PE448 lab task 4, 5 & 6
INTRODUCTION

Transmission lines are a bridge between the generation and distribution in electrical
power system. Power is transmitted using high voltage transmission lines to
minimize the losses. The problem however associated with high voltage transmission
is that of electric field around these high voltage lines. In these lab tasks, this
problem is investigated in COMSOL multiphysics environment.

LAB TASK 4: (Multiple Phase Conductors) Maximum Electric field and


Equipotential lines
Single wire
Duplex
Triplex

Quadruplex
LAB TASK 5: Overhead Lines: Arrangement of Phases
Electric field strength and potential distributions at two meters above ground for some different
values of ωt.
LAB TASK 6: Underground Cables
Cable with a grounded screen around each phase.
Cable where the phases have a common screen.
Cable with segment-shaped conductors and common screen.