2 D E S I G N P H A S E

PROJECT CONTRACT DOCUMENT


A DEFINITION PHASE D PHASE
DEFINITION OF REQUIREMENTS OF THE PROJECT PREPARATION OF COMPLETE CONTRACT
DOCUMENTS CONSITING OF DETAILED DESIGNS
AND CONSTRUCTION DRAWINGS; 7 SETS OF ALL
CONSTRUCTION DRAWINGS AND TECHNICAL
SCHEMATIC
B
SPECIFICATIONS FOR PURPOSES OF OBTAINING
DESIGN PHASE BUILDING PERMIT

PREPARATION OF SCHEMATIC DESIGN STUDIES;


BIDDING OR
CONCEPTUAL PLANS
E NEGOTIATION PHASE
DESIGN DEVELOPMENT
C PREPARATION OF BID DOCUMENTS; CONTRACT
PHASE PRE-CONSTRUCTION
LETTING, DOCUMENTS FOR CONSTRUCTION,
FORMS FOR INVITATION AND INSTRUCTION TO

1 PRE-DESIGN PHASE 3
BIDDERS
PREPARATION OF PLANS, ELEVATIONS, SECTIONS,
AND OTHER DRAWINGS PHASE
ARCHITECTURAL PLANNING BEFORE
A CONSULTATION E RESEARCH A CONSTRUCTION
ORAL OR WRITTEN ADVICE AND DIRECTION, CONDUCT OF PRIMARY AND SECONDARY
MAKE EVALUATIONS AND APPRAISALS RESEARCHES AND BASIS FOR CONCLUSION

FEASIBILITY ARCHITECTURAL B BUILDING PERMITS


B STUDIES F PROGRAMMING
DETAILED ANALYSIS OF THE PROJECT;
ANALYTICAL PROBLEM-SEEKING PROCESS; PURCHASING OF
C EQUIPMENTS
VIABILITY OF THE PROPOSED DEVELOPMENT
WILL LEAD TO STATEMENT, IDENTIFICATION
OF BOTH HORIZONTAL AND VERTICAL
REQUIREMENTS IN OFFERING A SOLUTION
SITE SELECTION
C AND ANALYSIS

D
SITE
UTILIZATION 
G SPACE PLANNING
PROJECT D MOBILIZATION
SITE'S DEVELOPMENT POTENTIALS
THROUGH PROPOER UTILIZATION OF LOT
PROCESS CONTRACTORS&
E SUBCONTRACTORS

FLOWCHART

POST-CONSTRUCTION
5 PHASE

4 CONSTRUCTION PHASE
A FINAL BILLING
EXECUTION AND ACTUAL
B DEMOBILIZATION A PROGRESS C CONSTRUCTION

C PUNCH LIST B CHANGE ORDERS D COST ANALYSIS