The purpose of the WPS and PQR is to determine that:
What is the earliest Edition of Section IX recognized by the current edition?
1962
New
Welding
Procedure
Specifications
must
meet
the
________Edition
and
addenda
of
Section
IX
Each
_______
shall
conduct
the
tests
required
by
Section
IX
to
quality
the
WPS's
used
during
the
construction,
alteration,
or
repair.
Manufacturer or contractor
The
records
of
procedure,
welder
and
welding
operator
qualification
must
be
available
to
the
________.
Authorized Inspector
A
welder
qualifying
with
a
groove
weld
in
plate
in
the
4G
position
is
qualified
to
weld
groove
welds
in
plate
and
pipe
over
24"
O.D.
in
the
_______
positions.
A
welder
qualifying
by
making
a
groove
weld
on
pipe
with
an
O.D.
of
3
to
4"
in
the
5G
position
is
qualified
to
weld
groove
welds
in:
In general, qualification on groove welds also qualifies a welder to make:
Fillet welds
Notch toughness
A
welder
making
a
groove
weld
using
the
SAW
process
on
P1
materials
may
be
qualified
using
radiography.
True
When
a
tensile
specimen
breaks
in
the
base
metal
outside
of
the
weld
or
fusion
line,
the
strength
recorded
may
be
_______
below
the
specified
tensile
and
be
accepted.
Guided-‐bend
specimens
shall
have
no
open
defects
in
the
weld
or
heat-‐affected
zone
exceeding
_______
measured
in
any
direction
on
the
convex
surface
of
the
specimen
after
bending.
1/8"
When
using
radiographs
to
qualify
welders,
the
acceptance
standards
used
are
found
in:
ASME Section IX
Essential variables
The
______________must
certify
the
PQR
as
accurate.
Manufacturer or contractor
For the SMAW process _____________is an essential variable for the WPS.
For the SAW process _______________is an essential variable for the WPS.
The basic purpose of testing a welder is to establish the welder's ________.
WPQ
IF
a
welder
qualified
with
the
manual
SMAW
process
on
Jan.
1,
1997
and
last
welded
with
manual
SMAW
on
March
15,
1997,
would
he
still
be
qualified
on
October
7,
1997?
No
A
welder
qualifying
with
SMAW
process
with
a
double-‐welded
groove
weld
is
qualified
to
weld
_________________.
Welder
performance
qualification
records
must
describe
all
the
_________
variables
specified.
Essential
A
welder
depositing
1/2"
of
weld
metal
in
three
layers
in
a
groove
weld
with
the
SMAW
process
is
qualified
to
deposit
up
to
______
of
weld
metal.
Max. to be welded
"P"
numbers
are
used
to
designate
groups
of
______________.
Base metals
P-21 to P-26
"F" number
"A" number
For welder qualification with the SMAW process _______ is an essential variable.
P- number
A unique identifier
A
welder
qualification
coupon
welded
in
the
2G
position
of
5/16"
thick
plate
material
must
have
how
many
root
and
face
bends?
2 total - 1 each
Welding in the 1G position qualifies a welder in what position?
Flat
Which
of
the
following
is
an
essential
variable
for
qualification
of
an
SMAW
welding
procedure?
"F" number
If a welder is to be qualified by RT or NDE (volumetric inspection), then:
The first 6" of the first production weld is radiographed for the processes & mode allowed
A
welder
may
be
qualified
using
volumetric
inspection
in
certain
processes
except
for
_______
A
tank
is
being
built
to
API
650
with
a
A516-‐Gr.
55
shell
material
that
is
1.125"
thick.
What
preheat
will
be
required?
32ºF