measures.
lifeline(s) of concern, i.e., familiarize yourself
and your organization with the overall problem. 8.4 Estimated Overall Benefits of
Sources include Appendix B and Chapter 10 Implementing Hazard Reduction
(References) of this report. Measures

2. Conduct an investigation of the seismic In order to provide an indication of the overall


vulnerability and impact of disruption for the benefit of implementing hazard mitigation
lifeline(s) and region(s) of concern. Lifeline measures, we have computed and compare
seismic evaluation methodologies and other estimated direct damage and indirect economic
potential resources for this purpose have been losses for the existing and an upgraded extended
developed by the ASCE Technical Council for regional electric network, with specific focus on
Lifeline Earthquake Engineering (see the most vulnerable component for this
references, Chapter 10), the Applied Techno- lifeline--substations. Estimated direct damage
logy Council (ATC, in preparation) and others. and indirect economic losses for the existing
network are taken from Chapters 5 and 6,
3. Focus first on the most vulnerable lifelines, respectively. Estimated direct damage and
components, and conditions (e.g., liquefaction indirect economic losses for the hypothetical
or landslidepotential). Vulnerable components upgraded network have been computed using
include: the same techniques and data as used for the
existing network, but seismic intensities have
For electric systems: been shifted downward two units to reflect the
* Substations improved performance of the upgraded system.
* Power stations While this is a rather simplistic approach, we
believe the results reasonably indicate the
For water systems: extent of benefit provided by rehabilitation.
* Pumping stations
* Tanks and reservoirs Direct Damage Comparisons. Percentages of
* Treatment plants substations in the existing and upgraded system
* Transmissions aqueducts in the various damage states are provided in
Tables 8-1 and 8-2 respectively. With the
For highway systems exception of 1% of the upgraded substations in
* Bridges Missouri and Tennessee that would sustain
* Tunnels major-to-destructive damage in the magnitude-
* Roadbeds 8.0 New Madrid event, none of the substations

Measures and Benefits ATC-25


176
176 8: Hazard Mitigation
8: Hazard Mitigation.Measures and BenefHs ATC-25
in other locations for this event or in other include data for states for which damage to the
events would sus lain damage this severe. In upgraded system was zero or insignificant. Data
contrast, 43 percent of the transmission for the upgraded system are based on residual
substations in Washington, 29 percent in capacity plots provided in Appendix C (Figures
Arkansas, 16 percent in South Carolina, 13 C-185 through C-20).
percent in California, 10 percent in Utah, 8
percent in Missouri, and 6 percent in Tennessee By comparing the results in Tables 8-3 and 8-4,
would sustain damage in this range in the it is clear that indirect economic losses are
various earthquake scenarios. Trends for lower substantially reduced through seismic upgrade
damage states, are similar, as are trends for measures. For example, the ratio of indirect
transmission lines (not shown here). economic loss to the retail trade sector resulting
from damage to the existing system versus loss,
Indirect Economic Loss Comparisons. Indirect resulting from damage to the upgraded system
economic losses resulting from damage to the ranges from 2.5 to 34 for the 7 events and 8
existing and upgraded systems are provided in states considered in both analyses. A
Tables 8-3 and 8-4. Table 8-3 includes data for comparisonof data for the other economic
all affected states, whereas Table 8-4 does not sectors shows similar trends.

and Benefits 177


ATC-25
ATC-25 8: Hazard
8: Mitigation Measures
Hazard Mitigation Measures and Benefits 177
Table 81 Damage Percent for Existing Electric Transmission Substations for Each
Scenario Earthquake (Percent of Substations in State)

CHARLESTON (M=7.5)
NEW MADRID (M=8.0)
South North
Arkansas Tennessee Kentucky Indiana Mississippi Carolina Carolina Georgia
Illinois Missouri
124 70 68 89 93 100 76 86
Total Number 108 95

Light Damage 0%
0% 0% 0% 0% 0% 0% 0%
1-10% 00/0 0%
Moderate 33%
N 8% 22% 16% 24% . 2% 63% 43% 20%
.10-30 % 14%
Heavy 0% 3%
0% 0% 10% 9% 7% 0% 8% 14%
co, 30-60 %
Major to Destructive 1% 2%
0/0 8% 29% 6% 1% 0% 10% 16%
60-100 %
(0
a
CAPE ANN (M=Z0) WASATCH FRONT(M=7.5)
CD
M Utah
Massachusetts Connecticut Delaware Rhode Island New Hampshire
.4
Total Number 153 69 3 22 22 10
CD
(1

Light Damage
M 0% 0/0 0% 0% 0%
1-10 % 0%
5n
CD Moderate
CD 10-30 % 82% 42% 33% 100% 45% 30%
rn Heavy 0%
0%/0 0% 0% 0% 20%
30-60 %
Major to Destructive
5% 0% 0% 0% 0%/0 10%
60-100 %

HAYWARD FORT TEJON PUGET SOUND NEW MADRID


(M7.5) (M=8.0) (M=7.5) (M=7.0)

California Washington Illinois Missouri Arkansas Tennessee Kentucky Mississippi


California
205 155 108 95 124 70 68 93
Total Number 205

*LightDamage
11% 0% 0% 0% 0% 0%/ 0%
1-10 % 8%
Moderate
6% 12% 0% 20/ 21% 16% 16% 14%
10-30 % 13%
0 Heavy
0% 16% O/% 0% 2%
t6 30-60 % 14% <1% 3% 0%
Major to Destructive 0%
13% 12% 43% 0% 6% 6% 3% 0%/0
60-100 %
0 Table 8-2 Damage Percent for Upgraded Electric Transmission Substations for Each
Scenario Earthquake (Percent of Substations in State)
C?'5

NEW MADRID (M=8.0) CHARLESTON (M=7.5)

South North
Illinois Missouri Arkansas Tennessea Kentucky Indiana Mississippi Carolina Carolina Georgia
Total Number 108 95 124 70 68 89 93 100 76 86

Light
0-10 % 0% 0% 0% 0% 0% 0% 0% 0% 0%
Moderate
::o 10-30 % 0% 0% 21% 11% 9% 0% 10% 24% 1% 1%
Heavy
30-60 % 0% 7% 8% 1% 0% 0% 6% 0% 1%
Major to Destructive
60-100 % 0/. 1% 0% 1% 0% 0% 0% 0% 0% a0%
00
-

0 CAPE ANN (M=7.0) WASATCH FRONT (M=7.5)


n Massachusetts Connecticut Delaware Rhode IslandNow Hampshire Utah
Total Number 153 69 3 22 22 10
a . .. _-~~~~~~~~~~~~o

Light
0-10 % 0%/. 0% 0% 0% 0O% 0%
, Moderate
10-30% 1% 0% 0% 0% 0% 30%
Heavy
30-60 % 5% 0% 0% 0% %/. 0%
Major to Destructive
60-100 % 0% 0% 0% 0% 0%/0 0%

HA YWARD FORT TEJON PUGET SOUND NEW MADRID


(M7.5) (M=8.0) (M= 7.5) (M4=7.0)

California California Washington Illinois Missouri Arkansas Tonnossee Kentucky Mississippi


Total Number 205 205 155 108 95 124 70 68 93

Light
0-10% 12% 6/. 0% 0% 0% 0% 0% 0/O 0%
Moderate
10-30 % 21% 11% 21% 0% 3% 6% 1% 0% 0%
Heavy
30-60 % 0% 1% 22 I% 0% 3% 0% 1% 0% 0%
Major to Destructive
60-100 % 0% 0% 0% 0% 0% 0% 0% 0% 0%
%a

Table 8-3 Indirect Economic Loss Due to Damage to the Existing Electric System
(Percent Monthly GNP)

NEWMADRID (M=8.0) CHARLESTON CAPEANN


U.'S.Econ. South North
ValueAdded Illinois Missouri Arkansas Tennessee Kentucky Mississippi Carolina Carolina Georgia Massachusetts Connecticut Delaware
(Percent)

:4 1 Livestock 0.45% 3.95% 6.58%/6 32.89% 13.16%/a 13.16% 44.74% 46.05% 7.89% 18.42% 44.74% 15.79% 10.53%
2 Agr. Prod. 1.06% 3.95% 6.58% 32.89% 13.16% 13.16% 44.74% 46.05% 7.89% 18.420/a 44.74% 15.79% 10.53%
N 3 Agr For. Fish 0.11% 3.95% 6.58% 32.89% 13.16% 13.16% 44.74% 46.05% 7.89% 18.42% 44.74% 15.79% 10.53%
Ca
4 Mining 3.89% 7.11% 11.84% 59.21% 23.68% 23.68% 80.53% 82.89% 14.21% 33.16% 80.53% 28.42% 18.95%
5 Construction 5.52% 3.16% 5.26% 26.32% 10.53% 10.53% 35.79% 36.84% 6.32/ 14.74% 35.79% 12.63% 8.42%
6 Food Tobacco 2.41% 7.11% 11.84% 59.21% 23.68% 23.68% 80.53% 82.890/ 14.21% 33.16% 80.53% 28.42% 18.95%
: 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
7 Textile Goods 0.37% 7.89% 13.16%
8 Misc Text. Prod. 0.73% 7.89% 13.16% 65.79% 26.32% 26.32% 89.47%. 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
9 Lumber & Wood 0.52% 7.89% 13.16% 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
5. 10 Furniture 0.34% 7.89% 13.16% 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
Q
EL 11 Pulp & Paper 0.87% 7.89% 13.16% 65.79% 26.32% 26.320/ 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
12 Print & Publish 1.31% 7.89% 13,16% 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
7 13 Chemical & Drugs 1.40% 7.11% 11.84% 59.21% 23.68% 23.68% 80.53% 82.890/ 14.21% 33.16% 80.53% 28.42% 18.95%
14 Petrol. Refining 0,96% 7.89% 13.16% 65.79% 26.320/a 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
15 Rubber & Plastic 1.03% 7.89% 13.16% 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
Ca
(D 16 Leather Prods. 0.12% 7.89% 13.16% 65.79/6 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
UP 17 Glass Stone Clay 0.62% 7.89% 13.16% 65.79% 26.32%/ 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
(a. 18 Prim. Metal Prod. 1.04% 7.11% 11.84% 59.21% 23.68% 23.68% 80.53% 82.89% 14.21% 33.16% 80.53% 28.420/a 18.95%
'4
Q 19 Fab. Metal Prod. 1.64% 7.89% 13.16% 65.79% 26.320/a 26.32% 89.470/ 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
CD 20 Mach. Exc. Elec. 1.56% 7.89% -13.16% 65.79% 26.320/ 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
21 Elec. & Electron 2.52% 7.89% 13.16% 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
(D 22 Transport Eq. 2.62% 7.89% 13.16% 65.79% 26.320/a 26.32% 89.47% 92.11% 15.79% . 36.84% 89.47% 31.58% 21.05%
23 Instruments 0.68% 7.89% 13.16% 65.79% 26.32% 26;32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
24 Misc. Manufact. 0.69% 7.89% 13.16%- 65.79% 26.32% 26.32% 89.47% 92.11% 15.79% 36.84% 89.47% 31.58% 21.05%
CA 25 Transp & Whse. 3.46% 2.37% 3.95% 19.74% 7.89%b 7.89% 26.84% 27.63% 4.74% 11.05% 26.84% 9.47% 6.32%
26 Utilities 5.89% 6.320/6 10.53% 52.63% 21.05% 21,05% 71.58% 73.68% 12.63% 29.47% 71.58% 25.26% 16.84%
in 27 Wholesale Trade 5.63% 7.11% 11.84% 59.21% 23.68% 23.68% 80.53% 82.890/a 14.21% 33.16% 80.53% 28.42% 18.95%
CJa 28 Retail Trade 5.63% 7.11% 11.84% 59.21% 23.68% 23.68% 80.53% 82.89% 14.21% 33.16% 80.53% 28.42% 18.95%
29 F.I.R.E. 16.64% 7.11% 11.84% 59.21% 23.68% 23.68% 80.53% 82.89% 14.21% 33.16% 80.53% 28.42% 18.95%
30 Pers./Prot Serv. 8.03% 7.11% 11.84% 59.21% 23.68% 23.68% 80.53% 82.89% 14.21% 33.16% 80.53% 28.42% 18.95%
31 Eating Drinking 2.12% 6.32% 10.53% 52.63% 21.05% 21.05% 71.58% 73.68% 12.63% 29.47% 71.58% 25.26% 16.84%
32 AutoServ. 1.09% 7.11% 11.84% 59.21% 23.68% 23.68% 80.53% 82.89% 14.21% 33.16% 80.53% 28.42% 18.95%
33. Amuse & Rec. 0.70% 6.32% 10.53% 52.63% 21.05% 21.05% 71.58% 73.68% 12.63% 29.47% 71.58% 25.26% 16.84%
34 Health Ed. Soc. 6.30% 6.32% 10.53% 52.63% 21.05% 21.05% 71.58% 73.68% 12.63% 29.47% 71.58% 25.26% 16.84%
35 Govt&GovtInd. 11.79% 4.74% 7.890/a 39.47% 15.79% 15.79% 53.68% 55.26% 9.47% 22.11% 53.68% 18.95% .12.63%
'-I 36 Households 0.25% S.32% 10.53% 52.63% 21.05% 21.05% 71.58% 73.68% 12.63% 29.47% 71.58% 25.26% 16.84%
9
t6
Table 83 Indirect Economic Loss Due to Damage to the Existing Electric System
0
I1
(Percent Monthly GNP) (Continued)

01

CAPE ANN WASATCH CALIFORNIA PUGET SOUND NEWMADRID (M=7.0)


U.S. Econ. -

Value Added RShode


(Percent) Island New Hampshire Utah Hayward Fort Thjon Washington Arkansas Tennessee
. . . .
Kentucky Mississippi

a
1 Livestock 0.4S% 42.11% 14.47% 35.53% 23.68% 13.16% 47.37% 23.68% 7.89% 3.95%
2 Agr. Prod. 106% 42.11% 14.47% 35.53% 23.68% 1.16% 47.37% 23,68% 7.89% 3.95% 3.96%
3 AgServ For. Fish 0.11% 42.11% 14.47% 35.53% 23.68% 13.16% 47.37% 23.68% 7.89% 3.95% 3,95%
R 4 Mining 3.89% 75.79% 26.05% 63.95% 42.63% 23.68% 85.26% 42.63% 14.21% 7.1 1% 7.11%
5 Construction 5.52% 33.68% 11.58% 28,42% 18.95% 10,53% 37.89% 18.95% 6.32% 3.16% 3.16%
6 Food Tobacco 2.41% 75.79% 26.05% 63.95% 42.63% 23.68% 85,26% 42.63% 14.21% 7.1l1% 7.11%
7 Textile Goods 0,37% 84.21% 28.95% 71.05% 47.37% 26,32% 94.74% 47.37% 15,79% 7.89% 7.89%
8 Misc Text. Prod. 0.73% 84.21% 28.95% 71.05% 47.37% 26.32% 94.74% 47.37% 15 79% 7.89% 7.89%
9 Lumber Wood 0.52% 84.21% 28.95% 71.05% 26.t32 /o
'- 10 Furniture 0.34% 47.37% 94.74% 47.37% 15.79% 7.89% 7.89%
84.2 1% 28.95% 71.05% 26.32% 94.74% 47.37% 16.79% 7.89% 7.89%
11 Pulp & Paper O.87Q/ 47.37%
- 84.21% 28.95% 71.05% 26.32% 94.74% 47.37% 15,79Q/9 7.89% 7.89%
C 12 Print & Publish 1.31% 47.37%
84.21% 28.95% 71.05% 26.32% 94.74% 47.37% 15.79% 7.89%
13 Chemical & Drugs 47.37% 7.89%
1.40%
!i 14 Petrol. Refining
1S Rubber & Plastic
0.96%
1.03%
75.79%
84.21%
84.21%
26.05%
28.95%
28.95%
63.95%
71.05%
71.05%
42.63%
47.37%
23.68%
26.32%
26.32%
85.26%
94,74%
94.74%
42.63%
47.37%
47,37%
14.21%
15S79%
15.79%
7.11%
7.89%
7.11%
7.89%
16 Leather Prods. 47.37% 7.89% 7.89%
0.12% 84.21% 28.95% 71 .05% 26,329/o 94.74% .47.37% 15.79% 7.89% 7.89%
17 Glass Stone Clay 0.62% 47.37%
84.21% 28.95% 71.05% 47.37%g 26.32% 94.74% 47.37% 15.79% 7.89% 7.89%
(D 18 Prim. Metal Prod. 1.04% 75.79% 26.05% 63.95% 42.63% 23.68%
W 85.26% 42.63% 14.21% 7.11 % 7.11%
19 Fab. Metal Prod. 1.64% 84.21% 28.95% 71.05% 47.37%, 26.32% 94.74% 4737% 15.79% 7.89% 7.89%
20 Mach. Exc. Elec, 1.56% 84.21% 28.95% 71 .05% 47.37% 26.326%a 94.74% 47.37% 15,79% 7.89% 7.89%
21 Eloe. & Electron 2.S20/O 84.21% 28.95% 71.05% 47.37% 26.32% 94.74% 47.3 7% 15,79% ,7.89% 7.89%
22 Transport Eq. 2.62% 84.21% 28.95% 71.05% 47.3r7% 26.32%9 94.74% 47.37% 15.79% 7.89% 7,89%
23 Instruments 0.68% 84.21% 28,95%. 71 .05% 47.37% 26.32% 94.74% 47.37% 15.79% 7.89% 7.89%
I-
24 Misc. Manufact. 0.69% 84.21% 28.95% 71.05% 47,37% 26.32LQ
0
U, 25 Transp & Whse. 3.46%
94.74% 47.37% 15.79% 7.89% 7.89%
25.26% 8.68% 21,32% 14.2 1% 7.89% 28.42% 14.21% 4.74% 2.37% 2.377%
26 Utilities 5.89% 67.37% 23.16% 56.84% 37.89% 21.05% 75.79% 37.89% 12.63% 6.32% 6.32%/9
27 Wholesale Trade 5.63% 75.79% 26,05% 63.95% 42.63% 23.68% 85.26% 42.63% 14.21% 7.1 1% 7.11%
28 Retail Trade 5.63% 75.79% 26.05% 63.95% 42.63% 23.68% 85.26% 42.63% 14.21% 7.1 1% 7.11%
29 F.I.R.E. 16.64% 75.79% 26.05% 63.95% 42.63% 23.68% 85.26% 42.63% 14.21% 7.11% 7.11%
30 Pers./Prof Serv. 8.03% 75.79% 26.05% 63.95% 42.63% 23.68% 85.26% 42.63% 14.21% 7.11% 7.11%
31 Eating Drinking 2.12% 67.3 7% 23.16% 56.84% 37.89% 21.05% 75.79% 37.89% 12.63% 6.32% 6.32/a
32 Auto Serv. 1.09% 75.79% 26.05% 63.95% 42.63% 23.68% 85.26% 42.63% 14.21% 7.1 1% 7.11%
33 Amuse & Rec. 0.70/a 67.37% 23.16% 56.84% 37.89% 21.05% 75.79% 37.89% 12.63% 6.32% 6.32%
34 Health Ed. Soc. 6.30% 67.37% 23.16% 56.84% 37.89% 21.05% 75.79% 37.89% 12.63% 6.32% 6.32%
35 Govt & Govt Ind, 11.79% S0.53% 17.37%/ 42.63% 28.42% 15.79% 56.84% 28.42% 9.47% 4.74% 4.74%
36 Households 0.25% 67.37% 23.16% 56.84% 37.89% 21.05% 75.79% 37.89% 12.63% 6.32% 6.320/0
o

Table 8-4 Indirect Economic Loss Due to Damage to the Upgraded Electric System
I (Percent Monthly GNP)

! , .. , _ .~~~~~~~~~
CHARLESTON CAPEANN WASATCH HAYWARD FT. TEJON WASHINGTO)q
NEW MADRID(~M=8.Q)

U.S. Econ.
Tennessee S Carolina Massachusetts Utah California California Washington
Value-Added Arkansas
(Percent)

0 1 Livestock 0.45% 13.16% 5.26% 15.79% 1.32% 10.53% 5.26% 2.63% 18.42%
5.26% 15.79% 1.32% 10.53% 5.26% 2.63% 18.42%
2 Agr. Prod. 1.06% 13.16%
5.26% 15.79% 1.32% 10.53% 5.26% 2.63% 18.42%
3 AgServ For. Fish 0.11% 13.16%
9.47% 28.42% 2.37% 18.95% 9.47% 4.74% 33.16%
4 Mining 3.89% 23.68%
4.21% 12.63% 1.05% 8.42% 4.21% 2.11% 14.74%
5 Construction 5.52% 10.53%
2.41% 9.47% 28.42% 2.37% 18.95% 9.47% 4.74% 33.16%
6 Food Tobacco 23.68% D
2.63% 21.05% 10.53% 5.26% 36.84%
(a 7 Textile Goods 0.37% 26.32% 10.53% 31.58% :
10.53% 5.26% 36.84%
a 8
9
Misc Text. Prod.
Lumber & Wood
0.73%
0.52%
26.32%
26.32%
10.53%
10.53%
31.58%
31.58%
2.63%
2.63%
21.05%
21.05% 10.53% 5.26% 36.84%
10.53% 31.58% 2.63% 21.05% 10.53% 5.26% 36.84%
10 Furniture 0.34% 26.32%
. 10.53% 31.58% 2.63% 21.05% 10.53% 5.26% 36.84%
CR 11 Pulp & Paper 0.87% 26.32%
1.31% 10.53% 31.58% 2.63% 21.05% 10.53% 5.26% 36.84%
D 12 Print & Publish 26.32%
33.16%
-Q 1.40% 9.47% 28.42% 2.37% 18.95% 9.47% 4.74%
13 Chemical & Drugs 23.68%
0.96% 10.53% 31.58% 2.63% 21.05% 10.53% 5.26% 36.84%
14 Petrol. Refining 26.32%
1.03% . 10.53% 31.58% 2.63% 21.05% 10.53% 5.26% 36.84%
In 15 Rubber & Plastic 26.32%
(D 0.12% 10.53% 31.58% 2.63% 21.05% 10.53% 5.26% 36.84%
16 Leather Prods. 26.32%
0.62% 10.53% 31.58% 2.63% 21.05% 10.53% 5.26% 36.84%
17 Glass Stone Clay 26.320/
1.04% 9.47% 28.42% 2.37% 18.95% 9.47% 4.74% 33.16%
18 Prim. Metal Prod. 23.68%
1.64% 10.53% 31.58% 2.63% 21.05% 10.53% 5.26% 36.84%
19 Fab. Metal Prod. 26.32%
1.56% 10.53% 31.58% 2.63% 21.05% 10.53% 5.26% 36.84%
20 Mach. Exc. Elec. 26.32%
2.52% 10.53% 31 58% 2.63% 21.05% 10.53% 5.26% 36.84%
21 Elec. & Electron 26.32%
(D 10.53% 31.58% 2.63% 21.05% 10.53% 5.26% 36.84%
22 Transport Eq. 2.62% 26.32%
0.68% 26.32% 10.53% 31.58% 2.63% 21.05% 10.53% 5.26% 36.84%
- 23 Instruments
0.69% 10.53% 31.58% 2.63% 21.05% 10.53% 5.26% 36.84%
24 Misc. Manufact. 26.32%
3.46% 3.16% 9.47% 0.79% 6.32% 3.16% 1.58% 11.05%
25 Transp & Whse. 7.89%
5.89% 8.42% 25.26% 2.11% 16.84% 8.42% 4.21% 29.47%
26 Utilities 21.05%
33.16%
0
an
27 Wholesale Trade 5.63% 23.68% 9.47% 28.42/6 2.37% 18.95%
18.95%
9.47%
9.47%
4.74%
4.74% 33.16%
28 Retail Trade 5.63% 23.68% 9.47% 28.42% 2.37%
C' 9.47% 4.74% 33.16%
29 F.I.R.E. 16.64% 23.68% 9.47% 28.42% 2.37% 18.95%
8.03% 9.47% 28.42% 2.37% 18.95% 9.47% 4.74% 33.16%
30 Pers./Prof Serv. 23.68%
31 Eating Drinking 2.12% 21.05% 8.42% 25.26% 2.11% 16.84% 8.42% 4.21% 29.47%
947% 28.42% 2.37% 18.95%. 9.47% 4.74% 33.16%
32 Auto Serv, 1.09% 23.68%
0.70% 8.42% 25.26% 2.11% 16.84% 8.42% 4.21% 29.47%
33 Amuse & Rec. 21.05%
6.30% 8.42% 25.26% 2.11% 16.84% 8.42% 4.21% 29.47%
34 Health Ed. Soc. 21.05%
11.79% 6.32% 18.95% 1.58% 12.63% 6.32% 3.16% 22.11%
35 - Govt & Govt Ind. 15.79%
0.25% 8.42% 25.26% 2.11% 16.84% 8.42% 4.21% 29.47%
36 Households 21.05%
Recommendations for Further Work
9.
9.1 Introduction should also investigate lifeline recovery data,
and incorporate the extensive experience
The ATC-25 project has raised a number of realized during the 17 October 1989 Loma
questions and indicated areas in which Prieta, California, earthquake, as well as from
knowledge is inadequate or nonexistent with other damagingearthquakes.
respect to the impact of lifeline disruption due
to earthquake. Following is a discussion of 9.4 Seismic Hazard Data
recommendations for further research and other
efforts. This list is not meant to be all inclusive The project has uncovered the relative paucity
but rather an overview of some of the more of seismichazard models and resources at the
important issues that should be pursued. regional/national scale. Only two models are
available,those of Evernden and Thompson
9.2 Lifeline Inventory (1985) and Algermissen et al. (1990), the latter
of which does not incorporate a soils database.
This project has initiated the development of a While a nationally agreed upon seismic hazard
comprehensive national lifelines inventory model may be desirable, this is less of a priority
database. Completion of this monumental task than the need for a digitized soils database.
will require many person-years of effort. That is, existing models (e.g., attenuation
Organizations such as the Federal Emergency relations, seismicity databases, seismotectonic
Management Agency, Department of models) are sufficient for a number of site-
Transportation, and American Society of Civil specific purposes, and can be expanded to
Engineers Technical Council of Lifeline regional modeling, given an adequate soils
Earthquake Engineering are encouraged to database. We suggest that the U. S. Geological
build on the work performed in this project, Survey develop, or coordinate through the
develop standards for complete lifeline various states' Office of Geologists, a series of
inventories, and coordinate the acquisitionof digitized soils/geologic databases.
the needed additional and updated data from
various lifeline owners. Capacity data in the 9.5 Economic Analysis and Impacts
National Petroleum Council's oil/gas Data and Methodology
transmission line inventory is an example of the
kind and extent of information that is needed in This project has presented a rational
lifeline inventory databases. An integral part of comprehensivemodel for the estimation of the
any project to augment the existingATC-25 economic impacts due to lifeline disruption.
lifeline database should be its wide availability in Many steps of the process necessarily involved
the public domain. approximations and limited analyses. We
recommend further research, especially in
9.3 Lifeline Component Vulnerability economic areas such as:
This project employed lifeline component * Economic impacts associated with
vulnerability functions developed in the ATC-13 lifeline disruption,
project (ATe, 1985) on the basisof expert
opinion obtained by surveys. While the ATC-13 i Second-order economic effects (e.g.,
expert-opinion data are extremelyuseful, interaction between lifelines, such as the
comprehensive information based on hard field effect of disrupted electric power on the
data would provide an improved basis for water supply),
estimating lifeline vulnerability. We recommend
a major effort to acquire data on lifeline seismic * Elasticitiesof demand, or substitution of
performance and damage, and conduct analysis a lesser disrupted lifeline (e.g., fuel oil)
towards the development of improved for a more disrupted lifeline (e.g.,
component vulnerability functions. This effort natural gas),

9: Recommendations for Further Work 183


ATC-25
ATC-25 9: Recommendations for Further Work 183
* Inter-regional impacts (e.g., economic
impacts in New York due to disruption
in California), and

* So-called "benefits," such as increased


economic activity associated with repair,
or replacement of older equipment with
new technology.

Lastly, we note that this study did not address


environmental consequences associated with
lifeline disruption, especiallythe potential for
oil spills from broken pipelines in the nation's
waterways following a New Madrid event.
Investigation of this issue is critically important.

Work ATC-25
184
184 9: Recommendations
9: Recommendations for Further
for Further Work ATC-25
10 References
AIRAC, 1987, "Fire Following Earthquake-- .ofKnowledge
of Lifeline Earthquake
Estimates of the Conflagration Risk to Engineering, New York, NY.
Insured Property in Greater Los Angeles
and San Francisco," All-Industry Research American Society of Mechanical Engineers,
Advisory Council, Oak Brook, Illinois. 1979, "National Congress on Pressure
Vessels and Piping' (3rd: 1979: San
Aid, K., 1982, "Strong Motion Prediction Using Francisco, Calif.); "Lifeline Earthquake
Mathematical Modeling Techniques," Bull. Engineering--Buried Pipelines, Seismic
Seis. Soc. Anm,Vol. 72, pp. 529-541. Risk, and Instrumentation," Presented at
the Third National Congress on Pressure
Aid, K., and Richards, P. G., 1980, Quantitative Vessels and Piping, San Francisco,
Seismology, W. H. Freeman, San Francisco. California, June 25-29, 1979, New York.
Algermissen, S.T., 1969, "Seismic Risk Studies in American Society of Mechanical Engineers,
the United States," In Proc. 4th World Conf 1980,Symposiumon RecentAdvances in
on Earthquake Engineering, Santiago, Chile, Lifeline EarthquakeEngineeringin Japan
Vol. 1, pp. 14-27. (San Francisco, Calif.),."Recent Advances
in Lifeline Earthquake Engineering in
Algernmissen,S.., and D.NL Perkins, 1976,A Japan,".
ProbabilisticEstimate of Maximum
Accelerationin Rock in the Contiguous American Society of Civil Engineers, Technical
United States, U.S. Geological Survey Council on Lifeline Earthquake
'Open-File Report 76-416. Engineering, 1980,Annotated Bibliography
on LifelineEarthquake Engineering,
Algermissen, S.T., R J. Brazee, C.W. Stover, Prepared by Technical Council on Lifeline
and L.C. Pakiser, 1977, Madinum Intensity Earthquake Engineering, American Society
of the Washington Earthquake of of Engineers.
December 14, 1872,"Report of
USGSINOAA Ad Hoc Working Group on American Society of Civil Engineers (ASCE-
Intensities of Historic Earthquakes. TCLEE), 1981, "Lifeline Earthquake
Engineering: The'Current State of
AIlgermissen, S.T., D.M. Perkins, P.C. Knowledge,"in Proceedingsof the Second
Thenhaus, S.L. Hanson, and B.L. Bender, SpecialtyConference of the Technical
1982,ProbabilisticEstimatesof Maximum Councilon Lifeline Earthquake Engeering,
Accelerationand Velocityin Rock in the Oakland Hyatt House, Oakland, New York,
Contiguous United States, U.S. Geological N.Y.
Survey Open-File Report 82-1033.
American Society of Civil Engineers, 1983,
Algermissen, S.T., 1983, "An Introduction to the "Advisory Notes on Lifeline Earthquake
Seismicityof the United States," Engineering,' New York, NY.
Earthquake Engineering Research
Institute, Berkeley, Calif, 148 pp. American Society of Civil Engineers (ASCE-
TCLEE), Technical Council on Lifeline
Algermissen, S. T. et aL, 1990, "Probabilistic Earthquake Engineering, 1983, "Advisory
Earthquake Acceleration and Velocity for Notes on Lifeline Earthquake
the United States and Puerto Rico," U. S. Engineering," A Report Prepared by the
Geological Survey Map MF-2120. Technical Committees, New York, N.Y.

American Society of Civil Engineers (ASCE- American Society of Civil Engineers, Technical
TCLEE), 1977, Conference on Crrent State Council on Lifeline Earthquake

10: References 185


ATC-25
ATC-25 10: References 1851
Engineering, 1984, "Lifeline Earthquake Applied Technology Council (ATC-13), 1985,
Engineering: Performance, Design, and EarthquakeDamageEvaluation Data for
Construction," in Proceedings of a California, Report ATC-13, Redwood City,
Symposium Sponsoredby the Technical Calif.
Council on Lifeline EarthquakeEngineering
of theAmerican Societyof Civil Engineers, Applied Technology Council (ATC-21), 1988,
New York, N.Y. Rapid VisualScreeningof Buildingsfor
PotentialSeismicHazards:A Handbook,
American Society of Civil Engineers, Technical Report ATC-21, Redwood City, Calif.
Council on Lifeline Earthquake
Engineering, 1986, "Lifeline Seismic Risk Applied Technology Council (ATC-23), 1991,
Analysis--Case Studies," in Proceedings of GeneralAcute CareHospitalEarthquake
the Session Sponsoredby the Technical SurvivabilityInventoryfor California,
Council of Lifeline EarthquakeEngineering Report ATC-23, Redwood City, Calif.
of the American Societyof CivilEngineersin
Conjunction with the ASCE, New York, Applied Technology Council (ATC-25-1), in
N.Y. preparation,A Model Methodologyfor
Assessmentof SeismicVulnerabilityand
American Society of Civil Engineers Technical Impact of Disruptionof WaterSupply
Council on Lifeline Earthquake Systems. Report ATC-25-1, Redwood City,
Engineering, 1986, "Seismic Evaluation of Calif.
Lifeline Systems--Case Studies" in
Proceedings of a Session Sponsored by the Arabasz, W. J. and Smith, R. B., 1979,
Technical Council on Lifeline Earthquake EarthquakeStudies in Utah:1850-1978,
Engineering of the American Societyof University of Utah Seismograph Station.
Civil Engineers, New York, N.Y.
Ariman, T., ed, 1987, RecentAdvances in
American Society of Civil Engineers, 1988, LifelineEarthquakeEngineering,
"Seismic Design and Construction of Amsterdam; New York: Elsevier;
Complex Civil Engineering Systems." in Southampton, U.K; Boston:
Proceedingsof a SymposiumSponsoredby Computational Mechanics Publications;
the Technical Councilon Lifeline New York, N.Y.: Distributors for the U.S.
EarthquakeEngineeringof theAmerican and Canada, Elsevier Science Pub. Co.,
Society of Civil Engineers, New York, N.Y. Series Title: Developments in
Geotechnical Engineering; 49 pp.
Anderson, J.G., 1984, Synthesis of Seismicity
and Geological Data in California, USGS Ariman, T., ed, 1983, "Earthquake Behavior and
Open-file Rept. 84-424. Safety of Oil and Gas Storage Facilities,
Buried Pipelines and Equipment," Am. Soc.
Applied Technology Council (ATC 3-06), 1978, Mech. Engrs., New York, NY.
TentativeProvisionsfor the Developmentof
SeismicRegulationsfor Buildings,Report Ariman, T., Dobray, R. Grigoriu, M., Cozen, F.,
ATC 3-06, Palo Alto, Calif. O'Rourke, M., O'Rourke, T., and
Shinozuka,M., 1990,A Pilot Study of
Applied Technology Council (ATC-6), 1981, SeismicVulnerabilityof CrudeOil
Seismic DesignGuidelinesfor Highway Transmission Systems, National Center for
Bridges, Report ATC-6, Palo Alto, Calif. Earthquake Engineering Report 90-0008,
Buffalo, NY.
Applied Technology Council (ATC-6-2), 1983,
SeismicRetrofitDesignGuidelinesfor BEA, February 1989, "Survey of Current
Highway Bridges, Report ATC-6-2, Palo Business," Vol. 69, No. 2, pp. 21-36, Input-
Alto, Calif. Output Accounts of the U.S. Economy,
1983.

10: References
186;
186 10: References ATC-25
Binder, R.W., 1952,.EngineeringAspects of the GLFC, 1984, Guidelines for the Seismic Design
1933Long Beach Earthquake,in of Oil and Gas PipelineSystems, Committee
Earthquake and Blast Effects on Structures, on Gas and Liquid Fuel Lifelines, Am. Soc.
Duke, C.M. and Feigen, M., eds, Civil Engrs., New York, NY.
Earthquake Engineering Research
Institute, Los Angeles, Calif Citadel (Military College of South Carolina),
1988,An Earthquake VuZnerabilityAnalysis
Blackmon, Greg, July-August 1985, "How to of the Charleston,South Carolina,Area,
Reduce Business Interruption Following Report CE-88-1, Charleston, S. Carolina.
CatastrophicProperty Loss,Journalof
Property Management, Indianapolis, Vol. Cochrane, H. C. et aL, 1975, Social Science
50, No.4. Perspectiveson the ComingSan Francisco
Earthquake: Economic Impact, Prediction,
Bollinger, G.A., 1973, "Seismicity and Crustal and Reconstuction, Series title: Natural
Uplift in the Southeastern United States," Hazards Research Working Paper; No. 25,
American JnL Science, Vol. 273A, pp. 396- University of Colorado, Env Design
408. HC79.E3S6,. Boulder.

Bollinger, G.A., 1977, "Reinterpretation of the Cochrane, H., 1975, "Predicting the Economic
Intensity Data for 1886Charleston, South Impact of Earthquakes," in Social Science
Carolina Earthquake," StudiesRelatedto Perspectiveson the ComingSan Francisco
the Charleston,South CarolinaEarthquake Earthquake: Economic Impac, Prediction,
of 1886--A Preliminary Report, D. W. and Reconstruction,Universityof Colorado,
Rankin, ed, U.S. Geological Survey Prof Boulder.
Paper 1028, pp 17-32.
Coffman, J. L., and Von Hake, C.A., 1982,
Bollinger, G.A., 1983, Seismicity of the EarthquakeHistoryof the UnitedStates,
Southeastern United States," Bull Seis. Soc. NOAA Pub. 41-1, Washington, DC.
Amer., Vol. 63, No. 5, pp. 1785-1808.
Cooper, J.D. ed, 1984, Lifeline Earthquake
BSSC, 1987, "Abatement of Seismic Hazards to EngineeringPerformance,Designand
Lifelines," in Proceedings of a Workshop Construction, Am. Soc. Civil Engrs., New
held in Denver, in Seven Volumes, available York, NY.
from the Federal Emergency Management
Agency (EHRS 26 - 32), Washington, DC. Cornell, CA, 1968, "Engineering Seismic Risk
Analysis,"Bulletin of the Seismological
BSSC, 1988, NEHRP Recommended Provisions Society ofAmerica, Vol. 58, No. 5.
for the Developmentof SeismicRegulations
for New Buildings, Federal Emergency Dames & Moore, 1984,SeismicEvaluation
Management Agency, Eaerthquake Hazard OutletSystem, Lower Crystal Springs
Reduction Series Report 95, Washington, Reservoir, Phase II,,Report to San Mateo
DC. County, Cal
Bureau, G., Scawthorn, C., Gates, W.E., and Davis, J., et al., 1982, Earthquake Planning
Myksvoll, R., 1985, "Seismic Safety of the Scenariofor a Magnitude8.3 Earthquakeon
Lower Crystal Springs Reservoir Outlet the San Andreas Fault in Southern
System,"PaperPresentedat the 4th IntL California, Calif. Division of Mines and
Conf of StructuralSafety and Reliability, Geology Special Publ. 60, Sacramento, Ca.
Kobe.
Douty, C.M., 1970,The Economics of Localized
Calif Division of Mines and Geology (CDMG), Disasters, Arno Press, New York, NY.
1982,Earthquake PlanningScenariofora
Magnitude8.3 Earthquake on the San Eguchi,RT., ed, 1986,Lifeline SeismicRisk
Andreas Fault in the San FranciscoBay Analysis - Case Studies, Am. Soc. Civil
Area, Special Publ. 61, Sacramento, Calif Engrs., New York,, NY.

10: References 187


ATC-25
ATC-25 10: References 187
EQE Engineering, 1983,CoalingaEarthquake Gerlach, A. C., ed, no date, NationalAtlas of the
of May 2, 1983,A ReconnaissanceReport, UnitedStatesofAmerica, Dept. of the
San Francisco, Calif. Interior, U. S. Geological Survey,.
Washington, DC.
EQE Engineering, 1986,North Palm Springs
Earthquake, a ReconnaissanceReport,San Glendening, Frank S., 1980, Business
Francisco, Calif. InterruptionInsurance: What is Covered,
1st ed, Cincinnati, Ohio., National
EQE Engineering, 1988, Seismic Analysis, San Underwriter Co., UCLA AGS Mgmt HG
FranciscoFireDepartmentFacilities, 9970 B85 G53.
Report to the San FranciscoFire
Department, San Francisco, Calif. Gori, P.L. and Hays, W.W., 1983, A Workshop
on ContinuingActionsto Reduce Losses
Evernden, J.F., Kohler, W.M., and Clow, GD., from Earthquakesin the MississippiValley
1981, "Seismic Intensities of Earthquakes of Area, USGS Open-File Report 83-157,
Conterminous United States - Their
Prediction and Interpretation," U.S. Hanks, T. C., and Kanamori, H., 1979, "A
Geological Survey Prof. Paper 1223, Moment Magnitude Scale," J. Geophys.
Reston, Virginia. Res., Vol. 84, pp. 2348-2350.

Evernden, J. F., and J. M. Thomson, 1985, Harary, F., 1972, Graph Theory, Addison-
"Predicting Seismic Intensities, in Wesley.
Evaluating Hazards in the Los Angeles
Region--An Earth Science Perspective," J. Hays, W.W., and Gori, P.L., 1983, A Workshop
I. Ziony, ed., U. S. Geological Survey Prof. on The 1886Charleston,South Carolina,
v Paper 1360, U.'S. GPO, Washington, DC. Earthquakeand Its Implicationsfor Today,
USGS Open-File Report 83-843.
FEMA, 1985,FEMA Database Catalog, FEMA
Manual 1520.8 (interim), Washington, DC. Heaton, T.H., and Hartzell, S.H., 1986,
Estimationof StrongGround Motionfor
Freeman, J.R., 1932,EarthquakeDamageand HyotheticalEarthquakeson the Cascadia
Earthquake Insurance, McGraw-Hill, New SubductionZones, PacificNorthwest,USGS
York, NY. Open-File Rpt. 86-328.

Ford, L.R., and D.R. Fulkerson, 1962,Flow in Hopper M. G., 1985,Estimation of Earthquake
Networks, Princeton University Press. EffectsAssociatedwithLargeEarthquakes
in the New MadridSeismicZones, U.S.
Gates, J. H., 1987, "Available Criteria, Methods Geological Survey Open-File Report 85-
and Techniques for the Design and 457, Denver Colorado.
Construction of New Transportation
Facilities in California," in BSSC (1987), Hu, T.C., 1969,Integer Programming and
Vol.2. Network Flows, Addison-Wesley.

Gates, W.E. and Scawthorn, C., 1983, International Conference of Building Officials,
"Mitigationof Earthquake Effects on Data 1982, 1985, 1988, 1991, Uniform Building
Processing and Telecommunications Code, Whittier, Calif.
Equipment," Chapter in Earthquake
Damage Mitigation for Computer Systems, International Symposium on Lifeline
in Proceedingsof WorkshopSponsoredby Earthquake Engineering, 1983,
Finance, Insurance and MonetaryServices "Earthquake Behavior and Safety of Oil
Committee, Governor's Task Force (Thiel, and Gas Storage Facilities, Buried
C. and Olson, R., eds), San Francisco, Calif. Pipelines, and Equipment", Presented at
1983 International Symposium on Lifeline
Earthquake Engineering, New York, N.Y.

ATC-25
188 10: References
10: References ATC-25
Iwasaki, T. et aL, 1984, "Report on Damages to Klein, Henry C., 1886, "Business Interruption
CivilEngineering Structures Due to the Insurance and Extra Expense Insurance as
Nihonkai-Chubu Earthquake of 1983," 16th Written by Fire Insurance Companies in
Jt. Meeting, Wind and Seismic Effects, the United States and Canada,"Rev. by
UJNR. Wallace L. Clapp, Jr., [5th ed. Indianapolis]
Rough Notes, Co. 1964].
Japan Society of Civil Engineers, 1980,
Earthquake ResistantDesignfor Civ Kockelman, W.J., 1984, "Use of Geologic and
Engineering Structures, Tokyo, Japan. SeismologicInformation for Earthquake-
Hazard Reduction by Planners and
Jorgensen, James R., 1983,StandardFoms of Decision-makers in Southern California,"
Business Interruption Insurance, 3rd ed, San In Proc. Eighth World Conference on
Antonio, Texas. Earthquake Engineering, Vol. VII, p. 744-
752, Earthquake Engineering Research
Jorgensen, James R., 1983, Business Interruption Institute, Berkeley, Calif.
Insurance,HowIt Works:A Non-technical
Descrption of the Coverageand Pricingof Kubo, K, and Jennings, P., eds, 1976, in Proc. of
StandardForms ofBusiness Interuption US-JapanSeminar on Earthquake
Insurance, 3rd ed, San Antonio, Texas. EngineeringResearchwith Emphasis on
Lifeline Systems, Tokyo, Japan.
Johnsen, K-E., 1984, "An Overview of
Earthquake Design Requirements at Kubo, K, and Shinozuka, M., eds, 1981, in Proc.
Pacific Bell," (in Cooper, 1984). of ReviewMeeting of US-JapanCooperative
Researchon SeismicRiskAnalysis and its
Kahler, Clyde McCarty, 1930, Business Application to Reliability-basedDesignof
InterruptionInsurance: A Surveyof the Lifeline Systems, Honolulu, HawaiL
Coverageof BusinessInterruptionLosses
caused by FireandAllied zards, Other Lawson, A C., 1908, The California Earthquake
than Marine, Philadelphia. ofApril 18, 1906, State Investigation
Commission Report, Carnegie Institution,
Kawasumi,H., 1968,GeneralReporton the Washington, DC.
NiigataEarthquake of 1964, Tokyo,Japan.
Lindb, AG., PreliminaryAssessmentof Long-
Khater, M.M., M.D. Grigoriu, and T.D. TermProbabiitiesfor LargeEarthquakes
O'Rourke, 1989, "ServiceabilityMeasures Along SelectedFault Segments of theSan
and SensitivityFactors for Estimating AndreasFault System in California,USGS
Seismic Performance of Water Supply Open-File Report 83-63.
Sstems," in Proceedings of the 9th World
Conferenceon EarthquakeEngineering McGuire, R K, 1974,SeismicStructural
Tokyo, Japan, Vol. VII, pp. 123-128. ResponseRiskAnalysis IncorporatingPeak
Trespone Regressions on Earthquake
Khater, M.M. and M.D. Grigoriu, August 1989, Magnitudeand Distance,Mass. Inst. of
"Graphical Demonstration of Serviceability Technology Publication R74-51,
Analysis,"in Proceedingsof the Internaional Cambridge, Mass.
Conferenceon StructuralSafety and
Reliability, San Francisco, Calif, pp. 525- Miyasato, 'G.H. et al., 1986, "Implementation of
532. a Knowledge Based Seismic Risk
Evaluation System on Microcomputers,"J
Khater, M.M., Scawthorn, C., Isenberg, J., Atificial Intelligence in Engineering, VoL 1,
Lund, L., Larsen, T., and Shinozuka, 1990, No. 1.
"LifelinesPerformance During the October
17, 1989, Loma Prieta Earthquake," Wind
aid Seismic Effects Proceedings of the
22nd UJNR Joint Meeting, NIST, Special
Publication 79.

.T-51:Rfrne 8
ATC-25S 10: References 189
Monbusho, 1979, "Investigation of Disasters Phelan, John D., and James R. Gregory, 1951,
Caused by the 1978 Miyagiken-oki BusinessIntenuption Primer,[Indianapolis]
Earthquake,";NaturalHazardsSpecial Rough Notes.
Research No. 1, Tokyo, Japan (in
Japanese). Poppe, B. B., 1979, "Historical Survey of U. S.
Seismograph Stations," U. S. Geological
Morrison, R. M., A. G. Miller & S. J. Paris, Survey Prof. Paper 1096.
1986,Business InterruptionInsurance: Its
Theory and Practice, Cincinnati, Ohio: Reichle, Michael S., "Mexico Earthquake
National Underwriter. Damage: Lifeline Performance," in
California Geology, Vol. 39, N. 4 (Apr.
NBFU, 1933,Report on the Southern California 1986).
Earthquake of March 10, 1933,by the
National Board of Fire Underwriters,New Reitherman, R., 1985, "A Review of Earthquake
York, NY. Damage Estimation Methods," Earthquake
Spectra, Vol. 1, No. 4, pp. 805-848.
National Petroleum Council, 1989, Petroleum
Storageand Transportation,Washington, Richter, C. F., "Seismic Regionalization," Bull.
DC. Seis. Soc. Amer., 49:2, April 1959, pp. 123-
162.
National Research Council, 1982, Earthquake
EngineeringResearch-1982,Washington, Richter, C. F., 1958, Elementary Seismology, W.
D.C. H. Freeman Co., San Francisco, Calif.

Nuttli, O.W., 1974, The Mississippi Valley Riley, Denis, 1985, "Riley on Business
Earthquakes of 1811 and 1812,Earthquake Interruption and Consequential Loss
Information Bull., Vol. 6, No. 2, U.S. Insurance Claims," ed. by David Cloughton,
Geological Survey, pp. 8-13. London: Sweet & Maxwell.

Nuttli, O.W., 1979, "Seismicity of the Central Scawthorn, C., ed, 1985a, Proceedings, US-Japan
United States," Geologyin the Sitingof Workshopon UrbanEarthquakeHazards
Nuclear Power Plants, A. W. Hatheway and Reduction,Stanford University,Earthquake
C.R. McClure, eds, Geological Society of EngineeringResearch Institute.
America, Reviews in Engineering Geology,
Vol. 4, pp. 67-94. Scawthorn, C., 985b, "Fire Following
Earthquake-Two Recent Earthquakes
Nuttli, O.W., 1981, "Similarities and differences Indicate the Variety of Demands Placed
between western and eastern United States upon Fire Services," in Fire Engineering
earthquakes, and their consequences for (April).
earthquake engineering," in Proceedings of
Conferenceon Earthquakesand Earthquake Scawthorn, C., 1986a, "Use of Damage
Engineering: The Eastern U.S., Knoxville, Simulation in Earthquake Planning and
Tenn, pp. 24-51. Emergency Response Management,"
Chapter in Terminal Disasters: The Use of
Nuttli, O.W., et al., 1984, Strong Ground Motion Computers in Emergency Management,
Studiesfor S. CarolinaEarthquakes,U.S. Marston, S., ed, Monographs in
Nuclear Regulatory Commission, Environment and Behavior Series, No. 39,
NUREG/CR-3755. Institute of Behavioral Sciences, University
of Colorado,Boulder. .
O'Rourke, T.D., M.D. Grigoriu, and M.M.
Khater, 1985, "Seismic Response of Buried
Pipes,"PressureVesseland Piping
Technology-A Decade of Progress,C.
Sundararajan, ed., ASME, New York, NY,
pp. 281-323.

190 0~: :eeecsAC2


190 10: References ATC-25
Scawthorn, C., 1986b, "Fire-related Incidents," Seed, H.B. and Idriss, LI., 1971a, "Simplified
section in Report on the North Palm Procedure for Evaluating Soil Liquefaction
Springs, California, Earthquake-July 8, Potential," Am. Soc. Civil Engrs., J. Soil
1986,Special Earthquake Report in the Mech., Vol 97, No. SM9.
Earthquake Engineering Research Institute
Newsletter, AS. Brady, ed. Seed, 1IB. and Idriss, IM., 1971b, "Influence of
Soil Conditions on Building Damage
Scawthorn, C., 1986c, "Lifeline Aspects of Fire Potential During Earthquakes," Am. Soc.
Following Earthquake," Workshop on Civil Engrs, J. Struct Div., VoL 97, No. Sfl.
Abatement of Seismic Hazards to Lifelines,
Building Seismic Safety Council, Smethurst, H., 1933, "Data Collected as Result
Washington. of Southern CaliforniaEarthquake, March
10, 1933," The Travelers Fire Insurance
Scawthorn, C., 1986d, Simulation Modeling of Company, Eng. and Insp. Div., Los Angeles
Fire FollowingEarthquake, Proc. Third (manuscript).
U.S.National Conferenceon Earthquake
Engineering, Charleston, South Carolina. Smith, D.J., ed, 1981, 'he Current State of
Knowledge,"Lifeline Earthquake
Scawthorn, C., Bouhafr, M., Segraves, D.W., Engineering, Am. Soc. Civil Engrs., New
and Unnewehr, D.L, 1986, 'Fire Losses York.
from Earthquakes: Los Angeles Region,
Future Earthquake Lossesin the Los Steinbrugge,KV. et al., 1980,MetropolitanSan
Angeles, California Region,' Seminar Franciscoand Los Angeles Erthquake Loss
sponsored by the Committee on Seismic Studies: l9OAssessment, USGS Open-File
Risk of E.E.R.I., Santa Monica, Calif. - Report 81-113.
Scawthorn, C., Bureau, a., Jessup, C., and Steinbrugge, KV., 1982, Earthquakes,
Delgado, R., 1985, "Fire-related Aspects, of Volcanoesand Tsunamis, Skandia-America
24 April 1984 Morgan Hill Earthquake," Group, 392 pp., New York.
Earthquake Spectra, VoL 1, No. 3.
Steinbrugge, K. V., et al., 1987, Earthquake
Scawthorn, C. and Donelan, J., "Fire-Related PlanningScenariofor a Magnitude7.5
Aspects of the Coalinga Earthquake," Earthquakeon theHaywardFault in the
Chapter in the Earthquake Engineering San FranciscoBayArea, CaliforniaDivision
Research Institute report on the Coalinga of Mines and Geology Report, Sacramento,
Earthquake of May 2, 1983. Cali

Scawthorn, C. and Gates, W.E., February 1985, Swan, F. H., Schwartz, D. P., and Cluff L A.,
"Secure Data Centers from Seismic 1980, "Recurrence of Moderate-to-Large
Disturbances," in Data Management. Magnitude Earthquakes Produced by
Surface Faulting on the Wasatch Fault
Scawthorn, C. and E.M. Lofting, 1984, Zone, Utah", BulL Seis. Soc. Am., Vol. 70,
"Earthquake Recovery--Analytically Based No. 5, pp. 1431-1462.
Economic Policies for Reconstruction."
InternationalSymposiumon Earthquake Tarjan, R., 1972, 'Depth-first Search and Linear
Relief in Less IndustralizedAreas, Zurich. 'GraphAlgorithms,"SL4MJournal of
Computers, Vol. 1, pp. 146-160.
Scawthorn, C., Yamada, Y., and lemura, HL,
1978, Seismic Risk Analysis of Urban Taylor, C., Wiggins, J., Harper, G., and Ward,
Regions," 5th Japan Earthquake D., 1986,A SystemsApproach to Wasatch
Engineering Symposium, Tokyo, Japan. Front SeismicRisk Problems,U. S.
Geological Survey Report, 'Contract
#140800122013, Reston, Virginia.

191
ATC-25 10: References
AT:C-25 10: References 19I
TIPS Property Insurance Law Committee Wang, Leon RuLiang, et al., 1981, Lifeline
Meeting, 1987, "Business Interruption EarthquakeEngineeringLiteraturesin
Coverage: A Basic Primer," From Papers Japan, School of Engineering and
Presented at the TIPS Property Insurance Environmental Science, University of
Law Committee Midyear Meeting, March Oklahoma, Norman, Oklahoma, Technical
8-11, 1984, Pebble Beach, Calif., [Chicago]: Report No. LEE-001.
Tort and Insurance Practice Section,
American Bar Association. Whitman, R.V., 1973, Damage Probability
Matricesfor PrototypeBuildings,Rept. No.
"The Current State of Knowledgeof Lifeline 8, SDDA, MIT, Cambridge, MA.
Earthquake Engineering,", 1977, in
Proceedingsof the TechnicalCouncilon Whitman, R.V., 1974, "Earthquake Damage
Lifeline Earthquake EngineeringSpecialty Probability Matrices," In Proc. 5th World
Conference, University of California, Los Conf. EarthquakeEngr.,Rome.
Angeles, California, August, New York
Whitman, R.V. et al., 1975, "Seismic Design
The Society, 1977; Thenhaus, P.C. et al., 1980, Decision Analysis," In Proc., Am. Soc. Civil
ProbabilisticEstimates of Maximum Seismic Engrs., Vol. 101, No. ST5.
HorizontalGround Motion on Rock in
CoastalCaliforniaand theAdjacent Outer Whitmore, R. S., 1952, "Your Insurance
Continental Shelf, USGS Open-File Report Program; Charts of Exposures, Insurance
80-924. as a Factor in Credit, Fire, Extended
Coverage,Earthquake, Relation of
Toppozada, T.P et al., 1981, Preparation of Insurance to Value, Blanket Insurance,
IsoseismalMaps and Summariesof Coinsurance Clause, Prorata
ReportedEffectsfor Pre-1900California Distribution...," Culver City, Calif., Murray
Earthquakes, Calif. Div. Mines and & Gee.
Geology, Open-File Report 81-11 SAC,
Sacramento, Calif. Wiegel, R.L., ed, 1970,Earthquake Engineering,
Prentice-Hall, Englewood Cliffs, NJ.
Trautmann, C.H., and O'Rourke, T.D., 1983,
"Load Displacement Characteristics of a Withers, Kennett Woodson, 1893, Business
Buried Pipe Affected by Permanent InterruptionInsurance:Coverageand
Earthquake Ground Movements," in, Adjustment, Berkeley, Calif., Howell-North,
Ariman, 1983. 1957.

Uda,T., May 1984, "Inundation Damages Due to Wiggins,J.H., 1981,EarthquakeHazard and


the 1983Nihonkai-Chubu Earthquake Risk Mitigation, J.H. Wiggins Company,
Tsunami," 16th Jt. Meeting, Wind and Rept. No. 80-1371-1.
Seismic Effects, UJNR.
Wood H. O., and Newmann, F., 1931, "Modified
Univ. of Alaska and URR, 1984, "Seismic Mercalli Intensity Scale of 1931," Bull. Seis.
Hazard Mitigation: Planning and Policy Soc. Am., Vol. 21, No. 4, pp. 277,283.
Implementation, The Alaska Case," Lidia
L. Selkregg, Principal Investigator. Yanev, P.I. ed, 1978,Reconnaissance Report,
Miyagiken-oki Earthquake, June 12, 1978,
U. S. Geological Survey, 1990, Probabilities of Earthquake Engineering Research
LargeEarthquakesin the San FranciscoBay Institute, Berkeley, Calif.
Region, U. S. G. S. Circule 1053.

ATC-25
192 10: References
10: References ATC -25
Appendix A: ATC-25Project Participants
APPLIED TECHNOLOGY COUNCIL

Mr. Christopher Rojahn (Principal Investigator) Dr. Gerard Pardoen (Board Contact)
Applied Technology Council Dept of Civil Engineering, 101 ICEF
555 Twin Dolphin Drive, Suite 270 University of California
Redwood City, California 94065 Irvine, California 92717

FEDERAL EMERGENCY MANAGEMENT AGENCY

Mr. Kenneth Sullivan '(Project Officer)


Federal Emergency Management Agency
500 C Street, S.W.
Washington, DC 20472

SUBCONTRACTOR

EQE, Inc.
Dr. Charles Scawthorn, Principal-in-Charge
Dr. Mahmoud Khater, Principal Research Engineer
595 Market Street, 18th Floor
San Francisco, California 94105

EXPERT TECHNICAL ADVISORY GROUP

Mr. Lloyd Cluff Mr. Neal Hardman


Consulting Geologist Cali£ Office of Statewide Health
33 Mountain Spring Planning and Development
San Francisco, California 1600 9th Street
Sacramento, California 95814
Mr. James D. Cooper
(Federal Highway Administration) Mr. Jeremy Isenberg
116 North Johnson Road Weidlinger Associates
Sterling, Virginia 22170 4410 El Camino Real, Suite 110
Los Altos, California 94022
Mr. Holly Cornell
CH2M Hill, P.O. Box 428 Prof. Anne S. Kiremidjian
Corvallis, Oregon 97339 Dept. of Civil Engineering
Stanford University
Mr.-John W. Foss Stanford, California 94305
Bell Communications Research Inc.
435 South Street, #1A334 Mr. Le Val Lund
Morristown, New Jersey 07960 Consulting Engineer
3245 Lowry Road
Mr. James H. Gates Los Angeles, California 90027
CaliforniaDept. of Transportation
P.0. Box 942874 Mr. Peter McDonough
Sacramento, California 94274 144 Whitesides Street
Layton, Utah 84041

ATC-25. Appendix A: Project Participants 193


Dr. Dennis K. Ostrom Dr. J. Carl Stepp
Consulting Engineer Electric Power Research Inst.
16430 Sultus Street 3412 Hillview Avenue
Canyon Country, Calif. 91351 Palo Alto, Calif. 94303

Dr. Michael Reichle Mr. Domenic Zigant


Calif. Division of Mines & Geology Naval Facilities Engineering Command
630 Bercut Drive Code 402, P. 0. Box 727
Sacramento, Calif. 95814 San Bruno, California 94066

Prof. Anshel J. Schiff


Dept. of CivilEngineering
Stanford University
Stanford, California 94305

ATC-25
Participants
194
194 A: Project
Appendix A:
Appendix Project Participants ATC-25
Appendix B:Lifeline Vulnerability Functions
Table of Contents
Page
R1 T-Ticrhwav
" F , sLT
............................... --- ~~1 %

B 11
-.-.-_ _ _
Itinr Llj::
Rrdias..
>';'s1Qt_ _, _ _ _4, _ _

----------------- - - -
1IQw
B.1.2 Tunnels.................................................................................................................... ..................
197
B.1.3 Conventional Bridges............................................................................................ .................. 200
B.1.4 Freeways/Mighways.............................. <§.6.............et..........a. ....... .. 203 ..............

B
, 1u..f T nr-Al nsd
---- I)nQ ------ -- ----------------- ---
B.2 Railw ay...........................................................
.........................................................................................-
B.2.1 Bridges........................................... ................................................................................. .........208
B .2.2 Tunnels.............................................. ................................................................................. ......... 211
B.2.3 Tracks/Roadbeds............................ ................................................................................. ........ 215
R94 . .mr
TerminqI Sttinns 91A
_ _ _

B.3 Air Transportation. ................................................................................. .........218


B.3.1 Terminals. ................................................................................. ......... 218
B
. P
r 2
A-_ILLRnvnwavq
TT J 1H and
LIL L 7':h-iwvs.
IL T .. = q
991i
---
B.4 Sea/Water Transportation.........................I ................................................................................. ......... . M
B.4.1 Ports/Cargo Handling Equipment. ................................................................................. ......... 223
Rd9
.. ThndandL
.LJUL.LlZ 1 iWtwernvra
;.I L 1
fi T
996
B.5 Electrical......................................................... .............................................. .................................. ......... 229
B.5.1 Fossil-fuel Power Plants................. .................................................................................. ........ 229
__v.s
R 59_ sy-lOlLA
- T2
_,vlreiertrir
_ W,s. rP1ants
s Pnwer ..__ .. X,2
E

B.5.3 Transmission Lines ............................................................................................................ ........ 235


B.5A Transmission Substations................................................................................................ ........ 238
P 5-5._ . so,.sv _ssv
Tlistrihutinn Tines 9.49
B.5.6 Distribution Substations ................................................................................................. ........ 243
B.6 Water Supply.................................................I................................................................................ ......... 243
B. 6 1
..
_
.
Transmisinn
1voX.
. _ _ _
.' i
AnneTncfq
sH
a
- 5
.. 245
B.6.2 Pumping Stations .............................I................................................................................ ........ 248
B.6.3 Storage Reservoirs...........................I....................... ........................................................ ......... 251
_.R *.Kr.
641Trefmentf_ PInts
_s v.L.Ls:L; I 1Ws. 955
B.6.5 Terminal Reservoirs/Tanks.
................................................................................ .........260
B.6.6 Trunk Lines. ................................................................................ .........262
B.6.7 Wells. ................................................................................ .........266
PR7
_
Saqnibty Sevwer
_ ,
.. 2S,
wq

3.7.1 Mains . ................................................................................ ........ 268.

B.7.2 Pumping Stations. ............................................................................... ........ 271


B.7.3 Treatment Plants . ................................................................................ ........ 274
B.8 Natural Gas. ................................................................................ ........ 277
B.8.1 Transmission Lines. ................................................................................ ........ 277
P R 9 Cnrnnressnr
..
Stahtnn .
,.vU]UZ]L8X s .,sU >s
.. n
B.8.3 Distribution Mains.. ................................................................................. ........ 283
B.9 Petroleum Fuels. ................................................................................ I.........Z
B.9.1 Oil Fields. ....................... a ......................................................... ........ 286
B.9.2 Refineries. ................................................................................. .......... 2
B.9.3 Transmission Pipelines. ................................................................................. ........ 291
3.9.4 Distribution Storage Tanks. ................................................................................. ........ 294
B.10 Emergency Service. ................................................................................. ........295
iRfll TMelnthCre 1 '@u1sU \_
.. 05
. 0
. | W. JL v

B.1,0.2 Emergency Response Services. ........................................................................................ IG -1

ATC-25i AT5Appendix
B: Lifeline Vulnerability Functions 195
Included in this appendix. are vulnerability bridge piers and supporting foundation
functions used to describe the expected or (commonly piers, piles, or caissons) and the
assumed earthquake performance superstructure including the bridge deck,
characteristics of lifelines as well as the time girders, stringers, truss members, and cables.
required to restore damaged facilities to their Approaches may consist of conventional
pre-earthquake capacity, or usability. Functions highway bridge construction and/or
have been developed for all lifelines inventoried abutments.
for this project, for lifelines estimated by proxy,
and for other important lifelines not available Typical Seismic Damage: Major bridges are
for inclusion in the project inventory. The typically well- engineered structures
methodology used to calculate the quantitative designed for lateral loading (seismic loading
relationships for direct damage and residual was not typically considered until the 1970s).
capacity are described in Chapter 3. In most cases, damage will be limited to
ground and structural failures at bridge
The vulnerability function for each lifeline approaches. However, major ground failures
consists of the following components: including liquefaction and submarine
landsliding could lead to significant damage
* General information, which consistsof to bridge foundations and superstructures.
(1) a description of the structure and its
main components, (2) typical seismic Earthquake-resistant Design: Seismically
damage in qualitative terms, and (3) resistant design practices include dynamic
seismically resistant design characteristics analysis, which takes soil-structure
for the facility and its components in interaction into account. Foundations
particular. This information has been should be designed and detailed to
included to define the assumed withstand any soil failures that are expected
characteristics and expected due to unstable site conditions.
performance of each facility and to
make the functions more widely 2. Direct Damage
applicable (i.e., applicable for other
investigations by other researchers). Basis: Damage curves for highway system
major bridges are based on ATC-13 data for
* Directdamage information,which FC 30, major bridges (greater than 500-foot
consists of (1) a description of its basis in spans). Standard construction is assumed to
terms of structure type and quality of represent typical California major bridges
construction (degree of seismic under present conditions (i.e., a composite
resistance), (2) default estimates of the of older non-seismically designed bridges as
quality of construction forpresent well as modern bridges designed for site-
conditions, (3) default estimates of the specific seismic loads).
quality of construction for upgraded
conditions, and (4) time-to-restoration Present Conditions: In the absence of data
curves. on the type of construction, age, etc., the
following factors were used to modify the
B.1 Highway mean curves, under present conditions:

B. 1.I Major Bridges MMI


Intensity
1. General NEHRP Map Area Shift
California 7 0
Description: Major bridges include all California 3-6 +1
highway system bridges with individual spans Non-California 7 +1
Puget Sound 5 +1
over 500 feet. Steel bridges of this type All other areas +2
include suspension, cable-stayed, or truss.
Reinforced concrete arch or prestressed The modified motion-damage curves for
concrete segmental bridges are also major bridges are shown in Figure B-1.
common. The main components include the

196 Appendix B:Lifeline Vulnerability Functions ATC-25


Bridge Major
D=1118

a
0)

D=Y
I)' VII Vill IX X
Modified Mercalli Intensity (MMI)

Figure B-1 Damage percent by intensity for major bridges.

Upgraded Conditions: For areas where it Heavyytimbers and wood lagging (grouted
appears cost-effective to improve facilities, and urigrouted) may also be used to support
assume on a preliminary basis that upgrades tunnel walls and ceilings. Tunnels may
result in a beneficial intensity shift of one chang4F in shape and/or construction
unit (i.e., -1), relative to the above present materi ial over their lengths.
conditions.
Typia ii Seismic Damage: Tunnels may
Time-to-restoration: The time-to- experi ence severe damage in areas affected
restoration data assigned to SF 25a, major by per manent ground movements caused by
bridges for highway systems, are assumed to IandsliIdes or surface fault rupture, but rarely
apply to all major bridges. By combining suffer significant internal damage from
these data with the damage curves for FC grouniI shaking alone. Landslides at tunnel
30, the time-to-restoration curves shown in portal s can cause blockage. Damage has
Figures B-2 through B-4 were derived for been i iotedat tunnel weak spots such as
the various NEHRP Map Areas. inters( ctions; bends, or changes in shape,
constr uction materials, or soil conditions.
B3.2 Tunnels Dama.ge to lined tunnels has typically been
limite(I to cracked lining.
1. General
Seism ically Resistant Design: Lined tunnels
Description: In general, tunnels may pass have rperforned better than unlined tunnels.
through alluvium or rock, or may be of cut Conse quently, general Seismically resistant
and cover construction. Tunnels may be design*practices for tunnels include
lined or unlined, and may be at any depth providlingreinforced concrete lining;
below the ground surface. Tunnel lengths streng thening areas that have been
may range from less than 100 feet to several traditi onally weak such as intersections,
miles. Lining materials include brick and bends,, and changes in shape and in
both reinforced and unreinforced concrete. constr uction materials; and siting tunnels to

ATC-25 Appendix B:Lifeline Vulnerability Functions 197


Br idge mlajor
R=t00y - 5a 1.00 30 t .00

a b
6 0.217 0.795
7 0.215 0.780
.5 B 0.142 0.434
C-) 9 -0.204 0.831
10 -0.103 0.015
-
(A)
C)
R b * days a

n- n.F I i I I I I I
l
I

DAYS: 30 60 90 120 150 180 210 240 Z70 300 330 365
Elapsed Time in Days

Figure B-2 Residual capacity for major bridges (NEHRP California 7).

Bridge t ajor
n-r a an -n
H=100x - L34 I [lo J 1. I"E

/
a
MH~~~~~~~~~~~~~~~~~~1
b
0.215 0.780
7 _ 0 142 8.434
.5 8 - 0.204 0 .031
co
a 9 -10 .103 0.815
/ ~ ~~
to -1B .248 0.006
( R= ex Ja =
/ : b * days
R =~~~ a
.c
C).
Lr-

p
I I I
DAYS: 30 68 90 120 150 180 210 240 270 300 330 365
Elapsed Time in Days

Figure B-3 Residual capacity for major bridges (NEHRP Map Area 3-6, Non-California 7, and Puget
Sound 5).

19w8 Appendix B: Lifeline Vulnerability Functions ATC-25


Bridge hajor

a b
8.142 8.43
2,ZB4 8.31
.5 8.1EJ 0.815
.24H8 0.086
M
-0.421 8.B03
R= FEZ
0
* ay
(0
D5

R= x
BAYs: 30 8E 90 128 15 186 218 248 2?8 381 330 365
Elapsed Time in Days

Figure B-4 Residual capacity for major bridges (Al other areas).

eliminate fault crossings. Slope stability at Present Conditions: In the absence of data
portals should be evaluated and stabilization on the type of lining,age, etc., use the
undertaken if necessary. following factors to modify the mean curves,
under present conditions.:
2. Direct Damage
MMI
Basis: Damage curves for highway tunnels Intensity
are based on ATC-13 data for FC!38, NEHRP Map Area Shift
tunnels passing through alluvium '(see California 7 '0
Figure B-5). Tunnels passing through California 3-6 +O
alluvium are less vulnerable than cut-and- Non-California 7
Puget Sound 5
cover tunnels, and more vulnerable than All other areas +1
tunnels passing through rock; they were
chosen as representative of all existing Upgraded Conditions: For areas where it
tunnels. If inventory data identify tunnels, as appears cost-effective to improve facilities,
cut-and-cover or passing through rock, then assume on a preliminary basis that upgrades
use FC 40 or 39, respectively, in lieu of FC result in a beneficial intensity shift of one
38. unit (i.e., -1), relative to the above present
conditions.
Standard construction is assumed to
represent typical California highway tunnels Time-to-restoration: The Social Function
under present conditions (i.e., a composite class time-to-restoration data assigned to SF
of older and more modern tunnels). Only 25b, tunnel for highway system, are assumed
minimal regional variation in construction to apply to all tunnels. By combining these
quality is assumed. data with the damage curves for FC 38, the
time-to-restoration curves shown in Figures

ATC-25 Appendix B:Lifeline Vulnerability Functions 199


Tunnel (Highway)
D=108Y

,Sa D=S&;
E
CO

Other

IX P.S.5 X
VI VII VIII
Modified Mercalli Intensity (MMI)

Figure B-5 Damage percent by intensity for I highway tunnels.

B-6 and B-7 were derived for the various are used for girder support to accommodate
NEHRP Map Areas. temperature and shrinkage movements.
Shear keys are typically used to resist
B.1.3 Conventional Bridges transverse loads at abutments. Abutment
fills are mobilized during an earthquake as
1. General the bridge moves into the fill (longitudinal
direction), causing passive soil pressures to
Description: Conventional bridges in the occur on the abutment wall.
highway system include all bridges with
spans less than 500 feet. Construction may Typical Seismic Damage: The most
include simple spans (single or multiple) as vulnerable components of a bridge include
well as continuous/monolithic spans. Bridges support bearings, abutments, piers, footings,
may be straight or skewed, fixed, moveable and foundations. A common deficiency is
(draw bridge, or rotating, etc.), or floating. that unrestrained expansion joints are not
Reinforced concrete is the most common equipped to handle large relative
construction material while steel, masonry, displacements (inadequate support length),
and wood construction are common at water and simple bridge spans fall. Skewed bridges
crossings. Typical foundation systems in particular have performed poorly in past
include abutments, spread footings, battered earthquakes because they respond partly in
and vertical pile groups, single-column rotation, resulting in an unequal distribution
drilled piers, and pile bent foundations. of forces to bearings and supports. Rocker
Bents may consist of single or multiple bearings have proven most vulnerable.
columns, or a pier wall. The superstructure Roller bearings generally remain stable in
typically comprises girders and deck slabs. earthquakes, except they may become
Fixed (translation prevented, rotation misaligned and horizontally displaced.
permitted) and expansion (translation and Elastomeric bearing pads are relatively
rotation permitted) bearings of various types stable although they have been known to

200 Appendix B:Lifeline Vulnerability Functions ATC-25


Tunnel (Highway)
2sb 1.t0 3B t.0

MIII a. b
6 0.344 0.839
7 0.240 8.456
8 0.204 la.212
-o 9 0.13 8.189
1e 10.953 0.036
O R= SE0
co
R * das + a
._

Go

R= efl
DAYS: 30 60 90 120
l
,Ig,~~~~
;
150 IBB 218
Elapsed Time in Days
i
240
l l

Z7
l l

38 330
l

365

Figure B-6 Residual capacity for highway tunnels (NEHRPMap Area: California 3-6, California 7,
Non-California 7 and Puget Sound 5).

5; 5; 5;

2iEm Tunnel (Highway)


R=1007 25h, 1.B 38

MI L
6 9.24B 11.456
7 0.204 8 .212
8 B. 183 0.189
9 ;0. 953
w 0.819
10 _0.039
ce R= SEz
}I
R = * days +- a.
m

R.= O; LL I II I7 - I I f a i i I-

DAYS: 30 60 90 128 150 198 210 240' 278 308 330 365
Elapsed Time in Days

Figure B-7 Residual capacity for highway tunnels (All other areas).

ATC-25 Appendix B:Lifeline Vulnerability Functions 201


"walk out" under severe shaking. Failure of energy absorption features including ductile
backfill near abutments is common and can columns, lead-filled elastomeric bearings,
lead to tilting, horizontal movement or and restrainers. Foundation failure can be
settlement of abutments, spreading and prevented by ensuring sufficient bearing
settlement of fills, and failure of foundation capacity, proper foundation embedment,
members. Abutment damage rarely leads to and sufficient consolidation of soil behind
bridge collapse. Liquefaction of saturated retaining structures.
soils in river channels and floodplains and
subsequent loss of support have caused 2. Direct Damage
many bridge failures in past earthquakes.
Pounding of adjacent, simply supported Basis: Damage curves for highway system
spans can cause bearing damage and conventional bridges are based on ATC-13
cracking of the girders and deck slab. Piers data for FC 24, multiple simple spans, and
have failed primarily because of insufficient FC 25, continuous/monolithic bridges
transverse confining steel, and inadequate (includes single-span bridges). Highway
longitudinal steel splices and embedment system conventional bridges in California
into the foundation. Bridge superstructures located within NEHRP Map Area 7 have
have not exhibited any particular either been constructed after 1971 or have
weaknesses other than being dislodged from been recently analyzed or are in the process
their bearings. of being seismically retrofitted, or both.
These bridges are assumed to be best
Seismically Resistant Design: Bridge represented by a damage factor half of FC
behavior during an earthquake can be very 25, continuous/monolithic (see Figure B-8).
complex. Unlike buildings, which generally The conventional bridges located outside
are connected to a single foundation California NEHRP Map Area 7 are
through the diaphragmaction of the base assumed to be a combination of 50%
slab, bridges have multiple supports with multiple simple spans (FC 24) and 50%
varying foundation and stiffness continuous/monolithic construction (FC 25)
characteristics. In addition, longitudinal (see attached figure). If inventory data
forces are resisted by the abutments through identify bridges as simple span, or
a combination of passive backwall pressures continuous/monolithic, then use the
and-foundation embedment when the bridge appropriate ATC-13 data in lieu of the
moves toward an abutment, but by only the above.
abutment foundation as the bridge moves
away from an abutment. Significant Standard construction is assumed to
movement must occur at bearings before represent typical California bridges under
girders impact abutments and bear against - present conditions (i.e., a composite of older
them, further complicating the response. To and more modern bridges).
accurately assess the dynamic response of all
but the simplest bridges, a three- Present Conditions: In the absence of data
dimensional dynamic analysis should be on the type of spans, age, or implementation
performed. Special care is required for of seismic retrofit, etc., the following factors
design of hinges for continuous bridges. were used to modify the mean curves, under
Restraint for spans or adequate bearing present conditions:
lengths to accommodate motions are the
most effective way to mitigate damage. MM/
Damage in foundation systems is hard to Intensity
detect, so bridge foundations should be Shift
designed to resist earthquake forces NEHRP Map Areaa FC24 FC25
elastically. In order to prevent damage to California 7 NA NA*
piers, proper confinement, splices, and California 3-6 +1 +1
embedment into the foundation should be Non-California 7 +1 +1
Puget Sound 5 0 +1
provided. Similarly, sufficient steel should be All other areas +3 +3
provided in footings. Loads resisted by
bridges may be reduced through use of * Special case, damage half of FC 25

202 Appendix B:Lifeline Vulnerability Functions ATC-25


Br i dge Conventional

a
0
0)
E virco

0e
2~~~~~~~
C~~~~

Modified Mercalli Intensity (MMI)

Figure B-8 Damage percent by intensity for conventional major bridges.

Upgraded Conditions: For areas. where it Description: Freeways/highways includes


appears cost-effective to improve facilities, urban and rural freeways (divided arterial
assume on a preliminary basis that upgrades highway with full control of access), divided
result in an beneficial intensity shift of one highways, and highways. Freeway/highway
unit (i.e., -), relative to the above present includes roadways, embankments, signs, and
conditions. lights. Roadways include pavement, base,
and subbase. Pavement types may be either
Time-to-restoration: The time-to- portland cement concrete or asphaltic
restoration data assigned to SF 25c, concrete. Base and subbase materials
conventional bridges for the highway system, include aggregate, cement treated
are assumed to apply to all bridges with aggregate, and lime-stabilized, bituminous,
spans shorter than 504 feet. By combining and soil cement bases. Embankmrents may or
these data with the damage data from FC may not include retaining walls.
25, the attached time-to-restoration curves
for conventional bridges within California Typical Seismic Damage: Roadway damage
NEHRP Map Area 7 were derived. By can result from failure of the roadbed or
combining the time-to-restoration data for failure of an embankment adjacent to the
SF 25c with the damage curves derived by road. Roadbed damage can take the form of
using the data for FC 24 and 25, the time-to- soil slumping under the pavement, and
restoration curves shown in Figures B-9 settling, cracking, or heaving of pavement.
through B-11 were derived for the various Embankment failure may occur in
NEHRP Map Areas. combination with liquefaction, slope failure,
or failure of retaining walls. Such damage is
B-1.4 Freeways/Highways manifested by misalignment, cracking of the
roadway surface, local uplift or subsidence,
1. General or buckling or blockage of the roadway.
Sloping margins of fillswhere compaction is

Functions 203
ATC-25
ATC-25 Appendix B:
Appendix Lifeline Vulnerability
B:Lifeline Vulnerability Functions 203
Bridge Canventiona 1
Hz 10Hz

I1111 a b
16 0.297 0.907
7 0.272 0,759
>1 8 0 .096 0.049
0. 9 0 .874 0 . 021
10 -0.894 0.004
°-- R= Sex:
R =b *days + a
(n
a)

I I I I I I
R=
DAYS: 30 60 90 120 150 1B0 210 240 270 300 330 365
Elapsed Time in Days

Figure B-9 Residual capacity for conventional bridges (NEHRP California 7).

Br idge Conventional
H=1WZ Z!Sc 1.00 25 0.0
24 S

aL
6 0.017 0 .060
7 0.00 0.830
: , 8 0.010 0.8

f -0.:16 0.02
a)
R= 0e
Rb * days a
C
(I,
Cc

z= nz. I i i i - T ,l il il il il lI
I
DAYS: 30 60 90 120 150 180 210 240 270 300 330 365
Elapsed Time in Days

Figure B-10 Residual capacity for conventional bridges (NEHRP Map Area 3-6, Non-California 7, and
Puget Sound 5).

204 Appendix B: Lifeline Vulnerability Functions ATC-25


Bridage Conventicual

_5
c-
0_ R= Z

-D
co
cc

R= ex
DAYS: 31 60 9B 12 15 180 210 241 ZYS S6 Jbb
Elapsed Time in Days

Figure B-1 1 Residual capacity for conventional bridges (Allother areas).

commonly poor are particularly vulnerable Present Conditions: In the absence of data
to slope failure. Dropped overpass spans can on the type of construction, age,
effectively halt traffic on otherwise surrounding terrain, truck usage, etc., the
undamaged freeways/highways. following factors were used to modify the
mean curves,under present conditions: -

Seismically Resistant Design: Seismically


MMI
resistant design practices include proper Intensity
gradation and compaction of existing soils as NEHRP Man Area Shift
well as bases and subbases. Roadway cuts California 7 3
Th-
and fills should be constructed as low as, California 3-6
practicable and natural slopes abutting Non-California 7
Puget Sound 5 01
highways should be examined for failure
All other areas 0
potential.

2. Direct Damage UpgradedConditions: It is not anticipated


that it will be cost-effective to upgrade
Basis: Damage curves for freeways/highways facilities for the sole purpose of improving
are based on ATC-13 data for FC 48, seismic performance, except perhaps in very
highways (see Figure B-12). Standard isolated areas where supporting soils and/or
construction is assumed to represent typical adjacent embankments are unstable. The
California freeways/highways under present effect on overall facility performance in
conditions (i.e., a composite of older and earthquakes will be minimal, and no
more modern freeways/highways). It is intensity shifts are recommended.
assumed that no regional variation in
construction quality exists. Time-to-restoration: The time-to-
restoration data assigned to SF 25d,
freeways and conventional highways, are

ATC-25 Appendix B:Lifeline Vulnerability Functions 205


Freeway/Il ighway
.40 4 Oa
I.Mi
,to

a,
0)
E
W

VI VII Vi: l lx X
Modified Mercalli Intensity (MMI)

Figure B-12 Damage percent by intensity for freeways/highways.

assumed to apply to all freeways/highways. failure of an embankment adjacent to the


By combining these data with the damage road. Pavement damage may include
curves for FC 48, the time-to-restoration cracking, buckling, misalignment, or settling.
curves shown in Figure B-13 were derived. Failed embankments may include damaged
retaining walls, or landslides that block
B.1.5 Local Roads roadways or result in loss of roadbed
support. Damage to bridges--including
1. General dropped spans,settlement of abutment fills,
and damage to supporting piers--can restrict
Description: Local roads include roadways, or halt traffic, depending on the severity of
embankments, signs, lights, and bridges in the damage.
urban and rural areas. Localroads, on the
average, are older than freeways/highways Seismically Resistant Design: Seismically
and are frequently not designed for truck resistant design practices are not typically
traffic (inferior quality). Local roads may incorporated into local road design, expect
travel through more rugged terrain and perhaps for bridges. Proper gradation and
include steeper grades and sharper corners, compaction are necessary for good seismic
and may be paved or unpaved (gravel or performance. Cuts and fills should be
dirt), engineered, or nonengineered. Paved constructed as low as practicable and the
roads are typically asphaltic concrete over stability of slopes adjacent to roads in steep
grade and subgrade materials. Traffic could terrains should be evaluated. Seismically
be blocked by damaged buildings, broken resistant design practices for bridges include
underground water and sewer pipes, providing restraint for spans and/or
downed power lines, etc. adequate bearing lengths to accommodate
motions. Approach fills should be properly
Typical Seismic Damage: Roadway damage compacted and graded and pier foundations
can result from the failure of the roadbed or

B:Lifeline Vulnerability Functions ATC-25


206
206 Appendix B:
Appendix Lifeline Vulnerability Functions ATC-25
55Žx
'reeuag/Highuay
=100 25& 1.0 48 1.08

nMI b
h 0. 130 1.393
7 8.171
8 8 .H O.V73
9 E .824 8.2853
to e .024 0.032
R= 5;
R = * days a

R7 Oz: I I I I I 4 I

DfAYS: 36 68 90 126 158 188 218 240 272 380 330 36


Elapsed Time in Days

Figure B-13 Residual capacity for major bridges (NEHRP Map Area: California 3-6, California 7, Puget
Sound, and all other areas).

- should be adequate to support bridge spans following factors were used to modify the
if soil failure occurs. mean curves for the two facility classes listed
above, under present conditions:
2. Direct Damage
MMI
Basis: Damage curves for highway system Intensity
local roads are based on ATC-13 data for Shift
FC 48, highways, and FC 25, NEHRP Map Area FC25 FC48
continuous/monolithic bridge (includes California 7 o 0
single-span,'see Figure B-14). All local roads, California 3-6 +1 0
Non-California 7 +1 0
were assumed to be a combination of 80% PugetSound 5 +1 0
roadways and 20% bridges. If inventory data All other areas +2 0
permit a more accurate breakdown of the
relative value of roadway and bridges, such Upgraded Conditions: For areas where it
data should be used and the damage curves appears cost-effective to improve facilities,
re-derived. assume on a preliminary basis that upgrades
result in a beneficial intensity shift of one
Standard construction is assumed to unit (i.e., -1), relative to the above present
represent typical California local roads (i.e., conditions. In most cases. upgrades will be
a composite of older and more modern local limited to strengthening of bridges, and
roads). It is assumed that no regional perhaps, areas where embanluments and
variation in construction quality exists. adjacent slopes are most unstable.
Present Conditions: In the absence of data Time-to-restoration: The time-to-
on the type of surrounding terrain, restoration data assigned to SF 25e, city
construction material, age, etc., the streets for highway systems, are assumed to

Functions
Vulnerability Functions 207
ATC-25
ATC-25 Appendix B:Lifeline
Appendix B: Lifeline Vulnerability 207
Local Roads
Cram
4b
n
t.WJ
n[z t

~~~
D=100v
25 0.20

Other

: '
80

a)
' D=S07.
E
(a
n
:R/
/ : CA 3-6
< NonCA7
f~~~~.. -:

- .; ~~~~~~CA7
7

' D=6/.
UI V11l - : 1i Ix X
Modified Mercalli Intensity (MMI)

Figure B-1 4 Damage percent by intensityfor local roads.

apply to all local roads. By combining these supported on piers. Only a few of the more
data with the damage curves derived using recently constructed bridges have
the data for FC 25 and 48, the time-to- continuous structural members.
restoration curves shown in Figures B-15
through B-17 were derived. Typical Seismic Damage: The major cause
of damage to trestles is displacement of
B.2 Railway unconsolidated sediments on which the
substructures are supported, resulting in
B.2.1 Bridges movement of pile-supported piers and
abutments. Resulting superstructure
1. General damage has consisted of compressed decks
and stringers, as well as collapsed spans.
Description: In general, railway bridges may Shifting of the piers and abutments may
be steel, concrete, wood or masonry shear anchor bolts. Girders can also shift on
construction, and their spans may be any their piers. Failures of approaches or fill
length. Included are open and ballasted material behind abutments can result in
trestles, drawbridges, and fixed bridges. bridge closure. Movable bridges are more
Bridge components include a bridge deck, vulnerable than fixed bridges; slight
stringers and girder, ballast, rails and ties, movement of piers supporting drawbridges
truss members, piers, abutments, piles, and can result in binding so that they cannot be
caissons. Railroads sometimes share major opened without repairs. Movable span
bridges with highways (suspension bridges), railroads are subject to misalignments, and
but most railway bridges are older and extended closures-are required for repairs.
simpler than highway bridges. Bridges that
cross streams or narrow drainage passages Seismically Resistant Design: Seismically
typically have simple-span deck plate girders resistant design practice should include
or beams. Longer spans use simple trusses proper siting considerations and details to

Vulnerability Functions ATC-25


208
208 Appendix B:Lifeline
Appendix -B:
Lifeline Vulnerabilityviinations .ATC_25
Local PkLds
R= 5B7 - 25e B i .130
5 ,0.20

a b
L -1. 808 'T. 125
-0 160
-B. 166 'B. 140
-5
-B .180 B. B9
-3 -0. iii 8. B2B
ru
0
R =b *das + a
a)

R= I I C

DAYS: 30 6 90 128 150 188 218 Z48 Z? 38 330 365


Elapsed Time in Days

Figure B-1 5 Residual capacity for local roads NEHRP California 7).

Local oads
sn. n ns
R=1BWA - e 1.03 4d Ul.b
Zs 8.28

MII a
6 -0. 253 7.855
7 01.464
8 -a.242 0.103
5 .9 -8.141 0.843
.1
to -W.0to H.O21
;) E- soy
R= * a
+dys
r
1

a I I
H= z 1' 3 I 1
I
1
I
1
I a E i . I
DAYS' 3a 68 98 128 158 188 218 248 27 3 330 365
Elapsed Time in Days

Figure B-t 6 Residual capacity for local roads (NEHRP Map Area 3-6, Non-California 7, and Puget
Sound 5).

ATC-25 Appendix B:Lifeline Vulnerability Functions 209V


R=0ofl
Local
--
Roads
are
f1UI.OU lf 4ff

25

MlII
6
n fa
0.28

a
-0.439 1.950
b

7 -8.345 0.441
.5 B -0.168 0.059
9 -8.123 0.838
10 -0.091 0.017
°CU
a
R=57
R = b * days + a
_,

R= x I I I I I I i
DAYS: 30 60 90 120 150 180 210 240 270 300 338 365
Elapsed Time in Days

Figure B-1 7 Residual capacity for local roads (All other areas).'

prevent foundation failure. Restraint for curve for continuous/monolithic bridges by


spans and/or adequate bearing lengths to one beneficial intensity unit.
accommodate motions are effective ways to
mitigate damage. Reinforced concrete piers Standard construction is assumed to
should be provided with proper confinement represent typical California railway bridges
and adequate longitudinal splices and under present conditions (i.e., a composite
embedment into the foundation. of older and more modem bridges).

2. Direct Damage Present Conditions: In the absence of data


to the type of construction (fixed or
Basis: Damage curves for railway system movable), age, type (fixed or movable) etc.,
bridges are based on ATC-13 data for FC. the following factors were used to modify
25, continuous/monolithic bridges (see the mean curves, under present conditions:
Figure B-18). Railroad bridges tend to be
both older and simpler than highway bridges MMI
and have survived in some areas where Intensity
highway bridges (simple-span bridges) have NEHRP Map Area Shift
Caliornia 7 -1
collapsed. Possible reasons for this superior California 3-6 -1
performance are the lighter superstructure Non-California 7 0
weight of the railroad bridges due to the Puget Sound 5 0
absence of the roadway slab, the beneficial All other areas +1
effects of the rails tying the adjacent spans
together, and the design for other transverse Upgraded Conditions: For areas where it
and longitudinal loads even when no seismic appears cost-effective to improve facilities,
design is done, Consequently, railroad assume on a preliminary basis that upgrades
system bridge performance is assumed to be result in a beneficial intensity shift of one
represented by shifting the mean damage

210 Appendix B:Lifeline Vulnerability Functions ATC-25


Bridge (Railway)
25 .O0

a)
ra D=90M
E

Other

Non-CA7
PS3
CA
CA 7

VI X
Modified Mercalli ntensity (Mlii)

Figure B-1 8 Damage percent by intensity for railway bridges.

unit (i.e., -1), relative to the above present may change in shape and/or construction
conditions. material over their lengths.

Time-to-restoration: The time-to- Typical Seismic Damage:Tunnels may


restoration data assigned to SF 26a, railway experience severe damage in areas affected
bridges, are assumed to apply to all railway by permanent ground m ovements due to
bridges. By combining these data with the landslides or surface fault rupture, but rarely
damage curves for FC 25, the time-to- suffer significant internal damage from
restoration curves shown in Figures. B-19 ground shaking alone. Landslides at tunnels
through B-21 were derived. portals can cause blockage. Damage has
been noted at tunnel weak spots such as
B.2.2 Tunnels intersections; bends; or changes in shape,
construction materials, or soil conditions.
1. General Damage to lined tunnels has typically been
limited to cracked lining.
Description: In general, tunnels may pass
through alluvium or rock, or may be of cut- Seismically Resistant Design: Lined tunnels
and-cover construction Tunnels may be have performed better than unlined tunnels.
lined or unlined, and may be at any depth Consequently, general Seismically resistant
below the ground surface. Tunnel lengths design practices for tunnels, include
may range from less than 100 feet to several providing reinforced concrete lining;
miles. Lining materials include brick, strengthening areas that have been
reinforced and unreinforced concrete, and traditionally weak such as intersections,
steel. Heavy timbers and wood lagging bends, changes in shape and in construction
(grouted and ungrouted) may also be used materials; and siting tunnels to eliminate
to support tunnel walls and ceilings. Tunnels fault crossings. Slope stability at portals

ATCC-25 Appendix B:Lifeline Vulnerabiliy Functions 211


Bridge (Railway)
,-. Dd 4 Ra
GO 4 O
R=100;x

1111 a b

7 -0.8 1.451
,. 8 -8.189: 1.192
9 -0.878 0.069
CZ
C)
Q 16 -0.065 0.0Z9
H= 5%
a)
R = b * days a
co
a)
rc

it
if I I I I I I
0 -
n- V.
.
I II II I I I I

DAYS: 30 60 90 120 150 180 210 240 Z7 308 330 365


Elapsed Time in Days

Figure B-19 Residual capacity for railway bridges (NEHRP California 7).

Bridge (Railway)
4 01
h=100, 1.00 25 v."u-
1 ,

H111 a b
6 -0.208 1.451
7 -0. 9 i192
1.
: >s 8 -0.078 0.069
a 9 -8.065 0.829
._ 16 -8.023 0.005
CU
co
C_
H = b * days + a
0-- R=Se
a)
Er

R= e L 3 6 | l l I
i~ ~~ I I -- i
Sf
DAYS: 30 60 90 120 150 180 210 I'M
oun
Ir
oqn
JOU ono
ona
JJU J=c
Elapsed Time in Days

Figure B-20 Residual capacity for railway bridges (NEHRP Map Area 3-6, Non-California 7, and Puget
Sound 5).

212. Appendix B:Lifeline Vulnerability Functions T


ATC-25
. I - 1 I,
R=180Z

lilf a b
- . 183 1.192
7 -. 87, 8.8&9
-5
B -E.865 8. M2
0- 9 -E.823 E.BE5
Ca 10 -0.012 0. 04
0
0 R= SE
= da9s + &
-D
.0

R= fly -

DAYS: 3 68 98 128 158 188 218 249 Z78 30 338 365


Elapsed Time in Days

Figure B-21 Residual capacity for railway bridges (All other areas).

should be evaluated and stabilization factors were used to modify the mean
undertaken if necessary. curves, under present conditions:

2. Direct Damage mm[


Intensity
Basis: Damage curves for railway tunnels NFHRPMap Area Sh ift
are based on ATC-1¶3data for FC 38, California 7 0
tunnels passing through alluvium (see California 3-6 0
Non-California 7 0
Figure B-22). Tunnels passing through Puget Sound 5 0
alluvium are less vulnerable than cut-and- All other areas 1
cover tunnels, and more vulnerable than
tunnels passing through rock; they were Upgraded Conditions: For areas where it
chosen as representative of all existing appears cost-effective to improve facilities,
tunnels. If inventory data identify tunnels as assume on a preliminary basis that upgrades.
cut-and-cover or passing through rock, then result in a beneficial intensity shift of one
use ATC-13 FC 40 or 39, respectively, in unit (i.e., -1), relative to the above present
lieu of FC 38. conditions.

Standard construction is assumed to Time-to-restoration: The time-to-


represent typical California railroad tunnels restoration data assigned to SF 26b, railroad
under present conditions (Le., a composite - system tunnels, are assumed to apply to all
of older and more modem tunnels). Only tunnels. By combining these data with the
minimal regional variation in construction damage curves for FC 38, the time-to-
quality is assumed. restoration curves shown in Figures B-23
and B-24 were derived.
Present Conditions: In the absence of data
to the type of lining, age, etc., the following
... . t

ATC-25 Appendix B: Lifeline Vulnerability Functions 213


Tunnel (Railway)
)O- 4 MA4
D=1800

:~~~ :

0)
CD
D=SOY.
E
Ca
0

Othe
CA 7

I 1 1 7
Kl~~~~nn-r.A

VI VII Vill ix P.S.5 X


Modified Mercalli Intensity (MMI)

Figure B-22 Damage percent by intensity for railway tunnels.


_
My)
R=1Ovv 38 1.00

MHI a b
6 0.344 0.839
7 i0, 248 0.456
B 0.284 0.212
9 8.183 0.109
Ca' 10 0.053 8.036
aCZ'
R = b * days + a
n
a)
cc

R= 0X
DAYS: 30 60 90 120 150 180 210 240 ZI 38 JJU zbb
Elapsed Time in Days

Figure B-23 Residual capacity for railway tunnels (NEHRP Map Area: California 3-6, California 7,
Non-California 7, and Puget Sound 5).

Functions ATC25L
214
214 Appendix B:
Appendix Lifeline Vulnerability
B:Lifeline Vulnerability Functions ATC-25-
5M

Tunnel fRnilwvavI
10 38 i

MMI
2 3
7 8.2 P
1
B 81. 3
0 9 2.2
a
Eo ie -E. 11
0
C,
C R 5; R b *

R= x S
I
DAYs: 30 68 9U 120 158 10 218 248 278 300 338 365
Elapsed Time in Days

Figure B-24 Residual capacity for railway tunnels (All other areas).

B.23 Tracks/Roadheds potential for track failure can be reduced by


properly grading and compacting imported
I. General track bed materials and by keeping cuts and
fills as low as practicable. Track alignments
Description: In general, track/roadbed in must be precise and the track clear of debris
the railway system includes ties, rail, ballast for train operations.
or roadbed, embankments, and switches.
Ties may be wood or prestressed concrete. 2. Direct Damage
Rail is exclusively steel and is periodically
fastened to ties with spikes and/or steel clips. Basis: Damage curves for railroad system
Roadbed typically includes imported tracks/roadbedsare based on ATC-13 data
aggregate on prepared subgrade. for FC 47, railroads (see Figure B-25).
Standard construction is assumed to
Typical Seismic Damage: The most represent typical California tracks/roadbeds
frequent source of damage to track/roadbed (i.e., a composite of older and more modern
is settlement or slumping of embankinents. tracks/roadbeds). Age may not be as
Landslides can block or displace tracks. important a factor for tracks/roadbeds as it is
Settlement or liquefaction of roadbeds in for other facilities, because the compaction
alluvial areas is also a source of damage. *ofsoils in poor grounds through usage may
Only in extreme cases are rails and roadbeds improve their behavior significantly. Only
damaged by shaking alone. minimal regional variation in construction
quality is assumed.
Seismically Resistant Design: Seismic
design practice includes providing special Present Conditions: In the absence of data
attention to the potential for failure of to the type of material, age, etc., the
slopes adjacent to the tracks; cut slopes and following factors were used to modifr the
fills are particularly susceptible. The mean curves, under present conditions:

A.TC-25 Appendix B:Lifeline Vulnerability Functions 2-15


Track/Roadbed
ID=10v 47 i -A0

g" D=90Y
E
0

uu/.s
VI I I iI
M IX
Modified.Mercalli Intensity (MMI)

Figure B-25 Damage percent by intensity.for.tracks/roadbeds.

MMI Desc ription: Terminal stations may be large


Intensity or snrWaIl.
The structure housing the station
NEHRPMap Area Shift may Igenerally be any type of construction
California 7 0 from steel frame to unreinforced masonry
California 3-6 0 b ng walls. The terminal station typically
Non-California 7 0 beal des switching and control equipment, as
Puget Sound 5 inclu
All other areas 0 well is electrical and mechanical equipment
comE nonlyfound in commercial buildings.
Upgraded Conditions: It is not anticipated Limitted lengths of rails are also included in
that it will be cost-effective to retrofit termiinal stations.
facilities for the sole purpose of improving
seismic performance, except perhaps in very Typilcal Seismic Damage: In general,
isolated areas where the slopes and soils are termiinal stations in railway systems may
unstable. The effect on overall facility expelrience generic building and equipment
performance in earthquakes will be minimal, dameage.Building damage may range from
and no intensity shifts are recommended. crackksin walls and frames to partial and
total collapse. Unanchored or improperly
Time-to-restoration: The time-to- anch,ored equipment may-slide or topple,
restoration data assigned to SF 26c, railways, expe riencing damage or causing attached
are assumed to apply to all tracks/roadbeds. pipinig and conduit to fail. Rail damage in
By combining these data with the damage the s witching yard will occur due to severe
curves for FC 47, the time-to-restoration shakiing or ground failure only.
curves shown in Figure B-26 were derived.
Seis] nically Resistant Design: Seismically
B.2.4 Terninal Stations resistLantdesign practice includes, performing
all bijilding design in accordance with
1. General seisn iic provisions of national or local

216 Appendix B: Lifeline Vulnerability Functions ATC-25


>
Track/Roadbed
R-IF10 - 26k 1.80 :4
4 ani
Il.sDU

I a b
0.163 0.S5
El153 .s239
_ 0.148 'M. 1
CL
06
8.145 0.835
a.142 0.021
c) R= 58x
:3
. _

412
R =I * days + a
in

Rz O/ I
|
j
l
I il
DAYS: 38 88 90 120 150 188 2101 240 278 388 338 365
Elapsed Time in Days

Figure B-26 Residual capacity for tracks/roadbeds (NEHRP Map Area: California 3-6, California 7,
Non-California 7, Puget Sound, and all other areas).

building codes. All critical equipment should roadbed/embankments within the station
be well-anchored. Provisions should be and that only minimal variation exists for
made for backup emergency power for mechanical equipment.
control and building equipment essential for
continued operations.. Present Conditions: In the absence of data
to the type of construction material, age,
1. Direct Damage etc., the following factors were used to
modify the mean curves for each of the
Basis: Damage curves for the railway system three facility classes listed above, under
terminal station are based on ATC-13 data present conditions:
for FC 10, medium-rise reinforced masonry
shear wall buildings; FC 68, mechanical MM!
equipment; and FC 47, railways seee Figure Intensity
B-27). FC 10 was chosen to represent a Shift
generic building, based on review of damage NEHRP Map Area FC OFC 47FC 68
curves for all buildings. Railway terminals California 7 0 0 0
were assumed to be a combination of 60% California 3-6 +1 0 0
generic buildings, 20% mechanical Non-California 7 +1 0 0
Puget Sound 5 +1 0 0
equipment, and 20% railways. All other areas +2 0 +1
Standard construction is assumed to Upgraded Conditions: For areas, where it
represent typical California railway system appears cost-effective to improve facilities,
terminals under present conditions (i.e., a assume on a preliminary basis that upgrades
composite of older and more modern result in one or two beneficial intensity
terminals). It is assumed that there is no
regional variation in construction quality of

ATC-25 Appendix B:Lifeline Vulnerability Functions 217


Terninal Station
1

Other
80

a)

E
cE
0

VI VII Vill Ix X
Modified Mercalli Intensity (MMI)

Figure B-27 Damage percent by intensity for railway terminal stations.

shifts (i.e., -1 or -2), relative to the above wood long-span structures. Equipment at air
present conditions. terminals ranges from sophisticated control,
gate, and x-ray equipment to typical
Time-to-restoration: The time-to- electrical and mechanical equipment found
restoration data assigned to SF 26d, terminal in commercial buildings. Airplane refueling
stations for railway systems, are assumed to is accomplished by either on-site or off-site
apply to all terminal stations. By combining fuel tanks and underground pipelines.
these data with the damage curves derived
using the data for FC 10, 47, and 68, the Typical Seismic Damage: Damage may
time-to-restoration curves shown in Figures include generic building and equipment
B-28 through B-30 were derived. damage. Building damage may range from
broken windows and cracks in walls and
B.3 Air Transportation frames to partial and total collapse.
Unanchored or improperly anchored
B.3.1 Terminals equipment may slide or topple, experiencing
damage or causing attached piping and
1. General conduit to fail. The source of this damage
can be ground shaking or soil failure, as
Description: In general, air transportation many airports are located in low-lying
terminals include terminal buildings, control alluvial regions. Gate. equipment may
towers, hangars, and other miscellaneous become misaligned and inoperable. Fuel
structures (including parking garages and tanks and fuel lines may rupture or
crash houses). These structures may be experience damage, reducing or eliminating
constructed of virtually any building refueling capacity. Tank damage may
material, although control towers are include wall buckling, settlement, ruptured
typically reinforced concrete shear wall piping, or loss of contents, or even collapse.
buildings and hangars are either steel or Such collapses could lead to fires and

Functions ATC-25
218
218 Appendix
Appendix B: Lifeline Vulnerability
B: Lifeline Vulnerability Functions ATC-25
Termial Station
- 26d LOB to 1.

HI
6 0.2
7 8.2
ii
B E.1
-5
O:L 3 1.1
u E 0.
w

-o
(n R= *
E

R= ;e I, - - -f ;& - - - 4 I, - - - I,
b
DAYS: 0 68 90 128 158 182 212 248 270 3 330 365
Elapsed Time in Days

Figure B-28 Residual capacity for railway terminal stations (NEHRP California 7).

rerminaI Station
1.82 1 1.82

MI a b
2.222 H. 1321
7 O. 141
8. I6 O.H19
-U
0- 8 .8138 ...21IH
w
C-a 10 H.H&M
R= 07
-oU B * days a
'n
Qc
fE

I
- - --- '
F -j
1 1

I
l
l
I~~~~~~~~~
DAYS 38 60 92 120 152 182 218 240 272 300 330 365
Elapsed Time in Days
Figure B-29 Residual capacity for railway terminal' stations (NEHRP Map Area 3-6, Non-California 7,
and Puget Sound 5).

ATC-25 Appendix B:Lifeline Vulnerability Functions 219


Terminal Station
R=t11Bi/ 10 1.00 -

1MI a b
6 0.141 0035
7 0.187 8.819
B 0.08 0.810
._ 1.860 8.886
9
(a 11. 52
10 e.005

-
Ca R=
H =b * days a
U)
a)
EC

U- MU I I I - . I
1 , , ,

DAYS: 3 60 90 120 150 IBO 210 240 270 30 330 365


Elapsed Time in Days

Figure B-30 Residual capacity for railway termiinal stations (All other areas).

explosions. Damage to ground access and structures (see Figure B-31). FC 10 was
egress routes may seriously affect chosen to represent a generic building,
operations. Airports in low-lying areas may based on review of damage curves for all
be subject to damage due to flooding or buildings. Air transportation system
tsunamis. terminals are assumed to be a combination
of 40% generic buildings, 40% long-span
Seismically Resistant Design: Building structures, and 20% on-ground liquid
design should be performed in accordance storage tanks.
with seismic provisions of building codes.
Control-tower design should receive special Standard construction is assumed to
attention based on its importance and the represent typical California air terminals
fact that the geometry of the tower makes it under present conditions (i.e., a composite
prone to earthquake damage. Enhanced of older and more modern terminals). Only
design criteria (e.g., a higher importance minimal regional variation in construction
factor) may be appropriate for control quality of long-span structures is assumed, as
towers. All critical equipment should be design wind and seismic loads may be
anchored. Provisions should be made for comparable.
backup emergency power for control
equipment and landing lights. Present Conditions: In the absence of data
on the type of construction, age, etc., the
2. Direct Damage following factors were used to modify the
mean curves for each of the three facility
Basis: Damage curves for air transportation classes listed above, under present
system terminals are based on ATC-13 data conditions:
for FC 10, mid-rise reinforced masonry
shear wall buildings; FC 43, on-ground liquid
storage tanks; and FC 91, long-span

220 Appendix B: Lifeline Vulnerability Functions ATC-25


Terminal
Dz=IUz
91 8.4<
43 0.20

0,
CD
co Dz=9tY
co

Other A/

Dz=Ox
HI VII Vil IX X
Modified Mercalli Intensity (MM[)

Figure B-31 Damage percent by intensity for airport terminals.

MMI B.3.2 Runwaysand Taxiways


. Intensity
Shift 1.
NEHRP Map Area General
FC 10 FC 43 FC 91
California 7 0 0 0
California 3-6 +1 +1 Description: In general, runways and
+1
Non-California 7 +1 +1 +1 taxiwaysin the air transportation system
Puget Sound 5 +1 +1 +1 include runways, taxiways, aprons, and
All other areas +2 +2 +1 landing lights. Runways and taxiways
comprise pavements, grades, and subgrades.
Upgraded Conditions: For areas where it Pavement types include portland cement
appears cost-effective to improve facilities, concrete and asphaltic concrete.
assume on a preliminary basis that upgrades
result in one or two beneficial intensity Typical Seismic Damage: Runway damage
shifts (i.e., -1 or -2), relative to the above is a direct function of the strength
present conditions. characteristics of the underlying soils.
Airports tend to be located in low-lying
Time-to-restoration: The time-to- alluvial areas or along water margins subject
restoration data assigned to SF 27a, air to soil failures. Hydraulic fills are especially
transportation terminals, are assumed to prone to failure during ground shaking.
apply to all terminals. By combining these Runways can be damaged by liquefaction,
data with the damage curves derived using compaction, faulting, flooding, and tsunamis.
the data for FC 10; 43, and 91, the time-to- Damage may include misalignment, uplift,
restoration curves shown in Figures B-32 cracking, or buckling of pavement.
through B-34 were derived
Seismically Resistant Design: Seismic
design practices include providing proper
- gradation and compaction of soils or
imported fills, grades, and subgrades-

Lifeline Vulnerabilijy Functions 221


ATC-25
ATC-25 Appendix B:
Appendix B:Lifeline Vulnerability Functions 21
Terminal (Air Transportation)
I
R=10v 27a 1.00 10 H.41
91 0.40
43 8.20

Mi,1 a b
6 0.010 11.262
7 0,848 3.864
B -0.004 0.206
9. -8.10 0. 056
0-
a( 10 -8.012 :.013
° R=
'a R = b * days + a

a)
cc

I I I I I
R= W*e t I
- S: I8 I
6 r

aAa
DAYS: 30 60 90 120 15 180 216 240 270 300 338 365
Elapsed Time in Days

Figure B-32 Residual capacity for airport terinals (NEHRP California 7).

Terminal (Air Transportation)


Iflt3/. 2,- a
fa 40
H=1JU IL~M U y ~ s
91 .46
43 8.20

/MNtH a b
" 6 0.040 3.864
7 -0.004 0.206
8 -0.010 0. 056
.0
C,
9 -0.612 0.013
a
CO 18 -0.006 0.004
0 R= I / /
.1.
n -- UU - L"ayl, - a-
.'a
r
i'
n- B.. ., ., .r ., I .I. .. I .. ..I ..

DAY"
3: 30 60 960 128 156 180 210 240 276 300 338. 365
Elapsed Time in Days

Figure B-33 * Residual capacity for airport terminals (NEHRP Map Area 3-6, Non-California 7, and
Puget Sound 5).
I

222 Appendix B: Lifeline Vulnerability Functions A


ATC-25
R=20;y

Cu
co

C,

R= O
DAYS: 3 68 90 128 I58! 180 218 2 40 278 308 330 365
Elapsed Time n Days

Figure B-34 Residual capacity forairport terminals All other areas

2. Direct Damage result in a beneficial intensity shift of one


unit (e., -1), relative to the above present
Basis: Damage curves for air transportation conditions.
system runways and taxiways are based on
ATC-13 data for FC 49, runways, (see Figure Time-to-restoration: The time-to-
B-35). Standard construction is assumed to restoration data assigned to SF 27b, runways
represent typical California runways and and taxiways, are assumed to apply for all
taxiways under present conditions (ie., a runways and taxiways. By combining these
composite of older and more modern data with the damage curves for FC 49, the
runways). time-to-restoration curves shown in Figure
B-36 were derived.
Present Conditions: In the absence of data
on the type of soils, material, age, etc., the B.4 Sea/Water Transportation
following factors were used to modify the
mean curves, under present conditions: B.4.1PortslCargoHandling Equipment
Mm/ 1. General
Intensity
HfRP Map Area Shift
California'7 0,
Description: In general, portslcargo
California 3-6 0 handling equipment comprise buildings
Non-California 7 0 (predominantlywarehouses), waterfront
Puget Sound 5 0 structures, cargo handling equipment, paved
Allother areas 0 aprons, conveyors, scales, tanks, silos,
pipelines, railroad terminals, and support
Upgraded Conditions: For areas where it services. Building type varies, with steel
appears cost-effective to improve facilities, frame being a common construction type.
assume on a preliminary basis that upgrades Waterfront structures include quay walls,

Lifeline Vulnerability Functions 223


Appendix 3:
AppendIx -
ATC-25
AT, C-25 B:Lifelfine Vulnerability Fu-nations 223
Runwaylaxiwa-9
Il
,if,
I
i.UU
RS
nO
D100HY

ao.O
a)
M D=90:/
E
Ca :

D=0f I
VI VII Vill IX X
Modified Mercalli Intensity (MMI)

Figure B-35 Damage percent by intensity for runways/taxiways.

Runwal/Tax iway
49 .1.00

MtII a b
6 0.458 0.834
7 0.435 0.413
8 H.315 0 .039
.
9 0.325 0.818
Co
10 0.270 0.011

:0 R b dags + a
U)
'a)
.

R= ex
DAYS 30 60 90 120 150 180 210 240 270 300 330 365
Elapsed Time in Days,

Figure B-36 Residual capacity for runways/taxiways (NEHRP Map Area: California 3-6, California 7,
Non-California 7, Puget Sound 5, and all other areas).

224 Appendix B:Lifeline Vulnerability Functions ATC-25


sheet-pile bulkheads, and pile-supported water, presenting fire hazards. Pipelines
piers. Quay walls are essentially waterfront from storage tanks to docks may be ruptured
masonry or caisson walls with earth fills where they cross areas of structurally poor
behind them. Piers are commonly wood or ground in the vicinity of docks. Failure of
concrete construction and often include access roads and railway tracks can severely
batter piles to resist lateral transverse loads. limit port operations. Port facilities,
Cargo handling equipment for loading and especially on the West Coast, are also
unloading ships includes cranes for subject to tsunami hazard.
containers, bulk loaders for bulk goods, and
pumps for fuels. Additional handling Seismically Resistant Design: At locations
equipment is used for transporting goods where earthquakes occur relatively
throughout port areas. frequently it is the current Seismically
resistant design practice to use seismic
Typical Seismic Damage: By far the most factors included in local building codes for
significant source of earthquake-induced the designof port structures. However, past
damage to port and harbor facilities has earthquakes have indicated that seismic
been pore-water pressure buildup in the coefficientsused for design are of secondary
saturated cohesionless soils that prevail at importance compared to the potential for
these facilities. This pressure buildup can liquefaction of the site soil materials. Quay
lead to application of excessivelateral wall and sheet-pile bulkhead performance
pressures to quay walls by backfill materials, could be enhanced by replacing weak soils
liquefaction, and massive submarine sliding. with dense soils, or designing these
Buildings in port areas are subject to generic structures to withstand the combination of
damage due to shaking, as well as damage earthquake-induced dynamic water
caused by loss of bearing or lateral pressures and pressures due to liquefied lls.
movement of foundation soils.Past Pier behavior in earthquakes has been good
earthquakes have caused substantial lateral primarily because they are designed for large
sliding, deformation, and tilting of quay walls horizontal berthing and live loads, and
and sheet-pile bulkheads. Block-type quay because they are not subject to the lateral
walls are vulnerable to earthquake-induced soil pressures of the type applied to quay
sliding between layers of blocks. This walls and bulkheads. However, effects on
damage has often been accompanied by bearing capacity, and lateral resistance of
extensive settlement and cracking of paved piles due to liquefaction and induced slope
aprons. The principal failure mode of sheet- instability should also be considered.
pile bulkheads has been insufficient anchor
resistance, primarily because the anchors 2. Direct Damage
were installed at shallow depths, where
backfill is most susceptible to a loss of Basis: Damage curves for ports/cargo
strength due to pore-water pressure buildup handling equipment in the sea/water
and liquefaction. Insufficient distance transportation system are based on ATC-13
between the anchor and the bulkhead wall data for FC 53, cranes, and FC 63,
can aso lead to failure. Pile-supported waterfront structures (see figure B-37).
docks typically perform well, unless soil Ports/cargo handling equipment were
failures such as major submarine landslides assumed to be a combination of 60%
occur. In such cases, piers have undergone waterfront structures and 40% cranes.
extensive sliding and buckling and yielding
of pile supports. Batter piles have damaged Standard construction is assumed to
pier pile caps and decking because of their represent typical California ports/cargo
large lateral stiffness. Cranes can be derailed handlingequipment under present
or overturn by shaking or soil failures. conditions (ie., a composite of older and
Toppling cranes can damage adjacent more modern ports/cargo handling
structures or other facilities.Misaligned equipment). Only minimal regional variation
crane rails can damage wheel assemblies and in construction quality is assumed, as seismic
immobilize cranes. Tanks containing fuel design is performed only for selected port
may rupture and spill their contents into the

ATC-25 Appendix B: Lifeline Vulnerability Functions 225


Port/Cargo Handling Equipment
D=180Y

co D=5S&
c:
0

D=ax
VI VIl Vll Ix X
Modified Mercalli Intensity (MMI)

Figure B-37 Damage percent by intensity for ports/cargo handling equipment.

structures, and soil performance is the most and SF 28b, cargo handling equipment, were
critical determinant in port performance. assumed to apply to all ports/cargo handling
equipment. Ports/cargo handling facilities
Present Conditions: In the absence of data were assumed to be a combination of 60%
on the type of material, age, etc., the ports and 40% cargo handling facilities. By
following factors were used to modify the combining these data with the damage
mean curve for the two facility classes listed curves derived using the data for FC 53 and
above, under present conditions: 63, the time-to-restoration curves shown in
Figures B-38 and B-39 were derived.
MM!
Intensity B.4.2 Inland Waterways
Shift
NEHRP Map Area FC 53 FC 63 1. General
California 7 o 0
California 3-6 o 0 Description: In general, inland waterways of
Non-California 7 o 0 the sea/water transportation system can be
Puget Sound 5 o 0
natural (rivers and bays) or human-made
All other areas +1 +1
(canals). The sides and/or bottoms of inland
Upgraded Conditions: For areas where it waterways may be unlined or lined with
appears cost-effective to improve facilities, concrete. Portions of the waterway may be
assume on a preliminary basis that upgrades contained through the use of quay walls,
retaining walls, riprap, or levees.
result in a beneficial intensity shift of one
unit (i.e., -1), relative to the above present
conditions. Typical Seismic Damage: Damage to inland
waterwayswillbe greatest near ruptured
Time-to-restoration: The time-to- faults. Channels or inland waterways may be
restoration data assignedto SF 28a, ports, blocked by earthquake-induced slumping.

ATC-25
226
226 Appendix B:Lifeline
Appendix B: Vulnerability Functions
Lifeline Vulnerability functions ATC-25
Port/Cargo ait
RE=108, r 2Ba a
20b 3

l1HI b
i6 I 8. 1183
7
a 3
0U
M 9 3 8 813
Ca
to 0B88

lays + a
a)
o:

R= v Ir
I
DRYS: 38 68 90 128 15O 188 218 240 27 3080 330 365
Elapsed Time in Days

Figure B-38 Residual capacity for ports/cargo handling equipment (NEHRPMap Area: California 3-6,
California 7, Non-Cafifornia 7, and Puget Sound 5).

Pot/Cargo Handlinq Equipment


co
UD
au a
Uu

53 '3.40

MIl a b
6 W 306 8 8
7 0.206G O022
B 8.248 8.8,13
9 8.160 8.887
10 0826 0.805
R= SE
R = * days +.a

R= /
I
DAYS: 3 68 S 128 1S 188 218 240 27 3 330 365
Elapsed Time in Days

Figure B-39 Residual capacity for ports/cargo handling equipment All other areas).

Vulnerability Functions 227


ATC-25 Appendix B: Lifeline
Appendix B:
ATC:-25 Lifeline Vulnerability.Functions 227
Inlania Uaterway
D1=100V 61 1.00

0
C)
0) D=50O
E
C]

Other
-- ~CA
7
CA 3-6
Non-CA7
trll VII i P
D=O/
VI VI[ Vill IX X
Modified Mercalli Intensity (MMI)

Figure B-40 Damage percent by intensity for inland waterways.

Quay walls, retaining walls, or levees can be Stand ard construction is assumed to present
damaged or collapse. Deep channels typicaalCalifornia inland waterways under
dredged in soft mud are subject to prese.nt conditions (i.e., a composite of
earthquake-induced slides that can limit the natureal as well as new and old human-made
draft of ships that can pass. Channels lined water ways). It is assumed that the regional
with unreinforced concrete are susceptible variat ion in construction quality is minimal.
to damage due to differential ground
displacement. Loss of lining containment Prese nt Conditions: In the absence of data
can lead to erosion of soil beneath lining. on thee type of lining, age, etc., use the
Waterways can be blocked by fallen bridges follovwingfactors to modify the mean curve,
and are made impassable by spilled fuel or underr present conditions:
chemicals from tanks or facilities adjacent to
the waterway. MMI
Intensity
Seismically Resistant Design: Seismically EtHJRP
Map Area Shift
resistant design practices include providing C alifornia 7 0
walls of waterways with slopes appropriate C alifornia 3-6 0
0
for the embankment materials used, and/or p on-California 7 0
uget Sound 5
designing quay walls and retaining walls to Al1iother areas +1
restrain soils in the event of soil failure.
aded Conditions: For areas where it
2. Direct Damage appegirs cost-effective to improve facilities,
assurr ieon a preliminary basis that upgrades
Basis: Damage curves for inland waterways result in a beneficial intensity shift of one
in the sea/water transportation system are unit (i.e., -1), relative to the above present
based on ATC-13 data for FC 61, canals condi tions.
(see Figure B-40).
Time -to-restoration: The time-to-
restoiration data assigned to SF 35b, levees

228 Appendix B:Lifeline Vulnerability Functions ATC-25


53
Inlrn4 lJateruay
4 n
R=t8ffX 61 I .fOU

Km aL b
6 0. 245 8.127
7 E ,369 2.810
8 8. 95 8.899
9 8. 112
-o I'D
8.054
.0.238
2U) B= 07:
[) B b * days * a

m9

RW; Ox ll l
I
l
Il
DAYS: 30 60 90 128 158 108 210 248 27C 388 330 365
- Elapsed Time in Days

Figure B-41 Residual capacity for inland waterways (NEHRPMap Area: California 3-6, California 7,
Non-California 7, and Puget Sound 5).

in flood control systems, are assumed to conveyors, de-aerators, heaters, and


apply to all inland waterways. By combining associated equipment and piping. The fan
these data with the damage curves for FC area houses the air preheaters as well as the
61, the time-to-restoration curves shown in forced-draft fans and related duct work.
Figures B-41 and B-42 were derived. Other components include instrumentation
and control systems, water and fuel storage
B.5 Electrical tanks, stacks, cooling towers, both
underground and above ground piping,
B.5.1 Fossil-fuelPowerPlants cable trays, switchgear and motor control
centers, fuel handling and water treatment
1. General facilities, water intake and discharge, and
cranes. Associated switchyards step up
Description: In general, fossil-fuel power voltage and include transformers and circuit
plants can be fueled by either coal or oil. breakers.
Structures at fossil-fuel power plants are
commonly medium-rise steel braced frames. Typical Seismic Damage: Damage to steel
A generation building typically comprises structures at power plants in past
turbine, boiler, and fan areas. The turbine- earthquakes has usually been limited to
generators are typically supported on overstressed connections or buckled braces.
reinforced concrete pedestals that are Turbine pedestals may pound against the
seismically isolated from the generation surrounding fldor of the generation building
building. Boiler feed pumps are usually and damage the turbine-generators. Boilers
located below the turbine-generators. The may sway and impact the support structure,
boiler area typically includes the boilers causing damage to the expansion guides and
(which are usually suspended from the possibly the internal tubes of the boiler.
support structures), steam drums, coal silos, Structural damage to older timber cooling

ATC-25 Appendix B:Lifeline Vulnerability Functions 229


. . . A. ._ .. A. J
4 41.
R- 100x/ q no

MtIl a b
6 0.369 0.018
7 0.9S5 0.099
B 0.112 0.054
Ca, 9 8.230 8.616
aCa 18 8.268 0.004
Ax R 5x
R = b * days a
. -Z)
z
an
(jr
W

l
LSR= i I 1 I lI l l
i l
I
l
I 1
DAYS: 30 68 90 120 158 180 218 240 Z70 300 330 365
Elapsed Time in Days

Figure B-42 Residual capacity for inland waterways (All other areas).

towers may occur due to deterioration and provided between the boiler and the
weakening of the structures with age. Fan generation building to prevent pounding; all
blades and gearboxes in cooling towers have equipment should be anchored; sufficient
been damaged attributable to impact with clearance and restraints on piping runs
fan housing. Water and fuel tanks may should be provided to prevent interaction
experience buckled walls, ruptured attached with equipment and other piping; and piping
piping, stretched anchor bolts, or collapse. should be made-flexible to accommodate
Piping attached to unanchored equipment relative movement of structures and
or subjected to differential movement of equipment to which it is attached. Generous
anchor points or corrosion may lose its clearances between adjacent equipment
pressure integrity. Coal conveyors can should be provided to prevent interaction.
become misaligned, and coal bins without Sufficient joints between the turbine
proper seismic design may be severely pedestal and the generation building are
damaged. Unrestrained batteries may topple required to prevent pounding. Maintenance
from racks, and equipment supported on programs for some systems, including wood
vibration isolators may fall off supports and timber cooling towers, piping transporting
rupture attached piping. In the switchyard, corrosive materials, and steel tanks, should
improperly anchored transformers may slide be established so that these components are
and topple, stretching and breaking attached not in a weakened condition when an
electrical connections and/or ceramics. earthquake strikes. An emergency power
source consisting of well-braced batteries
Seismically Resistant Design: Seismically and well-anchored emergency generators is
resistant design practices include, as a necessary to permit restart without power
minimum, designing all structures to satisfy from the outside grid. Heavy equipment and
the seismic requirements of the applicable stacks should be anchored with long bolts
local or national building code. In addition, anchored deep into the foundation to allow
well-designed seismic ties should be for ductile yielding of the full anchor bolt

230 Appendix B:Lifeline Vulnerability Functions ATC-25


Fassi -Fuel Pouer Plamt
-4 no-,
Li- LruiA 13 adzf
69 0.58
66 .3

0-

0
DI)

'~~> Other CA
C -6

CA
7

I - - ____ I I
VI WII VIII IX X
Modified Mercalli Intensity (MMI)

Figure B-43 Darnage percent by intensity for fossil-fuel power plants.

length in extreme seismic load conditions. regional variation in construction quality of


Expansion anchor installation procedures mechanical equipment is assumed, as
should be subject to strict quality control. operational loads frequently govern over
seismic requirements.
2. Direct Damage
Present Conditions: In the absence of data
Basis: Damage curves for fossil-fuel power on the construction type, age, etc., the
plants in the electrical system are based on following factors were used to modify the
ATC-13 data for FC 13, medium-rise steel mean curves for each of the three facility
braced-frame buildings; FC 66, electrical classes listed above, under present
equipment, and FC 68, mechanical conditions:
equipment (see Figure B-43). Fossil-fuel
power plants are assumed to be a MM
combination of 20% mid-rise steel braced- Intensity
frame structures, 30% electrical equipment, Shift
and 50% mechanical equipment. Over the NEHRP Map Area FC 13 C 66FC 68
years power plants have been designed using California 7 -1 -1 -1
seismic provisions that equal or exceed California 3-6 10 0 0
those used for conventional construction. Non-California 7 10 0 0
Consequently, the beneficial intensity shifts Puget Sound 5 0 o 0
All other areas 1 1 0
indicated below are assumed appropriate.
Upgraded Conditions: For areas where it
Standard construction is assumed to appears cost-effective to improve facilities,
represent typical California fossil-fuel plants assume on a preliminary basis that upgrades
(and geothermal power plants) under result in a beneficial intensity shift of one
present conditions (i.e., a composite of older unit (i.e., -1) relative to the above present
and more modern plants). Only minimal conditions.

ATC-25 Appendix B: Lifeline Vulnerability Functions 21


Fossil-Fuel PowerPlant
Z-ja H.711 13 .20
66 0.58
66 0.30

Ml a b

7 0.871 0317
.
8 0.828 0.082
9 -8.805 0.836
Q
0 10 -0.038 O.817

-
H = b days a
_0

-
a)
Cr

I
n_ .
U-- UPS
no as. YS T I I I I I 28788 338
l3
DAYS: 30 68 98 120 158 180 218 240 Z70 30 330 365
Elapsed Time in Days

Figure B-44 Residual capacity for fossil-fuel power plants (EHRP California 7).

Time-to-restoration: The time-to- Typical Seismic Damage: Hydroelectric


restoration data assigned to SF 29a, powerhouses and dams are more likely to be
electrical generating facilities, are assumed seriously damaged by rock falls and
to apply to all fossil- fuel power plants. By landslides than by ground shaking. When
combining these data with the damage slides do occur, turbines may be damaged if
curves derived using data for FC 13, 66, and rocks or soils enter the intakes. Penstocks
68, the time-to-restoration curves shown in and canals can also be damaged by slides.
Figures B-44 through B-46 were derived. Intakes have been damaged by the
combination of inertial and hydrodynamic
B.5.2 Hydroelectric Power Plants forces. Most engineered dams have
performed well in past earthquakes,
1. General although dams constructed using fills of fine-
grain cohesionless material have
Description: In general, hydroelectric power experienced failures. Equipment in power
plants consist of a dam and associated plants typically performs well in earthquakes
equipment including water-driven turbines, unless unanchored. In such cases the
a control house and control equipment, and equipment may slide or topple and
a substation with transformers and other experience substantial damage.
switching equipment. The dam may be Unrestrained batteries have toppled from
earthfill, rockfill, or concrete and may racks. Piping may impact equipment and
include canals, penstocks, spillways, conduit, structures and damage insulation. Piping
tunnels, and intake structures. Gantry attached to unrestrained equipment may
cranes are frequently located on top of the rupture due to equipment movement. The
concrete dams. Equipment inside the dam control house may experience generic
typically includes turbines, pumps, piping, building damage ranging from dropped
switchgear, and emergency diesels. ceiling tiles and cracks in walls and frames to
partial and total collapse. Substation

Functions
Vulnerability Functions ATC-25
232
232 Appendix B:Lifeline
Appendix B: Lifeline Vulnerability ATC-25
Fossil-Fuel Power Plant
Sl Jf[
fl 712
0.20
315
0.30

11 a b
8.071 0.317
7 8. BZ a. 'Boz
-13 . BBS 0. B36
_5 3
g
-1 .830 8. B17
co 13 -1.071 1.0.99
(O_2 R= S07
ra R *days +a
C0

l l l l~~~I
R= 0;, I I . .

DYS: 30 60 98 120 150 150 2L1. 240 278 300 338 36S
Elapsed Time n Days

Figure B-45 Residual capacity for fossil-fuel power plants (NEHRPMap Area: California 3-6, Non-
California 7, and Puget Sound 5).

Fossil-Fuel Power Plant


10.7B 13 0.20
,60 3.5a
B.30

MI a b
6 M .034 B. 111
7 B. 613
.5
-0.021 B 023
c- 9 -0.054 MU01
C
'1 -M. 081 .00
R= sox
R b * days + a
-o
a)
Er

R= Mx I I I~~~ I I I I
DAYS: 30 60 90 120 150 I1B 210 240 278 300 338 365
Elapsed Time in Days

Figure B-46 Residual capacity for fossil-fuel power plants (All other areas).

233
Appendfx B: Lifeline Vulnerability Functions
ATC-25
ATC-25 Appendix B: Lifeline Vulnerability Functions 233
Hgdraelectric Pwer Plant
D=100

E
CH
0

Other

VI Vii Vill IX X
Modified Mercalli Intensity (MMI)

Figure B-47 Damage percent by intensity for hydroelectric power stations.

equipment, and ceramics in particular, are other critical systems function with turbine
vulnerable to damage. Higher-voltage trip and loss of power from the outside grid.
ceramics tend to experience the most
damage. 2. Direct Damage

Seismically Resistant Design: Seismically Basis: Damage curves for hydroelectric


resistant design practices for earthfill dams power plants in the electrical system are
include providing ample freeboard, based on ATC-13 data for FC 35, concrete
mechanically compacting soils, and using dams; FC 36, earthfill or rockfill dams; and
wide cores and transition zones constructed FC 68, mechanical equipment (see Figure
of material resistant to cracking. Generally, B-47). Hydroelectric power plants are
reducing slopes of earthfill dams can reduce assumed to be a combination of 35%
vulnerability. Thorough foundation concrete dams, 35% earthfill or rockfill
exploration and treatment are important. dams, and 30% mechanical equipment. Over
Dynamic analyses can be used to determine the years power plants have been designed
the liquefaction or settlement potential of usingseismicprovisionsthat equal or exceed
embankments and foundations, and the those used for conventional construction.
cracking potential of concrete dams and Consequently, the beneficial intensity shifts
dam appurtenances. All buildings should be indicated below for mechanical equipment
designed, as a minimum, to satisfy the Bareassumed appropriate.
seismic requirements of a national or local
building code. All equipment should be Standard construction is assumed to
anchored and generous clearances between represent typical California hydroelectric
adjacent equipment provided to prevent power plants under present conditions (i.e.,
interaction. An emergency power source a composite of older and more modern
consisting of well-braced batteries and well- plants). Only minimal regional variation in
anchored emergency generators is necessary construction quality is assumed for
to ensure that control systems, lighting, and mechanical equipment, as operational loads

234 Appendix B: Lifeline Vulnerability Functions ATC-25


.
"C,

38

0 =03 a b

17? BAK42
165 -8.. lis
._
8 0.839
(a
c-
Ceg 134 0.820
tJ R= 587
(a * days + a
_

M- In l l
A- C. l

DAYS 38 60 90 128 158 1B 218 248 278 388 330 365


Elapsed Time in Days

Figure B-48 Residual capacity for fossil-fuel power plants (NEHRP California 7).

frequently govern over seismic Time-to-restoration: The time-to-


requirements. restoration data assigned toSF 29a,
generating facilities, and SF 30c, storage
Present Conditions: In the absence of data reservoirs, are assumed to apply to all
on the type of material, age, etc., the hydroelectric power plants. By combining
following factors were used to modify the these data with the damage curves derived
mean curves for each of the three facility using the data for FC 35, 36, and 68, the
classes listed above, under present time-to-restoration curves shown in Figures
conditions: B-48 through B-50 were derived.

MM B.5.3 Transmission Lines


Intensity
Shift 1. General
NEHRP Map Area FC 35 FC 36 FC 68
California 7 0 0 -1 Description: In general, transmission lines
California 3-6 +1 +1 0 may be underground or above ground
Non-California 7 +1 +1 0 (supported by towers). Towers are usually
Puget Sound 5 +1 +1 0
All other areas +2 +2 0 steel and carry several circuits at high
voltages (64 kV or higher). Each circuit
Upgraded Conditions: For areas where it consistsof three conductors, one for each
appears cost-effective to improve facilities, phase. Towers are, provided with reinforced
assume on a preliminary basis that upgrades concrete footings and may be supported on
result in a beneficial intensity shift of one piles. Most transmission systems are ac, but
unit (i.e., -), relative to the above present some long-distance lines are dc. The dc
conditions- systems require convertor stations at each
end of the line.

ATC-25 A -AppendixB:Lifeline Vulnerability Functions 235


s1

*.35
.30

MIl a b
6 . 77 0. 426
7 ,065 0.115
B 048 0.H39
C.
9 .34 0 .020
10 ,09 0.008
o R= y

-a
* days a
0)
CC

a
H= B/ y l
I
l
-
l
i
l
I
l
i
l
I
l
I
l
i
|
i
l
I
DAYS: 30 60 90 120 158 188 210 Z40 Z70 30 330 365
Elapsed Time in Days

Figure B-49 Residual capacity for hydroelectric power stations (NEHRP Map Area: California 3-6,
- Non-California 7, and Puget Sound 5).

Hydroelectric Pauer Plantt


R=t1o8
36 0.35
68 0.30

MII a b
6 0.069 0.170
7 08 854 0.853
B 8.040 0. H26
Co
9 0.814 0.809
to -0.002 0.005
a R = b * days + a
(:)
*0a)

I I
= AY : 3 I I
I I
I I
DAYS: 30 60 90 120 150 18 210 248 270 30 330 365
Elapsed Time in Days

Figure B-50 Residual capacity for hydroelectric power stations (All other areas).

236 Appendix B: Lifeline Vulnerability Functions ATC-25


Transmission Lines (Electrical)
DztIOO S6 1.B

S
0a
CC
W
C

DwOx
VI 1IJl VIII IX X
Modified Mercalli Intensity (MMI)

Figure B-51 Damage percent by intensity for electric transmission lines.

Typical Seismic Damage: Transmission 1. Direct Damage


towers and the lines they support are
principally subject to damage through Basis: Damage curves for transmission lines
secondary effects such as landslides, and in the electrical system are based on ATC-13
rock falls, liquefaction, and other ground data for FC 56, major electrical transmission
failures. This is also true for the line towers (over 100 feet tall, see Figure B-
underground lines. It is possible that the 51). Standard construction is assumed to
conductors supported by towers can slap represent typical California transmission
against each other and bum down. Ceramics lines and towers under present conditions
used on transmission towers typically (i.e., a composite of older and more modern
perform well in earthquakes because they towers). It is assumed that no regional
are in compression rather than in tension or variation in construction quality exists, as
bending. Fault slippage is unlikely to seismic loads are relatively unimportant in
damage underground lines, (unless the line the design of transmission towers.
crosses the fault fracture) because
transmission lines have a thick-wall, welded- Present Conditions: In the absence of data
steel pipe jacket. on the type of tower, age, etc., the following
factors were used to modify the mean
Seismically Resistant Design: Seismic loads curves, under present conditions:
do not generally have much influence on the
design of transmission lines and towers. The MMI
towers are designed to,withstand heavy wind Intensity
and ice loads, as well as loads due to broken NEHRP Map Area Shift
wires. The primary Seismically resistant California 7 0
concern is siting towers and conductors in California 3-6
Non-California 7 U
locations where soils are stable, or providing Puget Sound 5
special foundations designed to survive All other areas
effects of soil failure.

Functions 237
ATC-25
ATFC-25 Appendix B:
Appendix Lifeline Vulnerability
B:Lifeline Vulnerability Functions, 237
xx
:; H Transmission Lines (Electrical)
R- 100 I .,OL
-v -.
I
.U-
GM Ct
U
4
L
IRR
._

M1111 a b
6 0.898 1.384
7 0.814 0.790
B -0.013 0.606
9 -0 .111 0,277
10 -0. 280 0. 168
0ia
:3
.n H = b * days a
U)
a:

D a.,
H= "/
1- Ut I
| I I I I I I
DAYS: 60 90 120 150 188 210 240 270 308 330 365
Elapsed Time in Days

Figure B-52 Residual capacity for electric transmission lines (NEHRP Map Area: California 3-6,
California 7, Non-California 7, and Puget Sound 5, and all other areas).

Upgraded Conditions: It is not cost- ground wires, underground cables, and


effective or practical to upgrade existing extensive electrical equipment including
transmission towers or lines unless banks of circuit breakers, switches, wave
supporting or adjacent soils are known to be traps, buses, capacitors, voltage regulators,
unstable. Therefore, no intensity shifts for and massive transformers. Circuit breakers
retrofitting are recommended. (oil or gas) protect transformers against.
power surges due to short circuits. Switches
Time-to-restoration: The time-to- prevent long-terminterruption of the
restoration data assigned to SF 29b, circuits. Wave traps enable transmission of
transmission lines for the electrical system, supervisory signals through power lines.
are assumed to apply to all transmission Buses provide transmission linkage of the
lines and towers. By combining these data many and varied components within the
with the damage curves for FC 56, the time- substation. Capacitors are used to keep the
to-restoration curves shown in Figure B-52 three phases of a transmission circuit in
were derived. proper relation to each other. Transformers
and voltage regulators serve to maintain the
B.5.4 TransmissionSubstations predetermined voltage, or to step down or
step up from one voltage to another.
1. General Porcelain lightning arresters are used to
protect the system from voltage spikes
Description: Transmission substations in the caused by lightning. Long, cantilevered
electrical system generally receive power at porcelain components (e.g., bushings and
high voltages (220 kV or more) and step it lightning arresters) are common on many
down to lower voltages for distribution. The electrical equipment items.
substations generally consist of one or more
control buildings, steel towers, conductors,

238 Appendix B: Lifeline Vulnerability Functions ATC-25


Typical Seismic Damage: Control buildings 2. Direct Damage
are subject to generic building damage
ranging from dropped suspended ceilings Basis: Damage curves for transmission
and cracks in walls and frames to partial and substations for the electrical system are
total collapse. Unanchored or improperly based on ATC-13 data for FC 66, electrical
anchored control equipment may slide or equipment (see Figure B-53). High-voltage
topple, experiencing damage or causing porcelain insulators, bushings, and supports
attached piping and conduit to fail. In the are vulnerable to damage, even when the
yard, steel towers are typically damaged only porcelain components have been designed
by soil failures. Porcelain bushings, and qualified to enhanced seismic criteria.
insulators, and lightning arresters are brittle Consequently, the detrimental intensity shift
and vulnerable to shaking and are frequently indicated below is assumed appropriate.
damaged. Transformers are large, heavy
pieces of equipment that are frequently Standard construction is assumed to
unanchored or inadequately anchored. represent typical California transmission
Transformers may shift, tear the attached substations under present conditions (e., a
conduit, break bushings, damage radiators, composite of older non-seismically designed
and spill oil. Transformers in older substations as well as more modern
substations that are mounted on rails substations designed to enhanced seismic
frequently have fallen off their rails unless requirements).
strongly anchored. Other top-heavy pieces
of electrical equipment can topple or slide Present Conditions: In the absence of data
when inadequately anchored, damaging on the type of equipment, substation
connections. Frequently, inadequate slack in voltage, age, etc., the following factors were
conductors or rigid bus bars result in used to modify the mean curves, under
porcelain damage resulting from differential present conditions:
motion.
MM!
Seismically Resistant Design: Porcelain is .intensity
used extensively in ways that make it NEHRPMap Area Shift
susceptible to damage (bending and California 7 +1
tension). Recent developments including California 3-6 +2
gas-insulated substations and installation
Non-California 7 +2
Puget Sound 5 +2
details that base isolate, reinforce, or add All other areas +3
damping, may reduce the problem in the
future. Seismically resistant design practice Upgraded Conditions: For areas where it
includes the use of damping devices for appears cost-effective to improve facilities,
porcelain; proper anchorage for equipment assume on a preliminary basis that upgrades
(avoid the use of friction clips); provision of result in a beneficial intensity shift of one
conductor slack between equipment in the unit (i.e., -1), relative to the above present
substation; use of breakaway connectors to conditions.
reduce loads on porcelain bushings and
insulators; and replacement of single Time-to-restoration: The time-to-
cantilever-type insulator supports with those restoration data assigned to SF 29c,
having multiple supports. Transformer transmission substations, are assumed to
radiators that cantilever from the body of apply to all transmission substations in
transformer can be braced. Adequate California. For transmission substations in
spacing between equipment can reduce the other areas, response planning is not as
likelihood of secondary damage resulting complete, and the restoration time is
from adjacent equipment falling. Control assumed to be 1.5 times longer. By
buildings and enclosed control equipment combining these data with the modified
should be designed to satisfy the seismic damage curves for FC 66,the time-to-
requirements of the local or national restoration curves shown in Figures B-54
building code, as a minimum. through B-56 were derived.

ATC-25 Appendix B:Lifeline Vulnerability Functions 239


Transmission Substation
transnission Substation
D=108x

813

E
co
0

wD=Sox

Dlix
IVI VII Vill Ix x
'Modified Mercalli Intensity (MMI)

Figure B-53 Damage percent by intensity for electric transmission substations.

transnission Substation
U- en.,.
LUur.
00_ 4 aa 11 I .n
ii- - i~
1.un nb i.nn3-

Mlil a b
6 0.126 0.092
7 0.101 0,030
B H.882 0.019
: tf
a 9 8.67 0.01O
0- 18 8.858 0.009
:-5.
R= sez
R b *days a
co

R= OXL I I I I I I i l

,DAYss
1: 30 60 90 120 150 180 218 248 Z71' 300 330 365
Elapsed Time in Days

Figure B-54 Residual capacity for electric transmission substations (NEHRP California 7).

240 Appendix B:Lifeline Vulnerability Functions ATC-25


Transnission Substation
14=100v J 1
1n .V[!I
rr
UU
I
g
n
sULI'

.=Zz MM a b
6 8.101 0.03B
7 8.802 0.019
8 8.867 8.812
C. 9 8.8;52 0.009
a 18 H.844 0.007
O R= S/z
~0

_ R =b days + a
Cd,
0co
rD

R= z lI lI l l l l
I l

DAYS: 38 G8 98 128 158 188 218 240 278 308 338 365
Elapsed Time in Days
Figure B-55 Residual capacity for electric transmission substations NEHRPMap Area: California 3-6,
Non-California 7 and Puget Sound 5).

Transmission Substation
1.08 68 1.02

MKIl Ia b
6 8.819
8.86?
7 .012
8.858 E.289

:Cs
CL
9 8.8 8.887

-a R b * days + a

EG

n- O.,
"->
I
.
M= I
- :. 3 I I I
I
DAYTS: 8EI 9 128 I58 188 218 248 278 308 330 365
Elapsed Time in Day,

Figure B-56 Residual capacity for electric transmission substations (All other areas).

A+TC-25 Appendix B:Liteline Vulnerability Functions 241


Distribution Lines
DzI100v s5 1.af0

0 =80

ax
CY)

Other
CA 7
- CA3-6
- Non-CA7-
D=O/ P.S.5
VI ViI U111 ix X
Modified Mercalli Intensity (MMI)

Figure B-57 Damage percent by intensity for electric distribution lines.

B.S.S DistributionLines Seismically Resistant Design: Seismic loads


do not generally have much influence on the
1. General design of distribution lines and towers. The
towers are typically designed to withstand
Description: In general, distribution lines wind loads. The primary concern is siting
may be underground or above ground towers and poles where soils are stable to
supported by towers or poles. Towers are prevent foundation failures.
usually steel, and poles are usually treated
wood. Towers are provided with concrete 2. Direct Damage
footings, and poles may have footings or
may be embedded directly into the ground. Basis: Damage curves for distribution lines
Transformers on poles may be supported on in the electrical system are based on ATC-13
platforms or anchored directly to poles. data for FC 55, conventional electrical
Distribution lines typically operate at lower transmission line towers (less than 100 feet
voltages (64 kV or less). tall, see Figure B-57). In general, less
conservative design criteria are used for
Typical Seismic Damage: Unanchored pole- distribution lines than for lines in the
mounted transformers may be knocked transmission system.
down and some will burn. Towers and poles
are generally undamaged except by Standard construction is assumed to
secondary effects such as landslides, represent typical California distribution
liquefaction, and other ground failures. lines, towers, and poles, under present
Conductor lines swinging together can cause conditions (i.e., a composite of older and
burnouts and/or start fires. Settlement of more modern lines and towers). Only
soils with respect to manholes can minimal regional variation in the
sometimes cause underground line routed construction quality is assumed.
through the manhole to fail.
Present Conditions: In the absence of data
on the type of tower/pole or conductor, age,

242 Appendix B:Lifeline Vulnerability Functions ATC-25


istribution Lines
!9L 1.80 55 4 an
1.
v.alu

lil a. b
S 8.448 1.375
7 0.445 e.882
8 .443 8. 59
_5
aco 9 8.432 8.174
10 8.393 0.08
(3
R =3 * Jays + a
(/2
C,
mr

R= z lI l
I l
i - lI l, l -
l
,I

DAYS: G0 98 128 158 188 210 248 278 380 338 365
Elapsed Time in Days

Figure B-58 Residual capacity for electric distribution lines (NEHRPMap Area: California 3-6,
California 7, Non-California 7, and Puget Sound 5).

etc., the following factors were used to modify B.516Distribution Substations


the mean curves, under present conditions:
1. General
MMI
Intensit Description: Distribution substations in the
NEHRP Map Area Shift electrical system generally receive power at
California 7 0 low voltages (64 kV or less) and step it down
California 3-6 0
Non-California 7 to lower voltages for distribution to users.
0
Puget Sound 5 0 The substations generally consist of one
All other areas +1 small control building, steel towers,
conductors, ground wires, and electrical
Upgraded Conditions: It is not cost- equipment including circuit breakers,
effective or practical to upgrade existing switches, wave traps, buses, capacitors,
transmission towers, unless supporting or voltage regulators, and transformers.
adjacent soils are known to be unstable.
Therefore, no intensity shifts for upgrading Typical Seismic Damage: Control buildings
are recommended. are subject to generic building damage
ranging from cracks in walls and frames to
Time-to-restoration: The time-to- partial and total collapse. Unanchored or
restoration data assigned to SF 29d, improperly anchored control equipment
distribution lines, are assumed to apply to all may slide or topple, experiencing damage or
distribution lines. By combining these data causing attached conduit to fail- In the yard,
with the damage curves for FC 55, the time- steel towers are typically damaged only by
to-restoration curves shown in Fiugres B-58 soil failures. Porcelain bushings, insulators,
and B-59 were derived. and lightning arresters are brittle and
vulnerable to shaking and are frequently

ATC-25 Appendix B: Lifeline Vulnerability Functions 243


listribution Lines
4 a
R=100 29d 1.08 55 .. "u-

8488x MtlI a b
6 0.445 8.80Z
7 0.443 8.589
8 0.432 8.174
co
9 B.393 0.8DB
0- 10 0.297 0.847
° R= Sex
ia
C5
W H = b * days a
(U

Rz
_

I~~~~~~~~~~~~~~~
H= I
. . .I
I I
.Ii -I.
I
.I .I I

1AYS: 30 68 98 120 150 188 218 240 Z78 300 338 365
Elapsed Time in Days

Figure B-59 Residual capacity for electric distrit )ution lines (All other areas).

damaged. Transformers are large, heavy single cantilever-type insulator supports


pieces of equipment that are frequently with those having multiple supports; and
unanchored or inadequately anchored. provision of adequate slack in conductors
Transformers may shift, tear the attached and bus bars connecting components that
conduit, break bushings, damage radiators, may experience differential movement will
and spill oil. Transformers in older significantly reduce seismic vulnerability.
substations that are mounted on rails
frequently have fallen off their rails unless 2. Direct Damage
strongly anchored. Other top-heavy pieces
of electrical equipment can topple or slide Basis: Damage curves for distribution
when inadequately anchored, damaging substations for the electrical system are
connections. Frequently, inadequate slack in based on ATC-13 data for FC 66, electrical
conductors or rigid bus bars result in equipment (see Figure B-60). It is believed
porcelain damage resulting from differential that this facility class best approximates the
motion. expected performance of distribution
substations.
Seismically Resistant Design: Porcelain in
distribution substation is susceptible to Standard construction is assumed to
damage but is less vulnerable than porcelain represent typical California distribution
in transmission substations by virtue of its substations under present conditions (i.e., a
shorter cantilever lengths. Seismically composite of older non-seismically designed
resistant design practices include the use of substations as well as more modern
installation details that base isolate, substations designed to enhanced seismic
reinforce, or add damping devices to the requirements).
porcelain. Proper anchorage details should
be used for all yard equipment. Breakaway Present Conditions: In the absence of data
connectors for porcelain; replacement of on the type of equipment, substation

244 Appendix B: Lifeline Vulnerability Functions A


ATC-25
.'. I
Distribution Sstation
Dzt0lH

E
)
a)
E
(U
C

D=O
1l ViI VIII Ix X
Modified Mercalli ntensity (MMI)

Figure B-60 Damage percent by intensity for electric distribution substations.

voltage, age, etc., the following factors were with the damage curves for FC 66, the time-
used to modify the mean curves, under to-restoration curves shown in Figures B-61
present conditions: through B-63 were derived.

Mm/ B.6 Water Supply


Intensity
NEHRP Map Area Shift B.6.1 Transmission Aqueducts
California 7 0
California 3-6 +1 1. General
Non-California 7 +1
Puget Sound 5 +1
All other areas +2 Description: In general, various types of
transmission aqueducts can be used for
Upgraded Conditions: For areas where it transporting water, depending on
appears cost-effective to improve facilities, topography, head availability, construction
assume on a preliminary basis that upgrades practices, and environmental and economic
result in a beneficial intensity shift of one considerations. Open channels are used to
unit (i.e., -1), relative to the above present convey water under conditions of
conditions. atmospheric pressure. Flumes. are open
channels supported above ground. Channels
Time-to-restoration: The time-to- may be lined or unlined. Lining materials
restoration data assigned to SF 29e, include concrete, bituminous materials,
distribution substations, are assumed to butyl rubber, vinyl, synthetic fabrics, or other
apply to all distribution substations in products to reduce the resistance to flow,
California. For distribution substations in minimize seepage, and lower maintenance
other areas, response planning is not as costs. Flumes are usually constructed of
complete and restoration time is assumed be concrete, steel, or timber. Pipelines are built
1.5 times longer. By combining these data where topographic conditions preclude the

AT-2Apni :Lfln unrblt ucin 4


ATC-25 Appendix B: Lifeline Vulnerability Functions 245
Distribution Substation
R=10f 29e 1.00 66 1.0n

MITI a b
6 0.0838 0.273
7 08,05 8.139
8 0.082 0.055
9 0.806 0.826
a 10 0.078 0.015
Ca
() n_r
Ca
R = b * days + a
n
cR

a,

Ay, I I I I I I
I II
DA. i I I
DAYS 30 60 90 120 150 180 210 240 Z70 300 330 365
Elapsed Time in Days

Figure B-61 Resicdual capacity for electric distribution substations (NEHRP California 7).

Distribution Substation
S A .
Rz! -2Z9e I.001 bb 1. 00-
L

KH1 a b
6 0.085 0.139
7 0.802 0.655
>. 8 0.080 0.026
aC_ 9 0.070 0.815
I0 10 0.077 0. 11
I- -=
B b * days + a
._
a)

. ?,/I

- -- I
V-
n-
uv
u. - I
L
I I i I I I I 1 I I

DAYS: t30 60 90 120 150 180 210 240 270 300 330 365
Elapsed Time in Days

Figure B-62 Residual capacity for electric distribution substations (NEHRP Map Area 3-6, Non-
California 7, and Puget Sound 5).

246 Appendix B:Lifeline Vulnerability Functions A


ATC-25,,,
DistributionSstation

tMl1I a b,
6 8 82 8 .855
7 2.80 BI26

8 8.878 .8.815
-0
co 9 8.877 8.8i
10 0.876 8.888
0 R= 50;x
-D
[I
C) R = lb days a
0
. _

R= 80/
DIr 60
Elapsed Time in Days

Figure B-63 Residual capacity for electric distribution substations (All other areas).

use of canals. Pipelines may be laid above- Seismically Resistant Design: Seismically
-orbelow ground, or may be partly buried. resistant design practices include providing
Most modern pressure conduit are built of reinforced concrete linings for channels and
concrete, steel, ductile iron, or asbestos tunnels. Channels should have slopes
cement. Tunnels are used where it is not appropriate for embankment materials to
practical to lay a pipeline, such as mountain prevent slumping. Tunnels, should be
or river crossings. They may be operated strengthened at intersections, bends, and
under pressure or act as open channels. changes in shape and construction materials.
Linings may be unreinforced concrete, Aqueducts should be sited to eliminate or
reinforced concrete, steel, or brick. minimize fault crossings. Aqueducts that
cross faults can be routed through pipe
Typical Seismic Damage: Channels are buried in shallow loose fill or installed above
most susceptible to damage from surface ground near the fault, to allow lateral and
faulting and soil failures such as differential longitudinal slippage.
settlement, liquefaction, or landsliding.
Unreinforced linings are more susceptible to 1. Direct Damage
damage than are reinforced linings. Small
fractures in the lining can result in a Basis: Damage curves for transmission
transmissionaqueduct being taken out of aqueducts of the water supply system are
service, as water leaking through the lining based on ATC-13 data for FC 3, tunnels
could erode supporting embankments or passing through alluvium, and FC 61, canals
surrounding soils and cause significant (see Figure B-64). Aqueducts are assumed
damage. Regional uplift could result in long- to be a-combination of 50% tunnels and
term loss of function by changing the 50% canals. Tunnels passing through
hydraulic flow characteristics of the alluvium are less vulnerable than cut-and-
aqueduct. cover tunnels and more vulnerable than

ATC-25 Appendix B: Lifeline Vulnerability Functions 247


Transmission Aqueduct
En -
-n.:n
u=lnnz
-1-1
_
-
61 O.so

80

a)
0)
PA-U.
E
0

Figure B-64
u tu,. I)^
V
VI
VI
I1 ,XI
V11
V II I
Vill
Modified Mercalli Intensity (MMI)

Damage percent by intensity for transmission aqueducts.


IX
Other

GA 3-6
P,-s-

P.S.
CA 7-

I X
X

tunnels passing through rock; they were assume on a preliminary basis that upgrades
chosen as representative of all tunnels. result in a beneficial intensity shift of one
unit (i.e., -1), relative to the above present
Standard construction is assumed to conditions.
represent typical California aqueducts under
present conditions (i.e., a composite of older Time-to-restoration: The time-to-
and more modern aqueducts). Only minimal restoration data assigned to SF 30a,
regional variation in construction quality of transmission aqueducts, are assumed to
aqueducts is assumed. apply to all transmission aqueducts. By
combining these data with the damage
Present Conditions: In the absence of data curves derived using the data from FC 38
on the type of construction, age, etc., the and 61, the time-to-restoration curves shown
following factors were used to modify the in Figures B-65 and B-66 were derived.
mean curves for the two facility classes listed
above, under present conditions: B.6.2 PumpingStations
MM! 1. General
Intensity
Shift Description: Pumping equipment forms an
NEHRP Map Area FC 38 FC 61 important part of the water supply system
California 7 0 0 transportation and distribution facilities. In
California 3-6 0 0 general, pumping stations include larger
Non-California 7 . 0 0 stations adjacent to reservoirs and rivers,
Puget Sound 5 0 0
+1 and smaller stations distributed throughout
All other areas +1
the water system intended to raise head.
Large pumping stations typically include
Upgraded Conditions: For areas where it
intake structures. Pumping stations typically
appears cost-effective to improve facilities,

248 Appendix B:Lifeline Vulnerability Functions ATC-25


> 5 5
Transnission queduct
R1iB10. / ,XI- I 0f -in aU.;)ra
.61 9.50
x

MMI a
6 -1.8B1 1.718
7 -8.913 0.599
B -0.951 0.545
9 -8.922 8.354
fl -0. 40 0.142
-o
01D R= 90Z
GU R = ays a

- .I
.11 I I T T I I I i I
. -- -

DAYS: e ~90 12 150 186 218 240 27 3 330 365


Elapsed Time in Days

Figure B-65 Residual capacity for transmission aqueducts (NEHRPMap Area: California 3-6, Californa
7, Non-California 7, and Puget Sound 5).

Thansnission Aueduct

.0
Cs
co
cc _
0 R 0

68 90 1201 158 180 218 240 278 308 330 365


Elapsed Time in Days

Figure B-66 Residual capacity for transmission aqueducts (All other areas).

Vulnerability Functions 249


ATC-25 B:Lilellne
Appendix B:
Appendix Lifeline Vulnerability Functions 249
comprise shear-wall-type buildings, intake water, and these structures should be built
structures, pump and motor units, pipes, on stable soil. Also, pumps and heavy
valves, and associated electrical and control equipment should be provided with positive
equipment. Requirements vary from small means (anchorage) of resisting lateral
units used to pump only a few gallons per forces; base isolators should be used only
minute to large units capable of handling when adequate snubbers are provided.
several hundred cubic feet per second. Buildings enclosing plant equipment should
Vertical turbine (most common) and be designed with seismic provisions of local
displacement pumps are the two primary or national building codes. The casings of
types used. Horizontal centrifugal pumps, wells should be separated from the pump
air-lift and jet pumps, and hydraulic rams are house by at least 1 inch to allow for relative
also used in special applications. Centrifugal movement and settlement. Pumps that are
pumps have impellers, which impart energy hung from the motor at the top of the well
to the water. Displacement pumps are by a non-flexible drive shaft inside the pump
commonly the reciprocating-type where a column are not recommended. Submersible
piston draws water into a closed chamber motor-driven, vertical turbine pumps do not
and then expels it under pressure. Pumps require the long drive shaft, and the need
may be in series or in parallel. Often an for a perfectly straight well casing is
emergency power supply comprising a therefore eliminated. Horizontal pumps and
standby diesel generator, battery rack, and their motors should be mounted on a single
diesel fuel tank is included in primary foundation to prevent differential
pumping stations to operate in emergency movement. Provisions for emergency power
situations when electric power fails. should be made for pump stations critical to
systems operation.
Typical Seismic Damage: Pumping stations
will suffer damage closely related to the 1. Direct Damage
performance of the soils on which they are
constructed. Intake structures are typically Basis: Damage curves for pumping stations
tower-type structures that are vulnerable to for the water system are based on ATC-13
inertial effects, and settlement and data for FC 10, medium-rise reinforced
landslides at bottoms of reservoirs and masonry shear wall buildings; FC 66,
rixcrs. Toppling of these towers allows electrical equipment, and FC 68, mechanical
coarse sediment to enter the distribution equipment (see Figure B-67). FC 10 was
system, plugging pipelines and causing chosen to represent a generic building,
extensive damage to pump bearings and based on review of damage curves for all
seals. Piping attached to heavy pump buildings. Pumping stations are assumed to
structures is susceptible to damage caused be a combination of 30% generic buildings,
by differential settlement. Unanchored 20% electrical equipment, and 50%
electrical and control equipment may be mechanical equipment.
severely damaged. Pumps with long shafts
may suffer misalignment, and shafts may be Standard construction is assumed to
cracked or sheared by ground movement. represent typical California pumping
Pipe hangers may be damaged by relative stations for water systems under present
settlement of building and associated conditions (i.e., a composite of older and
equipment. Damage to substation more modern stations). Only minimal
transformers can result in the loss of power. regional variation in construction quality of
mechanical equipment is assumed, as
Seismically Resistant Design: Seismically operational. loads frequently govern over
resistant design practice includes avoiding seismic requirements.
unstable soils in siting the pumping stations,
or providing foundations for structures and Present Conditions: In the absence of data
equipment capable of resisting expected soil on the type of pumps, age, etc., the
failures without damage. Design of intake following factors were used to modify the
structures should consider inertial forces mean curves for each of the three facility
developed from self-mass and surrounding

250 Appendix B: Lifeline Vulnerability Functions ATC-25


Pumping Station (Water Supply)
Dz=100/ I0 -H -
60' 0.5a
66 0.20

Other
CD
coD, 6;
(a

N-CA? 36

'A 5

VI Ul" VIII Ix X
Modified Mercalli ntensily (MMI)
Figure B-67 Damage percent by intensity for water supply pumping stations.

classes listed above, under present B.6.3 Storage Reservoirs


conditions:
1. General
MM!
Intensity Description: In general, storage reservoirs
Shift
for the water system comprise earthfill,
NEHRP Map Area FCI OFC 66 FC 68 rockfill, or concrete dams with gates,
California 7 o 0 1 spillways, conduit, tunnels, and intake
California 3-6 +1 +1 structures. Earthfill dams include an
Non-California 7 +1 +1
Puget Sound 5 *+1 +1 impervious, core, typically a clay material,
A1Iother areas +2 +2 +1
transition zones, drains, and sand filters
adjacent to the core. Grout is frequently
Upgraded Conditions: For areas where it providedunder the imperviouscore in the
appears cost-effective to improve facilities, foundation material, and in the abutments
assume on a preliminary basis that upgrades to prevent water penetration through cracks
result in one or two beneficial intensity and fissures in bedrock or flow through
shifts (ie., - or -2), relative to the above permeable native soils. Rockfill dams
present conditions. typically have concrete linings to prevent
water penetration. Concrete dam types
Time-to-restoration: The time-to- include gravity and arch. Roadways and/or
restoration data assigned to SF 30b, gantry cranes are commo nly located at the
pumping stations for water systems, are crest of the dam.
assumed to apply to all pumping stations. By
combining these data with the damage Typical Seismic Damage: Most engineered,
curves derived using the data for FC 10, 66, mechanically compacted earthfill dams have
and 68, the time-to-restoration curves shown performed well in earthquakes. Additionally,
in Figures B-68 through B-70 were derived. earthfill dams,constructed predominantly

ATC-25 Appendix B:Lifeline Vulnerability Functions 251


R=1800 1.00 10 0.30
Go 0.so
66 0.20

M1i1 a b
6 0.223 0.165
7 0,190 8.876
8 0.142 0.036
C 9 0. 18 0.021
C
C 10 0.078 0.014
CU
n R= so/:
c R = b * days a
-

:
a:

R.= S0
IIO

DAYS: 30 60 90 120 150 180 210 248 270 388 330 365
Elapsed Time in Days

Figure B-68 Residual capacity for water supply pumping stations (NEHRP California. 7).

Pumping Station (Wal ter Supply)


R=1 r 3Bb 1.00 10 8.30-
68 8.58
66 0.20

11111 a b
6 0 .156 0.044
7 0.122 0,026
8 0.092 0.017
.
9 0.064 0.012
a
CO'
CL' 10 0.042 0.0B9
_ R-
R =b days + a
Ir
ca

R= 0/. I l II I I I l

DAYS: 30 60 120 158 180 210 240 270 3 338 365


Elapsed Time in Days

Figure B-69 Residual capacity for water supply pumping stations (NEHRP Map Area 3-6, Non-
California 7, and Puget Sound 5).

252 Appendix B: Lifeline Vulnerability Functions ATC-25


Pumping Station (Water Supply)
na SA
D-4 GO1.. OCR.
3GO i~I1tR
.
toRa o..Ma
68 8.50
fis 8.20

MMT -
ul 4i
.
6 0.20S 08.103
7 0. 16 8. 044
1
8 A. 826

05
9 .8692 8.817
10 W8064 0.012

R b * days a
-CL
-..

O'R= 907

EC ~

. . L
l~ .I
l ~
.I
~
.I
L
.
l
.
I
l
.
I
.

DhYS: 30 60 90 128 190 188 218 240 278 308 338 365
Elapsed Time in Days

Figure B-70 Residual capacity for water supply pumping stations (Allother areas).

with clayey soils have performed well. Dams Settlement of rockfill dams is also a
constructed of hydraulic fill using saturated, possibility. Concrete dams have also
poorly compacted, fine-grain cohesionless performed well with little damage known.
material;dams constructed on natural Cracking of dams and foundation failures
cohesionless deposits that are not as dense are possible.
as the embankments; and dams with
unusually steep embankments have Seismically Resistant Design: Seismically
experienced failures in past earthquakes. resistant design practices for earthfill dams,
Dam embankments may respond to soil include providing ample freeboard to allow
failures by cracking (usually at the crest or for settlement and other movements, and
near the crest and abutments), spreading or using wide cores and transition zones
settling, or by slope stability failures. or zonal constructed of material resistant to cracking.
separations. Liquefaction may occur in Current design typically used dynamic
saturated zones of cohesionless materials analyses for all but small dams on stable
that are loose or marginally compacted, such foundations. These analyses are used to
as hydraulic fills. Both soil and rock determine the liquefaction or strain
foundations may be damaged by fault potential of embankments and foundations,
rupture, resulting in loss of continuity or and to estimate the settlement of
integrity of internal design features, (drains, embankments. Conservative crest details
imperious zones, etc.) and water-release include providing transition and shell zones
features (conduit and tunnels). Earthquake- that extend to the crest to control any
induced landslides may block water outlet seepage that develops through cracks, and
features or spillways, Or cause waves that providing camber for static and dynamic
overtop the dam and cause erosion. Where settlement. Conservative zoning consists of
cracks are opened in the embankment or providing confined clay cores, wide
foundation, the danger of piping exists if cohesionless transitions, and free draining
cracks remain open. Rockfill dams have shells. Reduction of embankment slopes and
performed well, with some damage to eliminationof embankment saturation
material near the crest of the dam. through linings can reduce susceptibility to

253
ATC-25 Appendix B:Lifeline Vulnerability Functions
Appendix B:
ATC-25 Lifeline Vulnerability Functions 253
Storage Reservoir
35 0.50-
36 a.5

a)
E
CZ
Other

0a

VI I Vi Vill Ix X

Figure B-71 Damage percent by intensity for storage reservoirs.

embankment failures. Seismically resistant rockfill, then the appropriate damage curves
design of concrete dams includes thorough will need to be developed (see ATC-13).
foundation exploration and treatment, and
selection of a good geometrical Standard construction is assumed to
configuration. Dynamic analyses similar to represent typical California reservoirs (i.e., a
those used for earthfill dams may be used to composite of older and more modern
check designs, and to determine stresses and reservoirs).
cracking potential of dams and dam
appurtenances. Effective quality control is Present Conditions: In the absence of data
necessary in the design and construction of on the type of construction, age, etc., the
all dams. Stabilization of existing dams can following factors were used to modify the
be achieved by buttressing, draining, or mean curves for each of the two facility
reduction in reservoir storage. Potentially classes listed above, under present
liquefiable soils have been densified by conditions:
blasting, vibratory probing, adding backfill,
and driving compaction piles. MM/
Intensity
Shift
1. Direct Damage
NEHRP Map Area FC35 FC36
California 7 Oo 0
Basis: Damage curves for storage reservoirs
in the water supply system are based on California 3-6 0 0
Non-California 7 +1 +1
ATC-13 data for FC 35, concrete dams, and Puget Sound 5 +-1 +1
FC 36, earthfill or rockfill dams (see Figure All other areas +2 +2
B-71). Storage reservoirs are assumed to be
a combination of 50% concrete dams and Upgraded Conditions: For areas where it
50% earthfill or rockfill dams. If inventory appears cost-effective to improve facilities,
data identify dams as concrete, or earthfill or assume on a preliminary basis that upgrades

ATC-25
Appendix B: Lifeline
Appendix B, Vulnerability Functions
Lifeline Vulnerability Functions ATC-25
254
254
age fleservolrr
1.a INs
au
a C14
U..JU
38 8.58

li aL b
0.871 8.537
7 8D865
8 e . 94
*0 2.866
co 9 e.833
CL
0.066
to 8.819
B= S8Z
= * das a
En
CD
IC

r= z. I
l l
t
:
k
l
I
j
i
l Sl

DAYS: 0 60 90 128 158 1B 218 248Z 78 388 330 365


Elapsed Time in ays

Figure B-72 Residual capacity for storage reservoirs (NEHRP California 7).

result in a beneficial intensity shift of one requires the most. Types of water treatment
unit (i.e., -1), relative to the above present plants include aeration, split treatment, or
conditions. chemical treatment plants. Flexibility and
room for growth are typically provided to
Time-to-restoration: The time-to- handle changing quality of water.
restoration data assigned to SF 30c, storage Consequently, plants commonly contain
reservoirs for water supply systems, are components of different vintages and
assumed to apply to all storage reservoirs. constructiontypes. Current pre-treatment
By combining these data with the damage processes are screening, pre-sedimentation
curves derived using the damage data for FC or desilting, chemical addition, and aeration.
35 and 36, the time-to-restoration curves Components in the treatment process
shown in Figures B-72 through B-74 were include pre-sedimentation basins, aerators,
derived. detention tanks, flocculators, clarifiers,
backwash tanks, conduit and channels, coal-
B.6.4 TreatmentPlants sand or sand filters, mixing tanks, settling
tanks, clear wells, and chemical tanks.
1. General Processes used for flocculation include
paddle (most common in modem facilities),
Description: Water treatment plants are diffused air, baffles (common in older
complex facilities. In general, the typical facilities), transverse or parallel shaft mixers,
water sources for a treatment plant are vertical turbine mixers, and walking-beam-
shallow or deep wells, rivers, natural lakes, type mixers. Sedimentation basin
and impounding reservoirs. Treatment construction may vary from excavation in
processes used depend on the raw-water the ground to a structure of concrete or
source and the quality of finished water steel construction. Most modern
desired. Water from wells typically requires sedimentation basins are circular concrete
the least treatment, and water from rivers tanks (open or covered), equipped with

ATC:-25 Appendix B:Lifeline Vulnerability Functions 255


Storage Reservohi I
- 30c, 1.00

co
o R= 5O
.D

a)
I~r:

R= 0;/ 1
DAYS: 30 68 98 120 150 188 218 ; 40 278 300 338 365
Elapsed Time in Days

Figure B-73 Residual capacity for storage reservoirs (NEHRP Map Area: California 3-6, Non-California
7, and Puget Sound 5).

Storage Reservoir

. _

CL
co
ma
2 R=_SOV
:3
,
C,
En

.R= Ox
DAYS: 30 68 90 120 158 188 218 Z40 270 308 330 365
Elapsed Time in Days

Figure B-74 Residual capacity for storage reservoirs (All other areas).

Functions ATC-25
256
256 Appendix
Appendix B: Lifeline Vulnerability
B: Lifeline Vulnerability Functions ATC-25
mechanical scrapers for sludge removal. emergency power to provide pumping
Depths typically vary from 8 to 12 feet and capacity must be available. Slopes adjacent
diameters from 30 to 150 feet. Sludge to the plant should be studied to ascertain
processing components include holding their stability, and mitigating measures
tanks and clarifier thickeners. Control should be taken if necessary. Damage to
equipment, pumps, piping, valves, and other channels and conduit can be mitigated by
equipment are ypically housed in a control providing wall penetrations that allow for
building. Yard equipment generally includes differential settlement. Similarly, flexibility
transformers and switchyard equipment. should be provided in connections and
piping where they span across erypansion
Typical Seismic Damage: Structures and joints or between structures on difterent
equipment in water treatment plants are foundation types. Equipment damage can be
vulnerable to settling of foundations, reduced by using cast-in-place bolts rather
especially when founded on fill. Differential than expansion anchors and using
settlement of adjacent structures and equipment with a low center of gravity.
components supported on different Equipment and piping should be protected
foundations is a particular problem Pipes from falling debris. Building design should
are vulnerable at locations where they satisfy the seismic requirements of the local
connect to or penetrate treatment building code, as a minimum. Heavy
structures. Equipment such as pumps can be equipment such as sludge-processing
damaged by loads imposed by piping when equipment should be located as low as
differential settlement occurs. Channels and possible in the building. Horizontal tanks on
large conduit connecting processing units saddles should be restrained to saddles to
are subject to seismic damage from several prevent slippage and rupture of attached
mechanisms, including differential piping. Design of equipment immersed in
movement from inertial loading, differential water (e.g., paddles, rakes, baffles) should
settlement, and increased lateral earth consider both inertial effects and those due
pressures. Liquefaction may cause some to sloshing of water. Design of such
underground structures in areas of high equipment should also consider ease of
groundwater to float. Concrete basins and replacement. Vertical turbine pumps
tanks are subject to cracking and collapse of hanging in tanks should be avoided if
walls and roofs. Pounding damage or possible--or designed for seismic loads, as a
permanent movement may result in the minimum. Chlorine cylinders should be
opening of expansion joints in basins. strapped in place on snubbed chlorine
Within basins, sloshing and wave action, as scales. Standard safety and shutdown
well as shaking, can damage anchor bolts systems for gas and chemical systems should
and support members for reactors and rakes. be installed and properly maintained.
Building damage may range from dropped Routine checks are recommended to ensure
suspended ceilings and cracks in walls and that valves are operable, and that stockpiles
frames to partial and total collapse. of spare parts and tools are available. Basins
Unanchored or improperly anchored or structures founded on separate
equipment may slide or topple, experiencing foundation materials should have separate
damage or causing attached piping and foundations and should be separated by a
conduit to fail. Damage to substation flexible joint. All critical piping (exclusive of
transformers can result in loss of power corrosive chemical systems) should be
supply. welded steel.

Seismically Resistant Design: Seismically 2. Direct Damage


resistant design includes providing capability
to bypass plant treatment and to provide Basis: Damage curves for treatment plants
emergency chlorination in the event of in the water supply system (see Figure B-75)
damage caused by an earthquake. An are based on ATC-13 data for C 10,
emergency power system for the chlorine medium-rise reinforced masonry shear wall
injection, controls, and radios is a minimum buildings; C 41, underground liquid storage
and if gravity flow is not possible, sufficient tanks, and FC 68, mechanical equipment.

ATC-25 Appendix B: Lifeline Vulnerabilitly Functions 257


Treatment Plant (Water Supply)

a)
0)
E D=S07
3 Other

VI VII Viii IX X
Modified Mercalli Intensity (MMI)

Figure B-75 Damage percent by intensity for water supply treatment plants.

FC 10 was chosen to represent a generic MM/


building, based on review of damage curves Intensity
Shift
for all buildings. Water treatment plants are
assumed to a combination of 20% generic NEHRP Map Area FC 10FC41FC68
buildings, 30% underground storage tanks, California 7 o 0 0
and 50% mechanical equipment. California 3-6 +1 0 0
Non-California 7 +1 0 0
Puget Sound 5 +1 0 0
Standard construction is assumed to All other areas +2 +1 +1
represent typical California treatment plants
under present conditions (i.e., a composite Upgraded Conditions: For areas where it
of older and more modern treatment appears cost-effective to improve facilities,
plants). It is assumed that minimal regional assume on a preliminary basis that upgrades
variation exists in construction quality of result in a beneficial intensity shift of one
underground storage tanks and mechanical unit (i.e., -1), relative to the above present
equipment. Seismic loads have little impact conditions.
on underground storage tank design, and
operational loads often govern over seismic Time-to-restoration: The time-to-
requirements in the design of mechanical restoration data assigned to SF 30d,
equipment. treatment plants in the water supply system,
are assumed to apply to all treatment plants.
Present Conditions: In the absence of data By combining these data with the damage
on the type of material, age, etc., use the curves derived using the data for FC 10, 41,
following factors to modify the mean curves and 68, the time-to-restoration curves shown
for each of the three facility classes listed in Figures B-76 through B-78 were derived.
above, under present conditions:

258 Appendix B:Lifeline Vulnerability Functions ATC-25


5
atmentPlant (Water Supply)
H=1EB, 30d1 I.00 18 0.20
68 5.-5
41 0.3fi

a b
8.809 0.W11
7 .836
* 0.172
8 0.865 .858
8. 801 8. 22
18
13.894 8.811
,S R= x
R =b *days

R= 13;: I
I
,
I
, I
, i I I :

DAYS: 3f 68 981 120 150 188 218 240 2 3 38


Elapsed Time in Days

Figure B-76 Residuai capacity for water supply treatment plants NEHRP California 7).

Rz=1E0
I

b
0.404
5 891
80.838
B. 811
a
:
H.Hi
Ca
u5
I
G
-a ys +

B= x I I
lJAYS: 38 68 98 128 158 188 218 248 270 388 338 35
Elapsed Time in Days

Figure B-77 Residualcapacity for water supply treatment plants (NEHRP Map Area 3-6, Non-
California 7 and Puget Sound 5).

ATC-25 Appendix B: Lifeline Vulnerability Functions 259


Treatment Plant (Water Supply)
R-10 0 1.00 10 0.20
68 3.50
41 0.30

IHHI a b
6 0.051 0.091
7 0.870 0.830
._ 8 0.085 B.01B
9 0.897 0.818
Ca
10 0.106 0. 006

B b * da9s + a
C)
a)
cc

n n I I I I
A
1- Uio
U S: 3 I I II 1 I I :

DAYS: 30
I
60
I
90 120 15 180 210 248
1
270 300 330 II
365
Elapsed Time in Days

Figure B-78 Residual capacity for water supply treatment plants (All other areas).

B.6.5 Terminal ReservoirslTanks Impounding reservoirs may be lined or


unlined, and with or without roofs.
1. General
Typical Seismic Damage: Failure modes for
Description: In general, terminal reservoirs underground tanks include damage to
may be underground, on-ground, or concrete columns that support roofs,
elevated storage tanks or impounding sloshing damage to roofs, and cracking of
reservoirs. Underground storage tanks are walls. In cases of liquefaction, empty tanks
typically reinforced or prestressed concrete can become buoyant and float upward,
wall construction with either concrete or rupturing attached piping. Impounding
wood roofs. They may be either circular or reservoirs perform similarly to underground
rectangular. On-ground water supply tanks. At-ground tanks are subject to a
storage tanks are typically vertical anchored variety of damage mechanisms, including,
and/or unanchored tanks supported at for steel tanks: (1) failure of weld between
ground level. Construction materials include base plate and wall, (2) buckling of tank wall
welded, bolted, or riveted steel; reinforced (elephant foot), (3) rupture of attached rigid
or prestressed concrete; or wood. Tank piping resulting from sliding or rocking of
foundations may consist of sand or gravel, or tank, (4) implosion of tank caused by rapid
a concrete ring wall supporting the shell. loss of contents and negative internal
Elevated storage tanks consist of tanks pressure, (5) differential settlement, (6)
supported by single or multiple columns. anchorage failure or tearing of tank wall, (7)
Most elevated tanks are steel and are failure of roof-to-shell connection, (8)
generally cylindrical or ellipsoidal in shape. failure of shell at bolts or rivets, and (9) total
Multiple-column tanks typically have collapse. Concrete tank failure modes
diagonal braces, for lateral loads. Elevated include: (1) failure of columns supporting
tanks are more common in areas of flat roofs, (2) spalling and cracking, and (3)
terrain. There is large variation in tank sizes sliding at construction joints. Wood tanks
(i.e., height and diameter), so volumes range have not performed well in past earthquakes
from thousands to millions of gallons. and generally fail in a catastrophic manner.

260 Appendix B:Lifeline Vulnerability Functions ATC-25


Elevated tanks typically fail as a result of and anchoring or strapping the tank to the
inadequate bracing or struts, although foundation. Maintaining a height-to-
column buckling or anchorage or diameter ratio of between 0.3 and i07 for
connection failure (clevises and gusset tanks supported on-ground controls seismic
plates) are common causes. If elevated tank loading. Because the damage to elevated
damage exceeds minor bracing or tanks typically involves the supporting
connection failure, damage is usually structure rather than the supported vessel,
catastrophic- Piping and other the primary Seismically resistant design
appurtenances attached to tanks can also practices for elevated tanks are design of the
fail because of tank or pipe motion, causing braces for adequate lateral loads, providing
loss of contents. adequate anchorage at the column bases,
connectingthe tank to the frames that
Seismically Resistant Design: General support it for load transfer, and providing
Seismically resistant design practices for flexibility in the attached piping to
underground tanks include designing walls accommodate expected motions. The
for a combination of earth pressures and bracing system should be designed to yield
seismic loads; densifyng the backfill used prior to connection failure. Rods used for
behind the walls to reduce liquefaction bracing should have upset threads with large
potential; designing columns supporting the deformable washers under retaining nuts to
roof for seismic loads; tying the roof and absorb energy.
walls together; providing adequate
freeboard to prevent sloshing against the 2. Direct Damage
roof; and recognizing the potential for
flotation and providing restraint Control of Basis: Damage curves for water supply
buoyant forces can be achieved by tying the terminal reservoirs are based on ATC-13
tank to piles designed to resist uplift, data for FC 43, on-ground liquid storage
increasing the mass of the tank (e.g., provide tanks (see Figure B-79),.On-ground storage
overburden on the roo, or providinga tanks,are less vulnerablethan elevated
positive drainage system. An annular space tanks, and more vulnerable than
that permits relative movement should be underground tanks, and were chosen as
provided where piping penetrates the wall. representative of existing terminal
Seismically resistant design practices for at- reservoirs. If inventory data identify tanks as
ground tanks include the use of flexible underground or elevated, then use FC 41 or
piping, pressure relief valves, and well- 45, respectively, in lieu of FC 43.
compacted foundations and reinforced
concrete ring walls that prevent differential Standard construction is assumed to
settlement. Adequate freeboard to prevent represent typical California terminal
sloshing against the roof should be reservoirs under present conditions [i.e., a
maintained. Good practices, for steel tanks composite of older, non-seismically designed
include providing positive attachment tanks as well as more modern tanks designed
between the roof and shell, stiffening the to seismic requirements (e.g., AWWA
bottom plate and its connection to the shell, DI00, Appendix A)].
protecting the base plate against corrosion,
and avoiding abrupt changes in thickness Present Conditions: In the absence of data
between adjacent courses. Properly detailed as to type of material, age etc., use the
ductile anchor bolts may be feasible on following factors to modify the mean curves,
smaller steel tanks. For concrete tanks, under present conditions:
keying and detailing to prevent sliding is
good practice. Columns supporting roofs MMI
should be detailed to prevent brittle failures. Intensity
In areas where freeze-thaw cycles are a NEHRP Map Area Shift
problem, minimum strength requirements California 7 0
that ensure durabilityshould be met. For California 3-6 +1
wood tanks, Seismically resistant design Non-California 7 +1 '
Puget Sound 5 +1
practices include increasing hoop capacity, All other areas +2

ATCC:-25 Appendix B:Lifeline Vulnerability Functions 2,1


Terminal Reservoir (Storage
D=180v 43 1.

80
a)
0)
ca D=507
E
a Othi

1V WII III IX X
Modified Mercalli Intensity (MMI)

Figure B-79 Damage percent by intensity for water supply terminal reservoirs/storage tanks.

Upgraded Conditions: For areas where it inches or more in diameter) are usually
appears cost-effective to improve facilities, welded steel or reinforced concrete and may
assume on a preliminary basis that upgrades carry water at high pressures (several
result in one or two beneficial intensity hundred psi). Joints in steel pipes may be
shifts (i.e., -1 or -2), relative to the above welded or bell-and-spigot types. Except in
present conditions. areas of freezing, backfill measured from the
pipe crown is typically between 2.5 and 4.5
Time-to-restoration: The time-to- feet. In addition to the pipes themselves,
restoration data assigned to SF 30e, terminal trunk lines include a number of other
reservoirs for water supply, are assumed to components. Pipelines may require gate
apply to all tanks. By combining these data valves, check valves, air-inlet release valves,
with the damage curves for FC 43, the time- drains, surge control equipment, expansion
to-restoration curves shown in Figures B-80 joints, insulation joints, and manholes.
through B-82 are derived. Check valves are normally located on the
upstream side of pumping equipment and at
B.6.6 Trunk Lines the beginning of each rise in the pipeline to
prevent back flow. Gate valves are used to
1. General permit portions of pipe or check valves to be
isolated. Air-release valves are needed at
Description: In general, trunk lines may be the high points in the line to release trapped
underground, on-ground, or supported on gases and to vent the lines to prevent
elevated frames above ground. However, vacuum formation. Drains are located at low
most trunk lines in the water supply system points to permit removal of sediment and
are located underground. Pipe materials allow the conduit to be emptied. Surge tanks
include cast iron, welded steel, riveted steel, or quick-opening valves provide relief for
concrete-lined steel, asbestos cement, and problems of hydraulic surge.
plastic. Newer trunk lines (typically 20

262 Appendix B: Lifeline Vulnerability Functions ATC-25


ninalReservoir (Storage Tank)
,o-
-Uc
4 an
.Inju
AS
tzl
4
J. ULJ
ra

a b
6 1.347
7
8
0.26Z
E. 264
8.253
0,72
. 22
L;
9 8.236 a.878
c
le 0.802 0.827
W:

R =b * days + a
C,
nLa

R x I i J ! § { { *'
l I j I T
DAYS: 30 60 9 128 1581 1B8 218 24a 278 3 330
Elapsed Time in Days

Figure B-80 Residual capacity-for water supply terminal reservoirsgstoragetanks NEHRP California 7).

minal Reservoir (Storage Tank)


R=128O _
- -*.I
_ 11 aRI '
IR fl
4 .L.ZJ-
via

MII &
6 8.264 .757
7 1,'258 8.220
. _ ,B . 236 0.878
a 9 2.282 8,827
C.
C 18 - 43 E.821

0 R =b * days + a
FU

I I i i i
R= 8
I I I I I I I I
DAYS: 68 90 128 15 113 218 240 278 388 330 365
Elapsed Time in Days

Figure B-81 Residual capacity for water supply terminal reservoirs/storagetanks (NEHRP Map Area 3-
6, Non-California 7, and Puget Sound 5).

ATC-25 Appendix B: Lifeline Vulnerability Functions 23


nal Reservoir (Storage Tank)
I M 4A
AO 4 R R -
I R=10fly - Ie
L.IJU *ta L.nU

MII a b
6 0.258 0.220
7 0.236 0,870
.- B 0.002 0.827
9 -8.413 8.021
(a
c) 10 -0.534 .017
o R= S8,
:m R b * days + a
-a
Cn
(U)

D- AR,
1 I I I I I I

U- U. I I , I I I I I I

DAYS: 3 60 90 120 15R 180 210 240 270 300 330 365
Elapsed Time in Days

Figure B-82 Residual capacity for water supply terminal reservoirs/storagetanks (All other areas).

Typical Seismic Damage: The performance Seismically Resistant Design: Seismically


of pipelines is strongly dependent on *resistantdesign practices for trunk lines
whether or not the supporting or include the use of ductile pipe materials,
surrounding soil fails. Failure of a piping such as steel, ductile iron, copper, or plastic.
system resulting from inertial loads only is The performance of welded steel pipelines
rare; more typically differential settlement is dependent upon the quality of welds, with
or severe ground failure (e.g., landslide, more modern pipes generally having
liquefaction, faulting) causes damage. superior welds. Use of flexible joints (e.g.,
Regional uplift can alter the hydraulic bell-and-spigot with rubber gaskets,
characteristics of a transmission system mechanical joints, expansion joints, rubber
rendering it nonfunctional. Pipe damage is or metallic bellows, and ball joints) and
most common in soft alluvial soils or at placement of pipes in dense native or
interfaces between soft and firm soils. Types compact soil not subject to liquefaction,
of pipe damage include bending or crushing slides, or surface rupture will mitigate much
of the pipe, shearing of the pipe, of the potential damage. Special precautions
compressional buckling, soil deposits in the should be taken to reduce earthquake
pipe, circumferential and longitudinal effects at pumping plants, tanks, bay or river
cracks, and joint failure. It has frequently crossings, and fault crossings. Shut-off valves
been observed that pipelines with rigid should be installed near active fault zones so
joints fail more frequently than those with that flow can be stopped if the pipeline
flexible joints. Damage has been substantial crossing is damaged. Trunk lines at fault
at locations of local restraint such as crossings should be located in a sacrificial
penetrations to heavy subsurface structures tunnel or culvert, or lubricated, wrapped in
(including manholes), tees, and elbows. sheathing, or buried in shallow loose fill,
Water hammer induced by ground motions installed or above ground near the fault to
can cause damage by temporarily increasing allow lateral and longitudinal slippage.
pressure in pipelines. Anchors such as thrust blocks or bends

264 Appendix B:Lifeline Vulnerability Functions ATC-25


runk Lines
bpk=20 .

ID
G
E

byk=ia
0)
m
V)

bipk=O
VI lii VIII Ix
Modified Mercalli Intensity (MMI13

Figure B-83 Damage percent by intensity for water supply trunk lines.

should be excluded within a distance of 300 (between 4 and 20 inches in diameter) are
feet of a fault zone and strengthened pipe generally mc)re susceptible to damage
should be used within the zone. Valve because of tLheir construction type, and it is
spacing near fault zones, or in areas of assumed tha t their behavior can be
expected soil failure should be reduced. approximate :d using these data through the
Proper maintenance and cathodic use of one d etrimental intensity shift (i.e.,
protection to limit corrosion, which weakens + 1).
pipes, is important for mitigating damage.
Supports for on- or above ground piping Standard coiInstruction is assumed to
should provide restraint in all three represent y DpicalCalifornia trunk lines
orthogonal directions by using ring girders, under prese antconditions (ie., a composite
and spacing between adjacent trunk lines of older and -more modern trunk lines). Only
should be sufficient to prevent pounding. minimal regi onal variation in the
Use of pressure relief valves can mitigate construction quality is assumed.
damage caused by water hammer.
Redundancy should be built into the system Present Con ditions: In the absence of data
whenever possible; several smaller pipes on the type )f material, diameter, age, etc.,
should be used in lieu of one large pipe. Any the followin g factors were used to modify
equipment attached to piping should be the mean cu rves, under present conditions:
properly anchored.
MM/
2. Direct Damage Intensity
NFHRP Map Area Shift
Basis: Damage curves for trunk lines in the California 7 0
water supply system are based on ATC-13 California 3-6 0
Non-California 7 0
data for FC 31, underground pipelines (see Puget Sound 5 0
Figure B-83). Distribution pipelines, All other areas +1

ATC:-25 Appendix B: Lifeline Vulnerability Functions 26.5


>xx
TrunkLines .
R2 100 30F 1.00 31 I .00

*018 MII a b
6 0.002 0.449
7 0.883 8.449
. 8 8.109 0.176
co 9 8.880 0.212
Q
10 0.143 0.074
-F Rz So
-o R b * days + a
a<)
c:

- I
U --.
use
I I I1 I I I I
DAYS: 30 68 90 120 150 180 210 Z40 27 3 338 365
Elapsed Time in Days

Figure B-84 Residual capacity for water supply trur ik lines (NEHRP Map Area: California 3-6,
California 7, Non-California 7, and Putget Sound 5).

Upgraded Conditions: It is not cost- B.6. 7 Wells


effective or practical to upgrade existing
trunk lines in the water supply system, 1. General
except perhaps at fault crossings or in areas
of extremely unstable soils. Therefore, no Description: The collection of groundwater
intensity shifts for retrofitting are is accomplished primarily.through the
recommended. construction of wells or infiltration galleries.
A well system is generally composed of three
Typical Seismic Damage: The time-to- elements: the well housing structure, the
restoration data assigned to SF 30f, trunk motor/pump, and the discharge piping. The
lines, are assumed to apply to all trunk lines well system may or may not be located in a
in the water supply system. By combining well house.. The well contains an open
these data with the damage curves for FC section (typically a perforated casing or
31, the time-to-restoration curves shown in slotted metal screen) through which flow
Figures B-84 and B-85 were derived. enters and a casing through which the flow is
Distribution line restoration will take longer transported to the ground surface. Vertical
based on prioritization of work. It is turbine pumps are often used for deep wells.
assumed that restoration of distribution lines
will take approximately twice as long as Typical Seismic Damage: Well casings will
restoration of trunk lines. move with the surrounding soils. This
movement can result in damage to pumps
and/or discharge lines without flexible
couplings. Additional problems include
fluctuation in production (disruption of
aquifer), bad sanding conditions due to local
soil disturbance (mostly in older wells with

266 Appendix B: Lifeline Vulnerability Functions ATC-25


Trunk Lines
S3Br 1. 31 r fRR
.f

MII a- b
6 B .449
E . 03
7 E . 176
20 R B. 9 ..212
-a to 0.143 0. 874
C_ in 2. 179 E.034

U R= b * ays + a
C: i

M= oz.
M-f
D_ a.-

n- I I l I I I I I i i
DAYS: 38 60 90 126 158I 1 216 248 272 380 338 365
Elapsed Time in Days

Figure B-85 Residual capacity for water supply trunk lines (Allother areas).

insufficient screen design), kinked tubing, equipment should be provided with


and collapse of the casing. The well shaft adequate seismic anchorage. The well-
can be crushed or sheared off by ground housing structure should be designed with
displacement across, the shaft or by ground seismic provisions of local or national
vibration. Wells may be contaminated by building codes.
inflow from nearby sewers, septic tanks, and
cesspoolsthat are damaged by the 2. Direct Damage
earthquake. Damage to substation
transformers can result in loss of power Basis: Damage curves for wells in the water
supply. supply system (see Figure B-&6)are based
on ATC-13 data for FC 68, mechanical
Seismically Resistant Design: As seismic equipment. It is believed that this facility
design practices may include providing class best approximates the expected
double casing at depths below where performance of wells, which typically
horizontal movement is expected. comprise a vertical pump in a shaft.
Submersible pumps/motors have a greater
probability of remaining in service than do Standard construction is assumed to
pumps connected to motors at the surface represent typical California wells under
with drive shafts. Because the well casing present conditions (i.e., a composite of older
willrespond differentlythan the slab of the and more modern wells). Only minimal
surrounding well house, a flexible separation regional variation in the construction quality
joint should be provided between the casing is assumed.
and the slab. Effects of differential
movement and settlement can be mitigated Present Conditions: In the absence of data
by providing a flexible joint between the on the type of pump, etc., the following
pump discharge header and the discharge factors were used to modify the mean
piping. Other electrical and mechanical curves, under present conditions:

ATC-25 Appendix B: Lifeline Vulnerability Functions 27


Uell
68 1.00

0
a)
0) D=SOY
E
(6

Other
id

/ ~CA7,
~ CA 3-6
- - N~on-CA7
P.S.

V1 1)11 VI11 Ix X
Modified Mercalli Intensity (MMI)

Figure B-86 Damage percent by intensity for wells.

MMI B.7 Sanitary Sewer


Intensity
NEHRPMap Area Shift B. 7.1 Mains
California 7 0
California 3-6 0 1. General
Non-California 7 0
Puget Sound 5 0
All other areas +1 Description: In general, mains in the
sanitary sewer system are underground
Upgraded Conditions: For areas where it pipelines that normally follow valleys or
appears cost-effective to improve facilities, natural streambeds. Valves and manholes
assume on a preliminary basis that upgrades are also included in system. Pipe materials
result in a beneficial intensity shift of one commonly consist of cast iron, vitrified clay
unit (i.e., -1), relative to the above present concrete, asbestos cement pipe, brick, and
conditions. bituminized fiber. Pipe diameters are
generally greater than 4 inches. Joint
Time-to-restoration: The time-to- materials include welded bell-and spigot,
restoration data assigned to SF 30b, rubber gasket, lead caulking, cement
pumping stations in the water supply system, caulking, and plastic compression rings.
are assumed to apply to all wells. By Bolted flange couplings are also sometimes
combining these data with the damage used. Manholes are typically provided at
curves for FC 68, the time-to-restoration changes in direction or pipe size, or where
curves shown in Figures B-87 and B-88 were flow is received from collecting sewers.
derived. Wastewater pipelines are usually designed
as open channels except where lift stations
are required to overcome topographic
barriers. Sometimes the sanitary sewer

268 Appendix B: Lifeline Vulnerability Functions ATC-25


5
Uell
- 30h 30

.
L
a 0
Ii 17 0.2k,
39 0.89
E 56 0.4: 3
28 8.8 z
C, IE 3E6 0.011
') R= 5Ez
&ays a
;a

R= y I I L
I I
DAYS: 38 EB 98 i2o 158 is8 218 248 278 38 338
Elapsed Time in Days

Figure B-87 Residual capacity for wells (NEHRP Map Area: California 3-6, California 7, Non-California
7, and Puget Sound 5).

WelI
IaL
.IUD 1.80 68 1.00

LMI a b,
6 8.199
7 8015 0.043
8 8 .120
9 lEl.I68G 8.816
o 1o8 El. 62 0.0L2
_

R = b * days + a
-o

a) -

t I
R= l S 3I I I I I
. . . .

DAYS: 30 5Q 9l 120; 155 1BO 218 240 278 38 330 365


Elapsed Time in Days

Figure B-88 Residual capacity for wells (All other areas).

ATC-25. Appendix B: Lifeline Vulnerability Functions 2.69


system flow is combined with the storm maintenance to limit corrosion of metal
water system prior to treatment. pipes, which weakens pipes, is important to
mitigate damage. Any equipment attached
Typical Seismic Damage: The performance to piping should be properly anchored.
of pipelines is strongly dependent on
whether or not the surrounding soil fails 2. Direct Damage
(e.g., landslide, liquefaction, or fault
rupture). Pipe damage is most common in Basis: Damage curves for mains in the
soft alluvial soils or at interfaces between sanitary sewer system are based on ATC-13
soft and firm soils. Failure of piping caused data for FC 31, underground pipelines (see
by inertial loads is uncommon. Potential Figure B-89). In general, mains in the.
types of damage include pipe crushing and sanitary sewer system are more vulnerable
cracking caused by shearing and than those used in other systems because of
compression; joint breaking because of the construction materials used. Unlike the
excessive deflection or compression; joints water supply system, larger pipes generally
pulling open in tension; and changes in operate at lower pressures and thus are of
sewer grade, causing reduced flow capacity. similar construction quality to the smaller
Tension and compression failures at joints pipes. Consequently, the above damage
because of soil movement have been curves may be used for all pipelines in the
common. Flexible joints have suffered sanitary sewer system.
significantly less damage than rigid joints.
Welded bell-and-spigot joints have. Standard construction is assumed to
performed poorly when subjected to represent typical California mains in the
longitudinal stress. Cast-iron pipes with sanitary sewer system under present
rubber gaskets or lead-caulked joints have conditions (i.e., a composite of older and
accommodated movements better than more modern mains). Only minimal regional
those caulked with cement, but may still pull variation in the construction quality is
apart with major soil movements. assumed.

Seismically Resistant Design: Seismically Present Conditions: In the absence of data


resistant design practices for mains in the on the type of material, diameter, age, etc.,
sewer system include the use of flexible the following factors were used to modify
joints (e.g., butt-welded and double-welded the mean curves, under present conditions:
joints, restrained-articulated joints, and
restrained bell-and-spigot joints with ring MMI
gaskets on a short length of pipe section), Intensity
and avoiding longitudinally stiff couplings NEHRP Map Area Shift
such as cement or lead-caulked, plain bell- California 7 +1
and-spigot, and bolted flange. Placement of California 3-6 +1
Non-California 7 +1
mains in dense native or compact soil not Puget Sound 5 +1
subject to liquefaction, slides, or surface All other areas +2
rupture will mitigate much of the potential
damage. Special precautions should be Upgraded Conditions: It is not cost-
taken to reduce earthquake effects at fault effective or practical to upgrade existing
crossings. Main lines at fault crossings can mains in the sewer system, except perhaps at
be located in a sacrificial tunnel or culvert, fault crossings or in areas of extremely
or lubricated, wrapped in sheathing, buried unstable soils. Therefore, no intensity shifts
in shallow loose fill, or installed above for retrofitting are recommended.
ground near the fault to allow lateral and
longitudinal slippage. Anchors such as bends Time-to-restoration: The time-to-
should be excluded within a distance of 300 restoration data assigned to SF 31a, effluent
feet of a fault zone and strengthened pipe and main sewer lines, are assumed to apply
should be used within the zone. Isolation to all distribution lines. By combining these
valves should be placed near fault zones or data with the damage curves for FC 31, the
in areas of expected soil failure. Proper time-to-restoration curves shown in Figures

Functions ATC-25
270
270 Appendix B:
Appendix Lifeline Vulnerability
B:Lifeline Vulnerability Functions: ATC-25-
Mains/Lines
bpk=20 31

ID

a
0

a-
CL
_C

bpk=8
VI UVI VIII IX K
Modified Mercalli Intensity (MMI)

Figure B-89 Damage percent by intensity for sanitary sewer mains/lines.

B-'90 and B-91 were derived. Collector pipe Becauseof their function, these stations are
restoration will take longer because of its typically located in low-lying areas of soft
relatively lower priority. It is assumed that alluvium where soil failures may occur.
restoration of collector lines will take Buildings housing stations may experience
approximately twice as long as restoration of generic building damage ranging from
the mains. cracking of walls and frames to collapse, and
unanchored electrical and mechanical
B. 7.2 Pumping Stations control equipment may topple and slide,
experiencing damage and tearing piping and
1. General conduit connections. Piping attached to
heavy pump/motor equipment structures is
Description: Pumping stations or lift susceptible to damage caused by differential
stations are typically used to transport settlement. Pumps/motors may also
accumulated wastewater from a low point in experience damage as a result of differential
the collection system to a treatment plant. settlement. Damage to substation
Pumping stations consist primarily of a wet transformers can result in a loss of power
well, which intercepts incoming flows and supply.
permits equalization of pump loadings, and
a bank of pumps, which lift the wastewater Seismically Resistant Design: Seismically
from the wet well. The centrifugal pump resistant design practice includes avoiding
finds widest use at pumping stations. Lift unstable soils whenever possible and
stations are commonly located in small, addressing problems of expected differential
shear-waIl-type buildings. settlement and liquefaction in the design of
foundations. Flexibility of pipelines should
Typical Seismic Damage: Pumping stations be provided when pipes are attached to two
will suffer damage closely related to the soil separate structures on different foundations.
materials on which they are constructed. Annular space should be provided at pipe

ATC-25 Appendix B:Lifeline Vulnerability Functions 271


Ha ins/Lines
-1 a n n 4 o
R=tfloy - JeI .OU -. - uu

titl a *b
6 -8.517 0.355
7 -0.173 0.134
B -8.244 0.161
(a 9 -8.861 0 .855
(a 10 0.029 H.026
t) R=5v
- R = b * days + a
I)
a:

I I I~~~~~~~~~~~
i i i I I I I
DAYS: 30 60 9gY 128 150 180 210 Z48 270 300 330 365
Elapsed Time in Days

Figure B-90 Residual capacity for sanitary sewer mains/lines (NEHRP Map Area: California 3-6,
California 7, Non-California 7, and Puget Sound 5).

Hains/Lines
R R -
- illd 1II u~.U 1
J]L II .....

Mll a b
6 -0.173 0.134
7 -0.244 0.161
>o B -0.061 0.055
M 9 0.829 8.026
('3
18 B. 09? 0.013
0-0 R= 50:v
co R = b days a

:a

BR= O I i I I I I I I i
DAYS: 30 6 90 120 150 180 210 240 270 300 330 365
Elapsed Time in Days

Figure B-91 Residual capacity for sanitary sewer mains/lines (All other areas).

272 Appendix B:Lifeline Vulnerability Functions ATC-25


Pumping Station Sanitary Sewer)
D4Ei117

a Other
.0
C' D=SB7
E
Ca
C

UI lUJI 'JII IX X
Modified Mercalli ntensity (MMi)

Figure B-92 Damage percent by intensity for sanitary sewer pumping stations.

penetrations in massive structures. to below for mechanical and electrical


prevent pipe damage in the event of equipment is assumed appropriate.
differential settlement. All mechanical and
electrical equipment should be anchored Standard construction is assumed to
and equipment on isolators properly represent typical California pumping
snubbed. Buildings housing equipment stations for sanitary sewer systems under
should be designed in accordance with present conditions (i.e., a composite of older
seismic provisions of a local or national and more modern stations). Only minimal
building code. Provisions for emergency regional variation in construction quality of
power should be made for pumping stations mechanical equipment is assumed.
critical to systems operation.
Present Conditions: In the absence of data
2. Direct Damage on the type of pumps, age, etc., the
following factors were used to modify the
Basis: Damage curves for pumping stations mean curves,for each of the threefacility
for the sanitary sewer system (see Figure B- classes listed above, under present
92) are based on ATC-13 data for FC 10, conditions:
medium-rise reinforced masonry shear wall
buildings; FC 66, electrical equipment, and MMI
FC 68, mechanical equipment (see attached intensity
figure). FC 10 was chosen to represent a Shift
generic building, based on review of damage NEHRP Map Area FC 10FC 66FC 68
curves for all buildings. Pumping stations are California 7 0 0 +1
assumed to be a combination of 30% California 3-6 +1 +1 +1
generic buildings, 20% electrical equipment, Non-California 7 +1 +1 +1
Puget Sound 5 +1 +1 +1
and 50% mechanical equipment. Pumping All other areas +2 +2 +2
plants in the sewage system are assumed to
be located in poor soil areas. Consequently,
the detrimental intensity shift indicated

ATC-25 Appendix B:Lifeline Vulnerability Functions 273


Pumping Station (Sanitary Sewer)
RAHt8Wz 31b 1.00 1 0.30
60 0.50
166 0.20

M111 a b
6 -0.146 0. 182
7 -0.189 0,887
8 -0.232 0.043
*0
M 9 -8.261 0.026
a 10 -0.280 1.018
0
:)
B= 50x
R = b * days a
-D
Ir
0)

I'/!
B= en; "I l l i l l l li lI
DAYS: 3 68 90 120 ISO 180 210 240 27 3 330 365
Elapsed Time in Days

Figure B-93 Residual capacity for sanitary sewer pumping stations (NEHRP California 7).

Upgraded Conditions: For areas where it circulation and wastewater pumping


appears cost-effective to improve facilities, stations, chlorine storage and handling,
assume on a preliminary basis that upgrades tanks, and pipelines. Concrete channels are
result in a beneficial intensity shift of one frequently used to convey the wastewater
unit (i.e., -1), relative to the above present from one location to another within the
conditions. complex. Within the buildings are
mechanical, electrical, and control
Time-to-restoration: The time-to- equipment, as well as piping and valves.
restoration data assigned to SF 31b, booster Conventional wastewater treatment consists
pumping and main sewer pumping stations, of preliminary processes (pumping,
are assumed to apply to all pumping stations screening, and grit removal), primary settling
in the sanitary sewer system. By combining to remove heavy solids and floatable
these data with the damage curves derived materials, and secondary biological aeration
using the data for FC 10, 66, and 68, the to metabolize and flocculate colloidal and
time-to-restoration curves shown in Figures dissolved organics. Waste sludge may be
B-93 through B-95 were derived. stored in a tank and concentrated in a
thickener. Raw sludge can be disposed of by
B.7.3 TreatmentPlants anaerobic digestion and vacuum filtration,
with centrifugation and wet combustion also
1. General currently used. Additional preliminary
treatments (flotation, flocculation, and
Description: Treatment plants in the chemical treatment) may be required for
sanitary sewer system are complex facilities industrial wastes. Preliminary treatment
which include a number of buildings units vary but generally include screens to
(commonly reinforced concrete) and protect pumps and prevent solids from
underground or on-ground reinforced fouling grit-removal units and flumes.
concrete tank structures or basins. Common Primary treatment typically comprises
components at a treatment plant include sedimentation, which removes up to half of
trickling filters, clarifiers, chlorine tanks, re- the suspended solids. Secondary treatment

ATC-25
274 Appendix B: Lifelinc ?Vulnerability Functions
Functions ATC-25
Pumping Station (Sanitary Sewer)
a- R , Q1
I . L11
4. 00
i--
Jfl
. - -
s
I-

Go 8.53
66 0.20

mfl a b
6 -0. 163 3. 131
7 -0 .216
8 -8.24B 0. 833
9 -8.272 2.821
0 18 -H.2RB O. 815
U E= 0Z
co
R b= * days +
r42
e0

R= O/x i l
I
l
I
l
I
l
II-
|
I
|
I
E

DAYS: 30 68 98 128 158 18 218 248 Z78 388 330 365


Elapsed Time in Days

Figure B-94 Residual capacity for sanitary sewer pumping stations (NEHRP Map Area: California 3-6r
Non-California 7, and Puget Sound 5.

Pumping Station (Sanitary Sewer)


,1 L 4 . i} - I -i 1
1 -i-R I i1 i1 i
G2 0.58
66 8.28

Ml a b
6 -0 .2Ih 3E. 57
7 -2,248 B.833
8 -0. 27Z H. 821
9 -8.200 8.815
o- - 111 -. 381 8.812
iC
m
R= b * aays + a

B= 8ot i
I
l l
Ii
l l
I
DAYS: 30 68 98 128 158 188 210 240 278 308 338 365
Elapsed Time in Days

Figure B-95 Residual capacity for sanitary sewer pumping stations (Allother areas).

Functions 275
ATC-25
ATC-25 Appendix B:
. Appendix Lifeline Vulnerability
B:Liteline Vulnerability Functions 275
removes remaining organic matter using be compacted properly to avoid liquefaction.
activated-sludge processes, trickling filters, If buoyant loading is possible, foundations
or biological towers. Chlorination of should be designed to resist such loading.
effluents is commonly required. All equipment should be properly anchored,
and equipment on base isolators properly
Typical Seismic Damage: Sanitary sewer snubbed. Arms, rakes, and other equipment
treatment plants are commonly located in in basins should be designed for
low-lying areas on soft alluvium. hydrodynamic forces associated with
Consequently, soil failure (e.g., liquefaction sloshing. Embankment stability and
or settlement) is common. Many of the considerations for buried piping should be
heavystructures are supported on taken into account for sewage outfalls.
foundations that include piles. Differential Outfall diffusers are also subjected to
settlements between these structures and hydrodynamic forces, which should be
structures not supported on piles will result included in design consideration.
in damage to pipes or conduit, especially at
structure penetrations. Liquefaction may 2. Direct Damage
cause some underground structures to float
in areas of high groundwater. Pumps and Basis: Damage curves for treatment plants
other equipment can be damaged by loads in the sanitary system are based on ATC-13
imposed by piping when differential data for FC 10, medium-rise reinforced
settlement occurs. Generic building damage masonry shear wall buildings; FC 41,
ranging from cracked walls and frames to underground liquid storage tanks; and FC
collapse may occur. Unanchored equipment 68, mechanical equipment (see Figure B-
may slide or topple, rupturing attached 96). FC 10 was chosen to represent a
piping and conduit. Damage to substation generic building, based on review of damage
transformers can result in a loss of power curves for all buildings. Sanitary sewer
supply. Damage as the result of sloshing or treatment plants are assumed to a
wave action is likely in basins that contain combination of 20% generic buildings, 30%
rotating equipment or other moving devices. underground storage tanks, and 50%
Basin walls may crack or collapse. Pounding mechanical equipment. Treatment plants in
damage or permanent movement may result the sewage system are assumed to be located
in the opening of expansion joints in basins. in poor soil areas. Consequently, the
detrimental intensity shift indicated below
Seismically Resistant Design: Seismically for mechanical equipment is assumed
resistant design practice includes siting appropriate.
treatment plants in areas of stable soil, or
designing foundations and systems to Standard construction is assumed to
perform adequately in the event of expected represent typical California treatment plants
soil failure. Each structure should be under present conditions (i.e., a composite
supported on one foundation type only if of older and more modern treatment
adjacent structures have different plants). It is assumed that minimal regional
foundation types; structures should be variation exists in construction quality of
adequately separated; and piping and other underground storage tanks and mechanical
systems spanning between structures should equipment. Seismic loads have little impact
be provided with adequate flexibility to on underground storage tank design, and
accommodate relative motions. Piping operational loads often govern over seismic
should be provided with annular space requirements in the design of mechanical
where it penetrates heavy structures to equipment.
accommodate settlement. Buildings should
be designed in accordance with the seismic Present Conditions: In the absence of data
requirements of a local or national building on the type of construction, age, etc., the
code. Walls for all basins should be designed following factors were used to modify the
for a combination of soil and hydrodynamic mean curves for each of the three facility
pressures, taking into consideration the classes listed above, under present
possibility of soil failure. All backfills should conditions:

276 Appendix B:Lifeline Vulnerability Functions ATC-25


Treatment

60 8.50
41 al30

.0
E
a

D=Cx
HI liII 14ll IX X
Modified Mercalli Intensity {MMI}

Figure B-96 Damage percent by intensity for sanitary sewer treatment plants.

MM B.8Natural Gas
intensity
Shift
B.8.1 Transmission Lines
NEHRP Map Area FC 18FC41 FC 68
California 7 o +1 +1 1. General
California 3-6 +1 +1 +1
Non-California 7 +1 +1 +1
Puget Sound 5 +1 +1 +1 Description: In general, transmission lines
All other areas +2 +2 +2 in the natural-gas system are located
underground, except where they cross rivers
Upgraded Conditions: For areas where it or gorges, or where they emerge for
appears cost-effective to improve facilities, connection to compressor or pumping
assume on a preliminary basis that upgrades stations. They are virtually always welded
result in a beneficial intensity shift of one steel and operate at high pressures.
unit, relative to the above present. Transmission pipelines range between 2 and
conditions. 25 inches in diameter, but most are larger
than 12 inches. Shut-off valves, which
Time-to-restoration: The time-to- automatically function when line pressure
restoration data assigned to SF 3 ic, drops below a certain threshold pressure,.
treatment plants in the sanitary sewer are frequently included.
system, are assumed to apply to all
treatment plants- By combining these data Typical Seismic Damage: The performance
with the damage curves derived using data of pipelines is strongly dependent on
for FC 1 41, and 68, the time-to- whether or not the supporting soil fails,
restoration curves shown in Figures B-97 Routes are often selected along the edges of
through B-99 were derived. river channels to avoid urban buildup and
street crossings and to simplify the
acquisition of real estate. Such routes have
high liquefaction potential. Failures in the
past have typically occurred at sharp vertical

ATC-25 Appendix B: Lifeline Vulnerability Functions 277


RzI6W.v

.0
0CII H: 0,%
-o
'a
a)
cc

H=8%
DAYS: 36 Go 90 120 ISO 18O 210 240 270 386 338 365
Elapsed Time in Days

Figure B-97 Residual capacity for sanitary sewer treatment plants (NEHRP California 7).

a)
a:,

R2: a
DAYS: 36 60 90 120 ISO 186 216 240 276 300 338 365
Elapsed Time in Days

Figure B-98 Residual capacity for sanitary sewer treatment plants (NEHRP Map Area 3-6, Non-
California 7, and Puget Sound 5).

278 ~~Appendix
278 B:LifelineVulnerability Functions AC2
ATC-25
2-,

Q R= sox
C
OL

R ox
DAYS: 3 - - 98 128 150 1BO ;218 24* 278 388 338 365
Elapsed Time in Days

Figure B-99 Residual capacity for sanitary sewer treatment plants (Allother areas).

or lateral dislocationsor ruptures of the Special precautions should be taken to


ground. Pipes may buckle under reduce earthquake effects at bay, river, and
compressive forces, especially where they fault crossings. Transmission lines at fault
cross ruptured faults. Damage has also crossings should be buried in shallow loose
occurred as a result of axial elongations fill or installed above ground near the fault
caused by relative movement of two to allow lateral and longitudinal slippage.
horizontally adjacent soil layers. Damage Anchors such as thrust blocks or bends
may occur because of displacements of should be excluded within a distance of 300
unanchored compressors or pumps or other feet of a fault zone, and strengthened pipe
above ground structures. Several past should be used within the zone. Valve
failures have been attributed to corrosion spacing near fault zones or in areas of
combined with surges in line pressure during expected soil failure should be reduced.
the earthquake. Failures of above ground Automatic shut-off valves should not rely on
lines have been caused by support failure, electricity to operate. Proper maintenance
failure of pipeline attachment to support to limit corrosion, which weakens pipes, is
structure, and relatively large support important to mitigate damage.
movement. Rupture of pipes and loss of
contents could lead to fire and explosions. 1. Direct Damage
Seismically Resistant Design: Modern high- Basis: Damage curves for transmission lines
pressure gas lines provided with proper full in the natural-gas system are based on ATC-
penetration welds and heavy walls are very 13 data for FC 31, underground pipelines
ductile and have considerable resistance to (see Figure B-1lO). Transmission pipelines
earthquake damage. Welded steel pipeline are typically large-diameter, welded steel
performance depends on the integrity of the pipes that are expected to perform in
welds--modern butt-welded pipelines earthquakes in a manner superior to that of
perform well, whereas gas lines constructed typical underground pipelines, as indicated
before and during the early 19310susing by the beneficial intensity shift below.
oxyacetylene and electric-arc welds do not.

ATC-25 Appendix B:Lifeline Vulnerability Functions 279:


Transmission Lines (Natural Gas)
byk=20 31 1.00-

a)
,
E
0
< bpk=1i
a

bpk

Other
CA7
-M
i.'M 0-v-
Non-CA7
VI VII vIII Ix P.S. 5 X
Modified Mercalli Intensity (MMI)

Figi Lire B-100 Damage percent by intensity for natural gas transmission lines.

Standard construction is assumed to intensity shifts for*retrofitting are


represent typical California natural-gas recommended.
transmission lines under present conditions
(i.e., a composite of older and more modern Time-to-restoration: The time-to-
transmission lines). Only minimal regional restoration data assigned to SF 32a,
variation in the construction quality is transmission lines , are assumed to apply to
assumed. all transmission litries in the natural-gas
system. By combil iing these data with the
Present Conditions: In the absence of data damage curves fo:r FC 31, the time-to-
on the type of material, diameter, age, etc., restoration curvess shown in Figures B-101
the following factors were used to modify. and B-102 were derived.
the mean curves, under present conditions:
B.8.2 Compressor Statnions
MMI
Intensity 1. General
NEHRP Map Area Shift
California 7 -1 Description: In general, compressor stations
California 3-6 -1 include a variety of electrical and
Non-California 7 -1
mechanical equipment, as well as structures
Puget Sound 5 -1
All other areas 0 and buildings. A typical plant yard may
contain electrical equipment, heat
Upgraded Conditions: It is not cost- exchangers, horizontal gas-storage tanks on
effective or practical to upgrade existing plinths, compressors, fans, air-operated
valves, pumps, cooling towers, steel stacks
natural-gas transmission lines, except
and columns, and piping. The control
perhaps at fault crossings or in areas of
equipment is usually located in a control
extremely unstable soils. Therefore, no
building. Cryogenic systems may also exist

280 Appendix B: LifelineVulnerability Functions ATC-25


Transmission Lines (Natural
n-tan..
F.- Lhut. - 32a l.1E 31
X
5a

7
B
9

0
1 A
.
L
0I2 H R -

'i :: W

,l ,l ,l ,
l rl rl l
j
Mys'. 30 680 90 120' 150 8 218 240 20 30 330 365
Elapsed Time in Days

Figure B-1 01 Residual capacity for natural gas transmission lines (NEHRP Map Area: California 3-6,
California 7 Non-California 7, and Puget Sound 5).

Transmission Lines (Natural Gas)


12 o4 -g

MHI
R:= E36e 6h-
? -8
. 8 -E
rU 9 -E
(a 10 -0
° B= soz
-o R t
<D -
G

R= . . . . .
DAYS: 30 80 90 120 15 180 216 240 278 300 330 385
Elapsed Time in Days

Figure B-1 02 Residual capacity for natural gas transmission lines (All other areas).

ATC-25 Appendix B:Lifeline Vulnerability Functions 28.1


Compressor Station
0.30
a.50
0.20

80

a)
U) Other,
(0 D=Y
E
(0
Q

VI V11 Vill IX X
Modified Mercalli Intensity (MMI)

Figure B-103 Damage percent by intensity for compressor stations.

on the site. Compressors are typically used designed to yield over a long length to
to boost pressures in long distance dissipate energy.
transmission lines.
2. Direct Damage
Typical Seismic Damage: Damage
experienced at the site may include sliding Basis: Damage curves for compressor
and toppling of unanchored equipment, stations in the natural-gas system are based
stretching of anchor bolts on stacks and on ATC-13 data for FC 10, medium-rise
columns, damage to old timber cooling reinforced masonry shear wall buildings; FC
towers, and sliding of unrestrained 66, electrical equipment; and FC 68,
horizontal tanks on plinths. Piping may mechanical equipment (see Figure B-103).
rupture because of movement of attached Compressor stations are assumed to be a
unanchored equipment. Generic building combination of 30% generic buildings, 20%
damage ranging from cracking of frames and electrical equipment, and 50% mechanical
walls to partial or total collapse may be equipment.
experienced by the control building and
other buildings. Standard construction is assumed to
represent typical California compressor
Seismically Resistant Design: Seismically stations under present conditions (i.e., a
resistant design practices include designing composite of older and more modern
the buildings and structures in accordance stations). Only minimal regional variation in
with the seismic requirements of a local or construction quality of mechanical
national building code. In addition, all equipment is assumed.
equipment should be well anchored and
equipment on isolators properly snubbed. Present Conditions: In the absence of data
Inspection and maintenance of timber on the type of material, age, etc., the
cooling towers and piping can mitigate following factors were used to modify the
damage. Anchor bolts on stacks should be mean curves for each of the three facility

282 Appendix B: Lifeline Vulnerability Functions ATC-25


>>
Canpress.arStation
R=iE8x

b,
1.261
0. 488
B . B3
10
a 0.I803
8.092:
~a
cc 3
-0
'L
r

R= ax7

Bc 8

DAYS: 3 68 90 120' 158 188 218 248 278 300 330 365
Elapsed Time in Days

Figure B-104 Residual capacity for compressor stations (NEHRPCalifornia 7).

classes listed above, under present conditions: restoration curves shown in Figures B-104
through B-106 were derived.
MMI
Intensity B.&3DistributionMains
Shift
NEHRP Mar Area FC 0 FC 66 FC 68 1. General
California 7 o 0 0
California 3-6 +1 +1 0 Description: n general, the distribution
Non-California7 +1 +1 0 mains in the natural-gas system are located
Puget Sound 5 +1 +1 0
All other areas +2 +1 +1 underground, except where they cross rivers
or gorges or where they emerge for
connection to compressor or pumping
Upgraded Conditions: For areas where it stations. They typically are between 2 and 20
appears cost-effective to improve facilities, inches in diameter and may be composed of
assume on a preliminary basis that upgrades steel, cast iron, ductile iron, or plastic.
result in a beneficial intensity shift of one Approximately 80% of all new distribution
unit (i.e., -1), relative to the above present piping is made of plastic. Shut-off valves,
conditions. which automatically function when line
pressure drops below a certain threshold
Time-to-restoration: Te time-to- pressure, are frequently used
restoration data assignedto SF 32c,
compressor stations, high-pressure holders, Typical Seismic Damage: The performance
and mixer/switching terminals, are assumed of pipelines is,strongly dependent on
to apply to all compressor stations in the whether not the supporting soil fails.
natural-gas system. By combining these data Routes are often selected along the edges of
with the damage curves derived using the river channels to avoid urban buildup and
data for C 10, 66, and 68, the time-to- street crossings and to simplify the

Lifeline Vulnerability Functions 283


ATC-25
ATC-25 Appendix B:
Appendix B:Lifeline Vulnerability Functions 283
Coipressor Station
R=100 0.38
60 0.50
66 0.20

M1l a b
6 -2.604 0 .709
7 -2.091 0.239
8 -i.854 0 .123
. -1.693 0.073
9
-1.578 0 .849

CU
a:
R = b * days + a

a)

: -
L ~ ~ I
IAYS: l I 1 I I
R= RJ If I 2 I 3 3
38 68 90 120 150 180 210 240 Z70 300 330 365
Elapsed Time in Days

Figure B-1 05 Residual capacity for compressor stations (NEHRP Map Area: California 3-6, Non-
California 7, and Puget Sound 5).

Conpressor Station
R=I100 32c 1.00 10 0.3
'Rl l_-- R I R rIR
66 0.20

M"Il a b
6 -2.173 0.289
7 -1.908 0.145
>1 8 -1.724 0.881
.
C.) 9 -1.592 0.052
Cu
10 -1.5i4 0 .039
0
R-
R = b * days + a
0-
U)
a)
CC

1 I I!
R- R I I ) f 18I 26 I
2. 2I
: 3. 68 96 1. 18
DAYS: 30: 560 90 120 150 180 210 240 Z70 300 330 365
Elapsed Time in Days

Figure B-1 06 Residual capacity-for compressor stations (All other areas).

Functions ATC-25
284
284 Appendix B:
Appendix Lifeline Vulnerability
B,Lifeline Vulnerability Functions ATC-25
Distribution lain
bpk=2 o< a-
i1 1.0tl

to
a)
E
_
bpk=l2
a
02
to
to
m> R-S. S
Other

CA7
CA 3-6
__ ~Non-C
7

bp=0
VI V U111 X X
Modified Mercalli Intensity {MMI)

Figure B-107 Damage percent by intensity for natural gas distribution mains.

acquisition of real estate. Such routes have to allow lateral and longitudinal slippage.
high liquefaction potential Pipe damage is Anchors such as thrust blocks or bends
most common in soft alluvial soils, at should be excluded within a distance of 300
interfaces between soft and firm soils, at feet of a fault zone and strengthened pipe
locations of fault ruptures, or at sharp should be used within the zone. Valve
vertical or lateral dislocationsor ruptures of spacingnear fault zones or in areas of
the ground. Pipes may buckle under expected soil failure should be reduced.
compressive forces, especially where they Automatic shut-off valves, which operate
cross ruptured faults. Damage may occur as when pressure reduces, should not rely on
a result of displacements of unanchored electricityto operate. Proper maintenance
compressorsor pumps or other above to limit corrosion, which weakens pipes, is
ground structures. Several past failures have important for mitigating damage.
been attributed to corrosion combined with
surges in line pressure during the 2. Direct Damage
earthquake. Rupture of pipes and loss of
contents could lead to fire, explosions, or Basis: Damage curves for distribution mains
both. in the natural-gas system are based on ATC-
13 data for FC 31, underground pipelines
Seismically Resistant Design: Seismically (see Figure B-107). Standard construction is
resistant design provisions for distribution assumed to represent typical California
piping are typically minimal. Consequently, distribution mains under present conditions
large urban distribution systems should have (i.e., a composite of older and more modern
suitable valving installed so that large areas mains). Minimal regional variation in
can be broken down into zones. Special construction quality is assumed.
precautions should be taken to reduce
earthquake effects at bay, river, and fault PresentConditions:In-the absence of data
crossings. Distribution mains at fault on the type of material, diameter, age, etc.,
crossings should be buried in shallow loose the following factors were used to modify
fill or installed above ground near the fault the mean curves, under present conditions:

ATC-25 Appendix B:Lifeline Vulnerability


Functions 285
Distribution Hains
-3 1.00 31 1.00-I-

111 a b
6 -0.038 0.373
-7 -0.038 0.373
8 -0.038 0.280
*0
9 -0.030 0.228
10 -0.036 0.095
(a
I B = b * days + a
-c
n
U,

n- el- II II II I I
H
n- V - I
I
I I0 I

DAYS,: 30 68 90 120 150 1883 210 240 270 308 330 365
Elapsed Time in Days

Figure B-1 08 Residual capacity for natural gas distribution mains (NEHRP Map Area: California 3-6,
California 7, and Non-California 7).

MM/ B.9Petroleum Fuels


Intensity
NEHRP Map Area Shift B. 9.1 Oil Fields
California 7 0
California 3-6 0 1. General
Non-California 7 0
Puget Sound 5' +1
All other areas +1 Description: In general, oil fields in the
petroleum fuels system may includes
Upgraded Conditions: It is not cost- pressure vessels, demineralizers, filters,
effective or practical to upgrade existing vertical tanks, horizontal water and oil
natural-gas distribution mains, except pumps, large heat exchangers, air
perhaps at fault crossings or in areas of compressors, extensive piping, and air-
extremely unstable soils. Therefore, no operated valves. Additionally they may
intensity shifts for retrofitting are include their own water treatment plant,
recommended. which demineralizes and filters water before
it is injected as steam into oil wells in the
Time-to-restoration: The time-to- area. Control houses with control
restoration data assigned to SF 32d, equipment may monitor production and
distribution feeder mains, are assumed to flow in and out of the field.
apply to all distribution mains in the natural-
gas system. By combining these data with the Typical Seismic Damage: Building damage
damage curves for FC 31, the time-to- may range from cracks in walls and frames to
restoration curves shown in Figures B-108 partial and total collapse. Unanchored or
and B-109 were derived. improperly anchored equipment may slide
*ortopple, experiencing damage or causing
attached piping and conduit to fail. Well

286 Appendix B: Lifeline Vulnerability Functions ATC-25


Distribution hins
32d 1,88 31 L.
a

MHI a b
6 -e.038 8.373
-0.83 0.208
.r_ -8.038 0 228
5 9
Ca
IS -E. 83G E. 85
lo -0.33 0.858
C
n
*0
R =b *days + a
:0
WI

x=
-
n.e -
.1. 1 I I I I I i I a 11
DAYS: 38 60 90 120 158 IB18 210 248 270 3 338 365
Efapsed lime fin Days

Figure B-109 Residual capacity for natural gas distribution mains (Puget Sound 5 and all other areas)'.

casings will move with the surrounding soils is assumed, as shown in the intensity shift
and may result in damage to the oil pumps. factors below.
Reduction or increase in production may
occur after an earthquake as a result of Present Conditions: In the absence of data
geological changes in the oil field. on the type of equipment, age, etc., the
following factors were used to modify the
Seismically Resistant Design: Buildings mean curve, under present conditions:
should be designed in accordance with the
seismic provisions of a local or national Mm/
building code. All equipment should be well Intensity
anchored. NEHRP Map2Area Shift
California 7
California 3-6 0
2. Direct Damage 01
Non-California 7
Puget Sound 5 0
Basis: Damage curves for oil fields in the All other areas +1
petroleum fuels system (see Figure B-110)
are based on ATC-13 data for FC 68, Upgraded Conditions: For areas where it
mechanical equipment. It is believed that appears cost-effective to improve facilities,
this facility class best approximates the assume on a preliminar basis that upgrades
expected performance of oil fields. result in a beneficial intensity shift of one
unit (i.e., -1),
relative to the above present
Standard construction is assumed to conditions.
represent typical California oil fields under
present conditions (i.e., a composite of older Time-to-restoration: The time-to-
and more modern fields). Only minimal restoration data assigned to SF 1Sa is
regional variation in the construction quality assumed to apply to all oil fields. By
combining these data with the damage

Vulnerability Functions 287


ATC-25
ATC-25 B:Lifeline
Appendix 3:
AppendIx Lifeline Vulnerability Functions 287
Oil Fields : _

a)
0)
E
o0

Other

08
. . .

vi I VII Vill IX X

Modified Mercalli Intensity (MMI)

.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ ,

_ . L . . Ir_ Al r1. I'-


Figure B-i 10 Damage percent by intensity Toroil tields.

curves for FC 68, the time-to-restoration Control rooms house control equipment.
curves shown in Figures B-ill and B-112 Timber cooling towers, refueling stations,
were derived. administrative buildings, and wharf loading
facilities are also included in some
B.9.2 Refineries refineries.

1. General Typical Seismic Damage: A major concern


after any earthquake that affects a refinery
Description: The typical oil refinery is a is fire. Loss of contents from any one of a
complex facility with many different types of large number of tanks could lead to a fire
buildings, structures, and equipment. Tank that could spread throughout the facility.
storage for the various products produced at Similarly, toxic release and air emissions are
the refinery can consist of unanchored also serious concerns. The large cylindrical
vertical storage tanks supported on the ground-mounted steel tanks are typically the
ground, horizontal pressurized storage tanks most vulnerable components at the refinery
supported on steel or concrete plinths, and and can suffer tank-wall buckling, bottom
spherical tanks supported on legs. rupture, wall-to-bottom weld failure, roof
Refineries also include a large number of damage, settlement, or pipe failure. Piping
steel stacks or columns anchored to systems can experience flange separations,
concrete foundations.Throughout the damage to supports, rupture at connections
refinery there are extensive runs of piping, to unanchored equipment, and valve
both on the ground and elevated. damage. Mechanical equipment with
Mechanicalequipment throughout the inadequate anchorage can slide or topple.
refinery includes pumps, heat exchangers, Buildings and structures can experience
furnaces, motors, and generators. Electrical generic structural damage rangingfrom
equipment includes transformers, cracks in walls and frames to partial or
switchgear, and motor control centers. complete collapse. Control room panels may

28.8 Appendix B: Lifeline Vulnerability Functions ATC-25


Oil Fields
f_ 4 a.no - 4 .Rv

b
r
.21

-5_
21
211
o R= S81x
CU
n a
,a
._
.co

R=
r
DlhYS: 30 60 90 126 156 180 210 2401 2Z2 380 338 35
Elapsed Time in Days

Figure B-1 11 Residual capacity for oil fields NEHRP Map Area: California 3-6, California 7, Non-
California 7, and Puget Sound 5).

Oil Fields
- 4Za.,
n-t1,.
I l.
Jod 68 1.08

MM a
6 0, 344 1. H28
7 8.286 H.017
0.223 8.812
3
5 9 13.153 0.818
H.-HI
C to 8.103 0.8?
C) R= 8z
2~
R b * ays a

R= 6A. l lI l
a
l
I i
i

DAYS: 38 S 98 126 150 10 6 216 I48 278 308 30 35


Elapsed Time in Days

Figure B-1 12 Residual capacity for oil fields (All other areas).

ATC-.25 Appendix B:Lifeline Vulnerability


Functions 2859
Ref inery
D=100;Y 68 0.30-
43 0.48
52 8.30

c)
0)
Co DZSO7
E
co Other
0

VI ViI Vill Ix X
Modified Mercalli Intensity (MMI)

Figure B-1 13 Damage percent by intensity for oil refineries.

slide or topple, or experience relay implemented. Supports for piping should be


problems. Stacks or columns may stretch designed for seismic loads. An emergency
anchor bolts. Horizontal tanks may slide on. power system should be provided for control
their plinths and rupture attached piping. and emergency equipment as a minimum.
Brick linings in boilers may break.
2. Direct Damage
Seismically Resistant Design: Seismically
resistant design practices include design of Basis: Damage curves for refineries in the
all buildings and structures (including tanks) petroleum fuels system are based on ATC-
for seismic requirements in a local or 13 data for FC 43, on-ground liquid storage
national code. Storage tanks should be tanks; FC 52, steel chimneys; and FC 68,
provided with flexible piping, pressure relief mechanical equipment (see Figure B-1 13).
valves, and well-compacted foundations Refineries are assumed to be a combination
resistant to differential settlement. of 40% on-ground storage tanks, 30%
Retention dikes with sufficient capacity to chimneys, and 30% mechanical equipment.
retain all of the oil contained in the enclosed
tanks are necessary to mitigate the danger of Standard construction is assumed to
catastrophic fire after an earthquake. represent typical California refineries under
Embankments for such dikes should be present conditions (i.e., a composite of older
stable when subjected to ground shaking. and more modern refineries). Only minimal
Horizontal tanks on plinths should be regional variation in the construction quality
restrained to prevent attached pipes from of mechanical equipment is assumed, as
rupturing. Long anchor bolts that are operational loads frequently govern over
properly embedded in foundations should seismic requirements.
be used for heavy equipment and stacks.
Mechanical and electrical equipment should Present Conditions: In the absence of data
be anchored to prevent sliding and toppling. on the type of construction, age, etc., the
Maintenance and inspection programs for following factors were used to modify the
cooling towers and piping should be mean curves for each of the three facility

Functions ATC-25
290
290 Appendix B:
Appendix Lifeline Vulnerability
B: Lifeline Vulnerability Functions ATC-25
R=1Bx AR H--la
43 0.48
52 0.38

II a b
6 EA46 0.7&0
7 X,443 0.222
B 1.422 8.062
.5
9 101.37B 89. 2
o
nL 10 0.139 '0.012
O R= gov
CU R = * days + a

cc

D- fI.,
A- tA I~ I i I I

DAYS: 68 90 120 150 1DB 210 241 278 308 330 365
Elapsed Time in Days

Figure B-114 Residual capacity for oil refineries (NEHRP California 7).

classes listed above, under present in Figures B-114 through B- 16 were


conditions: derived

MMI B.9.3 TransmissionPipelines


Intensity
Shift 1. General
NEFHRP Map Area FC 43 FC 52 FC 68
California 7 0 0 0 Description: In general, transmission lines
California 3-6 +1 +1 0 in the petroleum fuels system are located
Non-California 7 +1 +1 0
underground, except where they cross rivers
Puget Sound 5 +1 +1 0
All other areas +2 +2 +1 or gorges,or where they emerge for
connection to compressor or pumping
Upgraded Conditions: For areas where it stations. They are virtually always welded
appears cost-effective to improve facilities, steel and operate at high pressures. Shut-off
assume on a preliminary basis that upgrades valves, which automatically function when
result in a beneficial intensity shift of one line pressure drops below a certain
unit (i.e., -), relative to the above present threshold pressure, are frequently included.
conditions.
Typical Seismic Damage: The performance
Time-to-restoration: The time-to- of pipelines is strongly dependent on
restoration data assigned to SF lb, whether or not the supporting soil fails.
refineries, are assumed to apply for all Routes are often selected along the edges of
refineries in the petroleum fuels system. By river channels to avoid urban buildup and
combining these data with the damage street crossings and to simplify the
curves derived using the data for FC 43, 52, acquisition of real estate. Such routes have
and 68, the time-to-restoration curves shown high liquefaction potentials. Failures in the
past have typically occurred at sharp vertical

ATC-25 Appendix B:Lifeline Vulnerability Functions 291


nery
1.00 68 0.30
43 8.40
52 0.30

M'lI a b
6 0.446 0.468
7 0.435 0.101
i3 B 0.401 0.835
9 0.234 0.Oi3
10 -0.221 0.009
o R Sx
-o3 R b * days a

1I*
4)

R= eV. I
I
I I I I I
DAYS: 30 60 90 120 150 180 210 240 270 300 330 365
Elapsed Time in Days

Figure B-1 15 Residual capacity for oil refineries (NEHRP Map Area: California 3-6, Non-California 7,
and Puget Sound 5).

Ref inery
R=100x 401.
LO 4.TU
00c tO
D 11a

8.40
0.30
/ g~~~~2

Mi a b
6 0.435 0.16 I
7 0.401 0.83!
. , 8 0.234 0.01:
a 9. -0.221 0.88
3

co 10 -0.285 0.00!
o R= SOZ

-/ =- b *days
~~~~R a
In
4)
Er

R= In-v
DAYS:
L 30
I
68
I

90
I
I
120 150 180
I
210 240
I I I
I
270 308 330 365
I

Elapsed Time in Days

Figure B-116 Residual capacity for oil refineries (All other areas).

292 Appendix B:Lifeline Vulnerability Functions -ATC-25


Transmission Pipelines (Petroleum Fuels)
Z -
bpk=2 -1S I H

C)
a)
E
01

0
a.
0
-r
C)
M

tirJ-U
km >-H
_ J I

VI VII VII Ix X
Modified Mercalli Intensity (MMI)

Figure 8-117 Damage percent by intensity for petroleum fue[s transmission pipelines.

or lateral dislocationsor ruptures of the the early 1930s may not. Special precautions
ground. Pipes, may buckle under should be taken to reduce earthquake
compressive forces, especially where they effects at bay, river, and fault crossings.
cross ruptured faults. Damage has also Transmission lines at fault crossings should
occurred because of axial elongations be buried in shallow loose fill or installed
caused by relative movement of two above wound near the fault to allow lateral
horizontally adjacent soil layers. Damage and longitudinal slippage. Anchors, such as
may occur as the result of displacements of thrust blocks or bends should be excluded
unanchored compressors or pumps or other within a distance of 300 feet of a fault zone,
above ground structures. Several past and strengthened pipe should be used within
failures have been attributed to corrosion the zone. Valve spacing near fault zones or
combined with surges in line pressure during in areas of expected soil failure should be
the earthquake. Failures of above ground reduced. Automatic shut-off valves should
lines have resulted from support failure, not rely on electricity to operate. Proper
failure of pipeline attachment to support maintenance to limit corrosion which
structure, and relatively large support weakens pipes, is important for mitigating
movement. Rupture of pipes and loss of damage.
contents could lead to ignition, fire, and/or
explosions. 2. Direct Damage

Seismically Resistant Design: Modern high- Basis: Damage curves, for transmission lines
pressure petroleum fuel lines provided with in the petroleum fuels,system are based on
proper full penetration welds, heavy walls, ATC-13 data for FC 31, underground
and strong couplings are very ductile and pipelines (see Figure -117). Transmission
have considerable resistance to earthquake pipelines are typically large-diameter welded
damage. Welded steel pipeline performance steel pipes that are expected to perform in
depends on the integrityof the welds-- earthquakes in a manner superior to typical
modern butt-welded pipelines perform well, underground pipelines, as indicated by the
whereas lines constructed before and during beneficial intensity shift below.

AT,C-25 Appendix B:Lifelind Vulnerability Functions 23


E~2
Transmission Pipelines (Petroleum Fuels)
I 40_ 4 WI 11 4 Rn_-
svQ x .uU vs 1.UU
X
E.

Mui a b

7 8.144 e .195
8 0.144 0 195
. 9 e.116 8. 106
10 e.124 e.116
R- SOY
R = b * days + a

a)
W

D- R%.
DAYS:
I I I I I
II
I I I I I I I
DAYS: 30 6 98 128 150 1 210, 240 270 30 330 365
Elapsed Time in Days

Figure B-118 Residual capacity for petroleum fuels transmission pipelines (NEHRP Map Area: California
3-6, California 7, Non-California 7, Puget Sound 5, and all other areas).

Standard construction is assumed to intensity shifts for retrofitting are


represent typical California petroleum fuels recommended.
transmission lines under present conditions
(i.e., a composite of older and more modern Time-to-restoration: The time-to-
transmission lines). Only minimal regional restoration data assigned to SF 18c,
variation in the construction quality is transmission pipelines, are assumed to apply
assumed. to all transmission pipelines in the
petroleum fuels system. By combining these
Present Conditions: In the absence of data data with the damage curves for FC 31, the
on the type of material, diameter, age, etc., time-to-restoration curves shwon in Figure
the following factors were used to modify B-i 18 were derived.
the mean curves, under present conditions:
B.9.4 Distribution Storage Tanks
MM/
Intensity 1. General
NEHRP Map Area Shift
California 7 -1 Description: Most oil storage tanks are
California 3-6 -1
unanchored, cylindrical tanks supported
Non-California 7 -1
Puget Sound 5 -1 directly on the ground. Older tanks have
All other areas -1 both fixed and floating roofs, while more
modern tanks are almost exclusively
Upgraded Conditions: It is not cost- floating-roofed. Diameters range from
effective or practical to upgrade existing approximately 40 feet to more than 250 feet.
petroleum fuels transmission pipelines, Tank height is nearly always less than the
except perhaps at fault crossings or in areas diameter. Construction materials include
of extremely unstable soils. Therefore, no welded, bolted, or riveted steel. Tank

294 Appendix B:Lifeline Vulnerability Functions ATC-25


foundations may consist of sand or gravel, or are based on ATO-13 data for FC 43, on-
a concrete ring wall supporting the shell. ground liquid storage tanks (see Figure B-
119). Standard construction is assumed to
Typical Seismic Damage: On-ground oil represent typical California distribution
storage tanks are subject to a variety of storage tanks under present conditions (ie.,
damage mechanisms, including: (1) failure of a composite of older, non-seismically
weld between base plate and wall, (2) designed tanks as well as more modern tanks
buckling of tank wall (elephant foot), (3) designed to seismic requirements (e.g., API
rupture of attached rigid pipingbecause of 650).
sliding or rocking of tank, (4) implosion of
tank resulting from rapid loss of contents Present Conditions: In the absence of data
and negative internal pressure, (5) on the type of material, age, etc., the
differential settlement, (6) anchorage failure following factors.were used to modify the
or tearing of tank wall, (7) failure of roof-to- mean curves, under present conditions:
shell connection or damage to roof seals for
floating roofs (and loss of oil), (8) failure of MMI
shell at bolts or rivets because of tensile Intensity
hoop stresses, and (9) total collapse. NEHRP Map Area Shift
Torsional rotations of floating roofs may California 7 0
damage attachments such as guides, ladders, California 3-6 +1
Non-California 7 +1
etc. Puget Sound 5 +1
All other areas +2
Seismically Resistant Design: Seismically
resistant design practices for ground oil Upgraded Conditions: For areas where it
distribution storage tanks include the use of appears cost-effective to improve facilities,
fledbIe piping, pressure relief valves, and assume on a preliminary basis that upgrades
well-compacted foundations and concrete result in one or two beneficial intensity
ring walls that prevent differential shifts (i.e., -1 or -2), relative to the above
settlement. Adequate freeboard to prevent present conditions.
sloshing against the roof should be
maintained. Positive attachment between Time-to-restoration: The time-to-
the roof and shell should be provided for fix- restoration data assigned to SF 18d,
roofedtanks. The bottom plate and its distribution storage tanks, are assumed to
connection to the shell should be stiffened apply to all tanks. By combining these data
to resist uplift forces, and the base plate with the damage curves for FC 43, the time-
should be protected against corrosion. to-restoration curves shown in Figures B-
Abrupt changes in thickness between 120 through B-121 were derived.
adjacent courses should be avoided.
Properly detailed ductile anchor bolts may B.10Emergency Service
be feasible on smaller steel tanks.
Maintaining a height-to-diameter ratio of B.10.1Health Care
between 0.3 and 0.7 for tanks supported on
the ground controls seismic loading. 1. General
Retention dikes are needed to retain spilled
oil and prevent it from reaching ignition Description: Health care facilities
sources. These dikes should have sufficient (hospitals)are typicallyhoused in one or
capacity to retain all oil that could spill more buildings. Construction type varies
within their confines. Also, all retention dike significantly. Smaller hospitals may contain
embankments should be stable in ground only limited equipment associated with
shaking. building services. Large hospitals may
contain water treatment equipment,
2. Direct Damage emergency power diesels, chillers, and
boilers, as well as sophisticated equipment
Basis: Damage curves for distribution used for treating patients.
storage tanks in the petroleum fuels system

ATC-25, Appendix B:Lifeline Vulnerability Functions 25


Distribution Storage Tanks
: D=11.' lid 1.00

a)
Eo D=50z

Other

CA 36
Non CA 7

0 I
VII Vi1 Vill IX
I X
Modified Mercalli Intensity (MMI)

Figure B-1 19 Damage percent by intensity for petroleum fuelds distribution storage tanks.
,, :

Distribution Storage anks


41
R=111,/ ,

8d 1.00 43 1.0f1

hII a b
6 0.408 0.110
7 0.403 0.891
.. 8 0.3U30 H.041
9 8.352 0.020
10 0.258 0.009
;a
.2
R b * days + a
Fi
n
1)

D- £A.
l- A. I I I I I I I I I

DAYS: 30 60 90 120 150 1 210 248 Z70 300 330 365


Elapsed Time in Days
Figure B-i 20 Residual capacity for petroleum fuelds distribution storage tanks (NEHRP California 7).

296- 296 Appendix B: Lifeline Vulnerability Functions ATC-25


>
ribution Storage Tanks
R=tlx 4a lt Af 1 O1

"ml a b
6 0.403 0.091
7 0113 :80 0.841
8 352 0.828
.6,
9 0.258 8.889
C1
Ca 10 8.142 0.006
-0 R= E0x
R = * days a
Ln
a
CC

Rz 07 I I I I I
I i I I
DAYS: 3D 68 so 128 158 188 218; Z48 278 388 33 35
Elapsed Time in Days

Figure B-1 21 Residual capacity for petroleum fueldscdistribution storage tanks (NEHRP Map Area:
California 3-6, Non-California 7, and Puget Sound 5).

Distribution Storage anks


5=1808 1.88 43 1.0

ml a b
6 8.388 8.841
7
0.828
'U O .258 . 809
a 9 8.142 8. BO
a 1 80.860 .00,
0 R= 96c
R b * days + a
£/2
.) -
CE

R rvD.-
ur _ I
I
I
I I
I
I I,,
DAYS: 38 G 9B 128 158 188 218 24 278 3881 330 35
Elapsed Time in Days
Figure B-122 ResiduaEcapacity for petroleum fuelds distribution storage tanks (AlI other areas).

ATC-25 Appendix B:Lifeline Vulnerability Functions 297


Health Care
D=A08V 10

80

o
0)
CU D=SO;.
E
Ca
0

UI Vil ViII Ix X
Modified Mercalli Intensity (MMI)

Figure B-1 23 Damage percent by intensity for health care facilities.

Typical Seismic Damage: Buildings may design. However, equipment and


experience generic building damage ranging nonstructural items also require special
from cracks in walls and frames to partial attention if the hospital is to remain
and total collapse. Unanchored or functional. All critical equipment should be
improperly anchored equipment may slide anchored. Equipment on isolators should be
or topple. Equipment supported on isolation snubbed. The emergency power system
mounts with no snubbers may fall off the should be closely scrutinized, and the
mounts and rupture attached piping and emergency diesel-generator system should
conduits. Unrestrained batteries on racks be maintained and tested frequently.
may fall, rendering the emergency power Equipment used to treat patients should be
systems inoperable. Suspended ceilings may stored and restrained properly. Medicine in
fall and impede operations. Equipment cabinets should be stored in a manner that
necessaryfor treating patients maybe prevents it from falling to the floor.
damaged, especially if it is supported on
carts or on wheels, or is top-heavy. 2. Direct Damage
Equipment that requires precise alignment
is also susceptible to damage. In garages, Basis: Damage curves for health care
structural damage may result in ambulances facilities are based on ATC-13 data for FC
being unavailable when they are needed. 10, medium-rise reinforced masonry shear
wall buildings (see Figure B-123). FC 10 was
Seismically Resistant Design: As essential chosen to represent a generic building,
facilities, hospital should be designed to based on review of damage curves for all
remain operational in the event of a major buildings.
earthquake. Typically this involves using
larger design forces and meeting more Standard construction is assumed to
restrictive design requirements than those represent typical California health care
required by building codes for the building facilities under present conditions (i.e., a

VulnerabilIty Functions ATC-25


298
298 Appendix B: Lifeline
Appendix B: Lifeline Vulnerability Functions ATC-25
Health Care
R=1010x 4 Dt-
I.0J

a b

8.1?1 O. O25
0.i~i 0.Hi4
3 -0.801 8.8e7
-El.878 EMs
C
) R= SOz

-i:5
C
* days+ a
1)
C
a

R= l l i l

DAYS: 38 60 98 126 150 180 218 240 27 3 330 365


Elapsed Time in Days

Figure B-124 Residual capacity for health care facilities (NEHRP California 7).

composite of older and more modern health Time-to-restoration: The time-to-


care). It is assumed that such facilities were restoration data assigned to SF 8, health
designed using enhanced seismic care services, are assumed to apply to all
requirements and that the beneficial health care facilities. By combining these
intensity shifts, indicated below are data with the damage curves for FC 10, the
appropriate. time-to-restoration curves shown in Figures
B-124 through B-126 were derived.
PresentConditions:In the absence of data
on the type of construction, age, etc., the B. 0.2 Emergency Response Services
following factors were used to modify the
mean curves, under present conditions: 1. General

Mm/ Description: Emergency response services


Intensity include fire and police stations. Both fire
NEHRP Map Area Shift and police stations may be housed in low- to
California 7 -1 medium-rise structures of virtually any type
California 3-6 0 of construction.In manyurban areas these
Non-California 7 0
Puget Sound 5 0
structures are old and were built prior to the
All other areas adoption of earthquake design codes.
Firehouses typically include garages to
Upgraded Conditions: For areas, where it house engines, sleeping quarters, kitchens,
appears cost-effective to improve facilities, utility rooms, and communications rooms.
assume on a preliminary basis that upgrades Some stations have hose towers used to dry
result in one or two beneficial intensity hoses after use. Police stations typically
shifts (i.e., -1 or -2), relative to the above include a dispatch center, detention area,
present conditions. and squad room.

ATC-25 Appendix B:Lifeline Vulnerability Functions 299


Health Care
R=100v

MrII a b
76 0.171 0.025
7 0.116 0.014
8 -0.001 0. 00?
9 -0.878 0.005
0CU
10 -0.165 0.004
C)
R= 5e
R = b * days a
-o
(I)
a)
cc

.S
!
OX / I I I I

30 6e 98 210 Z40 270 300 330 365


. .

DAYS, . 120 10 180


Elapsed Time in Days

Figure B-1 25 1Residual capacity for health care facilities (NEHRP Map Area: California 3-6, Non-
California 7, and Puget Sound 5).

Health Care
R=

(U
.5
I 0
Cl
-cz
(n
i)

n_
jl: . W . I I I I .I I I I i

DAYS: 30 60 98 128 158 180 210 240 278 308 330 365
Elapsed Time in Days

Figure B-i 26 Residual capacity for health care facilities (All other areas).

. 300 Appendix B: Lifeline Vulnerability Functions ATC-25


Emergency Response Seruice

C5

0)

VI WI VIll Ix x
Modified Mercalli Intensity (MM])

Figure B-127 Damage percent by intensity for emergency response service facilities.

Typical Seismic Damage: Buildings housing separate hose towers should be provided).
fire and police stations may experience Communications equipment should be
generic building damage ranging from properly restrained and provided with
cracking of frames and walls to partial or backup emergency power. All equipment,
total collapse. Fire stations may be more especially boilers, should be well anchored.
susceptible to damage than most buildings Engines and patrol cars should be stored in
because of the presence of the large garage areas that are expected to escape serious
door openings and the hose towers, which damage.
interrupt the continuity of the roof
diaphragm and frequently have 2. Direct Damage
discontinuous shear walls or frames.
Significant damage to a fire station could Basis: Damage curves for emergency
lead to loss of use of engines housed within response service are based on ATC-13 data
them. UJnanchored communications for FC 10, medium-rise reinforced masonry
equipment in both stations could severely shear wall buildings (see Figure B-127). FC
hinder operations immediately after an 10 was chosen to represent a generic
earthquake. building, based on review of damage curves
for all buildings. Although more modern
Seismically Resistant Design: Both fire and facilities may be designed to enhanced
police stations are critical buildings that seismic design criteria, many old police and
should remain operational after a major fire stations are still in use. Consequently,
earthquake. Accordingly, these facilities no intensity shifts from typical FC 10
should be designed to meet the seismic performance are assumed.
requirements for critical buildings of a
national or local building code. Geometric Standard construction is assumed to
irregularities that will result in poor seismic represent typical emergency response
performance should be avoided (e.g., facilities under present conditions (Le., a

ATC-25 Appendix B: Lifeline Vulnerability Functions3 3!0


Emergency Response Service
R=1O0Y

.H .
ea
C,
(a
Ca
o R= So.
C
:3

a)

m =e

DAYS: 3 68 90 128 150 180 210 248 270 3 338 365


I Elapsed Time in Days

Figure B-128 Residual capacity for emergency response service facilities (NEHRP California 7).

composite of older and more modern police Upgraded Conditions: For areas where it
and fire stations). appears cost-effective to improve facilities,
assume on a preliminary basis that upgrades
Present Conditions: In the absence of data result in one or two beneficial intensity
on the type of construction, age, etc., the shifts (i.e., -1 or -2), relative to the above
following factors were used to modify the present conditions.
mean curves, under present conditions:
Time-to-restoration: The time-to-
MM/ restoration data assigned to SF 23,
Intensity emergency response services, are assumed
NEHRP Map Area Shift to apply to all emergency response service
California 7 0, facilities. By combining these data with the
California 3-6 +1 damage curves for FC 10, the time-to-
Non-California 7 +1
Puget Sound 5 +1 restoration curves shown in Figures B-128
All other areas +2 through B-130 were derived.

302 Appendix B:Lifeline Vulnerability Functions ATC-25


Emergenc Response Seruice

"Ml a b
6 - .1B5 O. O854
7 -0.84 0,.022
8 -1,023 8.214
-5
9 -8.BB 8. 1009
0
10 8.815 0.887
CO

:3 R = b, * days +- a
.0

R=
OM: 30 68 98 128 1S 188 218 248 278 3 33 35
Elapsed Time in Days

Figure B-129 Residual capacity for emergency response service facilities (NEHRP Map Area: California
3-6, Non-California 7, and Puget Sound 5).

bergency Response Serviice


R=I8% 1.00 10 1.00. 3

nI a b,
6 -0.048 8 .822
7 -8823 0,i84
B -8.BB2 ,8009
.) 9 El15 0.087
ID 0. 025 0. 808,
7
R =bt * days + a
:3
:0

R= I 1 I I i I

DAYS: 38 68 98 128 158 188 218 248 278 3081 33 35


Elapsed Time in Days

Figure B-130 Residual capacity for emergency response service facilities (All other areas).

ATCC-25 Appendix B:Lifeline Vulnerability Functions 303


Appendix C: Residual Capacity Plots for Each
Lifelineand Scenario Earthquake
Table of Contents
Page
Air Transportation ................I..............................................................................................................I .............. 306
Ports........................................................................................................................................................ I......... 318

Medical Care Centers............ ................................................................................................................ .............. 322


Fire Stations........................................................................................................................................... ... . 334
Police Stations .......................II................ . .......... . ......................................... . ..................................... I.............. 346
Broadcast Stations . ........................................................................................................................... .............. 356
PRaidrnnd.
J.\ u;uuL - .
. _ 1 60

Highways ................................. I
.......................................... . ........................................................... I....................... 373
Electric System....................................................................................................................................... .............. 377
Water System .... ..... . . I................................................................................................. . .......................... 389
friFIdp
As mu vP;nielineC
W%9Cil 1(wk_ lion
.. Jo
R q W
a

Refined Oil Pipelines ............ I..................................................... . ........................................................ .............. 392


Natural Gas Pipelines..... I............................................................................................................... ... 393

Upgraded Electric System.................................................................................................................... .39...........839

ATC-25 Appendix C:Residual Capacity Plots 305


OR
0
.
0
4-'
cc

Elapsed Time in Days

Figure C-1 Residual capacity of Illinois air transportation following New Madrid event (M=8).

0~

0
C,
Q)
ir

Elapsed Time in Days

Figure C-2 Residual capacity of Missouri air transportation following New Madrid event (M=8).

ATC-25
Appendix C: Residual Capacity Plots
306
306 Appendix C: Residual Capacity Plots ATC-25
C
0

0
CD,
0

Elapsed Time in Days

Figure C-3 Residual capacity of Arkansas air transportation following New Madrid event (M=8).

C
0

0
CD,
EC

Elapsed Time in Days

Figure C-4 Residual capacity of Tennessee air transportation following New Madrid event (M=8).

307
ATC-25 Appendix C: Residual Capacity Plots
ATC:-25 Appendix C:Residual Capacity Plots 3017
n nn-
I UV-. . . \ :1

95-

0 90-
I-
0
4- 85-
.Er

80 ) _

-7e
I
- _
|

14
_
28
0I 7
Elapsed Time in Days

Figure C-5 Residual capacity of Kentucky air transportation following New Madrid event (M=8).

I 1

.2
1
a

. .
.

112 1
Elapsed Time in Days

Figure C-6 Residual capacity of Mississippi air transportation following New Madrid event (M=8).

309 Appendix C: Residual Capacity Plots ATC-25


4 P. - S

95-

85-

0- 80-
C i

.4-
75-
70-
65-
60-
hn-
.
I.
7 14 lUI itI
.
^4 ^1 1 .- - -- ^- -- - - -1 -- I I
0 a : 0 1 4f 00 CC 0 'Ili] d 1U*
Elapsed Time in Days

Figure C-7 Residual capacity of South Carolina air transportation following Charleston event
(M=7.5).

An_
1 uu,

II

01
C:

C)
90-

85-

non
d'LI

'0 7 14 28
Elapsed Time in Days

Figure C-8 Residual capacity of North Carolina air transportation following Charleston event
(M=7.5).

Appendfx C: Residual Capacity Plots 309~~~~~~~


ATC-25
AT C-25 Appendix C:Residual Capacity Plots 309
100 -
r- |

- 95-

0
90-

.2
en
W
0: 85-

80-

75.- f
0 7 14 21 28 35 42 49 56 63
Elapsed Time in Days

Figure C-9: Residual capacity of Georgia air transportation following Charleston event (M=7.5).

100
95 I
90-
85-
at 80-
O 75-
0 E70-
-2 65-
CC 60-
55-
50-
45-
40 .
I I I
, .
-I-
.
-.-
.
.I- ..- .-.-
. ..
-I-
.
-.-
S
A
0 7 14 21 28 35 42 49 tO Oj U I o'i.
Elapsed Time in Days

Figure C-1 0 Residual capacity of Massachusettsair transportation following Cape Ann event (M=7.0).

Plots ATC-25
310
310 Appendix C:
Appendix Residual Capacity
C: Residual Ca acity Plots ATCI-25
0
c:0o
V)
en
oX

Elapsed Time in Days

Figure C-i1 Residual capacity of Connecticut air transportation following Cape Ann event (M=7.0).

Inn
]111N

9:.

go-
g 85-
.° 80-
o 75-
c 70-

60-
=e
in ,-

U 7 14
Elapsed Time in Dayts

Figure C-12 Residual capacity of Delaware air transportation following Cape Ann event (M=7.0).

Residual Capacity Plots 311


ATC-25
ATC-25 Appendix C:
Appendix C: Residual Capacity Plots 311
0

Elapsed Time in Days

Figure C-1 3 Residual capacity of Rhode Island air transportation following Cape Ann event (M=7.O).

I Mn

95-

90-

0 85-
Cu
0 80-
._
cc01) 75-
70-

65-

60 14
0
Elapsed Time in Days

Figure C-1 4 Residual capacity of New Hampshire air transportation following Cape Ann event
(M=7.0).

Plots ATC-25
Capacity Plots
312
312 C: Residual
Appendix C:
Appendix Residual Capacity ATC-25
1

Elapsed Time in Days

Figure C-1 5 Residual capacity of Utah air transportation following Wasatch Front event M=7.5).

.no
1,.W
I 1I

1 1

95-
C
0
0CD
0
a)

90-

85-
To 7 14 21 28 35 42 49
Elapsed Time in Days

Figure C-16 Residual capacity of California air transportation following Hayward event (M=7.5)!.

313
ATC-25 Appendix C: Residual Capacity Plots
ATC-25 AppendixC: Residual Capacity Plots 313
0
0
EC
U,
a,

Elapsed Time in Days

Figure C-1 7 Residual capacity of California air transportation following Fort Tejon event (M=8.0).

Elapsed Time in Days

Figure C-i 8 Residual capacity of Washington air transportation following Puget Sound event (M=7.5)..

314 - Appendix C: Residual Capacity Plots ATC-25


100

zi-

0 14
Elapsed Time in Days

Figure C-19 Residual capacity of Illinois air transportation following New Madrid event (M=7.0).

1 UU.

r 'l

c
0
HE 95-
0
Cc

A
l l i

0
7 14 21 35 42 49 56 63 70 77 84
Elapsed Time in Days

Figure C-20 Residual capacity of Missouri air transportation following New Madrid event (M=7.0).

Capacity Plots 315


ATC-25 Appendix C:
Appendix C:Residual
Residual Capacity Plots 315
100 -
-

95-

90-
0
O-
85-

80-
a)

75-

70-

KS,-
-

0 14 28 42 56 70 84 98 112 126 14U


Elapsed Time in Days

Figure C-21 Residual capacity of Arkansas air transportation following New Madrid event (M= 7.0).

100 , _

95-
I0

0
.o 90-
CD
Ia

85-

nr -

v
0 7 14 21 28 42
Elapsed Time in Days

Figure C-22 Residual capacity of Tennessee air transportation following New Madrid event (M=7.0).

316 Appendix C: Residual Capacity Plots ATC-25


100 fi

90- I I
0 7 14 21
Elapsed Time in Days

Figure C-23 Residual capacity of Kentucky air transportation following New Madrid event (M=7.0).

100-

95-

01 90-
0
Co
cc 85-

80-

75-
C
7 14 21
Elapsed Time in Days

Figure C-24 Residt jai capacity of Mississippiair transportation following New Madrid event (M=7.iO).

Capacity Plots 317


ATC-25
ATFC-25 C:Residual
Appendix C:
Appendix Residual Capacity Plots 317
1

0A

.r-
2

Elapsed Time in Days

Figure C-25 Residual capacity of South Carolina ports following Charleston event (M=7.5).

1
. r

90-

80-

70-
0
.4-n

60-
cc
a:
50-

40-

30 -
0 7 14 21
Elapsed Time in Days

Figure C-26 Residual capacity of North Carolina ports following Charleston event (M=7.5).

Plots ATC-25
Appendix
Appendix C: Residual Capacity
C: Residual Capacity Plots ATC-25
318
318A
0

0
0
a:

)o
Elapsed Time in Days

Figure C-27 Residual capacity of Georgia ports following Charleston event M=7.5).

Elapsed Time in Days

Figure C-28 Residual capacity of Massachusetts


ports following Cape Ann event (M=7.0).

Capacity Plots 319


ATC-25
ATC:-25 C:Residual
Appendix C:
Appendix Residual Capacity Plots 319
1

0
0
CC)

Figure C-29 Residual capacity of Rhode Island ports following Cape Ann event (M=7.0).

a0R
.E
0C)
CC,

Elapsed Time in Days

c
a of C C A n e. (

Figure C-30 Residual capacity of Connecticut ports following Cape Ann event (M=7.0).

320 Appendix C: Residual Capacity Plots M-26


AC
0
0
0
c)
c2

Elapsed Time in Days

Figure C-31 Residual capacity of California ports following Hayward event (M=7.5).

I0
0-
4

0
ad
0

Elapsed Time in Days

Figure C-32 Residual capacity of California ports following Fort Tejon event M=8.O).

Capacity Plots 321


ATC-25
ATC-25, C.Residual
Appendix C:
Appendix Residual Capacity Plots 321
1

: g~~~~-
c0
0
4-

a:

Elapsed Time in Days

Figure C-33 Residual capacity of Washington ports following Puget Sound event (M=7.5).

11
C
0
.I

Elapsed Time in Days

Figure C-34 Residual capacity of Illinois medical care centers following New Madrid event (M=8.0).

Capacity Plots ATC-25


Appendix C: Residual
Appendix C: Residual Capacity Plots ATC-25
322
1 UU7

0 95-
C
Q,

or)- l l -
! - -
I
42 63 84 105 126 147 168 189 210 231 252 273 234
0 21
Elapsed Time in Days

Figure C-35 Residual capacity of Missouri medical care centers following New Madrid event (M=8.0).

C:
0
0
co~
a,

Elapsed Time in Days

Figure C-36 Residual capacity of Arkansas medical care centers following New Madrid event (M=8O0).

Plots 323
ATC-25
ATC-25 Appendix C:
Appendix Residual Capacity
C: Residual Capacity Plots 323
1

0
a u
Ci
ir
a)

Figure C-37 Residual capacity of Tennessee medical care centers following New Madrid event
(M=8.0).

I it I-

C
.2
95-
0
. -
z,
a)

90- - I I I -

U 7 14 21 28 35 42 49 56 63 70
Elapsed Time in Days

Figure C-38 Residual capacity of Indiana medical care centers following New Madrid event (M=8.0).

Capacity Plots ATC-25


324 Appendix C: Residual
Appendix C: Residual Capacity Plots ATC-25
324
1

0
.2
C,

Zl
Figure C-39 0 Residual capacity of Kentucky medical care centers following New Madrid event
-0 (M=8.:O).

TU

0,
Figure C-39 Fe

Elapsed Time in Days

Residual capacity of Mississippi medical care centers following New Madrid event
(M=8.O).

Capacity Plots 325


ATC-25
ATC-25
C: Residual
Appendix C:
Appendix Residual Capacity Plotr, 325
0

0
.4

-
a)

55

Elapsed Time in Days

Figure C-41 Residual capacity of South Carolina medical care centers following Charleston event
(M= 7.5).

0
a,

Elapsed Time in Days

Figure C-42 Residual capacity of North Carolina medical care centers following Charleston event
(M =7.5).

ATC-25
Appendix C: Residual Capacity Plots
326
326 Appendix C: Residual Capacity Plots ATC-25
d
I
no5

95

90-

C
85-
.2
0
To 80-
cc
i
75- i
I
I

70-

I
U 14 2 42 56 70 84 8 112 126 140' 14 168 182
Elapsed Time in Days

Figure C-43 Residual capacity of Georgia medical care centers following Charleston event (M=7.5),.

0c:
0
.An
a:

0 14 28 42 56 70 84 98 112126140154 168182196 2 1 0
Elapsed Time in Days

Figure C-44 Residual capacity of Massachusetts medical care centers following Cape Ann event
(M=7.0).

Capacity Plots 327


ATC-25
AT,
C-25, Appendix Q Residual
Appendix C: Residual Capacity Plots 327
0
op
0
o2
W
v)
GC

Figure C-45 Residual capacity of Connecticut medical care centers following Cape Ann event
(M=7.0).

.2
0-

._
C
a)

Figure C-46 Residual capacity of Delaware medical care centers following Cape Ann event (M=7.0).

328 Appendix C: Residual Capacity PlotsA ATC-25


a,

Fui rge C-4 7~


~~

Elapsed Time in Days

C
Residual capacity of Rhode Island medical care centers following Cape Ann event
(M=7.0).

.0

D
4
D
I)

Elapsed Time in Days

Figure C-48 Residual capacity of New Hampshire medical care centers following Cape Ann event
(M=7.0).

Capacity Plots 329


ATS
ATC-25 Appendix C: Residual
Appendix C: Residual Capacity Plots 329
4-
U,
c)

Elapsed Time in Days

Figure C-49 Residual capacity of Utah medical care centers following Wasatch Front (M=7.5).

100

95-

90-
0

0
85-
cc

80- -F-j

A
r
AX PP
,
- . . I
. - . I. - I
. -- I
. - - -- I - --- I I
- - - - - - - - - -,
U Zd 56 84 112 140 168 196 224 22 280 308 336 364
Elapsed Time in Days

Figure C-50 Residual capacity of California medical care centers following Hayward event M=7.5).

Capacity Plots ATC-25


330 C: Residual
Appendix C:
Appendix Residual Capacity Plots ATC-25
C

0
CZ

Elapsed Time in Days

Figure C-51 Residual capacity of California medical care centers following Fort Tejon event M=8.0).

s:0

0
.F

Elapsed Time in Days

Figure C-52 Residual capacity of Washington medical care centers following Puget Sound event
(M=7.5).

331
Capacity Plots
Residual Capacity
ATC-25
ATC-25 Appendix C:
Appendix C:Residual Plots 331;
-I t]t]-
JV .
Al

&nn-

0O
C:
0
05
a,

_.-
- .-

0 14 28 42 56 70 84 98 112 126 140 154 168 182 196 2 0


Elapsed Time in Days

Figure C-53 Residual capacity of Missouri medical care centers following New Madrid event (M=7.0).

1 UU

95.

90-

C 85-
0
80-
0
a, 75-

70-

65-
on_
H11
:
W - -I rI r I I I I I I I T
U 21 42 63 84 105 126 147 168 189 210 231 252
Elapsed Time in Days

Figure C-54 Residual capacity of Arkansas medical care centers following New Madrid event (M=7.0).

Capacity Plots ATC-25


332 C: Residual
Appendix C:
Appendix Residual Capacity Plots ATC-25
1

.2
Fn

Elapsed Time in Days

Figure C-55 Residual capacity of Tennessee medical care centers following New Madrid event
(M=7.0).

no z
r Or
AUV~

C: - 'I
0
M

rjr

no
Cal
.ZV
U 7 14 21 28 35 42 49 56 63 70 7
Elapsed Time in Days

Figure C-56 Residual capacity of Kentucky medical care centers following New Madrid event
(M =7.0).

ATC-25 Appendix C:Resiual 'Capacity Plots 33


AT,C-25 Appendix C: ResidualCa =ity Plols 333
100 -

H--

95-

a0

0
Cc, 90-
Cn
a:

85-

80
0 14 28 42 56 70 84 98 1i2 12b 14U
Elapsed Time in Days

Figure C-57 Residual capacity of Mississippi medical care centers following New Madrid event
(M=7.0).

a)
a:

Elapsed Time in Days

Figure C-58 Residual capacity of Illinois fire stations following New Madrid event (M=7.0).

ATC-25
C: Residual Capacity Plots
Appendix C:
334 Appendix Residual Capacity Plots ATC 25
100 -

0
95-
T0

-
I
r- - .i- -- -I- -.. I
112 126 140
0 14 2B 42 bt Pu 04 wv
Elapsed Time in Days

Figure C-59 Residual capacity of Missouri fire stations following New Madrid event (M=8.0).

0
0
rr
Qf)

Elapsed Time in Days

Figure C-60 Residual capacity of Arkansas fire stations following New Madrid event (M=8..0).

Plots 335
ATC-25 Appendbc
Appendix C: Residual Capacity
C: Residual Capacity Plots 335
ATC-25
1

*0
.0
C,
u,
cc)

Elapsed Time in Days

Figure C-61 Residual capacity of Tennessee fire stations following New Madrid event (M=8.0).

One
1I [](}
%JW

95-

0 90-

0
cc
c' 85-

80-
&

T -
, _
. l
0 7 14 21 28 35 42 49 56 63 70 77 84
Elapsed Time in Days

Figure C-62 Residual capacity of Indiana fire stations following New Madrid event (M=8.0).
~ ~~~ ~ ~ ~ ~~
* f 7 - I . . . I I I .I . i ; .~- Ii

336 Appendix C: Residual Capacity Plots 4 ATC-25


95- I
0

wry, _- r s l -
:Su

0 7 14 21 28 35 42 49 56
Elapsed Time in Days

Figure C-63 Residual capacity of Kentucky fire stations following New Madrid event M=8.O).

0A
0
0
.4-

Eapsed Time in Days

Figure C-64 IResidual capacity of Mississippifire stations following New Madrid event (M=8.O).

337
Capacity Plots
ATC-25
ATC-25 C: Residual
Appendix C:
Appendix Residuca Ccipacity Plots 337
0

0
IN-
a)
EC

Elapsed Time in Days

Figure C-65 Residual capacity of South Carolina fire stations following Charleston event (M=7.5).

C
.2
0
0
u,

Figure C-66 Residual capacity of North Carolina fire stations following Charleston event (M= 7.5).

ATC-25
C: Residual Capacity Plots
Appendix C:
338
338 Appendix Residual Capacity Plots ATC-25
C
0
0W
.9-
in

I
Elapsed Time in Days

Figure C-67 Residual capacity of Georgia fire stations following Charleston event (M=7.5).

C
0
52
0
a,

Elapsed Time in Days

Figure C-68 Residual capacity of Massachusetts, fire stations following Cape Ann event (M=7.0).

Capacity Plots 339


ATC-25
ATC-25 C:Residual
Appendix C:
Appendix Residual Capacity Plots 339
1

0
cIr

Elapsed Time in Days

Figure C-69 Residual capacity of Connecticut fire stations following Cape Ann event (M=7.0).

100- -
-

95-
90-
85-
C 80-
0
E575- 2
,5 70-
65-
60-
55-
50- {
l

0 21 42 63 84 105 126 147 168 189 -1U


Elapsed Time in Days

Figure C-70 Residual capacity of Delaware fire stations following Cape Ann event (M=7.0).

340 Appendix C: Residual Capacity Plots ATC-25


I " 4.
C
0
+1
0
3:

Elapsed Time in Days

Figure C-71 Residual capacity of Rhode Islandfire stations following Cape Ann event (M=7.O).

*
0C

.To

Figure C-72 Residual capacity of New Hampshire fire'stations following Cape Ann event (M=7.0).

Capacity Plots 341


ATC-25
ATCC-25 Appendix C:
Appendix C:Residual
ResidualICapacity Plots 341
0
.2
0
a)

Elapsed Time in Days

Figure C-73 Residual capacity of Utah fire stations following Wasatch Front event (M=7.5).

100
-l
-i--ij
95-

0A

: 0
X ~90~
,o
)

85- _
I

I- l _!--7
0)
V 7 14 21 28 35 42 49 56 63 70 77 84 91 98
Elapsed Time in Days

Figure C-74 Residual capacity of California fire stations following Hayward event (M=7.5).

342 Appendix C: Residual Capacity Plots ATC-25


i, 4
C1-
a-
C
0
-0
0

Elapsed Time in Days

Figure C-75 Residualcapacity of California fire stations following Fort Tejon event (M=8.0).

0
CD
a:

Elapsed Time in Days

Figure C-76 Residual capacity of Washington fire stations following Puget Sound event (M=7.5).

Capacity Picts 343


ATC-25
ATC-25 Appendix C:Residual
Appendix C: Residual Cap=ffy Plots. 3
100 : T

0
.-
W,,
a)
1=

|
.Hn
i7_P
. Al. z ; S l
.
0 14 28 42 56 70 84 98 112 1 26
Elapsed Time in Days

Figure C-77 Residual capacity of Missouri fire stations following New Madrid event (M=7.0).

0
.2

0
an
:)

2
Elapsed Time in Days

Figure C-78 Residual capacity of Arkansas fire stations following New Madrid event (M=7.0).

Plots ATC-25
344 Appendix Residual Capacity
C: Residual
Appendix C: Capacity Plots ATC-25
1

0
Fo

63 70 77
Elapsed Time in Days

Figure C-79 RResidualcapacity of Tennessee fire stations following New Madrid event (M= 7.0).

100
I

I
0
.,

95-
0
co
Q)
ic

90 r lI

r 7 14 21 28 35 42 49 56 63
Elapsed Time in Days

Figure C-80 Residual capacity of Kentucky fire stations following New Madrid event (M=7.0).

Capacity Plots 345


ATC-25
ATC-25 Q Residual
AppendiX C:
AppendAz ResidUal Capacity Plots 345
1

: z~~~C
.2
0
.0
Cie
a)

Elapsed Time in Days

Figure C-81 Residual capacity of Mississippifire stations following New Madrid event (M=7.0).

100 -

0
C:

0
,
a,
cc

_-
S5.
U 7 114
Elapsed Time in Days:

Figure C-82 Residual capacity of Illinois police stations following New Madrid event (M=8.0).

346 Appendix C: Residual Capacity Plots ATC-25


C
0
0
wc

Elapsed Time in Days

Figure C-83 Residual capacity of Arkansas police stations following New Madrid event (M=8.O).

I:

C
.M
-

Elapsed Time in Days

Figure C-84 Residual capacity of Tennessee police stations following New Madrid event (M=8.O).

Residual Capacity Plots 347


ATC-25 Appendix C:
AppendixC:
AT:CE25 Residual Capacity Plots 347
C
0
0

a)
a:

Figure C-85 Residual capacity of Kentucky police stations following New Madrid event (M=8.0).

C
0

0
a:

Elapsed Time in Days

Figure C-86 Residual capacity of Mississippi police stations following New Madrid event (M=8.0).

348 348 Appendix C: Residual Capacity Plots ATC-25


C

.4-
C,

Elapsed Time in Days

Figure C-87 Residualcapacity of SouthCarolina police stations following Charleston event (M=7.5).

C10

-I

.4

I I)

Elapsed Time in Days

Figure C-88 Residual capacity of North Carolina police stations following Charleston event (M=7.5).

Residual Capacity Plots 349


ATC-25
ATC-25 Appendix C:
Appendix C:Residual Capacity Plots 349
1

0
I~~~~~~T
C

. I 0
En
Q)

Elapsed Time in Days

Figure C-89 5)
Residual capacity of Georgia police stations following Charleston event (M=7.5)

01
Cu

0
cc
a)

Elapsed Time in Days .

Figure C-90 Residual capacity of Massachusetts police stations following Cape Ann event (M=7.0);

350 Appendix C:Residual Capacity PlotsC ATC-25:


0'
I-

0)

,g

Figure C-91 Residual capacity of Connecticut police stations following Cape Ann event (M=7.0)..

"I

0C-
4-

Elapsed Time in Days

Figure C-92 Residual capacity of Delaware police stations following Cape Ann event (M=7.0).

Capacity Plots 351


ATC-25
ATC-25 C. Residual
Appendix C
Appendix Residual:Capaclty Plots 351
0
0
--
cc

Figure C-93 FResidualcapacity of Rhode Island police stations following Cape Ann event (M=7.0).

0
.!
al)
cc

Figure C-94 Residual capacity of New Hampshire police stations following Cape Ann event (M=7.0).''

::

362 Appendix C: Residual Capacity Plots ATC-25


1

.'-
4w
G2

Elapsed Time in Days

Figure C-95 Residual capacity of Utah police stations following Wasatch Front event ~(tM=7.5).

I
C
4-
Ci
11
cci.

Elapsed Time in Days

Figure C-96 Residual capacity of California police stations following Hayward event (M=7.5).

353
ATC-25 Appendix C: Residual Capacity Plots
ATC-25 Ain-pendixC: Residual Capacity Plots 353
.

-1- _
IUU-
-- - -- - I
95-
90-
85-

C 80-
0
I 75-
0
*i 70-
)
a:65-
60-
55-
A
on -
:rtJ
v -1| I I; I 7_
I TI
0 7 14 21 28 35 42 49 56 63 70 77 84
Elapsed Time in Days

Figure C-97 Residual capacity of California police stations following Fort Tejon event (M=8.0).

_
100- .

95-

0C-
.9-

0
.-

C)

_7 _7 - __
I I I I 11
,8 35 42 49 56 63 70 77 84 91 98 105
Elapsed Time in Days

Figure C-98 Residual capacity of Washington police stations following Puget Sound event (M=7.5).

Capacity Plots ATC-25


354. Appendix C: Residual
Appendix C: Residual Capacity Plots ATC-25
1

04-
a:

Elapsed Time in Days

Figure C-99 Residual capacity of Arkansas police stations following New Madrid event (M=7.0)..

10

001

Elapsed Time in Days

Figure C-100 Residual capacity of Tennessee police stations following New Madrid event (M=7.0).

355
ATC-25 Appendix C: Residual Capacity Plots
ATC-25 Appendix C: Residual Cqpacity Plots 35
100 \- -
-

95-
0

0.

cc
90-
-F,

oc;-
OD-
_-

I 1 _
w
0
Aft
14
- He
28 42 56 70 84 98 112 126 1 40
Elapsed Time in Days

Figure C-101 Residual capacity of Mississippi police stations following New Madrid event (M= 7.0).

CD,

Elapsed Time in Days

Figure C-102 Residual capacity of Illinois broadcast stations following New Madrid event (M=8.0).

Capacity Plots ATC-25


Appendix C:
Appendix Residual Ca.pacity'
C, Residual Plots ATC-25
356
356
100-

95-
0-1-

C)

C: 90-

Q -
I 42 63 84 105 126 147 Ib
U v1
Elapsed Time in Days

Figure C-103 Residual capacity of Missouri broadcast stations following New Madrid event (M=8.0).

0
1o
0a)
W
CE

Elapsed Time in Days

Figure C-104 Residual capacity of Arkansas broadcast stations following New Madrid event (M=8.0,).

ATC-25 Appendix C:Residual Capacity Plots 357


1

I2
a
.2

Elapsed Time in Days

Figure C-105 Resid ual capacity of Tennessee broadcast stations following New Madrid event (M=8.0).

100-
r--I
95-

0 90-
C

1X 85-
4-

cc,
80-

75-

70- . I l I I I I I I I I

0 7 14 21 28 35 42 49 56 63 70 77 84 91 98 105
Elapsed Time in Days

Figure C-106 Residual capacity of Kentucky broadcast stations following New Madrid event (M=8.0).

358 38Appendix C:Residual Capacity Plots ATC-25


1l t^^
1 []Q]
wwl
I

F
I

0- r
0 95-
Ca
cc

U 7 14 21 28 35 42 49 56
Elapsed Time in Days

Figure C-107 Residual capacity of Indiana broadcast stations following New Madrid event (M=8.0).

0
aE

aQ

Elapsed Time in Days

Figure C-108 Residual capacity of Mississippibroadcast stations following New Madrid event (M=8.0).

359
esidual Capacity Plots
ATC-25
ATC-25 Appendix C:
Appendix C.,Residual Capacity Plots 359
100_
95-
90-
85-
80:
75-
0
a 70
0 65-
(,
60
55-
50
45-
40 E

35-
0 14 28 42 56 70 84 98 112 126 140 154 168 182 196
Elapsed Time in Days

Figure C-109 Residual capacity of South Carolina broadcast stations following Charleston event
(M=7.5).

100

95

0 90-
.0
0
Cua

4) 85-
cc

80-

75 .
C 7 14 21 28 35 42 49 56 63 70 77 884
Elapsed Time in Days

Figure C-110 Residual capacity of North Carolina broadcast stations following Charleston event
(M=7.5).

360 Appendix C: Residual Capacity Plots ATC-25~~~~~~~~~~


360 Appendix C: iResidual Capacity Plots ATC-25
1

0
0
FC

0
Elapsed Time in Days

Figure C-1 1 1 Residual capacity of Georgia broadcast stations following Charleston event (M=7.5).

-
0
O
ma)
aC

Elapsed Time in Days

Figure C-1 12 Residual capacity of Florida broadcast stations following Charleston event (M=7.5).

ATC-25 Appendix C: Residual Capacity Plots 361


4 Pff
tJ[3
I---
I- 95-
90-
85-
80-
R 75-
C 70-
.2 65-
1 60-
°2 55-
0 50-
C 45-
40-
35-
30-
25-
vw I -I. -I -I- -I- .I- .I- -I-
L 14 21 2b 35 42 49 b 70 77 84 91
Elapsed Time in Days

Figure C-113 Residual capacity of Massachusetts broadcast stations following Cape Ann event (M=7.0).

aI
C
.2

at
cm

Figure C-114 Residual capacity of Connecticut broadcast stations following Cape Ann event (M=7.0).

Capacity Plots ATC-25


362 C: Residual
Appendix C:
Appendix Residual Capacity Plots ATC-25
1

0
0
.2
In
a:

Elapsed Time in Days

Figure C-115 Residual capacity of Delaware broadcast stations following Cape Ann event (M=7.O.

0
.o
0£D
ir

- Elapsed Time in Days

Figure C-1 16 Residual capacity of Rhode Island broadcast stations, following Cape Ann event (M=7.0).

ATC-25 Appendix C.Residual Capacity Plots 3


0

0
a)

Figure C-1 1 7 Residual capacity of New Hampshire broadcast stations following Cape Ann event
(M= 7.0).

01

Cu
0enZi

Elapsed Time in Days

Figure C-1 18 Residual capacity of Utah broadcast stations following Wasatch Front event (M=7.5).

364 Appendix C: Residual Capacity Plots ATC-25


C
0

0
to

Elapsed Time in Days

Figure C-11 9
U,
Residual capacity of California broadcast stations following Hayward event (P=75).
C,

0r

<n

Elapsed Time in Days

Figure C-120 Residual capacity of California broadcast stations following Fort Tejon event (M=8.0).

365
ATC-25 Appendix C: Residual Capacity Plots
ATC:-25 Appendix -C:Residual Capacity Plots 365
1

.2
0

U,
0F

Elapsed Time in Days

.Figure C-1 21 Residual capacity of Washington broadcast stations following Puget Sound event (M=7.5).

,.V

.E 95-
0
In
cc

an
0, 14 28 42 56 70 84 98 112 126 A.
I '+1U
Elapsed Time in Days

Figure C-122 Residual capacity of Missouri broadcast stations following New Madrid event (M=7.0).

ATC-25
Residual Capacity Plots
366 Appendix C:
Appendix C: Residual Capacity Plots ATC.25
C
0
0
M
Qw

Elapsed Time in Days

Figure C-123 Residual capacity of Arkansas broadcast stations following New Madrid event (M=7.).

0
0u
0
a)
CC

Elapsed Time in Days

Figure C-124 Residual capacity of Tennessee broadcast stations following New Madrid event (M=7.0).

Capacity P]ots 367


ATC-25
ATC-25, Appendix Q Residual
Appendix C: Residual Capacity Plots 367
a
nn-
1I tkJ

0
.X 95-
.X)

un-

-~.
:dU-
_-
_ . . I
I I
I I
I

0 7 14 21 28 35 42 49 56 63 70 77
Elapsed Time in Days

Figure C-125 Residual capacity of Kentucky broadcast stations following New Madrid. event (M=7.0).
~

100 I

95-

0CE
._

90-
0
a)

85-

80- i . , I I1 I .
U 7 14 21 28 35 42 49 56 63
Elapsed Time in Days

Figure C -126 Residual capacity of Mississippi broadcast stations following New Madrid event (M=7.0).

. ~ , S.L. A

368 Appendix C: Residual Capacity Plots I IATC,25


I . -
1

a
M

-Z

on

Elapsed Time in Days

Figure C-127 Residualcapacity of railroad system serving epicentral region following New Madrid event
(M=8.0).

-14 *f%
,uz

.6ii
9o
851
80~
m;-

615-

551
50-,
45
70-i
40i
35j
60
301
25d
20
10-
5-1
,O l46 i 1 12 14 16
Elapsed Timge in Day-s

Figure C-128 Residual capacity of railroad system serving Charleston, South Carolina following
Charleston event (M=7.5).

Appendix C:Residual Capacity Plot.


ATC-25 369~~~~~~
ATC-25 Appendix Q Residual Capacity Plots - 369
1007 I

951
90
85-
80-
75-
70
1 65-
60-
55-
50
~._ 45-
401
351
r?
30
25
20-i
151
10;..
5- 2
I
4
i

6 8
1

10
,

12
I:

14 16
0o
Elapsed Time i Days

Figure C-129 Residual capacity of railroad system serving Cape Ann region following Cape Ann event
(M=7.0).

100-

90-
80-
>E
70-
I'd
60-
1-

50-
.,i 40-
D=
30-

20-

t n-
I U-
I
i :
. . .

a 4 6 10
Elapsed Time in Days

Figure C-130 Residual capacity of railroad system serving Salt Lake City following Wasatch Front event
(M =7.5).

Capacity Plots ATC-25


370
370 Appendix C: Residual
Appendix C: Residual Capacity Plots ATC-25
Ann,_ _
QIIIP
344-
75-

s-

-,J 70

Oj 6o
I 551

z 501
M 45-i
,2 404
35-1
30 j
9RZi
C)
-
0 2 4I 6 8 10 12 14 16
ELapsed Time in Days

Figure C-131 Residual capacity of railroad system serving San Francisco County" Alameda County, and
Contra Costa County following Hayward event (M=7.5').

inn.
90

,..
85
so-
:1- 75-
_,
n.
701
_ _ I
- 65-I
60-
.E 55j

45d-
- 40X
-n 354
n_ 301
25 -1

20
15
10
,

O :2 4 6 8 10 12 14 16
_

Elapsed Time in Days

Figure C-132 Residual capacity of railroad system serving California following Fort Tejon event
(M=8.O).

Residual Capacity Plots 371


ATC-25
ATC-i25 Appendix C:
Appendix C:Residual Capacity Plots, 371L
I
.xn^.

IJW-
95
90
85
80
° 75
.. 70
D 65
I 60
C
t 55
50
CT
1 45
2
1 401
n 351
301
25-

0. 2 4 6 8 10 12 14 16
Elapsed Time in Davs

Figure C-133 Residual capacity of railroad system serving Seattle following Puget Sound event (M=7.5).

100-
951
901
85-
80-
0 75-
>` 701
Z 65-
a 60-
U 55j
_d 50-
e 45
2 40-4
ID 351
30H
25-
201
15-
. A. -
l

1n-

I2
I 4 6 8 10 12
Elapsed Time in Days

Figure C-134 Residual capacity of railroad system serving epicentral region following New Madrid event
(M=7.0).,

Plots ATC-25
372 Appezidlz C:
Appendix Residual Capacity
C: Residual Capacity Plots ATC-25,
0E
0
en
az

Figure C-1 35 Residual capacity of epicentral region highways following New Madrid event (=8.0).

0
0
.4--
Q)
C,

21
Elapsed Time in Days

Figure C-136 Residual capacity of epicentral region highways following Charleston event (M=7.5).

373
C: Residual Capacity Plots
ATC-25
ATC-25 Appendix
Appendix C, Residual Capacity Plots 3
100
95
90 I

I I
0
0
1o I

14 21 28 35 42 49 56 63 70 77 84 91 98 1051 2
Elapsed Time in Days

Figure C-137 Re,sidual capacity of epicentral region highways following Cape Ann event (M=7.0).

O
Cu

0
0

Elapseu I it III Lay

Figure C-138 REesidualcapacity of epicentral region highways following Wasatch Front event (M=7.5).

374 374Appendix C: Residual Capacity Plots ATC-25


I11
C
4-

Ci

*Elapsed Time in Days

Figure C-139 Residual capacity of epicentral region highways following Hayward event (M=7.5).

0111
C
0
M

.2
0
a)
in

1:IcLJdpsu UIEl 1U u ys

Figure C-140 Residual capacity of epicentral region highways folowing Fort Tejon event (M=8.o)

Plots 375
ATC-25 Appendix C Residual Capacity
ATC:-25. Appendix C:Residual Capacity Plots 376
-I

01~

II I t I ---- r- - I I
U alI4 A-
e- --
O'1
A 4^=
u
lUQ -a
| l IA7
I1 1AQ
'J
1JQQ
-, 210 231 252 273
Elapsed Time in Days

Figure C-1 41 Residual capacity of epicentral region highways following Puget Sound event (M= 7.5).

100-
95-
90-
85-
80-
75-
o 70-
a 65-
° 60-
55-
0a) 50-
cZ 45-
40-
35-
30-
25-
20- .j

1A - II
I I I I I
. I I
Ia _1II AI- Id
AA -I IAM
AA .I
0 28 56 84 112 140 168 196 224 252 280 Ud 33b 34 JUZ 42U 448
Elapsed Time in Days

Figure C-1 42 Residual capacity of epicentral region highways following New Madrid event (M=7.0)

Plots ATC-25
Appendix C: Residual Capacity Plats ATC-25
376
376 APpendix C: Residual CapacitY
C0
0
0
'I,-

Elapsed Time in Days

Figure C-l 43 Residual capacity of Illinois electric power following New Madrid event (M=8.0).

C
0
0To
ct
rrw

Elapsed Time in Days

Figure C-144 Residual capacity of Missouri electric power following New Madrid event (M=8.O)

Residual Capacity Plois 377


ATC-25
ATC-25 Appendix C:
Appendix C: Residual Capacity Plots 3771P
C
0
CZ
0
a)
c:

Elapsed Time in Days

Figure C-1 45 Residual capacity of Arkansas electric power following New Madrid event (M=8.0).

100- l

95-

* 90-
0.2
*i 85-
0
fn

rr 80-

75-

Iu- \ . . .

98
.

1,
.

112
.

U 14 28 42 56 70 84
Elapsed Time in Days

'- L
.AJI
ebL-
Figure C-146 Residual capacity of Tennessee electric power following New Madrid event (M=8.0)

SA--- - - - -2L
JLjJPWIIUL&
.
%.. AWAALLA&
-LLLLAL- 4.L 0 1
a A-,.
.9 -
3761
c
T
Q
1

Elapsed me in Days

Figure C-147 Residual capacity of Kentucky electric power following New Madrid event (M=8.0).

0
a0

Elapsed Time n Days

Figure C-148 Residual capacity of indiana electric power following New Madrid event (M=8.0)

C: Residual Cpacity Plots 379


ATC-25
ATC-25 Appendix
Apppendix C: ResidualCapacity Plots 379
1

A
C
0

U)

Elapsed Time in Days

Figure C-149 Residual capacity of Mississippi electric power following New Madrid event (M=8.0).

100
95-
90-
85-
80-
75-
o 70-
65-
60-
CD 55-
50-
45-
40
35-

0 14 28 42 56 70 84 98 1 12 126 140 154


Elapsed Time in Days

Figure C-1 50 Residual capacity of South Carolina electric power following Charleston event (M=7.5).

380 Appendix C: Residual Capacity Plots ATC-25


l

95-

-0

90-
-0

a)
85-

I
0o- I

75- I I I I
U t 14 21 2e 35 4Z 4Y Or 04 IU I1 04
Elapsed Time in Days

Figure C-151 Residual capacity of North Carolina electric power following Charleston event (M=7.5).

1001

95:

so
a
85
0
0 80 A
CZ
75-

70]
65 L

60 ! I I I I
0 7 14 1 28 35 42 49 56 63 70 77 84 1 98
Elapsed Time in Days

Figure C-152 Residual capacity of Georgia electric power following Charleston event (M=7.5).

381
ATC-25 Appendix C: Residual Capacity Plots
ATC-25 Appendix C:Residual Capacity Plots 381
0

0
a)
cc

Elapsed Time in Days

Figure C-153 Residual capacity of Massachusetts electric power following Cape Ann event (M=7.0).

: ::

95- I

90-
85-
.O
0 80-
C,,
T2
of 75-
(D

70-
65-

60 - :- -- - T I I I .
C 7 14 21 28 35 42 49 56
Elapsed Time in Days

Figure C-i 54 Residual capacity of Connecticut electric power following Cape Ann event (M=7.0).

382 Appendix C: Residual Capacity Plots AC2


ATC-25
1

.2
0

Elapsed Time n Days

Figure C-l 55 Residual capacity of Delaware electric power following Cape Ann event (M=7.0).

C
0
1%
0o

Elapsed Time in Days

Figure C-156 Residual capacity of Rhode Island electric power following Cape Ann event (M=7.0).

ATC-25 Appendix C: Residual Capacity Plots 383


0
0

0
a)
cc

... V--- -.. -.- .. - -- j -

Figure C-1 57 Residual capacity of New Hampshire electric power following Cape Ann event (M=7.0).

l, Ii I

90-

80-
0
4o
70-
0
T-
C,
60-

50-

an I , :
mu
0 20 40 60 80 iOO 120 14U
Elapsed Time in Days

Figure C-158 Residual capacity of Utah electric power following Wasatch Front event (M=7.5).

.. 4

384 Appendix C: Residual Capacity Plots T


ATC-25
-o
C
0

a:

Elapsed Time n Days

Figure C-159 Residualcapacityof California electric power following Hayward event (M=7.5).

.21-

0
.4-

lapsed Time n Days

Figure C-1 60 Residual capacity of !Californiaelectric power following Fort Tejon event (M=8.0).

385
ATC-25 Appendix C: Residual Capacity Plots
ATC:-25 Appendix C.,Residual Capacity Plots 385
80
Cu
0

Elapsed Time in Days

Figure C-1 61 Residual capacity of Washington electric power following Puget Sound event (M=7.5).

0
. -
Iri

Elapsed Time in Days

Figure C-i 62 Residual capacity of Missouri electric power following New Madrid event (M=7.0).

Plots ATC-25
386
386 Appendix C:
Appendix Residual Capacity
C, Residual Capacity Plots ATC-25
c

an
a)
EC

Elapsed Time in Days

Figure C-I 63 Residual capacity of Arkansas electric power following New Madrid event (M=7.0).

1001

95 1

C
0
0
4.

so )7 14 21 28 35 42 49 6 d3 77 84 1 ds 15

Elapsed Time in Days

FigureC-164 Residual capacity of Tennessee electric-power following New Madrid event (M=7.0).

ATC-25 Appendix C: Residual Cavacitv Plots 387


1 An
I Uu-
--

95-

0
CC
E- 90-
0
a)

85-

Ort
...
UV ----- I---------I------------ I
U 1 14 1 2U 35 4z 49 00 63 70 77 84
Elapsed Time in Days

Figure C-165 Residual capacity of Kentucky electric power following New Madrid event (M=7.0).

r-
0ca

0
.1-
C')

Elapsed Time in Days

Figure C-166 Residual capacity of Mississippi electric power following New Madrid event (M=7.0).

Capacity Plots ATC-25


388 C: Residual
Appendix C:
IAppendix Residual Capacity Plots ATC-25
388
I
.0?

rJr

Elapsed Time in Days

Figure C-167 Residual capacity of epicentral region water system following Fort Tejon event M=8.0).

. .

0
'n)
rr

Eiapsed Iime In Days

Figure C-168 Residual capacity of San Francisco Bay area water system following Hayward event
(M 7.5)..

ATC-25, Appendix C: Residual Capacity Plots 389'


-
MI

IA:

o f5i

10 20

Elapsed Time in Days

Figure C-169 Residual capacity of epicentral region water system following Puget Sound event
(M=7.5).

100- _

95-
90-
85-
>E
80-
75-
-)
70-
c::
. 65-
60-
55-
50-
45- --- ll

0 7 14
Elapsed Time in Days

Figure C-1 70 Residual capacity of crude oil delivery from Texas and Louisiana to Chicago following
New Madrid event (M=8.0).

Capacity Plots ATC-25


390
390 C: Residual
Appendix C:
Appendix Residual Capacity Plots ATC-25
100-.
954

85
80-j
X0 7 0 -i
65-
U 60-
551
50-
'U 45-
401
35 J
301
250

15
10
4 21
Elapsed Time in Days

Figure C-1 71 Residual capacity of crude oil delivery from Texas to Southern California following Fort
TeJon event (M=8.0).

E. l

95-
go-
85-
80-
75-
70-
65-
60-
55-
50-
45-
40-
35-
30-
25-
20-
15-
10-
I l

5 10 15
Elapsed Time in Days

Figure C-1 72 Residual capacity of crude oil delivery from Texas to Northern California following Fort
Tejon event (M=8.0).

391
Appendix C: Residual Capacity Plots
ATC-25
ATC-25 Appendix C: Residual Capacity Plots 1
'U
. O
(1

0.
ad

'U
CJ

Elapsed Time in Days

Figure C-1 73 Residual capacity of crude oil delivery from Texas and Louisiana to Chicago following
New Madrid event (M=7.0).-

1 UU

95.
0

90-
-63

m 85-

xa 80-

aj 75

70-

65 I
0 7 14
Elapsed Time in Days

Figure C-1 74 Residual capacity of refined oil delivery from Texas to Chicago following New Madrid
event (M=8.0).

392 Appendix C: Residual Capacity Plots ATC-25


I1c i

95-

90-
U
._
85-
23
-

._ 80-
75-

-7.
I -

C.;1 a
0 7 14
Elapsed Time in Days

Figure C-1 75 Residual capacity of refined oil delivery from Texas to Chicago following New Madrid
event M= 7.0).

0:
>f.
"J

, .
Al

.~

4
Elapsed Time in Days

Figure C-I 76 Residual capacity of natural gas delivery from Texas and Louisiana to Chicago following
New Madrid event (M=8.0).

Capacity Plots 393


ATC-25
AT:C-25 Appendix C:
Appendix C: Residual
Residual Capacity Plots 393
100
95. i
I

90.
0
85-
80-
tj
k1d
75-
kIj
70-
U
65-
7z
60-
72
A
aj
55-
1-1
50-
45
40I-
1; In

0o 2 .4 6 10
Elapsed Time in Days

Figure C-1 77 Residual capacity of natural gas delivery from Texas and Louisiana to northeast region
following New Madrid event (M=8.0).

100-
951
901
8 5 -1
I
I
i. .
80- I I!
*
75
70
65+
60-
55-
50-
45 -
40 -
35 -
30 A i
25- I
20- !
15+
10 7 ~ ~
Ii ~ ~~~~~~~
5- 12 14 16~~~~~~~~~~~~~~~~~~~~~~
tO+ t .*... .... .....
!. . . . .. . . ... . .. . ... .. . .. I . ..

-in , .

6I i i ;

0o 2 4 6 8 10
Elapsed Time in Days

Figure C-1 78 Residual capacity of natural gas delivery from Texas to Northern California following
Hayward event (M=7.5).

Residual Capacity Plots ATC-25


394 Appendix C:
Appendix C, Residual Capacity Plots ATC-25
100.
95-
I
on!Q i
I 7
85-
7 80-
Z
::I_ 75-
70-
65-
_r,
60-
55
50 -

~4
;-:.

U 4 6 a 10
EIa
I-sed Time in D s

Figure C-1 79 Residual capacity of natural gas delivery from Texas to Washington following Hayward
event (M=7.5).

100TF -

95
90+'
85-i
80-S
re 75.
70-.
> 65-
-6i 6 1
-C 551
.E Sol
z 45-
:.,
- 40-5
o1
*X 3 0 1,
*Z 25
20-
15-
10I
- i
-, I

J6 14
ElaPsed Time in Days

Figure C-180 Residual capacity of natural gas delivery in Utah following Wasatch Front event (M=7.5).

Appedix C Resdual apaciy Plos


ATC-2 39
ATC-25 Appendix C:Residual Capacity Plots 35
'2

n"
a)

Elapsed Time in Days

Figure C-1 81 Residualcapacity of natural gas delivery from Texas to California following Fort Tejon
event (M=8.0).

-
:'_
(a
._

73
:5

Elapsed Time in Days

Figure C-1 82 Residual capacity of natural gas delivery from Texas to Seattle following Puget Sound
event (M=7.5).

Capacity Plots ATC-25


396 C: Residual
Appendix C:
Appendix Residual Capacity Plots ATC-25
396-
ltil]
1 no
I VU

95-

go-

85-

80-

75-

70-

'
is 2 4 6 n

Elapsed Time in Days

Figure C-183 Residual capacity of natural gas delivery from Texas and Louisiana to Chicago folowing
New Madrid event (M=7.0).

4 no

95-

9o-
Q
85-
-71
5
E 80-

75-
71
'7 70-

65-

60I-

bb_11~-
U 2 4 6 a
Elapsed Time in DaYs

Figure C-1 84 Residual capacity of natural gas delivery from Texas and Louisiana to northeast region
following New Madrid event (M=7.0).

Capacity Plots 397


ATC-25 C:Residual
Appendix C:
Appendix Residual Capacity Plots 3,97
0

cc~

Elapsed Time in Days

Figure C-1 85 Residual capacity of Missouri upgraded electric system following New Madrid event.
(M=8.0).

0)
0

. )

Figure C-186 Residual capacity of Arkansas upgraded electric system following New Madrid event
(M =8.0).

398 Appendix C: Residual Capacity Plots ATC-25


100

95-
0
I-
a)
90-

85 l
l

0 7 14 21 28 35 42 49 56 63 70 77 84 91
Elapsed Time in Days

Figure C-187 Residual capacity of Tennessee upgraded electric system following New Madrid event
(M-8.0).

1o
0
.9-

3C

Elapsed Time in Days

Figure C-I 88 Residual capacity of Kentucky upgraded electric system following New Madrid event
(M =8.0).

AT:C-25 Appendix C: Residual Capacity Plots 399'


0

0
ax,
a)

Elapsed Time in Days

Figure C-189 Residual capacity of Mississippi upgraded electric system following New Madrid event
(M =8.O).

4 An,\
1 UU

95-

90-

0
t2 85-

a)
cm 80-

75-

7^ Iv I 1
0 7 14 21 28 35 42 49 56 63 70 77 84 91
Elapsed Time in Days

Figure C-1 90 Residual capacity of South Carolina upgraded electric system following Charleston event
I (M = 7.5). I I .r

400 Appendix : Residual Capacity Plots - ATC-25


11on,
11ELI . . i. .

i
i
i
_
.1
O0' U
0-
97-

96-

Us -

14 21 25
Elapsed Time in Days

Fgire C-1 91 Residual capacity of North Carolina upgraded electric system following Charleston event
(M=7.5).

*lnn

99-

C 98-
0

0 97-
a:

96-

- ._-
fig
- I I
35 42
7 14 21 28
.

U 4-9
Elapsed Time in Days

Figure C-1 92 Residual capacity of Georgia upgraded electric system following Charleston event
(M=7.5).

Plots 401
Appendix Residual 'Cpaclty
C: Residual
ATC-25
AiTC-25 Appendix Q Capacity Mots 401
100
99
98
I
97
C 96
. 95
In 94
a)
93
92
91
90 I I I i I . . .
I

6 7 14 21 28 35 42 49 56 63 70 77
Elapsed Time in Days

Figure C-193 Residual capacity of Massachusetts upgraded electric system following Cape Ann event
(M=7.0).

1 0(

5:

9C3
C:

0
8C,
a)

I I I Y I I I;
7E

7C
0 7 14 21 28 35 42 49 56 63 70 77 84
Elapsed Time in Days

Figure C-1 94 Residual capacity of Utah upgraded electric system following Wasatch Front event
(M= 7.5).

402 Appendix C: Residual Capacity Plots, . ATC-25


0
.a2
0
c)
3:

Elapsed Time in Days

Residual capacity of California upgraded electric system following Hayward event


(M =7.5).

C,

Elapsed Time in Days

Figure C-196 IResidual capacity of California upgraded electric system following Fort Tejon event
'M=8.0).

Capacity Plots 403


ATC-25
ATC-25 C:Residual
Appendix C:
Appendix Residual Capacity Plots .403
.

0
.

0
a)
cc

I
Elapsed Time in Days

Figure C-197 Residual capacity of Washington upgraded electric system following Puget Sound event

4 nn
1I .[.IU
VV

a)
cn 95-
Or
0,

.q, ..
I-U
7 14 21 28 35 42 49 56 63 70
Elapsed Time in Days

Figure C-1 98 Residual capacity of Missouri upgraded electric system following New Madrid event
(M=7.0).

ATC-25
Appendix C: Residual Capacity Plots
404 Appendix Q Residual Capacity Plots ATC-26
100I-
I-
-
E

0
Lo
95-
EC
a)
rr

9Ci -
I0 7 14 21 28 35 42 49 E
Elapsed Time in Days

Figure C-199 Residual capacity of Arkansas upgraded electric system following New Madrid event
(M=7.0).

TO
0

0
a)

Elapsed Time in Days

Figure C-200 Residual capacity of Tennessee upgraded electric system following New Madrid event
(M=7.0I1.

ATC-25Appendix C:Residual Capacity Plots 405~~~~~~~~


AT.C-25 Appendix-C, ResidualCapacity Plots 405
Appendix D: Economic Analysis Data
Table of Contents
Pane
Percent Value Added Lost Due to Specified Percent Loss Tables........................ ...................... 408
Table D.1 Water Supply ................................................................................................................
408
Table D.2 Electric .409
Table D.3 Oil Supply.410
Table D.4 Natural Gas Supply .411
Table D.5 Highways .412
Table D.6 Railroads .413
Table D.7 Sanitary Sewer .414
Table D.8 Air Transportation.415
Table D.9 Ports.416
Table D.10 Telephone .417
Residual Value Added After Loss of CapacityTables .............................................. 418
Table D.11 Water Supply .............................................. 418
Table D.12 Electric .............................................. 419
Tslh1l fl 12 fl iar .,-1-
Table D.14 Natural Gas Supply .............................. 421
Table D.A15 Highways
............................... 422
Table D.16 Railroads ........................... 423
Table D.17 Sanitary Sewi..er.424........................... 424
Table D.18 Air Transportation............................... 425
Table D.19 Ports .............................. 426
Table D.20 Telephone .............................. 427
Residual Value Addc-d as a Function of Lifeline Capacity Figures .............................. 428
Figure D.1 Oil Supply .............................. 428
Figure D.2 Natural Gas Supply .............................. 428
Figure D.3 Telephone .............................. 429
Figure D.4 Air Transportation.............................. 429
Figure D.5 Water Supply . 430
Figure D.6 Electric ........ 430
Figure D.7 U;nTio~ro AO
.............................................................
-6lblWayU1 ............................................................
1

Figure D.8 Railroads............................................................ ............................................................. 431


Figure D.9 Sanitary Sewer .................................................. I............................................................ 432

Analysis Data 407


ATC-25
ATC-25 D: Economic
Appendix D:
Appendix Economic Analysis Data 407
0
Table D-1 ' Percent Value-Added Lost Due to Specified Percent Loss of Water Supply
Lifeline

U.S. Econ.
LIL Capacity Loss--> Value Added 10% 20% 1 30% 40% 50% 60% 70% 80% 90%
(Percent), 100%

1 Livestock 0.45% 2.37% 7.11% 11.84% 16.58% 21.32% 26.05% 30.79% 35.53% 40.26% 45.00%
2 Agr. Prod. 1.06% 3.68% 11.05% 18.42% 25.79% 33.16% 40.53% 47.89% 55.26% 62.63% 70.00%
3 AgServ For. Fish 0.11% 2.37% 7.11% 11.84% 16.58% 21.32% 26.05% 30.79% 35.53% 40.26% 45.00%
4 Mining 3.89% 0.79% 2.37% 3.95% 5.53% 7.11% 8.68% 10.26% 11.84% 13.42% 15.00%
5 Construction 5.52% 2.63% 7.89% 13.16% 18.42% 23.68%
l: 6 Food Tobacco 2.41% 3.68% 11.05% 18.42%
28.95% 34.21% 39.47% 44.74% 50.00%
25.79% 33.16% 40.53% 47.89% 55.26% 62.63%
'K 7 Textile Goods 0.37% 3.68%/6 11.05% 18.42% 70.00%
25.79% 33.16% 40.53% 47.89% 55.26%
1z 8 Misc Text. Prod. 0.73% 3.68% 11.05% 62.63% 70.00%
18.42% 25.79% 33.16% 40.53% 47.89% 55.26%
9 Lumber & Wood 0.52% 2.63% 62.63% 70.00%
7.89% 13.16% 18.42% 23.68% 28.95% 34.21%
10 Furniture 39.47% 44.74% 50.00%
0.34% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74%
0 11 Pulp & Paper 0.87% 3.16% 9.47% 15.79% 22.11% 28.42% 34.74% 41.05% 47.37% 53.68%
50.00%
60.00%
12 Print & Publish 1.31% 1.58% 4.74% 7.89% 11.05%
0 14.21% 17.37% 20.53% 23.68% 26.84% 30.00%
13 Chemical & Drugs 1.40% 4.21% 12.63% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58%
14 Petrol. Refining 0.96% 2.63% 80.00%
0 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
15 Rubber & Plastic 1.03% 2.63% 7.89% 13.16% 18.42%
0 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
o 16 Leather Prods. 0.12% 2.63% 7.89% 13.16% 18.42% 23.68%
17 Glass Stone Clay 28.95% 34.21% 39.47% 44.74% 50.00%
n 0.62% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95%
18 Prim. Metal Prod. 34.21% 39.47% 44.74% 50.00%
1.04% 4.74% 14.21% 23.68% 33.16% 42.63% 52.11%
19 Fab. Metal Prod. 61.58% 71.05% 80.53% 90.00%
1.64% 4.21% 12.63% 21.05% 29.47% 37.89% 46.32%
20 Mach. Exc. Elec. 54.74% 63.16% 71.58% 80.00%
1.56% 3.16% 9.47% 15.79% 22.11% 28.42% 34.74%
21 Elec. & Electron 41.05% 47.37% 53.68% 60.00%
2.52% 4.74% 14.21% 23.68% 33.16% 42.63% 52.11%
22 Transport Eq. 61.58% 71.05% 80.53% 90.00%
2.62% 3.16% 9.47% 15.79% 22.11% 28.42% 34.74%
En
23 Instruments 41.05% 47.37% 53.68% 60.00%
tj 24 Misc. Manufact.
0.68%
0.69%
4.74%
3.16%
14.21%
9.47%
23.68%
15.79%
33.16%
22.11%
42.63%
28.42%
52.11% 61.58% 71.05% 80.53% 90.00%
25 Transp & Whse. 34.74% 41.05% 47.37% 53.68% 60.00%
3.46% 1.05% 3.16% 5.26% 7.37% 9.47%
26 Utilities 11.58% 13.68% 15.79% 17.89% 20.00%
5.89% 2.11% 6.32% 10.53% 14.74% 18.95% 23.16% 27.37% 31.58% 35.79% 40.00%
27 Wholesale Trade 5.63% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
28 Retail Trade 5.63% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
29 F.I.R.E. 16.64% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89%
30 Pers/Prof. Serv. 8.03% 1.05% 3.16% 5.26% 20.00%
7.37% 9.47% 11.58% 13.68% 15.79% 17.89%
31 Eating Drinking 2.12% 4.21% 12.63% 21.05% 20.00%
29.47% 37.89% 46.32% 54.74% 63.16% 71.58%
32 Auto Serv. 1.09% 0.53% 1.58% 2.63% 80.00%
3.68% 4.74% 5.79%
0 33 Amuse & Rec. 0.70% 4.21% 12.63% 21.05% 29.47% 37.89% 46.32%
6.84% 7.89% 8.95% 10.00%
34 Health Ed. Soc. 54.74% 63.16% 71.58% 80.00%
6.30% 2.11% 6.32% 10.53% 14.74% 18.95% 23.16%
35 Govt & Govt Ind. 11.79% 27.37% 31.58% 35.79% 40.00%
1.32% 3.95% 6.58% 9.21% 11.84% 14.47%
36 Households 0.25% 17.11% 19.74% 22.37% 25.00%
2.11% 6.32% 10.53% 14.74% 18.95% 23.16% 27.37% 31.58% 35.79% 40.00%
TOTAL 100.00% 2.70% 8.11% 13.52% 18.93% 24.34% 29.75% 35.16% 40.57% 45.98% 51.39%
Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Total V.A
Pct. V.A.
ID'
Table D-2 Percent Value-Added Lost Due to Specified Percent Loss of Electric Lifeline
t'-3

U.S. Econ. --
UL Capacity Loss--> Value Added 10% 20% 30% 40% 50% 60% 70% BO%
(Percent) 90% 100%
80% 100%

1 Livestock 0.45% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47%
2 Agr. Prod. 1.06% 2.63% 44.74% 50.00%
7.89% 13.16% 18.42% 23.68% 28.95% 34.21%
3 AgServ For. Fish 0.1 1% 2,63% 39,47% 44.74% 50.00%
7.89% 13.16% 18.42% 23.68% 28.95%
4 Mining 3.89%/ 34.21% 39.47%/a 44.74% 50.00%
4.74% 14.21% 23.68% 33.16% 42.63% 52.11%
S Construction 5.52% 61.58% 71.05% 80.53% 90,00%
2.11% 6.32% 10.53% 14.74% 18.95% 23.16%
6 Food Tobacco 2.41% 27.37% 31.58% 35.79% 40.00%
4.74% 14.21% 23.68% 33.16% 42.63% 52.11%
7 Textile Goods 61.58% 71.05% 80.53% 90.00%
'0 0.37% 5.26% 15.79% 26.32% 36.84% 47.37% 57.89% 68.42%
0 8 Misc Text, Prod. 0.73% 78.95% 89.47% 100.00%
5.26% 15.79% 26.32% 36.84% 47.37% 57,89%
CL 9 Lumber & Wood 0.52% 68.42% 78.95% 89.47% 100.00%
526% 15.79% 26.32% 36.84% 47.37% 57.89% 68,42%
10 Furniture 0.34% 78.95% 89.47% 100.00%
5.26% 15,79% 26.32% 36.84% 47.37% 57.89%
11 Pulp & Paper 0.87% 68.42% 78.95% 89.47% 100.00%
5.26% 15.79% 26.32% 36.84% 47.37% 57.89%
12 Print & Publish 68,42% 78.95% 89.47% 100.00%
1.31% 5.26% 15.79% 26.32% 36.84% 47.37% 57.89%
t 13 Chemical-& Drugs 1.40% 68.42% 78.95% 89.47% 100.00%
4.74% 14.21% 23.68% 33.16% 42.63% 52.11%
14 Petrol. Refining 0.96% 61.8% 71.05% 80.53% 90.00%
0 5.26% 15.79% 26.32% 36.84% 47.37% 57.89%
15 Rubber & Plastic 1.03% 68.42% 78.95% 89.47% 100.00%
5.26% 15.79% 26.32% 36.84% 47.37% 57.89%
16 Loather Prods. 68.42% 78.95% 89.47% 100.00%
0.12% 5.26% 15,79% 26.32°% 36.84% 47.37% 57,89%
17 Glass Stone Clay 0.62% 68.42% 78.95% 89,47% 100.00%
5.26% 15.79% 26.32% 36.84% 47.37% 57.89%
18 Prim, Metal Prod, 68.42% 78.95% 89.47% 100.00%
a 1.04% 4.74% 14.21% 23.68% 33.16% 42.63% 52.11%
19 Fab. Metal Prod. 61.58% 71.05% 80,53% 90.00%
1.64% 5.26% 15.79% 26.32% 36.84% 47.37%
20 Mach. Exo. Elec, 57.89% 68.42% 78.95% 89.47% 100.00%
1.56% 5.26% 15.79% 26.32% 36.84% 47.37%
21 Elec. & Electron 57.89% 68.42% 78.95% 89.47% 100.00%
2.52% 5.26% 15.79% 26.32% 36.84% 47.37% 57.89%
22 Transport Eq. 68.42% 78.95% 89.47% 100.00%
2.62% 5.26% 15.79% 26.32% 36.84% 4737%
23 Instruments 57.89% 68.42% 78.95% 89,47% 100.00%
in 0.68% 5.26% 15.79% 26.32% 36.84% 47.37%
24 Misc. Manufact. 57.89% 68.42% 78.95% 89.47% 100.00%
0.69% 5.26% 15.79% 26.32% 36.84% 4737%
0
'a 25 Transp & Whse. 57.89% 68.42% 78.95% 89.47% 100.00%
3.46% 1.58% 4.74% 7.89% 11.05% 14.21%
26 Utilities 17.37% 20.53% 23.68% 26.84% 30.00%
5,89% 4.21% 12.63% 21.05% 29.47% 37.89% 46,32%
27 Wholesale Trade 5.63% 54.74% 63.16% 71.58% 80.00%
4.74% 14.21% 23.68% 33.16% 42.63% 52.11%
28 Retail Trade 61.58% 71.05% 80.53% 90.00%
5,63% 4.74% 14.21% 23.68% 33.16% 42.63%
29 F.l.fl.E. 52.11% 61.58% 71.05% 80.53% 90.00%
16.64% 4.74% 14.21% 23.68% 33.16% 42.63% 52.11%
30 Pers./Prof. Serv. 8.03% 61.58% 71.05% 80.53% 90.00%
4.74% 14.21% 23.68% 33.16% 42.63% 52.11%
31 Eating Drinking 2.12% 61.58% 71.05% 80.53% 90.00%
4.21% 12.63% 21.05% 29.47% 37.89% 46.32%
32 Auto Serv. 54.74% 63.16% 71.58% 80.00%
1.09% 4.74% 14.21% 23.68% 33.16% 42.63%
33 Amuse & Rec. 52.11% 61.58% 71.05% 80.53% 90,00%
0.70% 4.21% 12.63% 21.05% 29.47% 37,89%
34 Health Ed. Soo. 46.320% 54.74% 63,16% 71.58% 80.00%
6.30% 4.21% 12.63% 21.05% 29.47% 37.89%
35 Govt & Govt Ind. 46.32% S4.74% 63.16% 71.58% 80.00%
11.79% 3.16% 9.47% 15,79% 22.1 1% 28.42% 34.74%
36 Households 0.26% 41.05% 47.37% 53,68% 60.00%
4.21% 12.63% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58% 80.00%
TOTAL 100.00% 4,52% 13.55% 22.59% 31.62% 40.66% 49.69% 58.73% 67.76%
Avg. Avg. 76.80% 85,83%
Avg. Avg. Avg. Avg. Avg. Avg. Avg. Total V.A
Pot. V.A.
C
ofd
CD
Table D-3 Percent Value-Added Lost Due to Specified Percent Loss of Oil Supply Lifeline

U.S. Econ.
ULLCapacity Loss--> Value Added 10% 20% 3001% 40% 50% 60% 70% 80% 90% 100%
(Percent)

1 Livestock 0.45% 2.63% 7.89% 13.16% 18.42%. 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
2 Agr. Prod. 1.06% 4.21% 12.63% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58% 80.00%
3 AgServ For. Fish 0.11% 4.21% 12.63% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58% 80.00%
4 Mining 3.89% 4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61.58% 71.05% 80.53% 90.00%
5 Construction 5.52% 4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61.58%
: ai 71.05% 80.53% 90.00%
6 Food Tobacco 2.41% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
7 Textile Goods 0.37% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
8 Misc Text. Prod. 0.73%
0 9 Lumber & Wood 0.52%
2.63%
2.63%
7.89%
7.89%
13.16%
13.16%
18.42% 23.68% 28.95% 34.21% 39.47%/ 44.74% 50.00%
18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
IA 10 Furniture 0.34% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
11 Pulp & Paper 0.87%
pT 12 Print & Publish 1.31%
2.63%
2.63%
7.89%
7.89%
13.16%
13.16%
18.42%
18.42%
23.68%
23.68%
28.95%
28.95%
34.21%
34.21%
39.47% 44.74% 50.00%
0 39.47% 44.74% 50.00%
13 Chemical Drugs 1.40% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21%
0 39.47% 44.74% 50.00%
14 Petrol. Refining 0.96% 5.26%. 15.79% 26.32% 36.84% 47.37% 57.89% 68.42% 78.95% 89.47% 100.00%
15 Rubber & Plastic 1.03% 2.63%
0 16 Leather Prods.
7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
0.12% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
17 Glass Stone Clay 0.62% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
18 Prim. Metal Prod. 1.04% 4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61.58% 71.05% 80.53% 90.00%
19 Fab. Metal Prod. 1.64% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
.0 20 Mach. Exc. Elec. 1.56% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
U) 21 Elec. & Electron 2.52% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
22 Transport Eq. 2.62% 4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61.58%
U 71.05% 80.53% 90.00%
a 23 Instruments 0.68% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
a 24 Misc. Manufact.
25 Transp & Whse.
0.69% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
3.46% 4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61.58% 71.05% 80.53%
26 Utilities 90.00%
5.89% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
27 Wholesale Trade 5.63% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
28 Retail Trade 5.63% 4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61.58% 71.05% 80.53% 90.00%
29 F.I.R.E. 16.64% 3.16% 9.47% 15.79% 22.11% 28.42% 34.74% 41.05% 47.37% 53.68% 60.00%
30 Pers./Prof. Serv. 8.03% 3.16% 9.47% 15.79% 22.11% 28.42% 34.74% 41.05% 47.37% 53.68% 60.00%
31 Eating Drinking 2.12% 4.21% 12.63% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58% 80.00%
32 Auto Serv. 1.09% 4.74% 14.21% 23:68% 33.16% 42.63% 52.11% 61.58% 71.05% 80.53% 90.00%
33 Amuse & Rec. 0.70% 4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61.58% 71.05% 80.53% 90.00%
34 Health Ed. Soc. 6.30% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
35 Govt & Govt Ind. 11.79% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
36 Households 0.25% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
TOTAL 100.00% 3.25% 9.74% 16.23% 22.72% 29.21% 35.70% 42.19% 48.68% 55.18% 61.67%
Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Total V.A
0 Pct. V.A.
:Dd
9~ Table D-4 Percent Value-Added Lost Due to Specified Percent Loss of Natural Gas
I', Supply Lifeline

U.S. Eon.
LIL Capacity Loss--> Value Added 10% 20% 30% 40% 50% 60% 705% B0% 90D/, 100%
(Percent)
60% 70% 80% 00% 100%

1 Livestock 0.45% 0,53% 1.S8% 2.63% 3.68% 4.74% 5.79% 6.84% 7.89% 8.95% 10.00%
2 Agr. Prod. 1.06% 1.58% 4.74% 7.89% 11.05% 14.2 1% 17.37% 20.53% 23,68% 26.84% 30.00%
3 AgServ For. Fish 0.11% 1.58% 4.74% 7.89% 11.05% 14.21% 17.37% 20.53% 23.68% 26.84% 30.00%
4 Mining 3.89% 0.53% 1.58% 2,63% 3.68% 4.74% 5.79% 6.84% 7,89% 8.95% 10.00%
S Construction 5.52% 0.00% O.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 Food Tobacco 2.41% 1.32% 3.95% 0.00%
6,58% 9.21% 11.84% 14.47% 17.11% 19.74% 22.37%
ad 7 Textile Goods 0.37% 25.00%
1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68%
(D 8 Misc Text. Prod. 0.73% 15,79% 17.89% 20.00%
1.05% 3.16% 5.26% 7.37% 9.47% 11.58%
9 Lumber& Wood 0.S2% 13.68% 15.79% 17.89% 20.00%
1.05% 3.16% 5.26% 7.37% 9.47% 11.58%
10 Furniture 13.68% 15.79% 17.59% 20.00%
0.34% 1.05% 3.16% 5.26% 7.37% 9.47%
11 Pulp & Paper 1.58% 13.68% 15.79% 17.89% 20.00%
0.87% 2.11% 6.32% 10.53% 14.74%
12 Print & Publish 18.95% 23.16% 27.37% 31 ,58% 35.79% 40,00%
1.31% 1.05% 3.16% 5.26% 7.37% 9.47%
13 Chemical & Drugs 11.58% 13.68% 15.79% 17.89% 20.00%
1.40% 4.74% 14.21% 23.68% 33.16%
14 Petrol. Refining 42.63% 52.11% 611.58% 71 .05% 80.53% 90.00%
0 0.96% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39,47% 44.74% 50.00%
0 1 Rubber & Plastic 1.03% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95%
16 Leather Prods, 34.21% 39.47% 44.74% 50.00%
0g 0.12% 1.05% 3.16% 5.26% 7.37% 9.47% 1 1.58% 13.68% 15.79%
17 Glass Stone Clay 0.62% 2.63% 17,89% 20.00%
Pn. 7.89% 13.16% 18,42% 23.68% 28.95% 34.21i% 39.47% 44.74%
18 Prim. Metal Prod. 1,04% 50.00%
2.63% 7.89% 13.16% 18.42% 23.68% 28.95%
19 Fab. Metal Prod. 1.64% 34.21% 39.47% 44.74% 50.00%
2,63% 7.89% 13,16% 18.42% 23.68% 28.95%
20 Mach. Exc. Elec. 34.21% 39.47% 44.74% 50.00%
1,56% 263% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47%
21 Elec. & Eectron 2.52% 2.63% 44.74% 50.00%
7.89% 13,16% 18,42% 23.68% 28.95% 34.21% 39.47% 44.74%
22 Transport Eq. 2.62% 2.63% 50.00%
tn 7.89% 13.16% 18.42% 23.65% 28.95% 34.21% 39.47% 44.74%
23 Instruments 0.68% 3.95% 50.00%
IM4
h'- 11.84% 19.74% 27.63% 35.53% 43.42% 51.32% 59.21% 67.11% 75,00%
24 Misc. Manufact. 0.69% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
25 Transp & Whse. 3.46% 0.00% 0.00% 0,00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
26 Utilities 5.89% 2.11% 6.32% 10.53% 14.74% 18.95% 23.16% 27.37% 31.58% 35.79% 40.00%
27 Wholesale Trade 5.63% 0.53% 1.58% 2.63% 3.68% 4,74% 5.79% 6.84% 7,89% 8.95% 10.00%
28 Retail Trade 5.63% 1.05% 3.16% 5.26% 7,37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
29 F.l.R.E. 16.64% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
30 Pers./Prof Serv. 8.03% 1.05% 3.16%
S1 Eating Drinking 5.26% 7.37% 9.47%6 11.58% 13.68% 15.79% 17.89% 20.00%
2.12% 2.11% 6,32% 10.53% 14.74%
32 Auto Serv. 18.95% 23.16% 27.37% 31.58% 35.79% 40.00%
1.09% 0.26% 0.79% 1.32% 1.84% 2.37%
33 Amuse & Rea. 2.89% 3.42% 3.95% 4.47% S.00%
0.70% 2.11% 6.32% 14.74%
34 Health Ed. Soo. 10.53% 18,95% 23.16% 27.37% 31.58% 35.79% 40.00%
6.30% 1.05% 3.16% 6.26% 7.37%
35 Govt & Govt Ind. 9.4 7% 11.58% 13.68% 15,79% 17.89% 20.00%
11.79% 1.05% 3.16% 5.26% 7.37%
36 Households 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
0.25% 1.84% 5.53% 9.21% 12.89% 16.58% 20.26% 23.95% 27,6S% 31.32% 35.00%
TOTAL 100.00% 1.68% 5.04% 8,41% 11.77% 15.13% 18.49% 21.86% 25,22% 28.58%
Avg. 31.94%
Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Total V.A
Pot. V.A.

a
Table D-5 Percent Value-Added Lost Due to Specified Percent Loss of Highways Lifeline

U.S. Econ.
LIL Capacity Loss-> Value Added 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
(Percent)

1 Livestock 0.45% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 50.00%
44.74%
2 Agr. Prod/ 1.06% 4.21% 12.63% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58% 80.00%
3 AgServ For. Fish 0.11% 4.21% 12.63% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58% 80.00%
4 Mining 3.89% 1.84% 5.53% 9.21% 12.89% 16.58% 20.26% 23.95% 27.63% 31.32% 35.00%
5 Construction 5.52% 2.11% 6.32% 10.53% 14.74% 18.95% 23.16% 27.37% 31.58% 35.79% 40.00%
6 Food Tobacco 2.41% 4.21% 12.63% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 80.00%
(D 71 .58%
7 Textile Goods 0.37% 3.95% 11.84% 19.74% 27.63% 35.53% 43.42% 51.32% 59.21% 67.11% 75.00%
Ic,
he 8 Misc Text. Prod. 0.73% 3.95% 11.84% 19.74% 27.63% 35.53% 43.42% 51.32% 59.21% 67.11%
V 9 Lumber & Wood 0.52% 75.00%
4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61.58% 71.05% 80.53% 90.00%
la 10 Furniture 0.34% 3.95% 11.84% 19.74% 27.63% 35.53% 43.42% 51.32% 59.21% 67.11% 75.00%
11 Pulp & Paper 0.87% 4.21% 12.63% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58% 80.00%
12 Print & Publish 1.31% 3.95% 11.84% 19.74% 27.63% 35.53% 43.42% 51.32% 59.21% 67.11% 75.00%
13 Chemical & Drugs 1.40% 4.21% 12.63% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58% 80.00%
14 Petrol. Refining 0.96% 4.74% 14.21% 23.68% 33.16% 42.63% 52.11% 61.58% 71.05% 80.53% 90.00%
15 Rubber & Plastic 1.03% 3.95% 11.84% 19.74% 27.63% 35.53% 43.42% 51.32% 59.21% 67.11% 75.00%
i 16 Leather Prods. 0.12% 3.95% 11.84% 19.74% 27.63% 35.53% 43.42% 51.32% 59.21% 67.11% 75.00%
17 Glass Stone Clay 0.62% 3.95% 11.84% 19.74% 27.63% 35.53% 43.42% 51.32% 59.21% 67.11% 75.00%
I:.
18 Prim. Metal Prod. 1.04% 4.21% 12;63% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58% 80.00%
(A 19 Fab. Metal Prod. 1.64%
0 4.21% 12.63% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58% 80.00%
a. 20 Mach. Exc. Elec. 1.56% 4.21% 12.63% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58% 80.00%
21 Elec. & Electron 2.52% 3.95% 11.84% 19.74% 27.63% 35.53% 43.42% 51.32% 59.21% 67.11% 75.00%
22 Transport Eq. 2.62% 4.21% 12.63% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58% 80.00%
23 Instruments 0.68% 4.21% 12.63% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58% 80.00%
24 Misc. Manufact. 0.69% 3.95% 11.84% 19.74% 27.63% 35.53% 43.42% 51.32% 59.21% 67.11% 75.00%
25 Transp & Whse. 3.46% 4.21% 12.63% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58% 80.00%
26 Utilities 5.89% 2.11% 6.32% 10.53% 14.74% 18.95% 23.16% 27.37% 31.58% 35.79% 40.00%
27 Wholesale Trade 5.63% 3.68% 11.05% 18.42% 25.79% 33.16%. 40.53% 47.89% 55.26% 62.63% 70.00%
28 Retail Trade 5.63% 2.89% 8.68% 14.47% 20.26% 26.05% 31.84% 37.63% 43.42% 49.21% 55.00%
29 F.I.R.E. 16.64% 2.37% 7.11% 11.84% 16.58% 21.32% 26.05% 30.79% 35.53% 40.26% 45.00%
30 Pers./Prof. Serv. 8.03% 2.37% 7.11% 11.84% -16.58% 21.32% 26.05% 30.79% 35.53% 40.26% 45.00%
31 Eating Drinking 2.12% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
32 Auto Serv. 1.09% 2.89% 8.68% 14.47% 20.26% 26.05% 31.84% 37.63% 43.42% 49.21% 55.00%
33 Amuse & Rec. 0.70% 2.63% 7.89% 13.16% 18.42% 23.68% 28.95% 34.21% 39.47% 44.74% 50.00%
34 Health Ed. Soc. 6.30% 2.89% 8.68% 14.47% 20.26% 26.05% 31.84% 37.63% 43.42% 49.21% 55.00%
35 Govt & Govt Ind. 11.79% 1.58% 4.74% 7.89% 11.05% 14.21% 17.37% 20.53% 23.68% 26.84% 30.00%
36 Households 0.25% 2.11% 6.32% 10.53% 14.74% 18.95% 23.16% 27.37% 31.58% 35.79% 40.00%
TOTAL 100.00% 3.50% 10.50% 17.51% 24.51% 31.51% 38.52/ . 45.52% 52.52% 59.52% 66.53%
Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Total V.A
Pot; V.A.
'q Table D-6 Percent Value-Added Lost Due to Specified Percent Loss of Railroads Lifeline
9
Ci

U.S. Econ.
IL Capacity Loss--> Value Added 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
(Percent)

1 Livestock 0.45% 2.11% 6.32% 10.53% 14.74% 18.95% 23.16% 27.37% 31.58% 35.79% 40.00%
2 Agr. Prod. 1.06% 2.11% 632% 10.53% 18.95% 23.16% 27.37% 31.58% 35.79% 40.00%
6 3
4
AgServ For. Fish
Mining
0.11%
3.89%
2.11%
1.84%
6.32%
.53%
10.53%
9.21%
14.74% 18.95% 23.16% 27.37%A. 31.58% 35.79% 40.00%
12.89% 16.58% 20,26% 23.95% 27.63% 31.32% 3.00%
5 Construction 5.52% 0.26% 0.79% 1.32% 1.84% 2.37% 2.89% 3.42% 3.95% 4.47% 5.00%
6 Food Tobacco 2,41% 1.05% 3.16% 5.26% 7.37% 9.47% 11.8% 13.68% 15.79% 17.89% 20.00%
7 Textile Goods 0.37% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
8 Misc Text. Prod. 0.73% 1.05% 3.16% 5;26% 7.37°/v 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
It' 9 Lumber & Wood 0.52% 2.11% 6.32% 10,53% 14.74% 18.95% 23.16% 27.37% 31.58% 35.79% 40.00%
10 Furniture 0.34% 1.05% 3.16% 5,26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
11 Pulp & Paper 0.87% 2.37% 7.11% 11.84% 16.58% 21.32% 26.05% 30.79% 35.53% 40.26% 45.00%
12 Print& Publish 1.31% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
ti 13 Chemical 1.40% 105% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17,89% 20.00%
0 14 Petrol; Refining 0.9% 2.11% 6.32% 10.53% 14.74% 18.95%
0 23.16% 27.37% 31.58% 35.79% 40.00%
15 Rubber & Plastio 1.03% 105% 3.16% 5.26% 7,37% 9.47% 1158% 13.68% 15.79% 17.89% 20.00%
0 16 Leather Prods. 0.12% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79%/o 17.89% 20.00%
V4, 17 Glass Stone Clay 0.62% 1.05% 3,16% 5.26% 7,37% 9.47% 11,58% 13.68% 15.79% 17.89% 20.00%
18 Prim. Metal Prod. 1.04% 2.63% 7.89% 13.16% 18.42% 23.68% 28,95% 34.21% 39.47% 44.74% 50.00%
19 Fab. Metal Prod. 1.64% 2.37% 7.11% 11.84% 16,58% 21.32% 26.05% 30.79% 35.53% 40.26% 45.00%
20 Mach. Exo. Elec. 1.56% 2.37% 7.11% 11.84% 16.58% 21.32% 26.05% 30.79% 35.53% 40.26% 4500%
21 1Ele. & Electron 2.52% 1.05% 3.16% 5.26% 7,37% 9.47% 11.58% 13.68% 15,79% 17.89% 20.00%
22 Transport Eq. 2.62% 2.37% 7.11% 11.84% 16.58% 21.32% 26.05/o 30.79% 35.53% 40.26% 4500%
23 Instruments 0.68% 0.26% 0.79% 1,32% 1.84% 2.37% 2.89% 3.42%
(A 3,95% 4,47% 5.00%
24 Misc. Manufact. 0.69% 1.05% 3.16% 5.26% 7,37% 9.47% 11.58% 13.68%
ti 1579% 17.89% 2000%
25 Transp & Whse, 346% 1.58% 4.74% 7.89% 11.05% 14.21% 17.37% 20.53% 23.68% 26.84% 30.00%
9. 26 Utilities 5.89% 0.00% 0.Q0% 0.00% 0.Q0% 0.00% 000% 000% 0.00% 0.00% 000%
27 Wholesale Trade 5.63% 0.79% 237% 395% 5,53% 7.11% 8.68% 10.26% 11.84% 13.42% 15.00%
28 Retail Trade 563% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
29 F.I.RE. 16.64% 0.53% 1.58% 2.63% 3.68% 4.74% 5.79% 6,84% 7.89% 8.95% 10.00%
30 Pers./Prof. Serv. 8,03% 0.53% 1.58% 2.63% 3.68% 4.74% 5.79% 6.84% 7.89% 8.95% 10.00%
31 Eating Drinking 2.12% 0.26% 0.79% 1.32% 1.84% 2.37% 2,89% 3.42% 3.95% 4.47% 5.00%
32 Auto Serv. 1.09% 0.00% 000% 0,00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
33 Amuse & Rea. 0.70% 0.26% 0.79% 1.32% 1.84% 2,37% 2.89% 3.42% 3.95% 4.47% 500%
34 Health Ed, Soc, 6.30% 0.26% 0.79% 1.32% 1.84% 237% 2.89% 3.42% 395% 4.47% 5.00%
35 Govt & Govt Ind. 11.79% 0.53% 1.58% 2.63% 3.68% 474% 5.79% 6.84% 7.89% 8,95% 10.00%
36 Households 0.25% 0.00% 0.00% 0.00% 000% O0% 0.00% 0.00% 000% 0.00% 0.00%
TOTAL 100.00% 1.18% 3.53% 5.88% 8.24% 10.59% 12.95% 15,30% 17.65% 20.01% 22.36%
Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Total V.A
Pot. V.A.
b-A
wD
I-A

Table D-7 PercentValue-Added Lost Due to Specified Percent Loss of Sanitary Sewer
Lifeline

US. Econ.
UL Capacity Loss-> Value Added 10% 20% 30% 40% 50% 60% 70% 80% 90% 100/o
(Percent)

1 Livestock 0.45% -1.05% -1.05% -1 05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05%
2 Agr. Prod. 1.06% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63%
3 AgServ For. Fish 0.11% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63%
4 Mining 3.89% -0.53% -0.53% -0.53% -0.53% -0-53% -0.53% -0.53% -0.53% -0.53% -0.53%
U 5 Construction 5.52% -1.05% -1.05% -1 05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05%
6 Food Tobacco 2.41% -3.68% -3.68% -3.68% -3.68% -3.68% -3-68% -3.68% -3.68% -3.68% -3.68%
7 Textile Goods 0.37% -3.68% -3.68% -3.68% -3.68% -368% -3.68% -3.68% -3.68% -3-68% -3.68%
U 8 Misc Text Prod. 0.73% -3.68% -3.68% -3.68% -3.68% -3.68% -3.68% -3.68% -3.68% -3.68% -3.68%
9 Lumber & Wood 0.52% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63%
10 Fumiture 0.34% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63%
11 Pulp Paper 0.87% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21%
I 12 Print & Publish 1.31% -1.58% -1.58% -1.58% -1.58% -1.58% -1.58% -1.58% -1.58% -1.58% -1.58%
0 13 Chemical & Drugs 1.40% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21%
14 Petrol. Refining 0.96% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63%
0 15 Rubber & Plastic 1.03% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63%
16 Leather Prods. 0.12% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63%
17 Glass Stone Clay 0.62% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63% -2.63%
18 Prim. Metal Prod. 1.04% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21%
19 Fab. Metal Prod. 1.64% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21%
20 Mach. Exc. Elec. 1.56% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% 4.21% -4.21% -4.21%
21 Elec. & Electron 2.52% -4.74% -4.74% -474% -4.74% -4.74% -4.74% -4.74% -4.74% -4.74% -4.74%
22 Transport Eq. 2.62% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21% -4.21%
Ca 23 Instruments 0.68% -3.16% -3.16% -3.16% -3.16% -3.16% -3.16% -3.16% -3.16% -3.16% -3.16%
24 Misc. Manufact. 0.69% -3.16% -3.16% -3.16% -3.16% -3.16% -3.16% -3.16% -3.16% -3.16% -3.16%
25 Transp & Whse. 3.46% -0.53% -0.53% -0.53% -0.53% -0.53% -0.53% -0.53% -0.53% -0.53% -0.53%
26 Utilities 5.89% -1.26% -1.26% -1.26% -1.26% -1.26% -1.26% -1.26% -1.26% -1.26% -1.26%
27 Wholesale Trade 5.63% -0.53% -0.53% -0.53% -0.53% -0.53% -0.53% -0.53% -0.53% -0.53% -0.53%
28 Retail Trade 5.63% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05%
29 F.I.R.E. 16.64% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05%
30 PerslProf Serv. 8.03% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05%
31 Eating Drinking 2.12% -4.21% -4.21% -4.21% -4.21% 4.21% -4.21% -4.21% -4.21% 4.21% 4.21%
32 Auto Serv. 1.09% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05%
0 33 Amuse & Rec. 0.70% -4.21% -4.21% 4.21% 4.21% 4.21% -4.21% -4.21% 4.21% -4.21% -4.21%
34 Health Ed. Soc. 6.30% 4.21% 4.21% -4.21% -4.21% -4.21% 4.21% 4.21% 4.21% 4.21% 4.21%
35 Govt & Govt Ind. 11.79% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05% -1.05%
36 Households 0.25% -3.95% -3.95% -3.95% -3.95% -3.95% -3.95% -3.95% -3.95% -3.95% -3.95%
TOTAL 100.00% -2.69% -2.69% -2.69% -2.69% -2.69% -2.69% -2.69% -2.69% -2.69%
/ -2.69%
Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Total V.A
Pct V.A.
(AI
rn-I Table D-8 Percent Value-Added Lost Due to Specified Percent Loss of Air Transportation
0 Lifeline
to
co

U.S. Econ.
L/L Capacity Loss-> Value Addacf 10% 20% 30% 40% 50% 60% 70% 80%
(Percent) 90% 100%

1 Livestock 0.4% 0.53% 1.58% 2.63% 3.68% 4.74% 5.79% 6.84% 7.89%
2 Agr. Prod. 1.06% 8.95% 10.00%
0.53% 1.58% 2.63% 3.6 8% 4.74% 5.79%/a 6.84% 7.89%
3 AgSev For. Fish 0.11% 8.95% 10.00%
0.53% 1.58% 2.63% 3.68% 4.74% 5.79% 6.84% 7.89%
4 Mining 3.89% 8.95% 1.00%
5 Construction 0.53%/o 1.S8% 2.63% 3.68% 4.74% 5.79 6.84% 7.89%
5.52% 8.95% 10.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 Food Tobacoo 2.41% 1.05%/0
0.00%
7 Textile Goods 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
0.37% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
8 Miso Text. Prod. 0.73%
.0
la 9 Lumber & Wood
1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
0.52%
'a 10 Furniture 0.34%
1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% .17.89% 20.00%
1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68%/6 15.79%
11 Pulp& Paper 0.87% 17.89% 20.00%
vn 12 Print & Publish 1.31%
0.3%
1.05/s
1.58%
3.160%
2.63%
5.26%
3.68% 4.74% 5.79% 6.84% 7.89% 8.95% 10.00%
tri 13 Chemical & Drugs 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
1.40% 1.05% 3.16% 5.26%/6 7.37% 9.47%
14 Patrol. Refining 0.9660 11.58% 13.68% 15.79% 17.89% 20.00%
n 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%0
0 15 Rubber& Plastic 1.03% 0.00% 0.00%
R 1.05% 3.16% 5.26% 7.37%/6 9.47% 11.58% 13.68% 15.79% 17.89%
16 Leather Prods. 0.12% 20.00%
0 1.05% A.16% 5.26% 7.37% 9.47% 11.58%8/o 13,68% 15.79% 17.89%
17 Glass Stone Clay 0.62% 20.00%
I1 Prim. Metal Prod. 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 1.79% 17.89%
1.04% 20.00%
0.53% 1.58% 2.63% 3.68% 4.74% 5.79% 6.84% 7.89%
a 19 Fab. Metal Prod.
20 Mach. Exc. Elec.
1.64% 0.53% 1.58% 2.63% 3.68% 4.74% 5.79% 6.84% 7.89%
8.9S%
8.95%
10.00%
10.00%
1.56% 1.05% 3.16%
21 Elec. & Electron 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
2.52% 1.58% 4.74% 7.89% 11.05% 14.21% 17.37% 20.53% 23.68% 26.84%
22 Transport Eq. 2.62% 30.00%
23 Instruments 1.58% 4.74% 7.89% 11.05% 14.21% 1 7.37%S 20.53% 23.68%/
0.68% 26.84% 30.00%
In 2.11% 6.32% 10.53% 14.74% 18.95% 23.16% 27.37% 31.58% 35.79%
24 Misc. Manufact. 0.69% 40.00%
1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79%
25 Transp & Whse. 3.46% 17.89% 20.00%
1.58% 4.74% 7.89% 11.05% 14.21% 17.37% 20.53% 23.68%
26 Utilities 26.84% 30.00%
a 27 Wholesale Trade
5.89%
5.631%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% O.OOo 0.00%o 0.00%
A 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68%
28 Retail Trade 5.63% 15.79% 17.89% 20.00%
1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79%
29 F.l.R.E. 16.64% 17.89% 20.00%/6
1.05% 3.16% 5.26% 7.370/ 9.47% 11.58% 13.68% 15.79%
30 Pers./Prof Sev. 8.03% 17.89% 20.00%
31 Eating Drinking 1.05% 3.16% 5.26% 7.3PXQ 9.47%/ 11.58% 13.68% 15.79% 17.89% 20.00%
2.12% 2.11% 6.32D
32 Auto Serv. 10.53% . 14.74% 18.95% 23.16% 27.37% 31.58% 35.79% 40.00%
1.096 0.00%
33 Amuse & Rec. 0.00% 0.00% 0.006X 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.70% 2.11% 6.32%
34 10.53% 14.74% 18.95% 23.16% 27.37% 31,58% 35.79% 40.00%
Health Ed. Soo. 6.30°h 0.53% 1.58% 2.63% 3.68% 4.74% 5.79% 6.84% 7.89%
35 Govt & Govt. lnd. 11.79% 8.95% 10.00%
1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89%
36 Households 0.251% 20.00%o
0.00% 0.00%0 0.00% 0.00% 0.00% 0.00% 0,00% 0.00% 0,00/ 0.00/
TOTAL 100.00% 0.92% 2.76% 4.61% 6.45% 8.29% 10.13% 11.97% 13.82%/h 15.66% 17.50%
Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Total V.A
Pct V.A.
I-.
C,'
P-I
0.
Table D-9 Percent Value-Added Lost Due to Specified Percent Loss of Water
TransportationLifeline (Ports)

U.S.Econ.
L/L CapacityLoss--> ValueAdded 10% 20% 30% 40% 50% 60% 70% -80% - 90% 100%
(Percent)

1 Livestock 0.45% 2.11% 6.32% 10.53% 14.74% 18.95% 23.16% 27.37% 31,.58% 35.79% 40.00%
2 Agr. Prod. 1.06% 2.11% 6.32% 1.53% 14.74% 18.95% 23.16% 27.37% 31.58% 35.79% 40.00%
3 AgServ For. Fish 0.11% 2.11% 6.32% 10.53% 14.74% 18.95% 23.16% 27.37% 31.58% 35.79% 40.00%
'01 4 Mining 3.89% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
5 Construction 5.52% 1.05% 3.16% 15.79% 17.89% 20.00%
0'a
5.26% 7.37% 9.47% 11.58% 13.68%
6 Food Tobacco 2.41% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
7 Textile Goods 0.37% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
8 Misc Text. Prod. 0.73% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
9 Lumber & Wood 0.52% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
M 10 Furniture 0.34% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
11 Pulp & Paper 0.87% 1.58% 4.74% 7.89% 11.05% 14.21% 17.37% 20.53% 23.68/6 26.84% 30.00%
:
Up
C) 12 Print & Publish 1.31% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
0
0 13 Chemical & Drugs 1.40% 1.05% 3.16% 5.26% 7.37% 947% 11.58% 13.68% 15.79% 17.89% 20.00%
14 Petrol. Refining 0.96% 4.21% 12.63% 21.05% 29.47% 37.89% 46.32% 54.74% 63.16% 71.58% 80.00%
15 Rubber & Plastic 1.03% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
16 Leather Prods. 0.12% 1.05%, 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
17 Glass Stone Clay 0.62% 1.05% 3.16% 5.260/ 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
18 Prim. Metal Prod. 1.04% 1.05% 3.16% 5.26% 7.37% 9.47%0 11.58% 13.68% 15.79% 17.89% 20.00%
19 Fab. Metal Prod. 1.64% 1.58% 4.74% 7.89% 11.05% 14.21% 17.37% 20.53% 23.68% 26.84% 30.00%
0 30.00%
20 Mach. Exc. Elec. 1.56% 1.58% 4.74% 7.89% 11,05% 14.21% 17.37% 20.53% 23.68% 26.84%
n 21 Elec. & Electron 2.52% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
rn 22 Transport Eq. 2.62% 1.58% 4.74% 7.89% 11.05% 14.21% 17,37% 20.53% 23.68% 26.84% 30.00%
23 Instruments 0.68%. 0.53% 1.58% 2.63% 3.68% 4.74% 5.79% 6.84% 7.89% 8.95% 10.00%
24 Misc. Manufact. 0.69% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58%: 13.68% 15.79% 17.89% 20.00%
25 Transp & Whse. 3.46% 1.58% 4.74% 7.89% 11.05% 14.21% 17.37% 20.53% 23.68% 26.84% 30.00%
26 Utilities 5.89% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
27 Wholesale Trade 5.63% 1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
28 Retail Trade 5.63% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% -
29 F.l.R.E. 16.64% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
30 Pers./Prof.Serv. 8.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
31 Eating Drinking 2.12% 0.00% 0.00% 0.00/0 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
32 Auto Serv. 1.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
33 Amuse & Rec. 0.70% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
34 Health Ed. Soc. 6.30% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
35 Govt & Govt Ind. 11.79% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
36 Households 0.25% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TOTAL 100.00% 0.99% 2.98% 4.97% 6.96% 8.95% 10.94% 12.92% 14.91% 16.90% 18.89%
I-11 Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Total V.A
0r4 .
Pct. V.A.
CA
Table D-10 Percent Value-Added Lost Due to Specified Percent Loss of Telephone
Ch*
Lifeline

CI'

U.S. Loon.
I/L ClapacityLoss--> Value Added 10% 20% 30% 40% 50% 60% 70%
(Percent) 80% 90% 100%

1 Livestock 0.45/s 1.0S% 3.16% 5.26% 7.37% 9.47% 11.58%


2 Agr. Prod. 1.06% 13.68% 15.79% 17.89% 20.00%
1.05%/ 3.16% 5.26% 7.37% 9.47% 11.58%
3 AgServ For. Fish 0,11% 13.68% 15.79% 17.89% 20.00%
1.05% 3.16% 5.26% 7.37%/ 9.47% 11.58%
4 Mining 3.89% 0.53% 13.68% 15.79% 17.89% 20.00%
1.58% 2.63% 3.68% 4.74% 5.79%
5 Construction 5.52% 0.53% 1.58% 2.63%
6.84% 7.89% 8.95% 10.00%
6 Food Tobacco 3.68% 4.74% 5.79% 6.84% 7.89%
4' 2.41% 0.79% 2.37% 8,95% 10.00%
3.95% 5.53% 7.11% 8.68% 10.26%
7 Textile Goods 0.37% 0.79% 11.84% 13.42% 15 .00%
2.37% 3.95% 5.53% 7.11% 8.68%
8 Miso Text, Prod. 0.73% 0.79% 2.37%
10.26% 11.84% 13.42% 15.00%
la 9 Lumber & Wood
3,95% 5.53% 7.11% 8.68% 10.26% 11.84% 13.42%
0,52% 0.79% 2.37% 3.95% 553% 15.00%
10 Furniture 7.11% 8.68% 10.26% 11.84%
0.34% 0.79% 2.37% 3.95% 13.42% 15.00%
M 5.53% 7.11%
q 11 Pulp & Paper
12 Print & Publish
0.87% 0.53% 1.58% 2.63% 3.68% 4.74%
8.68%
5.79%
10.26%
6.84%
11.84%
7.89%
13.42%
8.95%
15.00%
1.31% 0.79% 2.37% 3.95% S.53% 10.00%
tq 13 Chemical & Drugs 7.11% 8.68% 10.26% 11.84% 13.420/a
1.40% 0.79% 2.37% 3.95% 5.53% 15.00%
14 Petrol. Refining 7.11% 8.68% 10.26% 11.84%
0.96% 0,53% 1.58% 2.63% 13.420% 15.00%
15 Rubber & Plastic 3.68% 4.74% 5.79% 6.84%
0Ii 1.03% 0.79% 2.37% 3.95% 5.53% 7.11% 8.68%
7.89% 8.95% 10.00%
16 Leather Prods. 0.12% 10.26% 11.84% 13.42% 15.00%
0 0.79% 2.37% 3.95% 5.53% 7.11%
17 Glass Stone Clay 0.62% 8.68% 10.26% 11.84% 13.42% 15.00%
0.79% 2.37% 3.95% 5.53% 7.11%
18 Prim. Metal Prod. 1.04% 8.68% 10.26% 11.84% 13.42% 15,00%
0.79% 2.37% 395% 5.53% 7.11% 8.68%
19 Fab. Metal Prod. 1.64% 0.53% 1.S8%
10.26% 11.84% 13.42% 1 5.00%
2.63% 3.68% 4.74% 5.79% 6.84%
20 Mach. Exc. Elec. 1.56% 0.53% 7.89% 8.95% 10,00%
1.58% 2.63% 3.68% 4.74% 6.79%
21 Elec. & Electron 2.52% 0.79% 6.84% 7.89% 8.95% 10.00%
2.37% 3,95% 5.53% 7.11% 8.68%
a3. 22 Transport Eq. 2.62% 0.53% 1Q.26% 11.84% 13.42% 15.00%
1.58% 2.63% 3.68% 4.74% 5.79%
23 Instruments 0.68% 1,58% 6.84% 7.89% 8.95% 1 .00%
4.74% 7.89% 1105% 14.21% 17.37%
Q 24 Misc. Manufact, 0.69% 0.79% 20.53% 23.68% 26.84% 30.00%
25 Transp & Whse 2.37% 3.95% 5.53% 7.11% 8.68% 10.26%
3.46% 1.58% 4.74% 11.84% 13.42% 15.00%
7.89% 11.05% 14.21% 17.37% 20.53%
26 Utilities 5.89% 1.58% 4.74%
23.68% 26.84% 30.00%
27 Wholesale Trade 7.89% 11.05% 14.21% 17.37% 20.53%
5.63% 2.63% 7.89% 23.68% 26.84% 30.00%
13.16% 18.42% 23.68% 28.95% 34.21%
28 Retail Trade 5.63% 2.63% 39.47% 44.74% 50.00%
7.89% 13.16% 18.42% 23.68% 28.95%
29 F.I.R.E. 16.64% 3.16% 34.21% 39.47% 44.74% 50.00%
9.47% 1S.79% 22.11% 28.42% 34.74%
N- 30 Pers./Prof. serv. 8.03% 2.11% 41.05% 47.37% 53.68% 60.00%
6.32% 10.53% 14.74% 18.95% 23.16%
31 Eating Drinking 2.12% 2.11% 27.37% 31 .58% 35.79% 40.00%
6.32% 10.63% 14.74% 18.95% 23.16%
32 Auto Serv. 1.09% 2.11% 27.37% 31.58% 35.79% 40.00%
6.32% 10.53% 14.74% 18.95% 23.16%
33 Amuse & Rec. 0.70% 2.11% 27.37% 31.58% 35.79% 40.00%
6.32% 10.S3% 14.74% 18.95% 23.16%
34 Health Ed. Soo. 6.30% 27.37% 31.58% 35.79% 40.00%
0.79% 2.37% 3.95% 5.53% 7.11%
35 Govt & Govt Ind. 11.79% 8.68% 10.26% 11.84% 13.42% 15,00%
1.05% 3.16% 5.26% 7.37% 9.47% 11.58%
36 Households 0.25% 13.68% 15.79% 17.89% 20.00%
1.05% 3.16% 5.26% 7.37% 9.47% 11.58% 13.68% 15.79% 17.89% 20.00%
TOTAL 100.000 1.15% 3.46% 5.77% 8.08% 10.39% 12.70%
Avg. 15.01% 17.320/6 19.63% 21.94%
Avg. Avg. Avg. Avg. Avg. Avg. Avg. Avg. Total V.A
Pct. V.A.
Table D- 1 Residual Value-Added After Lossof Capacity--Water Supply Lifeline

0% 0 10% 20% 30% 40% 50% 60% 70% : 80% 90%: 100%

0.45% 0.44% 0.42% 0.40% 0.38% 0.36% 0.34% 0.31% 0.29% 0.27% 0.25%
1.06% 1.02% 0.94% 0.86% 0.79% 0.71% 0.63% 0.55%/ 0.47%/ 0.40% 0.32%
0.11% 0.11% 0.10% 0.10% 0.09% 0.09% 0.,08% 0.08% 0.07% 0.07% 0.06%
3.89% 3.86% 3.80% 3.74% 3.67%/ 3.61% 3.55% 3.49% 3,43%/ 3.37% 3.31%/
5.52% 5.37% 5.08% 4.79% 4.50% 4.21% 3.92% 3.63% 3.S4% 3.05% 2.76%
2.41%. 2.32% 2.14%/ 1.96% 1.79% 1.61% 1.43% 1.25% 1.08% 0.90% 0.72%
0.37% 0.36% 0.33% 0.30% 0.28% 0.25% 0.2% 0.19% 0. 17%/ 0.14% 0.1 1%
0.730% 0.70% 0.65% 0.59% 0.54% 0,49%/ 0.43% 0.38% 0.33% 0.27% 0.22%
0.52% 0.50% 0.48% 0.45% 0.42% 0.39% 0.37% 0.34% 0.31% 0.29% 0.26%
0.34% 0.33% 0.31 % 0.29% 0.28% 0.26% 0.24% 0.22%/ 0.21% 0.19% 0.17%
0.87% 0.84%/ 0.79% 0.73% 0.68% 0.62%/ 0.57% 0.51% 0.46% 0.40% 0.35%
1.31% 1.29% 1.25% 1.21% 1.17% 1.13% .1.08% 1.04% 1 .00% 0.96% 0.92%
1.40% 1.34% 1.23% 1.1 1% 0.99% 0.87% 0.75% 0.64%/ 0.52% 0.,40% 0.28%
0.96% 0.94% 0.89% 0.84% 0.79% 0.73% : 0.68% 0.63% 0.58% 0.53% 0.48%
l 1.03% 1.00% 0.95% 0.89% 0.79% 0.68% 0.62% 0.57% 0.51%
0.84% 0.,73%
0.12% 0.12% 0.11% 0.1 1% 0.10% 0.09% 0.09% 0.,08% 0.07% 0.07% 0.06%
0.62% 0.60% 0.57% 0.54% 0.50% 0.47% 0.44% 0.41% 0.37% 0.34% 0.31%
1 .4%/ 0.99% 0.89% 0.79% 0.70% 0.60% 0.50%/ 0.40% 0.30% 0.20% 0.10%
1.64% 1.57% 1.43% 1.30% 1.16% 1.02% 0.88% 0.74% 0.60% 0.47% 0.33%
1.56% 1.51% 1.41% 1.31% 1.22% 1.12% 1.02% 0.92%/ 0.,82% 0.72% 0.62%
2.52% 2.40% 2.16% 1.92% 1.69% 1.45% 1.21% 0.97%/ 0.73% 0.49% 0.25%
2.2% 2.54% 2.37% 2.21% 2.04% 1.87% 1.71% 1.54% 1.38% 1.21 % 1.05%
(D 0.68% 0.65% 0.58% 0.52% 0.45% 0.39% 0.33% 0.26% 0.20% 0.13% 0.07%
R 0.69% 0.67% 0.62% 0.58% 0.54% 0.49% 0.45% 0.'41% 0.36% 0.32% 0.27%
en 3.46% 3.42% 3.35% 3.28% 3.21 % 3.13% 3.06% 2.99% 2.91% 2.84%/ 2.77%
5.89% 5.76% 5.51 % 5.27% 5.02% 4.77%/ 4.52% 4.28% 4.03% 3.78% 3.53%
5.63% 5.57% 5.46% 5.34% 5.'22% 5.10% 4.98% 4.86% 4.74% 4.63% 4.51%
5.63% 5.57% 5.46% 5.34% 5.22% 5.10% 4.98% 4.86% 4.74% 4.63% 4.51%
16.64% 16.47% 16.12% 15.77% 15.42% 15.07% 14.72% 14.36% 14.01% 13.66% 13.31%
8.03% 7.95% 7.78% 7.61% 7.44% 7.27% 7.10% 6.76% 6.59% 6.42%
2.12% 2.03% 1.85% 1.67% 1.50% 1.32%/ 1.14% 0.96% 0.78% 0.60% 0.42%
1.09% 1.09% 1.08% 1.07% 1.05% 1.04% 1.03% 1.02% 1.01% 1 .00% 0.99%
0.70% 0.67% 0.61% 0.55% 0.49% 0.43% 0.37% 0.32% 0.26% 0.20% 0.14%/
6.30%/ 6.17% 5.90% 5.64% 5.37% 5.110% 4.84% 4.57% 4.31% 4.04% 3.78%
11.79% 11.64% 11.33% 11.02% 10.70% 10.39% 10.08% 9.77% 9.46% 9.15% 8.84%
0.25% 0.25% 0.24% 0.22% 0.21% 0.20% 0.19%/ 0.18% 0.17% 0.16% 0.15%
100.00%/ 98.06% 94.18% 90.30% 86.43% 82.55% 78.67% 74.79% 70.91% 67.04% 63.16%
100%/ 98% 94% 90% 86% 83% 79% 75% 71% 67% 63%/
th3 Table Di 2 Residual Value-Added After Loss of Capacity--Electric Lifeline

C,'

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

0.45% 0.44% 0.42% 0,39%/ 037% 0.35% 0.32% 0.30% 0.27% 0.25% 0.23%
1.06% 1.03% 0.98% 0.92% 0.86% 0.81% 0.75% 0.70% 0.64% 0.59% 0.53%
0.11% 0.11% 0.10% 0.10% 0,09% 0.08% 0.08% 0.07% 0.07/9 0.06% 0.06%
3.89% 3.70% 3.34% 2.97% 2.60% 2.23% 1.86% 1.49% 1.13% 0.76% 0.39%
5.52% 5.40% 5.17% 4.94% 4.71% 4.47% 4.24% 4.01% 3.78% 3.54% 3.31%
2.41% 2.29% 2.06% 1.84% 1.61% 1.38% 1.15% 0.92% 0.70% 0.47% 0.24%
0.37% 0.35% 0.31% 0.27% 0.24% 0.20% 0,16% 0.12% 0.08% 0.04% 0.00%
0,73% 0,69% 0.61% 0.54% 0.46% 0.38%
0.52% 0.31% 0.23% 0.15% 0.08% 0.00%
0.49% 0.43% 0.38% 0.33% 0.27%
0.34% 0.22% 0.16% 0.1 1% 0.05% 0.00%
0.32% 0.29% 0.25% 0.21% 0.18% 0.14%
0.87% 0,11% 0.07% 0.04% 0.00%
0.83% 0.73% 0.64% 0.55% 0.46%
!. 0.37% 0.28%
I, 1.31% 1.24% 1.10% 0.97% 0.83% 0,69% 0.55% 0.41%
0.18%
0.28%
0.09%
0.14%
0,00%
0.00%
1.40% 1.34% 1.20% 1.07% 0,94%
'0 0.81% 0.67% 0.54% 0.41% 0.27% 0.14%
0.96% 0.91% 0.81% 0.71% 0.61% 0.51% 0.41% 0.30% 0.20% 0.10% 0.00%
0 1.03% 0.98% 0.87% 0.76% 0.65% 0,54% 0,43% 0.33% 0.22% 0.1 1% 0.00%
4i 0.12% 0.12% 0.10% 0.09% 0.08% 0.06% 0.05%/ 0,04% O.03% 0.01% 0.00%
0.62% 0.59% 0.52% 0.46% 0.39% 0.33% 0.26% 0.20% 0.13% 0.07% 0.00%
1.04% 0.99% 0.89% 0.79% 0.7Q% 0,60% 0.50% 0.40% 0.30% 0.20% 0.10%
1.64% 1.55% 1.38% 1.21% 1.04%
CB 0.86% 0.69% 0.52% 0.35% 0.17% 0,00%
w 1.56% 1.48% 1.15% 0.99% 0.82% 0.66% 0.49% 0.33% 0.16% 0.00%
2.52% 2.39% 2.12% 1.86% 1.59% 1.33% 1,06% 0.80% 0.53% 0.27% 0.00%
2.62% 2.48% 2.21% 1.93% 1.65% 1.38% 1.10% 0.83% 0.55% 0.28% 0.00%
0.68% 0.64% O.57% 0.50%
0 0.69% 0.65% 0.58%
0.43% 0,36% 0.29% 0.21% 0.14% 0,07% 0,00%
0.51% 0.43% 0.36% 0.29% 0.22% 0.14% 0.07% 0.00%
3.46% 3.41% 3.30% 3.19% 3.08% 2.97% 2.86% 2.75% 2.64% 2.53% 2.42%
5.89% 5.64% 5.14% 4.65% 4.15% 3.66% 3.16% 2.66% 2.17% 1.67% 1.18%
5.63% 5.37% 4.83% 4.30% 3.77% 3.23% 2.70% 2.16% 1.63% 1,10% 0.56%
5.63% 5.37% 4.83% 4.30% 3.77% 3.23% 2.70% 2.16% 1.63% 1.10% 0.56%
16.64% 15.85% 14.28% 12.70% 11.12% 9,55% 7.97% 6.39% 4.82% 3.24% 1.66%
8.03% 7.65% 6.89% 6,13% 5.37% 4.61% 3.85% 3.09% 2.32% 1.56% 0.80%
2.12% 2.03% 1.85% 1.67% 1.50% 1.32% 1.14% 0.96% 0.78% 0.60% 0.42%
1.09% 1.04% 0.94% 0.84% 0,73% 0.63% 0.52% 0.42% 0.32% 0.21% 0.11%
0.70% 0.67% 0.61% 0.55% 0.49% 0.43% 0.37% 0.32% 0.26%o 0.20% 0.14%
6.30% 6.03% 5,50% 4.97% 4.44% 3.91% 3.38% 2.85% 2.32°% 1.79% 1.26%
11.79% 11.42% 10.67% 9.93% 9.18% 8.44% 7.70% 6.95% 6.21% 5.46% 4.72%
0.25% 0.24% 0.22% 0.20% 0.18% 0.16% 0.13% 0.11% 0,09% 0.07% 0.05%
100.00% 95.73% 87.19% 78.66% 70.12% 61 .58%
100% 96% 87%
53.04% 44.50% 3.97% 27.43% 18.89%
79% 70% 62% 53% 45% 36% 27% 19%

0
0
Table D-1 3 Residual Value-Added After Loss of Capacity--Oil Supply Lifeline

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

0.45% 0.44% 0.42% 0.39% 0.37% 0.35% 0.32% 0.30% 0.27% 0.25%
1.06% 1.01% 0.93% 0.84% 0.23%
0.75% 0.66% 0.57% 0.48% 0.39%
0.11% 0.11% 0.10% 0.09% 0.30% 0.21%
0.08% 0.07% 0.06% 0.05% 0.04%
3.89% 3.70% 3.34% 2.97% 0.03% 0.02%
2.60% 2.23% 1.86% 1.49% 1.13%
5.52% 5.26% 4.73% 4.21% 0.76% 0.39%
3.69% 3.17% 2.64% 2.12% 1.60%
2.41% 2.34% 2.22% 2.09% 1.07% 0.55%
1.96% 1.84% 1.71% 1.58% 1.46%
0.37% 0.36% 0.34% 0.32% 1.33% 1.20%
0.30% 0.28% 0.26% 0.25% 0.23%
0.73% 0.71% 0.67% 0.63% 0.21% 0.19%
(. 0.59% 0.55% 0.52% 0.48% 0.44%
0.52% 0.50% 0.48% 0.45% 0.40% 0.36%
O 0.42% 0.39% 0.37% 0.34% 0.31%
0.34% 0.33% 0.31% 0.29% 0.29% 0.26%
0.28% 0.26% 0.24% 0.22%
0.87% 0.85% 0.80% 0.21% 0.19% 0.17%
0.76% 0.71% 0.66% 0.62% 0.57%
1.31% 1.28% 1.21% 0.53% 0.48% 0.44%
1.14% 1.07% 1.00% 0.93% 0.86%
1.40% 1.37% 0.79% 0.72% 0.66%
00 1.29% 1.22% 1.15% 1.07% 1.00% 0.92% 0.85% 0.78%
0.96% 0.91% 0.81% 0.71% 0.61% 0.70%
0.51% 0.41% 0.30% 0.20% 0.10%
1.03% 1.00% 0.95% 0.89% 0.84% 0.00%
0.79% 0.73% 0.68% 0.62% 0.57%
0.12% 0.12% 0.11% 0.11% 0.10% 0.51%
0.09% 0.09% 0.08% 0.07%
0.62% 0.60% 0.57% 0.54% 0.07% 0.06%
is 0.50% 0.47% 0.44% 0.41%
I. 1.04% 0.99% 0.89% 0.37% 0.34% 0.31%
0.79% 0.70% 0.60% 0.50% 0.40%
1.64% 1.60% 1.51% 0.30% 0.20% 0.10%
1.42% 1.34% 1.25% 1.17% 1.08%
1.56% 1.52% 0.99% 0.91% 0.82%
1.44% 1.35% 1.27% 1.19% 1.11% 1.03%
2.52% 2.46% 2.32% 0.94% 0.86% 0.78%
2.19% 2.06% 1.92% 1.79%
2.62% 2.49% 1.66% 1.53% 1.39% 1.26%
2.25% 2.00% 1.75% 1.50% 1.25%
0.68% 0.66% 1.01% 0.76% 0.51% 0.26%
0.63% 0.59% 0.55% 0.52% 0.48%
Ca 0.69% 0.67% .0.45% 0.41% 0.38% 0.34%
0.63% 0.60% 0.56% 0.52% 0.49%
3.46% 3.30% 0.45% 0.42% 0.38% 0.34%
2.97% 2.64% 2.31% 1.99% 1.66%
5.89% 5.73% 1.33% 1.00% 0.67% 0.35%
5.42% 5.11% 4.80% 4.49% 4.18%
5.63% 5.49% 3.87% 3.56% 3.25% 2.94%
5.19% 4.89% 4.60% 4.30% 4.00%
5.63% 5.37% 3.71% 3.41% 3.11% 2.82%
4.83% 4.30% 3.77% 3.23% 2.70%
16.64% 16.12% 2.16% 1.63% 1.10% 0.56%
15.07% 14.01% 12.96% 11.91% 10.86%
8.03% 7.78% 9.81% 8.76% 7.71% 6.66%
7.27% 6.76% 6.26% 5.75% 5.24%
2.12% 2.03% 4.73% 4.23% 3.72% 3.21%
1.85% 1.67% 1.50% 1.32% 1.14%
An 1.090% 1.04% 0.96% 0.78% 0.60% 0.42%
9j 0.94% 0.84% 0.73% 0.63%
a,
U'
0.70%
6.30%
0.66%
6.23%
0.60% 0.53% 0.47% 0.40%
0.52%
0.33%
0.42%
0.27%
0.32%
0.20%
0.21%
0.14%
0.11%
6.10% 5.97% 5.83% 5.70% 5.57% 0.07%
11.79% 11.67% 5.44% 5.30% 5.17% 5.04%
11.42% 11.17% 10.92% 10.67% 10.43%
0.25% 0.24% 10.18% 9.93% 9.68% 9.43%
0.23% 0.22% 0.21% 0.19% 0.18% 0.17% 0.15% 0.14% 0.13%
100.00% 96.94% 90.83% 84.71% 78.60% 72.48% 66.37% 60.25% 54.14%
100% 97% 91% 85% 79% 48.02% 41.91%
72% 66% 60% .54% 48% 42%
:b. Table D-14 Residual Value-Added After Loss of Capacity--Natural Gas Lifeline

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

A/ OI V . ..
A A~o
V." -to V. 4 -/ U.44% 0.44% 0.43% 0.43%
1.06% 1.04% 0.42% 0.42% 0.41% 0.41%
1.01% 0.98% 0.94% 0.91% 0.88%
0.11% 0.11% 0.84% 0.81% 0.77% 0.74%
0.11% 0.10% 0.10% 0.09% 0.09%
3.89% 3.87% 0.09% 0,08% 0.08% 0.08%
3.83% 3,79% 3.75% 3.70% 3.66%
5.52% 5.52% 3.62% 3.58% 3.54% 3.50%
5.52% 5.52% 5,52% 5.52%
:
la
2.4 1%
0.37%
0,73%
2.37%
0.37%
0.72%
2.31%
0.36%
0.70%
2.25%
0.35%
2.18%
0.35%
2.12%
0.34%
5.52%
2.06%
0.33%
5.52%
1.99%
0.32%
5.52%
1.93%
0.31%
5.52%
1.87%
0.31%
5.52%
1.80%
0.30%
0,69% 0.67% 0.66% 0.64% 0.63%
0.52% 0.51% 0.61% 0.60% 0.58%
0.E0%

I
0.49% 0.48% 0.47% 0.46% 0.45% 0.43%
0,34% 0.34% 0.33% 0.42% 0.41%
0.32% 0.31% 0.31% 0.30% 0.29% 0.29% 0.28%
0.87% 0.85% 0.82% 0.27%
0.78% 0,74% 0.71% 0.67% 0.63% 0,60%
131% 130% 1.27% 0.56% 0,52%
1.24% 1.22% 1.19% 1.16% 1.10%
U 1.40% 1.34% 120%
1.13% 1.08% 1.05%
1.07% 0.94% 0.81% 0.67%
p
tqj 0.96% 0.94% 0.89% 0.84% 0.79% 0.73% 0.68%
0.54%
0.63%
0.41%
0.58%
0.27%
0,53%
0.14%
1.03% 1.00% 0.95% 0.48%
0 0.89% 0.84% 0.79% 0,73% 0.68% 0.62%
0.12% 0.12% 0.12% 0.57% 0.51%
0.12% 0.11% 0.11% 0.11% 0.11% 0.10% 0.10% 0.10%
0 0.62% 0.60% 0.57% 0.54% 0.50% 0.47% 0.44% 0.41% 0.37% 0.34% 0.31%
1,04% 1.01% 0.96% 0,90% 0.85% 0.79% 0.74% 0.68% 0.63% 0.68% 0.52%
164% 1.60% 1.51% 1.42% 1.34% 1.25% 1.17% 1.08% 0.99% 0.91% 0.82%
1.56% 1.52% 1.44% 1.35% 1.27% 1.19% 1.1 1% 1.03% 0.94% 0.86% 0.78%
2.52% 2.46% 2.32% 2.19% 2.06%
2.62% 1.92% 1.79% 1.66% 1.53% 139%M 1.26%
2.55% 2.41% 2.27% 2.14%
pa 2.00% 1.86% 1.72% 1.59% 1.45%
0.68% 0.65% 0.60% 0.55% 1.31%
0.49% 0.44% 0.38% 0.33% 0.28% 0,22% 0.17%
0.69% 0.67% 0.63% 0.60%
in 0.56% 0.52% 0.49% 0.45% 0.42% 0.38%
3.46% 3.46% 3,46% 3.46% 0.34%
. 3.46% 3.46% 3.46% 3.46% 3.46% 3.46% 3.46%
A 5.89% 5.76% 5.51% 5.27% 5.02% 4.77% 4.52% 4.28% 4.03% 3.78% 353Q%
5.63% 5.60% 5,54% 5.49% 5,43% 5.37% 5.31% 5.25% 6.19% 5.13% 5.07%
5.63% 5,57% 5.46% 5.34% 5.22% 5.10% 4.98% 4.86% 4.74% 4.63% 4.51%
16.64% 16.47% 16.12% 15.77% 15.42% 15.07% 14.72% 14.36% 14.01% 1 .66% 13.31%
8.03% 7.95% 7.78% 7.61% 7.44% 7.27% 7.10% 6.93% 6.76% 6.59% 6.42%
2.12% 2.08% 1.99/g 1.90% 1.81%
1.09% 1.72% 1.63% 1.54% 1.45% 1.36% 1.27%
1.09% 1.09% 1.08% 1.07% 1.07% 1.06% 1.06% 1.05% 1.05% 1.04%
0.70% 0.68% 0.65% 0,62% 0.59%
6,30% 0.56% 0.54% 0.51% 0.48% 0.45% 0.42%
6.23% 6.10% 5,97% 5.83% 5.70%
11.79% 5.57% 5,44% 5.30% 5.17% 5.04%
11.67% 11.42% 11.17% 10.92% 10.67%
0.25% 10.43% 10.18% 9,93% 9.68% 9.43%
0.25% 0.24% 0.23% 0.22% 0.21% 0.20% 0.19% 0.18% 0.17% 0.16%
100.00% 98,72% 96. 15% 93.58% 91 .01%
100% 88,45% 85,88% 83.31% 80.74% 78.17% 75.61%
99% 96% 94% 91% 88% 86% 83% 81% 78% 76%

I
Table D-15 Residual Value-Added After Loss of Capacity--Highways Lifeline

10% 20% 30% 40% . 50% 60% 70% 80% 9o0;' innqo

0.45%
/ 0.44% 0.42% 0.39% 0.37% 0.35% 0.32% 0.30% 0.27%
1.06% 1.01% 0.93% 0.84% 0.25% 0.23%
0.75% 0.66% 0.57% 0.48% 0.39% 0.30%
0.11% 0.11% 0.10% 0.09% 0.21%
0.08% 0.07O 0.06% 0.05% 0.04%
3.89% 3.82% 3.67% 3.53% 0.03% 0.02%
3.39% 3.24% 3.10°h 2.96% 2.81%
5.52% 5.40% 5.17% 2.67% 2.53%
4.94% 4.71% 4.47 4.24% 4.01%
2.41% 2.31% 2.10% 3.78% 3.54% 3.31%
I 1.90% 1.70% 1 A9°h 1.29% 1.09°h
CD 0.37% 0.36% 0.89% 0.68% 0.48%
0.33% 0.30% 0.27% 0.24% 0.21%
0. 0.73% 0.70% 0.64% 0.58% 0.53% 0.47 0.41%
0.18% 0.15% 0.12% 0.09%
0.52% 0.49% 0.35% 0.30°h 0.24% 0.18%
0.44% 0.39% 0.34% 0.30°h 0.25%
0.34% 0.33% 0.20% 0.15% 0.10% 0.05%
0.30% 0.27% 0.25% 0.22% 0.19%
-3. 0.87% 0.83% 0.16% 0.14% 0.11% 0.08%
0.76% 0.69% 0.61% 0.54% 0.47
1 31% 1.26% 0.39°h 0.32°h 0.25% 0.17%
1.16% 1.05% 0.95% 0.85% 0.74% 0.64%
1.40% 1.34% 1.23% 0.54% 0.43% 0.33%
1.11% 0.99% 0.87 0.75% 0.64% 0.52°h
0.96% 0.92% 0.83% 0.73% 0.40% 0.28%
0.64% 0.55% 0.46% 0.37% 0.28% 0.19%
1.03% 0:99% 0.91% 0.83% 0.10%
0.75% 0.66% 0.58% 0.50°h 0.42%
0.12% 0.12% 0.11% 0.34% 0.26%
o 0.10% 0.09% 0.08% 0.07% 0.06% 0.05% 0.04%
0.62% 0.59% 0.54% 0.50% 0.03%
0.45% 0.40% 0.35% 0.30°h 0.25% 0.20%
1.04% 1.00% 0.91% 0.82% 0.73%
0.15%
1.64% 0.65% 0.56% 0.47 0.38% 0.30% 0.21%
1.57% 1.43% 1.30% 1.16%
1.56% 1.02% 0.88% 0.74% 0.60% 0.47% 0.33%
1.49% 1.36% 1.23% 1.10%
2.52% 0.97 0.84% 0.71% 0.57% 0.44% 0.31%
2.42% 2.22% 2.02% 1.83%
2.62% 1.63% 1.43% 1.23% 1.03% 0.83% 0.63%
2.51% 2.29% 2.07% 1.85%
;a 0.68% 1.63% 1.41% 1.19% 0.96% 0.74%
0.65% 0.59% 0.54% 0.52%
0.48% 0.42% 0.36% 0.31% 0.25% 0.19%
0.69% 0.66% 0.61% 0.14%
n 3.46% 3.31%
0.55% 0.50% 0.44% 0.39% 0.33% 0.28% 0.23% 0.17%
3.02% 2.73% 2.44% 2.15% 1.86%
5.89% 5.76% 1.57% 1.27% 0.98% 0.69%
5.51% 5.27% 5.02% 4.77% 4.52% 4.28%
5.63% 5.43% 4.03% 3.78% 3.53%
5.01% 4.60% 4.18% 3.77°h 3.35%
5.63% 5.47% 2.94% 2.52°h 2.11% 1.69%
5.14% 4.82% 4.49% 4.1Po 3.84%.
16.64% 16.25% 3.51% 3.19% 2.86% 2.54%
15.46% 14.67% 13.88% 13.09% 12.31% 11.52°h
8.03% 7.84% 7.46% 10.73% 9.94% 9.15%
7.08% 6.70% 6.32% 5.94% 5.56%
2.12% 2.06% 5.18% 4.80% 4.42%
1.95% 1.84% 1.73% 1.62°h 1.51%
1.09% 1.06% 1.40°h 1.28% 1.17% 1.06%
1.00% 0.94% 0.87% 0.81% 0.75% 0.68%
0.70% 0.68% 0.62% 0.56% 0.49%
0.64% 0.60% 0.57% 0.53% 0.49%
6.30% 6.12% 0.46% 0.42% 0.38% 0.35%
5.75% 5.39% 5.02% 4.66% 4.29°h
11.79% 11.60% 3.93% 3.56% 3.20% 2.83%
11.23% 10.86% 10.49% 10.12°h 9.74%
0.25% 0.25% 9.37% 9.00%/0 8.63% 8.25%
0.24% 0.22% 0.21% 0.20% 0.19% 0.18% 0.17 0.16% 0.15%
100.00% 97.16% 91.47% 85.79% 80.10% 74.41% 68.73% 63.04% 57.36%
100% 97% 91% 86% 51.67% 45.98%
I- ' 80% 74% 69% 63% 57%
0 52% 46%
'.3
in
Table D-16 Residual value-Added After Lossof Capacity--Railroads Lifeline

0% 10% 20% 30% 40% s0% 60% 70% 80% 90%1 10 M


'00

0.45% 0.44% 0.42% 0.41% 0.39% 0.37% 0.35%/ 0.31%


0. 33%0/ 0.29% 0. 27%/
a 1.06% 1.04% 0.99% 0.95% 0.90% 0.86% 0.81% 0.77% 0.68%
0. 72% 0.64%
0.11% 0.11% 0.10% 0.10% 0.09%/ 0.09%/ 0.08%/ 0.08%/ 0.08%/ 0.07%
0.07%
3.89% 3.82% 3.67% 3.53% 3.39%/ 3.24% 3.10%/ 2.96% 2.81% 2.67% 2.53%
5.52%/ 5.50% 5.48% 5.45% 5.42% 5.39% 5.36% 5.33% 5.30%/ 5.27% 5.24%
2.41% 2.38% 2.33% 2.28% 2.23% 2.1i8%/ 2.130% 2.08% 2,03%/ 1.98% 1.93%
0.37%/ 0.37% 0.36% 0.35% 0.35% 0.34% 0.33% 0.32%0/ 0.31% 0.30%
0.31%
0.73% 0.72% 0.70% 0.69% 0.67% 0.66% 0.64% 0.63%/ 0.61% 0.60% 0.58%
0.52% 0.50% 0.48% 0.46% 0.44% 0.42%/ 0.40% 0.37%/ 0.35%/ 0.3 1%
0.33%
0.34% 0.34% 0.33% 0.32% 0.31% 0.31% 0.30% 0.29% 0.28%
0.29%/ 0.27%/
0.87% 0.85% 0.81% 0.770% 0.73% 0.69% 0.64% 0.60%/ 0.56% 0.52% 0.48%
I* 1.31% 1.30% 1.27% 1.24% 1.22% 1.19% 1.16%/ 1.13% 1.08% 1.05%
1.40% 1.39% 1.36% 1.33% 1.30% 1.27% 1.24% 1.15%
0.96% 1.12%
0.94% 0.90% 0.86% 0.82% 0.78%/ 0.74%/ 0.70% 0.62% 0.58%
1.03% 1.02% 1.00% 0.98% 0.95% 0.93% 0.91% 0.89%/ 0.87% 0.85% 0.82%
0.12% 0.12% 0.12% 0.12% 0.11% 0.11% 0.11% 0.11%/ 0.10%/ 0.10% 0.10%
0.62% 0.61% 0.60% 0.59% 0.57% 0.58%/ 0.55%/ 0.53% 0.52%/ 0.51% 0.49%
U I.04% 1.01% 0.96% 0.90% 0.85% 0.79% 0.74% 0.68%/ 0.63% 0.58% 0.52%
1.64%/ 1.60% 1.52% 1.45% 1.37% 1.29% 1.21% 1.14% 1.06%/ 0.90%
cri 0.98%
1.56% 1.52% 1.45% 1.38% 1.30% 1.23%
a 2.52%/ 2.50% 2.44%D/ 2.39% 2.34% 2.28%
1.15%/
2.23%/
1.08%
2.18%
1.01%
2.12%/
0.93%
2.07%
0.86%
2.02%
2.62%/ 2.56% 2.43% 2.31% 2.18% 2.06% 1.94% 1.81% 1.69%/ 1.56%/ 1.44%
0.68%/ 0.68% 0.67% 0.67% 0.67% 0.66%/ 0.66% 0.66% 0.65%/ 0.65%
0.65%/
0.69% 0.68% 0.67% 0.65% 0.64% 0.62%/ 0.6 1% 0.59% 0.58% 0.56% 0.55%
3.46% 3.41% 3.30% 3.19% 3.08% 2.97%/ 2.86% 2.75%/ 2.64%/ 2.53% 2.42%
5.89% 5.89% 5.89% 5.89% 5.89% 5.839%/ 5.890% 5.89% 5.89% 5.89% 5.89%
5.63% 5.59% 5.50% 5.41% 5.32% 5.23% 5.14% 5.06% 4.97%/ 4.88% 4,79%
5.63% 5.57% 5.46% 5.34% 5.22% 5.10%/ 4.98% 4.86% 4.74%/ 4.63% 4.51%
16.64% 16.55% 16.38% 16.20% 16.03% 15.85% 15.68% 50%
15S. 15.33%/ 15.15% 14.98%
8.03% 7.99% 7.90% 7.82% 7.74% 7.65%/ 7.57% 7.48% 7.40% 7.31% 7.23%
2.12% 2.12% 2.10% 2.09% 2.08% 2.07No 2.06%/ 2.05%/ 2.04%/ 2.03% 2.01%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%/ 1.09%/ 1.09% 1.09% 1.09%
0.70% 0.69% 0.69% 0.69% 0.68% 0.68%/ 0.68% 0.67% 0.67%/ 0.67% 0.66%
6.30% 6.28% 6.25% 6.22% 6.18% 6.1I5%/ 6.i10% 6.08%/ 6.02%
6.05%/ 5.98%
11.79% 11.73% 11.60% 11,48% 11.36%/ 11.23% 11.11% 10,98% 10.86%/c 10.74% 10.61%
0.25% 0.25% 0.25% 0.25% 0.25% 0.25%/ 0.25%/ 0.25%/ 0.25% 0.25% 0.25%
100.(00%0 99.17% 97.50% 95.83% 94.16% 92.49%/ 90.82%/ 89.15%/ 87.48%/ 85.81% 84.14%
100% 99% 97%0 96%/ 94% 92% 91% 89% 87%/ 86% 84%

CA)
&I
W
46
Table D-I 7 Residual Value-AddedAfter Loss of Capacity--Sanitary Sewer Lifeline

0%, 1 1k. 20% 30% 40% 50% 60% 70% 80% 90% 100%

0.45% 0.46% 0.46% OA6% 0.46% 0.46% 0.46% 0.46% 0.46% 0.46%
1.06% 1.09% t09% 1.09% 1.09% 1.09%
0,46%
1.09% 1.09% 1.09% 1.09% 1.09%
0.11% 0.11% 0.11% 0.11% 0.11% O 1% 0.11% 0.11% 0.11% 0.11% 0.11%
3.89% 3.91% 3,91% 3.91% 3.91% 3.91% 3.91% 3.91% 3.91% 3.91% 3.91%
5.52% 5.58% 5.58% 5.58%
2.41% 2.50% 2.50%_ 2.50%
5.58%
2.50%
5.58%
2.50%
5.58%
2.50%
5.58% 5.58% u8% 5.58%
0.37% 0;39% 2.50% 2.50% 2.50% 2.50%
0,39% 0.39% 0.39% 0.39% 0.39% 0.39%
0.73% 0.75% 0.75% 0.39% om39% 0.39%
0.75% 0.75% 0.75% 0.75% 0.75%
0.52% 0.53% 0.75% 0.75/. 0.75%
0.53% 0.53% 0.53% 0.53% 0.53%
0.34% U5% 0.53% 0.53% 0,53% 0.53%
0.35% 0.35% 0.35% 0.35% 0.35%
0.8 No 0.91%
0.35% 0.35% 0.35% 0,35%
0.91% 0.91% 0.91% 0.91% 0.91%
1.31% 1.33% 0.91% 0.91% O.9 i o/. 0.91%
1-33% 1.33% 1.33% 1.33%
1.40% 1,33% 1.33% 1.33% 1,33% 1.33%
1;46% 1.46% 1.46% 1.46% 1.46% 1.46% 1.46% 1,46% 1.46%
0.96% 0.99% 0.99% 0.99% 0.99% 0.99% 0.99% 0.99% 0.99% 0.99% 0.99%
1.030/0 1.061/o 1.06% 1.06./. 1.06% 1.06% 1.06% 1.06% 1.06% 1.06% 1.06%
0.12% 0.13% 0.13% 0.13%
0,13% 0.13% 0.13% 0.13% 0.13% 0. 13% 0.13%
0.62% 0.63% 0.63% 0.63% 0,63% 0.63% 0.63% 0.63%, 0.63% 0.63% 0.63%
1.04% 1,08% t08% 1M% 1.08% 1.08% 1.08% 1.08% 1.08% 1.08%
1.71% 1.71% 1.08%
1.71% 1.71% 1.71% 1.71% 1.71%
1.56% 1.63% 1.63% 1.71% 1.71% 1.71%
1'63% 1.63% 1.63% 1,63%, 1.63% 1.63% 1.63%
2.52% 2,64% 2.64% 1.63%
2.64% 2.649/. 2.64% 2.64% 2.64%
2.62% 2.73% 2.73% 2.64% 2'64% 2.64%
2.73% 2.73% 2.73% 2.73%
0.68% 0.70% 2.73% 2.73% 2.73%
0.70% 0.70% 0.70% 0.70% 0.70%
0.69% 0.71% 0.70% 0.70% 0.70% 0.70%
0.71% 0.71% 0.71% 0.71% 0.71%
3.46% 0.71% 0.71% 0.71% 0.71%
3.48% 3.48% 3.48% 3.48% 3.48% 3,48%
5.89% 5.96% 3.48% 3.48% 3.48% 3.48%
5.96% 5.96% 5.96% 5.96% 5.96%
5.63% 5.96% &96% 5.96%
5'66% 5.66% 5.66% 5.66% 5.66% 5.66%
5.63% 5.69% 5.66% 5.66% 5.66% 5.66%
5.69% 5.69% 5.69% 5.69% 6.69%
16.64% 16.82% 5.69% 5.69% 5.69% 5.69%
1&82% 16.82% 16,82% 16.829/o 16.82%
8.03% 8.12% 16.82% 16.82% 16.82% 16.82%
8.12% 8.12% 8.12% 8.12% 8.12%
2.12% 2.21% 8.12% 8.12% 8.12% 8.12%
2.21% 2.21% 2.21% 2.21% 2.21%
1.09% 1.11% 2.21% 2.21% 2.21% 2.21%
1.11% 1.11% 1.11% 1.11% .1.11%
0.70% 0.73% 1.11%, 1.11% 1.11% 1.11%
0.73% 0.73% 0.73% 0.73% 0.73%
6.30% 6.56% 0. 7 3O/o: 0.73% 0.73% 0'73%
6.56% 6.56% 6.56% 6.56% 6.56%
11.79% 11.91%
6.56% 6.56% 6,56% 6.56%
11.91% 11.91% 11.91% 11.91% 11.91%
0.25% 0.26% 11.91% 11.91% 11.91% 11.91%
0.26% 0.26% 0.26% 0.26% 0.26% 0.26% 0.26% 0.26% 0.26%
100.00% 101.88% 101.88% 101.88% 101.88% 101.88% 101.88% 101.88% 101.88% 101.88% 101.88%
100% 102% 102% 102% 102% 102% 102% 102% 109% 102% 102%
Table D-1 8 Residual Value-Added After Loss of Capacity--Air Transportation Lifeline
9
(A

0% 10% 20% 30% 40% 50% 60% 70% D80% 90% N0%

n AC OIn A,.,
-j,'J JQ U. 070 U.4b%/6 0.44% 0.44% 0.43% 0.43%
1.06i% 1.05% 0.42% 0.42% 0.41% 0.41%
1.04% 1.03% 1.02% 1.01% 1.00% 0.990/% 0.98%
0.11% 0.11% 0.96% 0.95%
0.11% 0.11% 0.11% 0.11% 0.10% 0.10% 0.10%
3,89% 3.87% 3.830% 0.10% 0.10%
3.79% 3.75% 3,70% 3.66% 3.62/0 3.58%
5.52% 5.52% 3,54% 3.50%
5.52% 5.52% 5.52% 5.52% 5.52%
2.41% 2.38% 5,52% 5.52% 5.52% 5.52%
2.33% 2.28% 2.23% 2.18% 2.13% 2.08%
0,37% 0.37% 2.03% 1.98% 1.93%
0.36% 0.35% 0.35% 0,34% 0,33%
0.73% 0.72% 0.32% 0.31% 0.31% 0.30%
0.70% 0.69% 0.67% 0,66% 0,64% 0.63% 0,61%
(D 0.52% 0.S1% 0.60% 0.68%
0.50%/o 0,49% 0.48% 0.4 7% 0.46% 0,45%
0.34% 0.34% 0.33%
0.43% 0.42% 0.41%
0.32% 0.31% 0.31% 0.30% 0.29% 0.29% 0.28%
0.87% 0,87% 0.86% 0.27%
a. 0.85% 0.84% 0.83% 0.82% 0.81% 0.80%
1.S1% 1.30% 0. 79% 0.78%
I, 1.27% 1.24% 1.22% 1.19% 1.16% 1.13% 1.10%
1.40% 1.39% 1.08% 1.05%
1.36% 1.33% 1.30% 1.27%/n 1.24% 1.21%
0,96% 0.96% 1.18% 1.15% 1.12%
0.96%/ 0.96% 0,96% 0.96% 0.96%
1.03% 0.96% 0.96% 0.96% 0.96%
1.02% 1.00% 0.98% 0.95% 0.93%
0 0.12% 0.91% 0.89% 0.87% 0.85% 0.82%
0.12% 0.12% 0.12% 0.11% 0.11%
0 0.62% 0.11% 0,11% 0.10% 0.10% 0.10%
0.61% 0.60% 0.59% 0.57% 0.56%
1.04% 0,55% 0.53% 0.52% 0.51% 0.49%
1.04% 1.02% 1.01% 1.00% 0,99%
Q 1.64% 0.98% 0.97% 0.96% 0.95% 0,94%
1.63% 1.61% 1.60% 1.58%
1.56% 1.56% 1.55% 1.53% 1.1% 1.49% 1.48%
1.54% 1.51% 1.48% 1.45% 1.41%
2.62% 1.38% 1.35% 1.31% 1.28% 1,25%
2.48% 2,40% 2.32% 2.24% 2.16%
2.62% 2.58% 2,08% 2.00% 1.92% 1.85% 1.77%
2.49% 2.41% 2.33% 2.25% 2.16% 2.08%
0.68% 0.66% 2.00% 1.92% 1.83%
0.64% 0.61% 0.58% 0.55% 0,52% 0.49%
i
0.69% 0.68% 0,46% 0.44% 0,41%
in 0.67% 0.65% 0.64% 0.62% 0.61% 0.59%
3.46% 3.41% 0.58% 0.56% 0.55%
3.30% 3.19% 3.08% 2.97% 2.86% 2.75%
5.89% 5.89% 2.64% 2.53% 2.42%
5.89% 5,89% 5.89% 5.89%
nFa 5.63°/b 5.57% 5.46% 5.34%
5.89% 5.89/1 5.89% 5.89% 5.89%
5.22% 5.10% 4.98% 4,86% 4.74% 4,63%
5.63% 5.57% 5.46% 4.51%
5,34% 5.229% 5.10% 4.98% 4.86% 4.74% 4.63%
16.64% 16.47% 16.12% 4.51%
15.77.% 1S.42% 1S.07% 14.72% 14.36% 14.01% 13.66%
5.03% 7.95% 7.78% 13.31%
7.61% 7.44% 7.27% 7.10% 6,93% 6.76%
2.12% 2.08% 6.59% 6.42%
1.99% 1.90% 1.81% 1.72% 1.63% 1.54%
1.09% 1.09% 1.45% 1.36% 1.27%
1,09% 1.09% 1.09% 1.09% 1.09% 1,09%
0,70% 0,68% 1.09% 1.09% 1.09%
0.65% 0.62% 0.59% 0.56% 0.54% 0.51%
6.30% 6.27% 0.48% 0,45% 0.42%
6.20% 6,13% 6.07% 6,00% S.93% 5,87% S.80% 5.73% 5.67%
a 11.79% 11.67% 11.42% 11.17% 10.92% 10Q.67% 10.43%
0.25% 0.25% 10.18% 9.93% 9.68% 9.43%
0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.2S% 0.25% 0.25%
100.00% 99.09% 97,27% 95.45% 93,63% 91.81% 90.00% 88.18% 86.36% 84.54% 82.72%
100% 99% 97% 95% 94% 92% 90% 88% 86% 85% 83%

Ebb
Table D-19 Residual Value-Added After Lossof Capacity--Water Transportation Lifeline
(Ports)

0%° 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

0.45% 0.44% 0.42% 0.41% 0.39% 0.37% 0.35% 0.33% 0.31% -0.29% 0.27%
1.06% 1.04% 0.99% 0.95% 0.90% 0.86% 0.81% 0.77% 0.72% 0.68% 0.64%
0.11% 0.11% 0.10% 0.10% 0.09% 0.09% 0.08% 0.08% 0.08%
3.89% 3.85% 3.77% 3.68% 3.60% 0.07% 0.07%
3.52% 3.44% 3.36% 3.27% 3.19% 3.11%
.' 5.52% 5.46% 5.34% 5.23% 5.11% 5.00% 4.88% 4.76% 4.65% 4.53% 4.42%
la 2.41% 2.38% 2.33% 2.28% 2.23% 2.18% 2.13% 2.08% 2.03% 1.98% 1.93%
0.37% 0.37% 0.36% 0.35% 0.35% 0.34% 0.33% 0.32%
0.73% 0.72% 0.70% 0.31% 0.31% 0.30%
0.69% 0.67% 0.66% 0.64% 0.63% 0.61%
0.52% 0.51% 0.50% 0.49% 0.60% 0.58%
0.48% 0.47% 0.46% 0.45% 043% 0.42% 0.41%
0 0.34% 0.34% 0.33% 0.32% 0.31% 0.31% 0.30%
CL 0.87% 0.29% 0.29% 0.28% 0.27%
0.86% 0.83% 0.80% 0.77% 0.75% 0.72%
1.31% 0.69% 0.66% 0.64% 0.61%
1.30% 1.27% 1.24% 1.22% 1.19% 1.16% 1.13% 1.10% 1.08% 1.05%
0 1.40% 1.39% 1.36% 1.33% 1.30% 1.27% 1.24% 1.21% 1.18% 1.15% 1.12%
0 0.96% 0.92% 0.84% 0.76% 0.68% 0.60% 0.520o
In 0.44% 0.35% 0.27% 0.19%
1.03% 1.02% 1.00% 0.98% 0.95% 0.93% 0.91%
0.12% 0.12% 0.89% 0.87% 0.85% 0.82%
0.12% 0.12% 0.11% 0.11% 0.11% 0.11%
0.62% 0.10% 0.10% 0.10%
0.61% 0.60% 0.59% 0.57% 0.56% 0.55%
1.04% 0.53% 0.52% 0.51% 0.49%
1.03% 1.01% 0.99% 0.96% 0.94% 0.92% 0.90% 0.88% 0.85% 0.83%
1.64% 1.61% 1.56% 1.51% 1.46% 1.41% 1.36% 1.30% 1.25% 1.20% 1.15%
1.56% 1.54% 1.49% 1.44% 1.39% 1.34% 1.29% 1.24% 1.19% 1.14% 1.09%
2.52% 2.50% 2.44% 2.39% 2.34% 2.28%
2.62% 2.23% 2.18% 2.12% 2.07% 2.02%
2.58% 2.49%
0.68%
0.69%
0.68%192183
0.68%
2.41% 2.33% 2.25% 2.16% 2.08% 2.00% 1.92% 1.83%
0.67% 0.66% 0.65% 0.65% 0.64%
0.69% 0.68% 0.67% 0.65% 0.64% 0.63% 0.63% 0.62% 0.61%
0.62% 0.61% 0.59% 0.58% 0.56% 0.55%
en
p 3.46%
5.89%
3.41%
5.89%
3.30%
5.89%
3.19%
5.89%
3.08%
5.89%
2.97% 2.86% 2.75% 2.64% 2.53% 2.42%
5.89% 5.89% 5.89% 5.89% 5.89% 5.89%
5.63% 5.57% 5.46% 5.34% 5.22% 5.10% 4.98% 4.86% 4.74% 4.63% 4.51%
5.63% 5.63% 5.63% 5.63% 5.63% 5.63%
0 5.63% 5.63% 5.63% .63% 5%
16.64% 16.64% 16.64% 16.64% 16.64% 16.64%
8.03% 16.64% 16.64% 16.64% 16.64% 16.64%
8.03% 8.03% 8.03% 8.03% 8.03% 8.03% 8.03% 8.03% 8.03% 8.03%
(n 2.12% 2.12% 2.12% 2.12% 2.12% 2.12% 2.12% 2.12% 2.12% 2.12% 2.12%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
0.70% 0.70% 0.70% 0.70% 0.70% 0.70% 0.70% 0.70% 0.70%
6.30% \ 6.30% 6.30% - 6.30% 6.30% 6.30% 6.30% 6.30%
11.79% 11.79% 11.79% 6.30% 6.30% 6.30%
11.79% 11.79% 11.79% 11.79% 11.79% 11.79%
0.25% 0.25% 0.25% 11.79% 11.79%
0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25%
100.00% 99.47% 98.40% 97.33% 96.26% 95.19% 94.12%
100% 93.05% 91.98% 90.91% 89.84%
99% 98% 97% 96% 95% 94% 93% 92% 91% 90%
:~ ~~~~~~~~~~~~~~~2 91:o/
Table D-20 Residual Value-Added After Lossof Capacity--Telephone Lifeline
s-
96
co'

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

0.45% 0.45% 0.44% 0.43% 0.42% 0.41% 0.40%1 0.39% 0.38% 0.37% 0.36%
1.06% 1.05% 1.00% 0.98% 0.96%
0.11% 0.94% 0,91% 0.89% 0.87%/ 0.85%
0.11% 0.10% 0.10% 0.10% 0,10%
3.89% 0.10% 0.09% 0.09% 0.09%
3.87% 3.83% 3.79% 3.75% 3.70% 3.66%
5.52% 3.62%/ 3.58% 3.54% 3.50%
5.49% 5.43% 5.37% 5.32% 5.26% 5.20%
2.41% 5.14% 5.08% 5.03% 4.97%
2.39% 2.35% 2.31% 2.27% 2.24% 2.20%
0.370% 2.16% 2.12% 2.06% 2.05%
0.37% 0.36% 0.36% 0.35% 0.35% 0.34%
0.73% 0.33% 0.33% 0.32% 0.32%
:00 0. 72% 0.71% 0.70% 0.69% 0.67%/ 0.66% 0.65%
0.52% 0.64% 0.63% 0.62%
0.51% 0.50% 0.50% 0.49% 0.4% 0.47%/ 0.46%
0.34% 0.34% 0.45% 0.45% 0.44%
0.33% 0.33% 0.32% 0.31% 0.31% 0.30% 0.30%
0.87%/ 0.87% 0.29% 0.29%
0.86% 0.85% 0.84% 0.8% 0.82% 0.81% 0.80%
1.31% 1.30% 1.28% 0.79% 0.78%
1.26% 1,24% 1.22% 1.20% 1.18% 1.16% 1.14%
til 1.40% 1.39% 1.37% 1.35% 1.33% 1.30% 1.28% 1.26% 1.24% 1.22%
0.96% 0.96% 0.95% 0.94% 0.93% 0.92% 0.91% 0.9% 0.89% 0.88% 0.87%
0 1.03% 1.02% 1.01% 0.99% 0,97% 0.96%
0.12% 0.94% 0.92% 0.91% 0.89% 0.88%
0.12% 0.12% 0.12% 0.12% 0.11% 0.11%
0.62%/ 0.11% 0.11% 0.11% 0.10%
0.61% 0.60% 0.59% 0.58% 0.57% 0.56%
0 1.04% 0,55% 0.54% 0.54% 0.53%
1.03% 1.02% 1.00% 0.98% 0.97%/ 0.95%
1.64% 0.93%/ 0.92% 0.90% 0.88%
1.63% 1.61% 1.60% 1.58% 1.56% 1.5%
1.56% 1,53% 1.5 1% 1.49% 1.48%
1.55% 1.54% 1.52% 1.50% 1.49% 1.47%/
2.52% 1.45% 1.44% 1.42% 1,40%
2.50% 2.46% 2.42% 2.38% 2.34% 2.30%
2.62% 2.26% 2.22%/ 2.18% 2.14%
2.61% 2.58% 2.55% 2.52% 2.49% 2.47% 2.44% 2.41% 2.38% 2.36%
0.68% 0.67 % 0O.65% 0.6% 0.60% 0.58% 0.56% 0,54% 0.52% 0.50% 0.48%
0.69% 0.68% 0,67% 0.66% 0.65% 0.64% 0.63% 0.62% 0.61% 0.60% 0.58%
3.46 3.41% 3.30% 3,19% 3.08% 2.97%/ 2.86% 2.75% 2.64% 2.53% 2.42%
5.89% 5.79%
a 5.63%/ 5,49%
5.61%
5.19%
5.42%
4.89%
5.24%
4.60%
5.05%
4.30%
4.86% 4.68% 4.49% 4.31% 4.12%
C 4.00% 3.71% 3.4 1% 2.82%
5.63% 5.49% 5.19% 4.89% 4.60% 4.30% 4.00% 3.71%O/ 3,41% 2.82%
16.64% 16.12% 15.07% 14.01% 12.96% 11.91% 1086 9.81% 8.76% 7.71% 6.66%
8.03% 7.86% 7.52% 7.19% 6,85% 6.51% 6.17% 5.83% 5.49% 5.16% 4.82%
2.12% 2.08% 1.99% 1.90% 1.81% 1.72%/ 1.63% 1.54% 1,45% 1.36% 1.27%
1.09% 1.07% 1.03% 0.98% 0.93% 0.89% 0.84% 0.80% 0.75%/ 0.70% 0.66%
0.70% 0.68% 0.6% 0.62% 0.59% 0.56% 0.54% 0.51% 0.48% 0.45% 0.42%
6.30%o 6.25% 6.15% 6.05% 5.95% 5.85% 5.75% 5.65% 5.55% 5.45% 5.35%
11.79% 11.67% 11.42% 11.17% 10.92% 10.67% 10.43% 10.18% 9.93% 9.68% 9.43%
0.25% 0.25% 0.24% 0.24% 0.23% 0.23% 0.22% 0.22% 0.21% -0.21% 0.20%
100.00%/ 98.38% 95. 14% 91 .91% 88,67% 85.43% 82,20% 78.96% 75.72% 72.48% 69.25%
100% 98% 95% 92% 89% 85% 82% 79%/ 78% 72% 69%

I
ID

a,

.
E

PercentUfelineAvailibility

Figure D-1 Residual Value Added as a Function of Oil Supply Lifeline Residual Capacity.
NaturalGas Supply Ufeline
..
_ . __

,_ ..

0.9 -
.- --- M

0.8 - -.- a
0.7 -
M
i: 0.6 -
C
0
0.5-

CI
S 0.4 -

0.3 -

0.2 -

0.1 -

0 -
0* 20 40 60 80 100

PercentUfelineAvailibilily

Figure D-2 Residual Value Added as a Function of Natural Gas Supply Lifeline Residual Capacity.

Data ATC-25
428 Appendix D: Economic Analysis
428 Appendix D:Economic Analysis Data ATC-25
TelephoneLifeline
1 -
.- U --
--- E-
It---

O. - a-U--
- ,--
0.7 -
-j0
V

' 0. -
a

0.5-
0
; 0.4 -
E

0.3 -

0.2 -

0.1 - I
I
I
0- I - --r-T- -F- -. 1

0 0.2 0.4 0.6 0.8

PercentLifelineAvailibifity

Figure D-3 Residual Value Added as a Function of Telephone Lifeline Residual Capacity.
Air TransportLifeline

0.94

0.8 -

0.7

o
c. 04.6 1
0.5

CL 0.4-
E
03

0.2 J.

0 -1 I I I . - --
0 0.2 0.4 0.6 08

PercentLifelineAvailibility

Figure D-4 Residual Value Added as a Function of Air Transportation Lifeline Residual Capacity.

ATC-25 Appendix D: Economic Analysis Data 429


WaterSupply Ufeline
- -0-- =-.
il ---

0.9
M-- --

0.8 'M-

0.7- -

0.6-
1
-3 0.5-
ao I
I
a 0.4 I
E

0.3-
0.2 i :

-0.1
0 i

0 20 40 60 80 101
0

PercentUfelineAvailibility

Figure D-5 Residual Value Added as a Function of Water Supply Lifeline Residual Capacity.

.ElectricitySupply Ufeline
I~~~~~~~~~~~.

0.9

0.8 -U

0.7
0

0.6-
w
0.5
a,
0.
Es 0.4
E
0.3 -

0.2 -.

o. j
O0

0 20 40 60 80 100
PercentUfelineAvailibility

Figure D-6 Residual Value Added as a Function of Electric Lifeline Residual Capacity.

430 Appendix D: Economic Analysis DataA ATC-25


HighwaysLifeline
1- - I - ~. - . ,-. ,
U
l
I-
V.9 -

C.Z- MU-

0.7 -
WU-.
C.6 -
G 0.5-
.5 -
D; ------ U-'

0.2 -

0.1 -

n
U; - . - - I - I I ft I

C 20 40 130 so
PercentUfelineAvailibiilly

Figure D-7 Residual Value Added as a Function of Highway Lifeline Residual Capacity.

RailroadUfLeine
1 - -UM -
-
-

0.9 U.- -07- ---

0. -1

0.7 -
a

'a 0. -
z

j-

0.4 -
CF

0.3 -

C.2'

C1'

-I
4_ -- 7 _ - j-i I Ir-I
1 I i 1

.1.
0 20 40 60 80 1C4

Percent UfelineAvaifibility

Figure D-8S Residual Value Added as a Function of Railroad Lifeline Residual Capacity.

Analysis Data 431


ATC-25
ATC'25 Appendix D: Economic
Appendix D: Economic Analysis Data 431
- WasteWater Lifeline _. _ _ __ _ _,_Z
1
1
_ O_
_ _ _ . _ _ _ _ _ _ _

__-
. _--
0.9 -
UI.-
0.8 - -U

aU--

0.7 -

11O
0.6 -

_0
U:
0.5 -

EB
0
0.4 -

0.3

0.2 -

0.1 --
I
I
11
u - I I oI I - I I

0 20 40 60 . 80 i .1 00

PercentLifelineAvailibility

Figure D-9 Residual Value Added as a Function of Sanitary Sewer Lifeline Residual Capacity.

Analysis Data ATC-25


432
432 D: Economic
Appendix D:
Appendix Economic Analysis Data ATC-25
Appendix E: Applied Technology Council
Projects and Report Information
One of the primary purposes of Applied Disaster Mitigation. Available through the
Technology Council is to develop resource ATC office. (270 Pages)
documents that translate and summarize useful
information to practicing engineers. This Abstract: This study evaluated the
includes the development of guidelines and applicability and cost of the response
manuals, as well as the development of research spectrum approach to seismic analysis and
recommendations for specific areas determined design that was proposed by various
by the profession. ATC is not a code segments of the engineering profession.
development organization, although several of Specific building designs, design
the ATC project reports serve as resource procedures and parameter values were
documents for the development of codes, evaluated for future application. Eleven
standards and specifications. existing buildings of varying dimensions
were redesigned according to the
Applied Technology Council conducts projects procedures.
that meet the following criteria:
ATC-3: The report, Tentative Provisionsfor the
1. The primary audience or benefactor is Developmentof SeismicRegulationsfor
the design practitioner in structural Buildings (ATC-3-06),iwas funded by NSF and
engineenng. NBS. The second printing of this report, which
included proposed amendments, is available
2. A cross section or consensus of through the ATC office. (505 pages plus
engineering opinion is required to be proposed amendments)
obtained and presented by a neutral
source. Abstract: The tentative provisions in this
document represent the result of a
3. ATC is requested to conduct the project concerted effort by a multi-disciplinary
by the project sponsor. team of 85 nationally recognized experts
in earthquake engineering. The project
A brief description of several major completed involved representation from all sections
projects and reports, is given in the following of the United States and had wide review
section. Funding for projects is obtained from by affected building industry and
government agencies and tax-deductible regulatory groups. The provisions
contributions from the private sector. embodied several new concepts that were
significant departures, from existing
ATC-1: This project resulted in five papers seismic design provisions. The second
which were published as part of Building printing of this document contains
Practices for Disaster Mitigation, Building proposed amendments prepared by a joint
Science Series, 46, proceedings of a workshop committee of the Building Seismic Safety
sponsored by the National Science Foundation Council (BSSC) and the NBS; the
(NS$) and the National Bureau of Standards proposed amendments were published
(NBS). Available through the National separately by BSSC and NBS in 1982.
Technical Information Service (NTiS), 5285
Port Royal Road, Springfield, VA 22151, as ATC-3-2: The project, Comparative Test
NTIS report No. COM-73-50188. Designs of Buildings Using ATC-3-06 Tentative
Provisions, was funded by NSF. The project
ATC-2: The report, An Evaluationof a consisted of a study to develop and plan a
Response Spectm Approach to Seismic Design program for making comparative test designs of
of Buildings, was funded by NSF and NBS and the ATC-3-06 Tentative Provisions. The project
was conducted as part of the Cooperative report was written to be used by the Building
Federal Program in Building Practices for

433
E:ATC Information
Appendix E: 43
ATC-25
ATC-25 Appendix ATC Information
Seismic Safety Council in its refinement of the Development (HUD). Availablethrough the
ATC-3-06 Tentative Provisions. ATC office. (576 pages)

ATC-3-4: The report, Redesign of Three Abstract: This report presents the results
Multistory Buildings: A Comparison UsingATC- of an in-depth effort to develop design
3-06 and 1982 Uniform Building Code Design and construction details for single-family
Provisions, was published under a grant from residencesthat minimizethe potential
NSF. Available through the ATC office. (112 economic loss and life-loss risk associated
pages) with earthquakes. The report: (1)
discussed the ways structures behave
Abstract: This report evaluates the cost when subjected to seismic forces, (2) sets
and technical impact of using the 1978 forth suggested design criteria for
ATC-3-06 report, Tentative Provisionsfor conventional layouts of dwellings
the Developmentof SeismicRegulations constructed with conventional materials,
for Buildings, as amended by a joint (3) presents construction details that do
committee of the Building Seismic Safety not require the designer to perform
Council and the National Bureau of analytical calculations, (4) suggests
Standards in 1982. The evaluations are procedures for efficient plan-checking,
based on studies of three existing and (5) present recommendations
California buildings redesigned in including details and schedules for use in
accordance with the ATC-3-06 Tentative the field by construction personnel and
Provisions and the 1982 Uniform Building building inspectors.
Code. Included in the report are
recommendations to code implementing ATC-4-1:The report, The Home BuildersGuide
bodies. for Earthquake Design, was published under a
contract with HUD. Available through the
ATC-3-5: This project, Assistance for First ATC office. (57 pages)
Phase of ATC-3-06 Trial Design Program Being
Conducted by the Building Seismic Safety Abstract: This report is a 57-page
Council, was funded by the Buildings Seismic abridged version of the ATC-4 report.
Safety Council and provided the services of the The concise, easily understood text of the
ATC Senior Consultant and other ATC Guide is supplemented with illustrations
personnel to assist the BSSC in the conduct of and 46 construction details. The details
the first phase of its Trial Design Program. The are provided to ensure that houses
first phase provided for trial designs conducted contain structural features which are
for buildings in Los Angeles, Seattle, Phoenix, properly. positioned, dimensioned and
and Memphis. constructed to resist earthquake forces. A
brief description is included on how
ATC-3-6: This project, Assistance for Second earthquake forces impact on houses and
Phase of ATC-3-06 Trial Design Program Being some precautionary constraints are given
Conducted by the Building Seismic Safety with respect to site selection and
Council, was funded by the Building Seismic architectural designs.
Safety Council and provided the services of the
ATC Senior Consultant and other ATC ATC-5: The report, Guidelines for Seismic
personnel to assist the BSSC in the conduct of Designand Constructionof Single-StoryMasonry
the second phase of its Trial Design Program. Dwellings in Seismic Zone 2, was developed
The second phase provided for trial designs under a contract with HUD. Available through
conducted for buildings in New York, Chicago, the ATC office. (38 pages)
St. Louis, Charleston, and Fort Worth.
Abstract: The report offers a concise
ATC-4: The report, A Methodology for Seismic methodology for the earthquake design
Designand Constructionof Single-Family and construction of single-story masonry
Dwellings, was published under a contract with dwellings in Seismic Zone 2 of the United
the Department of Housing and Urban States, as defined by the 1973 Uniform

ATC-25
Appendix E: ATC Informcxllon
434
434 Appendix E:ATC Information ATC-25
Building Code. The guidelines are based nationally recognized experts that
in part on shaking table tests of masonry included consulting engineers, academics,
construction conducted at the University state highway engineers, and federal
of California at Berkeley Earthquake agency representatives. The Guidelines,
EngineeringResearch Center. The applicable for use in all parts of the U.S.,
report is written in simple language and include a preliminary screening
includes basic house plans, wall procedure, methods for evaluating an
evaluations, detail drawings, and material existing bridge in detail, and potential
specifications. retrofitting measures for the most
common seismic deficiencies. Also
ATC-6: The report, Seismic Design Guidelines included are special design requirements
for HighwayBridges, was published under a for various retrofitting measures.
contract with the Federal Highway
Administration (FHWA). Available through ATC-7: The report, Guidelinesfor the Designof
the ATC office. (210 pages) Horizontal Wood Diaphragms, was published
under a grant from NSF. Available through the
Abstract: The Guidelines are the ATC office. (190 pages)
recommendations of a team of sixteen
nationally recognized experts that Abstract: Guidelines are presented for
included consulting engineers, academics, designing roof and floor systems so these
state and federal agency representatives can function as horizontal diaphragms in a
from throughout the United States. The lateral force resisting system. Analytical
Guidelines embody several new concepts procedures, connection details and design
that are significantdepartures from examples are included in the Guidelines.
existing design provisions. An extensive
commentary and an example ATC-7-1:The report, Proceedingsof a
demonstrating the use of the Guidelines Workshopof Designof HorizontalWood
are included. A draft of the Guidelines Diaphragms, was published under a grant from
was used to seismically redesign 21 bridges NSF. Available through the ATC office. (302
and a summary of the redesigns is also pages)
included.
Abstract: The report includes seven
ATC-6-1: The report, Proceedingsof a papers on state-of-the-practice and two
Workshopon EarthquakeResistanceof Highway papers on recent research. Also included
Bridges, was published under a grant from NSF. are recommendations for future research
Available through the ATC office. (625 pages) that were developed by the 35
participants.
Abstract: The report includes 23 state-of-
the-art and state-of-practice papers on ATC-8: This report, Proceedings of a Workshop
earthquake resistance of highway bridges. on the Designof PrefabricatedConcreteBuildings
Seven of the twenty-three papers were for Earthquake Loads, was funded by NSF.
authored by participants from Japan, New Available through the ATC office. (400 pages)
Zealand and Portugal. The Proceedings
also contain recommendations for future Abstract: The report includes eighteen
research that were developed by the 45 state-of-the-art papers and six summary
workshop participants. papers. Also included are
recommendations for future research that
ATC-6-2: The report, Seismic Retrofitting were developed by the 43 workshop
Guidelines for Highway Bridges, was,published participants.
under a contract with FHWA. Available
through the ATC office. (220 pages) ATC-9:The report,An Evaluation of the
ImperialCountySenwicesBuildingEarthquake
Abstract: The Guidelines are the Response and Associated Damage, was published
recommendations of a team of thirteen

435
ATC-25 Appendix E: ATC Information
ATUC-25 Appendix E: ATC Information 435
under a grant from NSF. Available through the ATC-11: The report, Seismic Resistance of
ATC office. (231 pages) ReinforcedConcreteShear Wallsand Frame
Joints: Implicationsof Recent Researchfor
Abstract: The report presents the results Design Engineers, was published under a grant
of an in-depth evaluation of the Imperial from NSF. Available through the ATC office.
County Services Building, a 6-story (184 pages)
reinforced concrete frame and shear wall
building severely damaged by the October Abstract: This document presents the
15, 1979 Imperial Valley, California, results of an in-depth review and synthesis
earthquake. The report contains a review of research reports pertaining to cyclic
and evaluation of earthquake damage to loading of reinforced concrete shear walls
the buildings; a review and evaluation of and cyclic loading of joint reinforced
the seismic design; a comparison of the concrete frames. More than 125 research
requirements of various building codes as reports published since 1971 are reviewed
they relate to the building; and and evaluated in this report. The
conclusions and recommendations preparation of the report included a
pertaining to future building code consensus process involving numerous
provisions and future research needs. experienced design professionals from
throughout the United States. The report
ATC-10: This report, An Investigationof the contains reviews of current and past
CorrelationBetweenEarthquake Ground Motion design practices, summaries of research
and BuildingPerformance,was funded by the developments, and in-depth discussions of
U.S. Geological Survey (USGS). Available design implications of recent research
through the ATC office. (114 pages) results.

Abstract: The report contains an in-depth ATC-12: This report, Comparison of United
analyticalevaluationof the ultimate or States and New Zealand Seismic Design Practices
limit capacity of selected representative for Highway Bridges, was published under a grant
building framing types, a discussion of the from NSF. Available through the ATC office.
factors affecting the seismic performance (270 pages)
of buildings, and a summary and
comparison of seismic design and seismic Abstract: The report contains summaries
risk parameters currently in widespread of all aspects and innovative design
use. procedures used in New Zealand as well
as comparison of United States and New
ATC-10-1: This report, CiticalAspects of Zealand design practice. Also included
Earthquake Ground Motion and Building are research recommendations developed
Damage Potential, was co-funded by the USGS at a 3-day workshop in New Zealand
and the NSF. Available through the ATC attended by 16 U.S. and 35 New Zealand
office. (259 pages) bridge design engineers and researchers.

Abstract: This document contains 19 ATC-12-1: This report, Proceedings of Second


state-of-the-art papers on ground motion, Joint U.S.-NewZealand Workshopon Seismic
structural response, and structural design Resistance of Highway Bridges, was published
issues presented by prominent engineers under a grant from NSF. Available through the
and earth scientists in an ATC seminar. ATC office. (272 pages)
The main theme of the papers is to
identify the critical aspects of ground Abstract: This report contains written
motion and building performance that versions of the papers presented at this
currently are not being considered in 1985 Workshop as well as a list and
building design. The report also contains prioritization of workshop
conclusions and recommendations of recommendations. Included are
working groups convened after the summaries of research projects currently
Seminar. being conducted in both countries as well

ATC-25
Appendix E: ATC Information
436
436 Appendix E: ATC Information ATC-25
; I . L
as state-of-the-practice papers on various Abstract: The report contains detailed
aspects of design practice. Topics technical papers describing current design
discussed include bridge design practicesin the United States and Japan
philosophy and loadings; design of as well as recommendations emanating
columns, footings, piles, abutments and from a joint U.S.-Japan workshop held in
retaining structures; geotechnical aspects Hawaii in March, 1984. Included are
of foundation design; seismic analysis detailed descriptions of new seismic
techniques; seismic retrofitting; case design methods for buildings in Japan and
studies using base isolation; strong-motion case studies of the design of specific
data acquisition and interpretation; and buildings(in both countries). The report
testing of bridge components and bridge also contains an overview of the history
systems. and objectivesof the Japan Structural
Consultants Association.
ATC-13: The report, EarthquakeDamage
EvaluationData for California,was developed ATC-15-1:The report, Proceedingsof Second
under a contract with the Federal Emergency U.S.-JapanWorkshopon Improvement of
Management Agency (FEMA). Available Building Seismic Design and Construction
through the ATC office. (492 pages) Practices,was,published under a grant from
NSF. Available through the ATC office. (412
Abstract: This report presents expert- pages)
opinion earthquake damage and loss
estimates. for existing industrial, Abstract: This report contains 23
commercial, residential utility and technical papers presented at this San
transportation facilities in California. Francisco workshop in August, 1986, by
Included are damage probability matrices practitioners and researchers from the
for 78 classes of structures and estimates U.S. and Japan. Included are state-of-
of time required to restore damaged the-practice papers and case studies. of
facilitiesto pre-earthquake usability. The actual building designs and information
report also describes the inventory on regulatory, contractual, and licensing
information essential for estimating issues.
economic losses and the methodology
used to develop the required data. ATC-15-2:The report, Proceedingsof Third
U S.-JapanWorkshopon Improvement of
ATC-14: The report, Evaluatingthe Seismic BuildingStructuralDesignand Construction
Resistance of Existing Buildings, was developed Practices,was published jointly by TAC and the
under a grant from the NSF. Available through Japan Structural Consultants, Association.
the ATC office. (370 pages) Available through the ATC office.

Abstract: This report, written for Abstract: This report contains 21


practicing structural engineers, describes a technical papers presented at this Tokyo,
methodology for performing preliminary Japan, workshop in July, 1988, by
and-etailed building seismic evaluations. practitioners and researchers from the
The report contains a state-of-practice U.S., Japan, China, and New Zealand.
review; seismic loading criteria; data Included are state-of-the-practice papers,
collection procedures; a detailed on various topics, including braced steel
description of the building classification frame buildings, beam-column joints in
system; preliminary and detailed analysis reinforced concrete buildings, summaries.
procedures; and example case studies, of comparative U. S. and Japanese design,
including non-structural considerations. and base isolation and passive energy
dissipation devices.
ATC-15: This report, Comparison of Seismic
DesignPracticesin the UnitedStates and Japan, ATC-16: This project, Development of a 5-Year
was published under a grant from NSF. Plan for Reducing the Earthquake Hazards
Available through the ATC office. (317 pages) Posed by Existing Nonfederal Buildings, was

437
ATC-25 Appendix Information
E: ATC Information 437
funded by FEMA and was conducted by a joint engineers and building inspectors, the
venture of ATC, the Building Seismic Safety report includes rapid and detailed
Council and the Earthquake Engineering evaluation procedures for inspecting
Research Institute. The project involved a buildings and posting them as "inspected"
workshop in Phoenix, Arizona, where (apparently safe), "limited entry" or
approximately 50 earthquake specialists met to "unsafe". Also included are special
identify the major tasks and goals for reducing procedures for evaluation of essential
the earthquake hazards posed by existing buildings (e.g., hospitals), and evaluation
nonfederal buildings nationwide. The plan was procedures for nonstructural elements,
developed on the basis of nine issue papers and geotechnical hazards.
presented at the workshop and workshop
working group discussions. The Workshop ATC-20-1: The report, Field Manual:
Proceedings and Five-Year Plan are available PostearthquakeSafetyEvaluationof Buildings,
through the Federal Emergency Management was developed under a contract from OES and
Agency, 500 "C" Street, S.W., Washington, DC OSHPD. Available through the ATC office
20472. (114 pages)

ATC-17: This report , Proceedingsof a Seminar Abstract: This report, a companion Field
and Workshopon Base Isolation and Passive Manual for the ATC-20 report,
Energy Dissipation, was published under a grant summarizes the postearthquake safety
from NSF. Available through the ATC office. evaluation procedures in brief concise
(478 pages) format designed for ease of use in the
field.
Abstract: The report contains 42 papers
describing the state-of-the-art and state- ATC-21: The report, Rapid Visual Screening of
of-the-practice in base-isolation and Buildingsfor PotentialSeismicHazards:A
passive energy-dissipation technology. Handbook, was developed under a contract
Included are papers describing case from FEMA. Available through the ATC
studies in the United States, applications office. (185 pages)
and developments worldwide, recent
innovations in technology development, Abstract: This report describes a rapid
and structural and ground motion issues. visual screening procedure for identifying
Also included is a proposed 5-year those buildings that might pose serious
research agenda that addresses the risk of loss of life and injury, or of severe
following specific issues: (1) strong curtailment of community services, in case
ground motion; (2) design criteria; (3) of a damaging earthquake. The screening
materials, quality control, and long-term procedure utilizes a methodology based
reliability; (4) life cycle cost methodology; on a "sidewalk survey" approach that
and (5) system response. involves identification of the primary
structural load resisting system and
ATC-20: The report, Proceduresfor building materials, and assignment of a
PostearthquakeSafety Evaluationof Buildings, basic structural hazards score and
was developed under a contract from the performance modification factors based
California Office of Emergency Services (OES), on observed defects. Application of the
California Office of Statewide Health Planning methodology identifies those buildings
and Development (OSHPD) and FEMA. that are potentially hazardous and should
Available through the ATC office (152 pages) be analyzed in more detail by a
professional engineer experienced in
Abstract: This report provides seismic design.
procedures and guidelines for making on-
the-spot evaluations and decisions ATC-21-1: The report, Rapid Visual Screening
regarding continued use and occupancy of of Buildingsfor PotentialSeismicHazards:
earthquake damaged buildings. Written Supporting Documentation, was developed
specifically for volunteer structural

438 Appendix E: ATC Information T


ATC-25, i
under a contract from FEMA. Available was developed under a contact from FEMA.
through the ATC office. (137 pages) Available througWthe ATC office. (160 pages)

Abstract: Included in this report are (1) a Abstract: Includ in this report, a
review and evaluation of existing companion volume t the ATC-22 report,
procedures; (2) a listing of attributes are (1) a review and evaluation of existing
considered ideal for a rapid visual buildings seismic evaluation
screening procedures; and (3) a technical methodologies; (2) results from field tests
discussion of the recommended rapid of the ATC-14 methodology; and (3)
visual screening procedure that is summaries of evaluations of ATC-14
documented in the ATC-21 report. conductedby the National Center for
Earthquake Engineering Research (State
ATC-21-2: The report, EarthquakeDamaged University of New York at Buffalo) and
Buildings:An Overviewof HeavyDebrisand the City of San Francisco.
Victim Extrication, was developed under a
contract from FEMA. Available through the
ATC office. (95 pages)

Abstract: Included in this report, a


companion volume to the ATC-21 and
ATC-21-1 reports, is state-of-the-art
informationon (1) the identificationof
those buildings that might collapse and
trap victims in debris or generate debris of
such a size that its handling would require
special or heavy lifting equipment; (2)
guidance in identifying these types of
buildings, on the basis of their major
exterior features, and (3), the types and
life capacities of equipment required to
remove the heavy portion of the debris
that might result from the collapse of such
buildings.

ATC-22: The report, A Handbookfor Seismic


Evaluationof ExistingBuildings(Preliminary),
was developed under a contract from FEMA.
Available through the ATC office. (169 pages)

Abstract: This handbook provides


methodology for seismic evaluation of
existing buildings of different tpes and
occupancies in areas of different
seismicitythroughout the United States.
The methodology, which has been field
tested in several programs nationwide,
utilizes the information and procedures
developed fog and documented in the
ATC-14 report. The handbook includes
checklists, diagrams, and sketches
desigpqd to assist the user.

ATC-22-1: The report, Seismic Evaluationof


Exising Buildings:SupportingDocumentation, *U.S. GOVE?ŽTENT
PRINTINGOFFMCE:1998-61a-146/90604

439
ATC-25
ATC-25 Appendix E: ATC Jnlormalion
Aplendix E: ATC Information 439

You might also like