You are on page 1of 1

CSP Utility Electrical Safety Audit Report

Audit Team Member :- Dhiraj R Zatale


Ruturaj M Patil

Area STATUS Remark


ELCB OK 30mA ELCB installed and no multiple connection.
CSP Scale Pit no.1 Auxillary JB OK Both side earthing available.
Earth Pit Ok Tested.
ELCB OK 30mA ELCB installed and no multiple connection.
Auxillary JB OK Both side earthing available.
Earth Pit Ok Tested.
Rubber mat in MCC room Available Front and rear side available.
CSP Scale Pit no.2 Availability of standard Discharg
Rod. Available

Electrical rooms are provided with


two doors. Available

ELCB OK 30mA ELCB installed and no multiple connection.


Auxillary JB OK Both side earthing available.
Earth Pit OK Tested.
Rubber mat in MCC room Available Front and rear side available.
CSP Scale Pit no.3
Availability of standard Discharg
Rods. Not Available
Electrical rooms are provided with
two doors. Available

Rubber mat in MCC room Available Front and rear side available.
Availability of standard Discharg
Rods. Available
ECRW1 HT MCC
Electrical rooms are provided with
two doors Available
Availability of Arc Flash Suit. Available
Rubber mat in MCC room Available Front and rear side available.
Availability of standard Discharg
Rods. Available
ECRW1 LT MCC
Electrical rooms are provided with
two doors. Available