ITEM METHOD STATEMENT OF INSTALLATION CHILLED, WS PUMP, TANK * REMARKS

PROJECT TAIYO INK VIETNAM IMPLEMENTATION CONTRUCTION PROJECT 2021.02.22: PREPARATION WORK
A
CHECK LIST 2021.02.23: CHILLER WORK,
STEEL WIRE D24 WEIGHT DIMENSION TANK, WATER SUPPLY PUMP
L=6m B CHILLER
steel wire d20 3t chain block 8850 KG W9560x D2260x H2425
L=4m LIFTING SUPPORT BEAM D35 TYPE SPEC. NOS SPEC.TABLE: SHOWN IN DRAWING
C CRANE FOR LIFTING * MAXIMUM LIFTING WEIGHT 200TON
DETAIL 1 TRUCK CRANE 200 TONS
* LIFTING WEIGHT&RADIUS TABLE
4.75t shackle LOCATION ROAD NEAR BY ELECTRICAL ROOM
CHILLER STEEL WIRE D20 D CRANE
4.75t shackle D35 SLOPE YES NO
chiller foundation beam 8850 KG L=4m
m D35 1. LEADING ROPE FOR LIFTING MATERIAS
DETAIL 2 2. KEEP OUT(WORKING RADIUS - MATERIAL LAYOUT YARD)

ETAIL-2 DETAIL-3 LIFTING SUPPORT 3. SAFETY NET AREA


SAFETY
E
BEAM FACILITIES 4. COMMUNICATION (HAND RADIO)
5. BARRICADE WORKING AREA.CRANE WORKING AREA.
UNDER LIFTING MATERIALS

SCOPE CRANE AND OTHER EQUIPMENTS


200T crane * FACILITY & MACHINE *TOOLS
1. CRANE VINATA SUB-CON 1. LIFTING TOOLS VINATA SUB-CON
2. OTHERS - 2. CHAIN BLOCK VINATA SUB-CON
* SAFETY FACILITIES 3. TURN BUCKLE VINATA SUB-CON
F
EQUIPMENT 4. WIRE TO LIFT VINATA SUB-CON
STEEL WIRE D24 PREPARATION 3. BARRICADE,OTHERS VINATA SUB-CON MATERIALS
L=6m CHAIN BLOCK 3T X 2 SETS 5. OTHERS VINATA SUB-CON
* OTHER TEMPORARY MATERIALS FOR INSTALLATION WORK
SUPPORT LIFTING BEAM
4. TURN TABLE ROLLER VINATA SUB-CON
150x150x8 CHAIN BLOCK 3T X 2 SETS
L1 5. CHAIN HOIST VINATA SUB-CON
STEEL WIRE D20
L=4m
200T CRANE - DEMAG AC200 6. OTHER(SHEET,OTHERS) VINATA SUB-CON

ORGANIZATION CHART:
CHILLER 8850kg DETAIL 2

direction rope PM: MR. MURAKOSHI


VINATA
HP: 090.227.5158
DETAIL 3

DONG ANH PM: MR. TAKEUCHI


GENERAL HOSPITAL HP: 0936.360.848
HP: 0243.8832450
ME LINH POLICE Y
HP: 113 U
SM: MR.P.D.QUANG SAFETY MANAGER : MR.VIET R
FIRE DEPARTMENT HP: 0978.686.180 HP: 0398.197.638 T
HP: 114
E
C
DETAIL FOR
MR. LAM MR. HOANG
CHILLED TANK HP: 0972.761.078 HP: 0328.322.904

crane
200 tons

Signal control Team Leader


(using radios) 1 Mr. Chinh
Signal man 1: Location - 1FL S
Signal man 2: Location - 4FL U
Worker on 1FL: 07 Persons
STEEL plate Worker on 4FL: 06 Persons B
Total :13 person -