You are on page 1of 18

PT.

PLN (PERSERO)
PEUSANGAN 1 & 2 HPP CONSTRUCTION PROJECT
NIPPON KOEI CO.,LTD. In association with TOKYO ELECTRIC POWER SERVICES CO.,LTD.,
PT. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTANT,
PT. TATA GUNA PATRIA, PT. CONNUSA ENERGINDO and PT. JAYA CM

REQUEST FOR JOINT INSPECTION


ID IHP1/LOT I/RJI/PP/PS2/071
Structure 6.11.2/001 (Concrete, type B for structure)
Submitted Request 20 January 2021
Joint Inspection Schedule 21 January 2021
Starting Time 9:00 until finish
Start Working Schedule 21 January 2021
Starting Time 09:30 until finish
Location No. 2 Outdoor Switchyard
Work Item Placing concrete type B For Wall
1. Concrete Pump (car) (1 unit)
2. Truck Mixer (2 Unit)
3. Concrete Vibrator electric (2 Unit)
4. Compressor (1 Unit)
5. Batching Plant (Mutiara)

Equipment
Remark
Sketch :

Placing concrete type B For Wall


Quantity
Code Length (m) Width (m) Height (m) Area (m2) Remaks
(m3)
W20 4.250 0.200 1.220 0.850 6.222 6

Total 6.222 m3

Submited date: Approval date:


20 January 2021 20 January 2021
Submitted by Approval by

Contractor CC: - Employer Engineer


Jumhar Febriko Masaki
PT. PLN (PERSERO)
PEUSANGAN 1 & 2 HPP CONSTRUCTION PROJECT
NIPPON KOEI CO.,LTD. In association with TOKYO ELECTRIC POWER SERVICES CO.,LTD.,
PT. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTANT,
PT. TATA GUNA PATRIA, PT. CONNUSA ENERGINDO and PT. JAYA CM

REQUEST FOR JOINT INSPECTION


ID IHP1/LOT I/RJI/PP/PS2/072
Structure 6.12.2/002 (Concrete, type B for structure)
Submitted Request 20 January 2021
Joint Inspection Schedule 21 January 2021
Starting Time 9:00 until finish
Start Working Schedule 21 January 2021
Starting Time 09:30 until finish
Location No. 2 Outdoor Switchyard
Work Item Placing concrete type B for Foundation
1. Concrete Pump (car) (1 unit)
2. Truck Mixer (3 Unit)
3. Concrete Vibrator electric (2 Unit)
4. Compressor (1 Unit)
5. Batching Plant (Mutiara)

Equipment
Remark
Sketch :

A B C

Placing concrete type B for Foundation


Quantity
Code Length (m) Width (m) Height (m) Area (m2) Remaks
(m3)
F21 2.500 2.500 0.500 6.250 12.500 4
F23 1.800 1.800 0.500 3.240 3.240 2

Total 15.740 m3

Submited date: Approval date:


20 January 2021 20 January 2021
Submitted by Approval by

Contractor CC: - Employer Engineer


Jumhar Febriko Masaki
PT. PLN (PERSERO)
PEUSANGAN 1 & 2 HPP CONSTRUCTION PROJECT
NIPPON KOEI CO.,LTD. In association with TOKYO ELECTRIC POWER SERVICES CO.,LTD.,
PT. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTANT,
PT. TATA GUNA PATRIA, PT. CONNUSA ENERGINDO and PT. JAYA CM

REQUEST FOR JOINT INSPECTION


ID IHP1/LOT I/RJI/PP/PS2/073
Structure 6.11.2/002 (Concrete type G for levelling concrete)
Submitted Request 22 January 2021
Joint Inspection Schedule 22 January 2021
Starting Time 14:00:00until
AMfinish
Start Working Schedule 22 January 2021
Starting Time 14:30:00until
AMfinish
Location No. 2 Outdoor Switchyard
Work Item Placing concrete type G for Levelling Concrete
1. Concrete Pump (car) (1 unit)
2. Truck Mixer (1 Unit)
3. Concrete Vibrator electric (2 Unit)
4. Compressor (1 Unit)
5. Batching Plant (Mutiara)

Equipment
Remark
Sketch :

Placing concrete type G for Levelling Concrete


Quantity
Code Length (m) Width (m) Height (m) Area (m2) Remaks
(m3)
F64 1.500 1.500 0.050 2.250 0.225 2
S61 4.250 0.650 0.050 2.763 0.276 2
S61 4.500 0.650 0.050 2.925 0.293 4
S61 4.700 0.650 0.050 3.055 0.611 2

Total 1.405 m3

Submited date: Approval date:


22 January 2021 22 January 2021
Submitted by Approval by

Contractor CC: - Employer Engineer


Jumhar Febriko Masaki
PT. PLN (PERSERO)
PEUSANGAN 1 & 2 HPP CONSTRUCTION PROJECT
NIPPON KOEI CO.,LTD. In association with TOKYO ELECTRIC POWER SERVICES CO.,LTD.,
PT. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTANT,
PT. TATA GUNA PATRIA, PT. CONNUSA ENERGINDO and PT. JAYA CM

REQUEST FOR JOINT INSPECTION


ID IHP1/LOT I/RJI/PP/PS2/074
Structure 6.11.2/001 (Concrete, type B for structure)
Submitted Request 25 January 2021
Joint Inspection Schedule 25 January 2021
Starting Time 10:00 until finish
Start Working Schedule 25 January 2021
Starting Time 10:30 until finish
Location No. 2 Outdoor Switchyard
Work Item Placing concrete type B for Pile Cap and Wall
1. Concrete Pump (car) (1 unit)
2. Truck Mixer (2 Unit)
3. Concrete Vibrator electric (2 Unit)
4. Compressor (1 Unit)
5. Batching Plant (Mutiara)

Equipment
Remark
Sketch :

Placing concrete type B for Pile Cap and Wall


Quantity
Code Length (m) Width (m) Height (m) Area (m2) Remaks
(m3)
F64 1.300 1.300 0.450 1.690 1.521 2
W20 4.250 0.200 1.220 0.850 7.259 7

Total 8.780 m3

Submited date: Approval date:


25 January 2021 25 January 2021
Submitted by Approval by

Contractor CC: - Employer Engineer


Jumhar Febriko Masaki
PT. PLN (PERSERO)
PEUSANGAN 1 & 2 HPP CONSTRUCTION PROJECT
NIPPON KOEI CO.,LTD. In association with TOKYO ELECTRIC POWER SERVICES CO.,LTD.,
PT. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTANT,
PT. TATA GUNA PATRIA, PT. CONNUSA ENERGINDO and PT. JAYA CM

REQUEST FOR JOINT INSPECTION


ID IHP1/LOT I/RJI/PP/PS2/075
Structure 6.12.2/002 (Concrete, type G for Levelling Concrete)
Submitted Request 25 January 2021
Joint Inspection Schedule 25 January 2021
Starting Time 10:00 until finish
Start Working Schedule 25 January 2021
Starting Time 10:30 until finish
Location No. 2 Outdoor Switchyard
Work Item Placing concrete type G for Service House
1. Concrete Pump (car) (1 unit)
2. Truck Mixer (2 Unit)
3. Concrete Vibrator electric (2 Unit)
4. Compressor (1 Unit)
5. Batching Plant (Mutiara)

Equipment
Remark
Sketch :

A B C D
C21 C21 C21
2
FG23 FG22

1 1
FG21

FG21

FG21

2 2
FG23 FG22
1
C21 C21 C21

A B C D

A B C

Placing concrete type G for Service House


Quantity
Code Length (m) Width (m) Height (m) Area (m2) Remaks
(m3)
FG21 5.350 0.050 0.050 0.268 0.027 2
FG22 3.350 0.500 0.050 1.675 0.251 3
FG23 6.850 0.500 0.050 3.425 0.343 2

Total 0.621 m3

Submited date: Approval date:


25 January 2021 25 January 2021
Submitted by Approval by

Contractor CC: - Employer Engineer


Jumhar Febriko Masaki
PT. PLN (PERSERO)
PEUSANGAN 1 & 2 HPP CONSTRUCTION PROJECT
NIPPON KOEI CO.,LTD. In association with TOKYO ELECTRIC POWER SERVICES CO.,LTD.,
PT. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTANT,
PT. TATA GUNA PATRIA, PT. CONNUSA ENERGINDO and PT. JAYA CM

REQUEST FOR JOINT INSPECTION


ID IHP1/LOT I/RJI/PP/PS2/076
Structure 6.11.2/002 (Concrete type G for levelling concrete)
Submitted Request 25 January 2021
Joint Inspection Schedule 25 January 2021
Starting Time 10:00 until finish
Start Working Schedule 25 January 2021
Starting Time 10:30 until finish
Location No. 2 Outdoor Switchyard
Work Item Placing concrete type G for Sloof
1. Concrete Pump (car) (1 unit)
2. Truck Mixer (2 Unit)
3. Concrete Vibrator electric (2 Unit)
4. Compressor (1 Unit)
5. Batching Plant (Mutiara)

Equipment
Remark
Sketch :

Placing concrete type G for Sloof


Quantity
Code Length (m) Width (m) Height (m) Area (m2) Remaks
(m3)
S61 4.850 0.650 0.050 3.153 0.315 2
S61 4.550 0.650 0.050 2.958 0.296 1
S61 4.250 0.650 0.050 2.763 0.138 1

Total 0.749 m3

Submited date: Approval date:


25 January 2021 25 January 2021
Submitted by Approval by

Contractor CC: - Employer Engineer


Jumhar Febriko Masaki
PT. PLN (PERSERO)
PEUSANGAN 1 & 2 HPP CONSTRUCTION PROJECT
NIPPON KOEI CO.,LTD. In association with TOKYO ELECTRIC POWER SERVICES CO.,LTD.,
PT. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTANT,
PT. TATA GUNA PATRIA, PT. CONNUSA ENERGINDO and PT. JAYA CM

REQUEST FOR JOINT INSPECTION


ID IHP1/LOT I/RJI/PP/PS2/077
Structure 6.11.2/001 (Concrete, type B for structure)
Submitted Request 30 January 2021
Joint Inspection Schedule 31 January 2021
Starting Time 9:30 until finish
Start Working Schedule 31 January 2021
Starting Time 10:00 until finish
Location No. 2 Outdoor Switchyard
Work Item Placing concrete type B For Wall
1. Concrete Pump (car) (1 unit)
2. Truck Mixer (2 Unit)
3. Concrete Vibrator electric (2 Unit)
4. Compressor (1 Unit)
5. Batching Plant (Mutiara)

Equipment
Remark
Sketch :

Placing concrete type B For Wall


Quantity
Code Length (m) Width (m) Height (m) Area (m2) Remaks
(m3)
W20 4.250 0.200 1.000 0.850 7.650 9

Total 7.650 m3

Submited date: Approval date:


30 January 2021 30 January 2021
Submitted by Approval by

Contractor CC: - Employer Engineer


Jumhar Febriko Masaki
PT. PLN (PERSERO)
PEUSANGAN 1 & 2 HPP CONSTRUCTION PROJECT
NIPPON KOEI CO.,LTD. In association with TOKYO ELECTRIC POWER SERVICES CO.,LTD.,
PT. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTANT,
PT. TATA GUNA PATRIA, PT. CONNUSA ENERGINDO and PT. JAYA CM

REQUEST FOR JOINT INSPECTION


ID IHP1/LOT I/RJI/PP/PS2/078
Structure 6.11.2/001 (Concrete, type B for structure)
Submitted Request 03 February 2021
Joint Inspection Schedule 03 February 2021
Starting Time 14:00 until finish
Start Working Schedule 03 February 2021
Starting Time 14:30 until finish
Location No. 2 Outdoor Switchyard
Work Item Placing concrete type B For Girder and Column
1. Concrete Pump (car) (1 unit)
2. Truck Mixer (1 Unit)
3. Concrete Vibrator electric (2 Unit)
4. Compressor (1 Unit)
5. Batching Plant (Mutiara)

Equipment
Remark
Sketch :

Placing concrete type B For Girder and Column


Quantity
Code Length (m) Width (m) Height (m) Area (m2) Remaks
(m3)
FG65 4.250 0.400 1.000 1.700 1.700 1
FG65 1.775 0.400 1.000 0.710 1.420 2
C61 0.500 0.500 1.400 0.250 0.700 2
C65 0.750 0.750 0.970 0.563 1.091 2

Total 4.911 m3

Submited date: Approval date:


03 February 2021 03 February 2021
Submitted by Approval by

Contractor CC: - Employer Engineer


Jumhar Febriko Masaki
PT. PLN (PERSERO)
PEUSANGAN 1 & 2 HPP CONSTRUCTION PROJECT
NIPPON KOEI CO.,LTD. In association with TOKYO ELECTRIC POWER SERVICES CO.,LTD.,
PT. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTANT,
PT. TATA GUNA PATRIA, PT. CONNUSA ENERGINDO and PT. JAYA CM

REQUEST FOR JOINT INSPECTION


ID IHP1/LOT I/RJI/PP/PS2/079
Structure 6.12.2/001 (Concrete, type B for structure)
Submitted Request 03 February 2021
Joint Inspection Schedule 03 February 2021
Starting Time 14:00 until finish
Start Working Schedule 03 February 2021
Starting Time 14:30 until finish
Location No. 2 Outdoor Switchyard
Work Item Placing concrete type B For Girder and Column
1. Concrete Pump (car) (1 unit)
2. Truck Mixer (3 Unit)
3. Concrete Vibrator electric (2 Unit)
4. Compressor (1 Unit)
5. Batching Plant (Mutiara)

Equipment
Remark
Sketch :

Placing concrete type B For Girder and Column


Quantity
Code Length (m) Width (m) Height (m) Area (m2) Remaks
(m3)
FG21 5.350 0.400 0.750 2.140 4.815 3
FG22 3.350 0.500 0.600 1.675 2.010 2
FG23 6.850 0.500 0.900 3.425 6.165 2
C21 0.650 0.650 1.050 0.423 2.662 6

Total 15.652 m3

Submited date: Approval date:


03 February 2021 03 February 2021
Submitted by Approval by

Contractor CC: - Employer Engineer


Jumhar Febriko Masaki
PT. PLN (PERSERO)
PEUSANGAN 1 & 2 HPP CONSTRUCTION PROJECT
NIPPON KOEI CO.,LTD. In association with TOKYO ELECTRIC POWER SERVICES CO.,LTD.,
PT. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTANT,
PT. TATA GUNA PATRIA, PT. CONNUSA ENERGINDO and PT. JAYA CM

REQUEST FOR JOINT INSPECTION


ID IHP1/LOT I/RJI/PP/PS2/080
Structure 6.11.2/001 (Concrete, type B for structure)
Submitted Request 05 February 2021
Joint Inspection Schedule 06 February 2021
Starting Time 14:00 until finish
Start Working Schedule 06 February 2021
Starting Time 14:30 until finish
Location No. 2 Outdoor Switchyard
Work Item Placing concrete type B For Wall
1. Concrete Pump (car) (1 unit)
2. Truck Mixer (2 Unit)
3. Concrete Vibrator electric (2 Unit)
4. Compressor (1 Unit)
5. Batching Plant (Mutiara)

Equipment
Remark
Sketch :

Placing concrete type B For Wall


Quantity
Code Length (m) Width (m) Height (m) Area (m2) Remaks
(m3)
W20 4.250 0.200 1.000 0.850 7.650 9

Total 7.650 m3

Submited date: Approval date:


05 February 2021 05 February 2021
Submitted by Approval by

Contractor CC: - Employer Engineer


Jumhar Febriko Masaki
PT. PLN (PERSERO)
PEUSANGAN 1 & 2 HPP CONSTRUCTION PROJECT
NIPPON KOEI CO.,LTD. In association with TOKYO ELECTRIC POWER SERVICES CO.,LTD.,
PT. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTANT,
PT. TATA GUNA PATRIA, PT. CONNUSA ENERGINDO and PT. JAYA CM

REQUEST FOR JOINT INSPECTION


ID IHP1/LOT I/RJI/PP/PS2/081
Structure 6.12.1/002 (Random backfilling)
Submitted Request 05 February 2021
Joint Inspection Schedule 06 February 2021
Starting Time 14:00 until finish
Start Working Schedule 06 February 2021
Starting Time 14:30 until finish
Location No. 2 Outdoor Switchyard
Work Item Random Backfilling for Service House
1. Excavator (1 unit)
2. Dump Truck (1 unit)

Equipment
Remark
Sketch :

Random Backfilling for Service House


Quantity
Code Length (m) Width (m) Height (m) Area (m2) Remaks
(m3)
16.150 2.075 1.000 33.511 67.023 2
6.500 2.000 1.000 13.000 26.000 2
5.500 1.500 1.000 8.250 16.500 2
4.100 1.500 1.000 6.150 12.300 2
5.500 3.600 1.000 19.800 19.800 1
2.500 1.600 1.000 4.000 4.000 1
Total 137.623 m3

Submited date: Approval date:


05 February 2021 05 February 2021
Submitted by Approval by

Contractor CC: - Employer Engineer


Jumhar Febriko Masaki
PT. PLN (PERSERO)
PEUSANGAN 1 & 2 HPP CONSTRUCTION PROJECT
NIPPON KOEI CO.,LTD. In association with TOKYO ELECTRIC POWER SERVICES CO.,LTD.,
PT. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTANT,
PT. TATA GUNA PATRIA, PT. CONNUSA ENERGINDO and PT. JAYA CM

REQUEST FOR JOINT INSPECTION


ID IHP1/LOT I/RJI/PP/PS2/082
Structure 6.12.2/002 (Concrete type G for levelling concrete)
Submitted Request 08 February 2021
Joint Inspection Schedule 08 February 2021
Starting Time 15:00 until finish
Start Working Schedule 08 February 2021
Starting Time 15:30 until finish
Location No. 2 Outdoor Switchyard
Work Item Placing concrete type G For Service House
1. Concrete Pump (car) (1 unit)
2. Truck Mixer (1 Unit)
3. Concrete Vibrator electric (2 Unit)
4. Compressor (1 Unit)
5. Batching Plant (Mutiara)

Equipment
Remark
Sketch :

Placing concrete type G For Service House


Quantity
Code Length (m) Width (m) Height (m) Area (m2) Remaks
(m3)
7.100 5.500 0.050 39.050 1.953 1
5.500 3.600 0.050 19.800 0.990 1

Total 2.943 m3

Submited date: Approval date:


08 February 2021 08 February 2021
Submitted by Approval by

Contractor CC: - Employer Engineer


Jumhar Febriko Masaki
PT. PLN (PERSERO)
PEUSANGAN 1 & 2 HPP CONSTRUCTION PROJECT
NIPPON KOEI CO.,LTD. In association with TOKYO ELECTRIC POWER SERVICES CO.,LTD.,
PT. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTANT,
PT. TATA GUNA PATRIA, PT. CONNUSA ENERGINDO and PT. JAYA CM

REQUEST FOR JOINT INSPECTION


ID IHP1/LOT I/RJI/PP/PS2/083
Structure 6.11.2/001 (Concrete, type B for structure)
Submitted Request 10 February 2021
Joint Inspection Schedule 10 February 2021
Starting Time 14:00 until finish
Start Working Schedule 10 February 2021
Starting Time 15:30 until finish
Location No. 2 Outdoor Switchyard
Work Item Placing concrete type B For Control House
1. Concrete Pump (car) (1 unit)
2. Truck Mixer (1 Unit)
3. Concrete Vibrator electric (2 Unit)
4. Compressor (1 Unit)
5. Batching Plant (Mutiara)

Equipment
Remark
Sketch :

Placing concrete type B For Control House


Quantity
Code Length (m) Width (m) Height (m) Area (m2) Remaks
(m3)
FG61 4.250 0.500 0.150 2.125 1.275 4
FG63 4.250 0.450 0.150 1.913 0.574 2

Total 1.849 m3

Submited date: Approval date:


10 February 2021 10 February 2021
Submitted by Approval by

Contractor CC: - Employer Engineer


Jumhar Febriko Masaki
PT. PLN (PERSERO)
PEUSANGAN 1 & 2 HPP CONSTRUCTION PROJECT
NIPPON KOEI CO.,LTD. In association with TOKYO ELECTRIC POWER SERVICES CO.,LTD.,
PT. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTANT,
PT. TATA GUNA PATRIA, PT. CONNUSA ENERGINDO and PT. JAYA CM

REQUEST FOR JOINT INSPECTION


ID IHP1/LOT I/RJI/PP/PS2/084
Structure 6.11.2/001 (Concrete, type B for structure)
Submitted Request 10 February 2021
Joint Inspection Schedule 10 February 2021
Starting Time 14:00 until finish
Start Working Schedule 10 February 2021
Starting Time 15:30 until finish
Location No. 2 Outdoor Switchyard
Work Item Placing concrete type B for Control House
1. Concrete Pump (car) (1 unit)
2. Truck Mixer (2 Unit)
3. Concrete Vibrator electric (2 Unit)
4. Compressor (1 Unit)
5. Batching Plant (Mutiara)

Equipment
Remark
Sketch :

Placing concrete type B for Control House


Quantity
Code Length (m) Width (m) Height (m) Area (m2) Remaks
(m3)
FB61 4.250 0.400 0.450 1.700 1.530 2
FB61 4.500 0.400 0.450 1.800 3.240 4
FB61 4.700 0.400 0.450 1.880 1.692 2

Total 6.462 m3

Submited date: Approval date:


10 February 2021 10 February 2021
Submitted by Approval by

Contractor CC: - Employer Engineer


Jumhar Febriko Masaki
PT. PLN (PERSERO)
PEUSANGAN 1 & 2 HPP CONSTRUCTION PROJECT
NIPPON KOEI CO.,LTD. In association with TOKYO ELECTRIC POWER SERVICES CO.,LTD.,
PT. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTANT,
PT. TATA GUNA PATRIA, PT. CONNUSA ENERGINDO and PT. JAYA CM

REQUEST FOR JOINT INSPECTION


ID IHP1/LOT I/RJI/PP/PS2/085
Structure 6.11.2/001 (Concrete, type B for structure)
Submitted Request 10 February 2021
Joint Inspection Schedule 10 February 2021
Starting Time 14:00 until finish
Start Working Schedule 10 February 2021
Starting Time 15:30 until finish
Location No. 2 Outdoor Switchyard
Work Item Placing concrete type B For Control House
1. Concrete Pump (car) (1 unit)
2. Truck Mixer (2 Unit)
3. Concrete Vibrator electric (2 Unit)
4. Compressor (1 Unit)
5. Batching Plant (Mutiara)

Equipment
Remark
Sketch :

Placing concrete type B For Control House


Quantity
Code Length (m) Width (m) Height (m) Area (m2) Remaks
(m3)
W20 4.250 0.200 1.000 0.850 7.650 9
W20 1.000 0.200 3.040 0.200 0.608 1
W20 0.410 0.200 3.040 0.082 0.249 1

Total 8.507 m3

Submited date: Approval date:


10 February 2021 10 February 2021
Submitted by Approval by

Contractor CC: - Employer Engineer


Jumhar Febriko Masaki
PT. PLN (PERSERO)
PEUSANGAN 1 & 2 HPP CONSTRUCTION PROJECT
NIPPON KOEI CO.,LTD. In association with TOKYO ELECTRIC POWER SERVICES CO.,LTD.,
PT. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTANT,
PT. TATA GUNA PATRIA, PT. CONNUSA ENERGINDO and PT. JAYA CM

REQUEST FOR JOINT INSPECTION


ID IHP1/LOT I/RJI/PP/PS2/086
Structure 6.12.2/001 (Concrete, type B for structure)
Submitted Request 12 February 2021
Joint Inspection Schedule 13 February 2021
Starting Time 9:30 until finish
Start Working Schedule 13 February 2021
Starting Time 10:00 until finish
Location No. 2 Outdoor Switchyard
Work Item Placing concrete type B For Service House
1. Concrete Pump (car) (1 unit)
2. Truck Mixer (2 Unit)
3. Concrete Vibrator electric (2 Unit)
4. Compressor (1 Unit)
5. Batching Plant (Mutiara)

Equipment
Remark
Sketch :

Placing concrete type B For Service House


Quantity
Code Length (m) Width (m) Height (m) Area (m2) Remaks
(m3)
S61 11.900 6.500 0.150 77.350 11.603 1

Total 11.603 m3

Submited date: Approval date:


12 February 2021 12 February 2021
Submitted by Approval by

Contractor CC: - Employer Engineer


Jumhar Febriko Masaki
PT. PLN (PERSERO)
PEUSANGAN 1 & 2 HPP CONSTRUCTION PROJECT
NIPPON KOEI CO.,LTD. In association with TOKYO ELECTRIC POWER SERVICES CO.,LTD.,
PT. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTANT,
PT. TATA GUNA PATRIA, PT. CONNUSA ENERGINDO and PT. JAYA CM

REQUEST FOR JOINT INSPECTION


ID IHP1/LOT I/RJI/PP/PS2/087
Structure 6.11.2/001 (Concrete, type B for structure)
Submitted Request 12 February 2021
Joint Inspection Schedule 13 February 2021
Starting Time 10:00 until finish
Start Working Schedule 13 February 2021
Starting Time 10:30 until finish
Location No. 2 Outdoor Switchyard
Work Item Placing concrete type B for Control House
1. Concrete Pump (car) (1 unit)
2. Truck Mixer (2 Unit)
3. Concrete Vibrator electric (2 Unit)
4. Compressor (1 Unit)
5. Batching Plant (Mutiara)

Equipment
Remark
Sketch :

Placing concrete type B for Control House


Quantity
Code Length (m) Width (m) Height (m) Area (m2) Remaks
(m3)
FB62 4.250 0.400 0.450 1.700 0.765 1
FB61 4.550 0.400 0.450 1.820 0.819 1
FG61 4.250 0.450 0.150 1.913 1.148 4
FG63 4.250 0.450 0.150 1.913 0.574 2

Total 3.305 m3

Submited date: Approval date:


12 February 2021 12 February 2021
Submitted by Approval by

Contractor CC: - Employer Engineer


Jumhar Febriko Masaki
PT. PLN (PERSERO)
PEUSANGAN 1 & 2 HPP CONSTRUCTION PROJECT
NIPPON KOEI CO.,LTD. In association with TOKYO ELECTRIC POWER SERVICES CO.,LTD.,
PT. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTANT,
PT. TATA GUNA PATRIA, PT. CONNUSA ENERGINDO and PT. JAYA CM

REQUEST FOR JOINT INSPECTION


ID IHP1/LOT I/RJI/PP/PS2/088
Structure 6.11.2/001 (Concrete, type B for structure)
Submitted Request 12 February 2021
Joint Inspection Schedule 13 February 2021
Starting Time 10:00 until finish
Start Working Schedule 13 February 2021
Starting Time 10:30 until finish
Location No. 2 Outdoor Switchyard
Work Item Placing concrete type B for Control House
1. Concrete Pump (car) (1 unit)
2. Truck Mixer (2 Unit)
3. Concrete Vibrator electric (2 Unit)
4. Compressor (1 Unit)
5. Batching Plant (Mutiara)

Equipment
Remark
Sketch :

Placing concrete type B for Control House


Quantity
Code Length (m) Width (m) Height (m) Area (m2) Remaks
(m3)
W21 4.250 0.200 0.900 0.850 4.590 6

Total 4.590 m3

Submited date: Approval date:


12 February 2021 12 February 2021
Submitted by Approval by

Contractor CC: - Employer Engineer


Jumhar Febriko Masaki

You might also like