WEEK NUMBER- 40
28/09/2020 – 04/10/2020
Revision Table
Table of Content
Topic: NA
Issue Description
Impact of Issue/defect
Status:
MAHA-Metro/PMPR/P1/RS-02/2020 Rev 04 dated on 04/09/2020
2.2 FIC Key Activities - Summary of activities undertaken during the period by the Consultant
3 Project status
Raised Total 0 NA
Raised Total 0
Date 28/09/2020
Location Titagarh
Topics1 NA
5.2 Other Meetings ( e.g escalation / Critical observation during inspection etc )
Location
FIC: Manufacturer:
Attendees
Topics1
7 Appendices
7.1 Appendix 1 – Photographs of any Level 1 log items raised during the reporting period.
Inspection Pictures:
Fig 1 : Assembling station under checking Fig 2 : Assembling tool for welding and
before CAB assembly strengthening currently in use for MP.003.001
Fig 3 : Assembly CAB station under Fig 4 : Engitech supplied End part strengthening
preparation for next phase and checking tool -PN
Fig 7: MP001.001 polishing after checking for Fig 8: MP001.001 roof testing,
NDC Strengthening and test station
Fig 9: MP002.001 - End part Fig 10 : MP002.001 End part assembled and
checked
Fig 13: MP3 Assembling and checking phase. Fig 14: MP3.001 Bottom floor assembling
Bottom Platform &Checking
Fig 15: Side frame panels MP.001.001 Fig 16: Top roof station. Bottom side preparation
for walking site
MAHA-Metro/PMPR/P1/RS-02/2020 Rev 04 dated on 04/09/2020
Fig 17 : Automatic robot machine -Testing for Fig 18: Dimension control test by electronic tool
alignment on Top roof MP001.001 -body MP002-001
Fig 19 : End part assembling phase -MP003-001 Fig 20: End part check for acceptance _MP002-
001
Fig 21: Head dimension test related to MP002- Fig 22: MP002-001 material acceptance test for
MAHA-Metro/PMPR/P1/RS-02/2020 Rev 04 dated on 04/09/2020
Fig 23: MP003-001 assembling phase.Please do Fig 24: Platform MP003-001 assembling phase-Next
not attach this picture to the reports only for end part fixing
showing and then delete.
Fig 25: Rotating Jigs ready to accept MP003-001 Fig 26: Side wall lots -MP003-001
basement
MAHA-Metro/PMPR/P1/RS-02/2020 Rev 04 dated on 04/09/2020
Fig 27: Stretchning tool preparation for testing Fig 28: Assembling line top view with components
MP002-001 head ready to be fixed on chassis MP001 and MP003
Fig 29: Bottom floor panel preparation and check Fig 30: Chassis MP001-001 positioned on jig for
for MP003-001 alignment and control-Next step assembling
sidewalls and top
Fig 31: End upper view of chassis Fig 32: Jig preparation to accept Head parts for
checks and finishing
MAHA-Metro/PMPR/P1/RS-02/2020 Rev 04 dated on 04/09/2020
Fig 33: MP001 Top Roof view- Controls before Fig 32: Panels preparation and controls for MP003-
assembling-Next step moving to CAB assembly 001
station
Fig 35 : Side wall on line to be assembled on Fig 36: Upper view of positioned chassis of MP001-
PM001-001 chassis 001