Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 4,2 Tons Load occurs at ................................................... Jun 1700
Total coil load .......................................................... 50,6 MBH OA DB / WB ...................................................... 83,9 / 73,1 °F
Sensible coil load ................................................... 35,8 MBH Entering DB / WB ............................................. 75,1 / 64,3 °F
Coil CFM at Jun 1700 ........................................... 1963 CFM Leaving DB / WB .............................................. 56,2 / 55,2 °F
Max block CFM ..................................................... 1963 CFM Coil ADP ..................................................................... 54,1 °F
Sum of peak zone CFM ........................................ 1963 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,708 Resulting RH ................................................................. 55 %
CFM/Ton ............................................................... 465,5 Design supply temp. ................................................... 54,0 °F
ft²/Ton ................................................................... 127,6 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ............................................................. 94,1 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise .................................... 10,13 gpm
Actual max CFM .................................................... 1963 CFM Fan motor BHP ........................................................... 0,27 BHP
Standard CFM ....................................................... 1753 CFM Fan motor kW ............................................................. 0,21 kW
Actual max CFM/ft² ................................................. 3,65 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT8 Oficina 1 1 34,1 Dec 1600 1963 2,7 538,0 3,65
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,016
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23
4 0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 2,6 Tons Load occurs at ................................................... Aug 1700
Total coil load .......................................................... 30,8 MBH OA DB / WB ...................................................... 84,9 / 73,2 °F
Sensible coil load ................................................... 21,9 MBH Entering DB / WB ............................................. 75,5 / 64,0 °F
Coil CFM at Aug 1700 ........................................... 1114 CFM Leaving DB / WB .............................................. 55,1 / 54,1 °F
Max block CFM ...................................................... 1114 CFM Coil ADP ..................................................................... 52,9 °F
Sum of peak zone CFM ......................................... 1114 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,713 Resulting RH ................................................................. 52 %
CFM/Ton ............................................................... 434,3 Design supply temp. ................................................... 54,0 °F
ft²/Ton .................................................................... 113,0 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ........................................................... 106,2 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise ...................................... 6,16 gpm
Actual max CFM .................................................... 1114 CFM Fan motor BHP ........................................................... 0,15 BHP
Standard CFM ......................................................... 995 CFM Fan motor kW ............................................................. 0,12 kW
Actual max CFM/ft² ................................................. 3,84 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT8 Oficina 2 1 19,3 Mar 1700 1114 1,1 290,0 3,84
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,016
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23 4
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 2,2 Tons Load occurs at ................................................... Sep 1600
Total coil load .......................................................... 26,2 MBH OA DB / WB ...................................................... 84,4 / 72,7 °F
Sensible coil load ................................................... 18,4 MBH Entering DB / WB ............................................. 75,6 / 64,0 °F
Coil CFM at Sep 1600 ............................................. 924 CFM Leaving DB / WB .............................................. 54,9 / 53,9 °F
Max block CFM ....................................................... 924 CFM Coil ADP ..................................................................... 52,6 °F
Sum of peak zone CFM .......................................... 924 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,705 Resulting RH ................................................................. 52 %
CFM/Ton ............................................................... 423,6 Design supply temp. ................................................... 54,0 °F
ft²/Ton ...................................................................... 96,7 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ........................................................... 124,0 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise ...................................... 5,24 gpm
Actual max CFM ...................................................... 924 CFM Fan motor BHP ........................................................... 0,13 BHP
Standard CFM ......................................................... 825 CFM Fan motor kW ............................................................. 0,10 kW
Actual max CFM/ft² ................................................. 4,38 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT8 Oficina 3 1 16,0 Mar 1700 924 0,9 211,0 4,38
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,016
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23 4
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 2,2 Tons Load occurs at ................................................... Sep 1600
Total coil load .......................................................... 26,2 MBH OA DB / WB ...................................................... 84,4 / 72,7 °F
Sensible coil load ................................................... 18,4 MBH Entering DB / WB ............................................. 75,6 / 64,0 °F
Coil CFM at Sep 1600 ............................................. 924 CFM Leaving DB / WB .............................................. 54,9 / 53,9 °F
Max block CFM ....................................................... 924 CFM Coil ADP ..................................................................... 52,6 °F
Sum of peak zone CFM .......................................... 924 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,705 Resulting RH ................................................................. 52 %
CFM/Ton ............................................................... 423,6 Design supply temp. ................................................... 54,0 °F
ft²/Ton ...................................................................... 96,7 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ........................................................... 124,0 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise ...................................... 5,24 gpm
Actual max CFM ...................................................... 924 CFM Fan motor BHP ........................................................... 0,13 BHP
Standard CFM ......................................................... 825 CFM Fan motor kW ............................................................. 0,10 kW
Actual max CFM/ft² ................................................. 4,38 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT8 Oficina 4 1 16,0 Mar 1700 924 0,9 211,0 4,38
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,016
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23 4
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 4,4 Tons Load occurs at ................................................... Jun 1600
Total coil load .......................................................... 52,9 MBH OA DB / WB ...................................................... 85,4 / 73,7 °F
Sensible coil load ................................................... 38,8 MBH Entering DB / WB ............................................. 75,6 / 63,9 °F
Coil CFM at Jun 1600 ........................................... 2004 CFM Leaving DB / WB .............................................. 55,6 / 54,5 °F
Max block CFM ..................................................... 2004 CFM Coil ADP ..................................................................... 53,3 °F
Sum of peak zone CFM ........................................ 2004 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,732 Resulting RH ................................................................. 52 %
CFM/Ton ............................................................... 454,4 Design supply temp. ................................................... 54,0 °F
ft²/Ton ................................................................... 124,7 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ............................................................. 96,2 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise .................................... 10,59 gpm
Actual max CFM .................................................... 2004 CFM Fan motor BHP ........................................................... 0,27 BHP
Standard CFM ....................................................... 1790 CFM Fan motor kW ............................................................. 0,22 kW
Actual max CFM/ft² ................................................. 3,64 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT8 Oficina 5 1 34,8 Jun 1600 2004 2,9 550,0 3,64
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,016
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23 4
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 4,6 Tons Load occurs at ................................................... Jun 1500
Total coil load .......................................................... 55,6 MBH OA DB / WB ...................................................... 86,0 / 74,0 °F
Sensible coil load ................................................... 41,1 MBH Entering DB / WB ............................................. 75,7 / 63,7 °F
Coil CFM at Jun 1500 ........................................... 2079 CFM Leaving DB / WB .............................................. 55,2 / 54,1 °F
Max block CFM ..................................................... 2079 CFM Coil ADP ..................................................................... 52,9 °F
Sum of peak zone CFM ........................................ 2079 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,739 Resulting RH ................................................................. 51 %
CFM/Ton ............................................................... 448,8 Design supply temp. ................................................... 53,8 °F
ft²/Ton ................................................................... 160,4 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ............................................................. 74,8 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise .................................... 11,12 gpm
Actual max CFM .................................................... 2079 CFM Fan motor BHP ........................................................... 0,28 BHP
Standard CFM ....................................................... 1856 CFM Fan motor kW ............................................................. 0,23 kW
Actual max CFM/ft² ................................................. 2,80 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT8 Oficina 6 1 36,5 Jun 1500 2079 3,1 743,0 2,80
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,016
2 0,012
34 5
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23
4 0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 1,7 Tons Load occurs at ................................................... Aug 1500
Total coil load .......................................................... 20,0 MBH OA DB / WB ...................................................... 87,0 / 74,0 °F
Sensible coil load ................................................... 14,1 MBH Entering DB / WB ............................................. 76,1 / 65,1 °F
Coil CFM at Aug 1500 ............................................. 770 CFM Leaving DB / WB .............................................. 57,2 / 56,2 °F
Max block CFM ....................................................... 770 CFM Coil ADP ..................................................................... 55,0 °F
Sum of peak zone CFM .......................................... 770 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,703 Resulting RH ................................................................. 56 %
CFM/Ton ............................................................... 461,3 Design supply temp. ................................................... 54,0 °F
ft²/Ton ................................................................... 126,3 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ............................................................. 95,0 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise ...................................... 4,01 gpm
Actual max CFM ...................................................... 770 CFM Fan motor BHP ........................................................... 0,11 BHP
Standard CFM ......................................................... 688 CFM Fan motor kW ............................................................. 0,08 kW
Actual max CFM/ft² ................................................. 3,65 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT8 Oficina 7 1 13,4 Mar 1000 770 0,9 211,0 3,65
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,016
5
0,012
34
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23 4
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 1,9 Tons Load occurs at ................................................... Aug 1500
Total coil load .......................................................... 22,6 MBH OA DB / WB ...................................................... 87,0 / 74,0 °F
Sensible coil load ................................................... 15,1 MBH Entering DB / WB ............................................. 76,7 / 65,7 °F
Coil CFM at Aug 1500 ............................................. 794 CFM Leaving DB / WB .............................................. 56,9 / 55,9 °F
Max block CFM ....................................................... 794 CFM Coil ADP ..................................................................... 54,7 °F
Sum of peak zone CFM .......................................... 794 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,671 Resulting RH ................................................................. 57 %
CFM/Ton ............................................................... 422,3 Design supply temp. ................................................... 54,0 °F
ft²/Ton .................................................................... 112,2 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ........................................................... 106,9 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise ...................................... 4,51 gpm
Actual max CFM ...................................................... 794 CFM Fan motor BHP ........................................................... 0,11 BHP
Standard CFM ......................................................... 709 CFM Fan motor kW ............................................................. 0,09 kW
Actual max CFM/ft² ................................................. 3,76 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT8 Oficina 8 1 13,8 Mar 1000 794 0,9 211,0 3,76
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,016
5 0,012
34
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23 4
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 1,1 Tons Load occurs at ................................................... Nov 1500
Total coil load .......................................................... 13,4 MBH OA DB / WB ...................................................... 80,0 / 71,0 °F
Sensible coil load ..................................................... 9,7 MBH Entering DB / WB ............................................. 74,7 / 63,9 °F
Coil CFM at Nov 1500 ............................................. 547 CFM Leaving DB / WB .............................................. 56,2 / 55,3 °F
Max block CFM ....................................................... 547 CFM Coil ADP ..................................................................... 54,2 °F
Sum of peak zone CFM .......................................... 547 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,726 Resulting RH ................................................................. 54 %
CFM/Ton ............................................................... 489,3 Design supply temp. ................................................... 54,0 °F
ft²/Ton ................................................................... 134,2 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ............................................................. 89,4 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise ...................................... 2,68 gpm
Actual max CFM ...................................................... 547 CFM Fan motor BHP ........................................................... 0,07 BHP
Standard CFM ......................................................... 488 CFM Fan motor kW ............................................................. 0,06 kW
Actual max CFM/ft² ................................................. 3,65 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT8 Oficina 9 1 9,5 Dec 1400 547 0,9 150,0 3,65
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23 4
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 3,6 Tons Load occurs at ................................................... Aug 1500
Total coil load .......................................................... 42,8 MBH OA DB / WB ...................................................... 87,0 / 74,0 °F
Sensible coil load ................................................... 26,7 MBH Entering DB / WB ............................................. 78,6 / 67,1 °F
Coil CFM at Aug 1500 ........................................... 1263 CFM Leaving DB / WB .............................................. 56,6 / 55,7 °F
Max block CFM ..................................................... 1263 CFM Coil ADP ..................................................................... 54,2 °F
Sum of peak zone CFM ........................................ 1263 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,625 Resulting RH ................................................................. 56 %
CFM/Ton ............................................................... 354,5 Design supply temp. ................................................... 55,0 °F
ft²/Ton ................................................................... 226,5 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ............................................................. 53,0 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise ...................................... 8,56 gpm
Actual max CFM .................................................... 1263 CFM Fan motor BHP ........................................................... 0,17 BHP
Standard CFM ....................................................... 1128 CFM Fan motor kW ............................................................. 0,14 kW
Actual max CFM/ft² ................................................. 1,57 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
PT8 Pasillo de Circulaci 1 20,7 Mar 1000 1263 0,3 807,0 1,57
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,016
5
0,012
34
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23 4
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )