Dear Sir/Mdm,

AMENDMENTS TO FIRE CODE 2018 - 4TH BATCH OF AMENDMENTS

SCDF would like to issue the 4th batch of amendments to the Code of Practice for Fire
Precautions in Buildings 2018 (Fire Code 2018). The amendments which were deliberated and
accepted by the Fire Code Review Committee are attached as Annex A of this circular.

2. Amendments stipulated in Annex A of this letter, shall take effect from the dates
specified therein. For those amendments that are to take effect at future dates as specified in
Annex A, Qualified Persons are encouraged to comply with the requirements at any time before
the effective dates. Any proposed plans of fire safety works for new buildings or existing
buildings that are submitted to SCDF for approval on or after the effective dates shall be
subjected to the amendments made to the Fire Code.

3. Please convey the contents of this circular to members of your Board/ Institution/
Association. This circular is also available in CORENET’s e-Info:
http://www.corenet.gov.sg/einfo.

SCDF – A member of the Home Team


HQ SINGAPORE CIVIL DEFENCE FORCE, 91 UBI AVENUE 4, SINGAPORE 408827
TEL: 68481457 FAX: 68481490 EMAIL:TAN_Chung_Yee@scdf.gov.sg
4. For any queries, you may contact Mr Randy Tan at DID: 68481461 or Mr Tan Yi Yang
at DID: 68481734.

Yours faithfully

(transmitted via email)

LTC Tan Chung Yee


for Commissioner
Singapore Civil Defence Force

Distribution list

CEO, BCA
CEO, URA
CEO, HDB
CEO, JTC
CE, LTA
CE, Enterprise Singapore
President, REDAS
President, IFE
President, SISV
President, FSMAS
President, SCAL
Honorary Secretary, SPM
Manager (Fire Safety & Building Control Unit), DSTA
SCDF Fire Safety Standing Committee
Fire Code Review Committee

SCDF – A member of the Home Team


HQ SINGAPORE CIVIL DEFENCE FORCE, 91 UBI AVENUE 4, SINGAPORE 408827
TEL: 68481457 FAX: 68481490 EMAIL:TAN_Chung_Yee@scdf.gov.sg
Annex A

Clause Amendment Effective


S/N Clause Status Clause Before Amendment Clause After Amendment
No Date Date
Workers’ dormitory Workers’ dormitory

Workers’ dormitories shall comply with the Workers’ dormitories shall comply with
following additional requirements: the following additional requirements:

a. Size a. Size

Each dormitory bedroom shall not Each dormitory bedroom shall not
exceed 120m2 and an occupant load exceed 120m2 and an occupant
of 40 persons. load of 4020 persons.
1 9.3.3 30 July 2020 1 Feb 2021 Revised
b. Occupant load b. Occupant load

The occupant load shall be based on The occupant load shall be based
accessible floor area on the basis of on accessible floor area on the
3m² per person. basis of 3m²6m² per person.

c. ………… c. …………

Temporary workers’ quarter in Temporary workers’ quarter in


uncompleted permanent buildings on uncompleted permanent buildings on
construction sites construction sites
Reinstatement of
2 9.3.4 30 July 2020 30 July 2020 a. General a. General
past requirement
(1) The temporary workers’ (1) The temporary workers’
quarters shall not be located quarters shall not be located
higher than 10m above the higher than 10m above the
fire engine access road level fire engine access road level
of the uncompleted building of the uncompleted building
and shall not be lower than and shall not be lower than
first basement level. first basement level.

(2) The temporary workers’ (2) The temporary workers’


quarters shall only be used for quarters shall only be used for
housing workers working housing workers working
within the construction site. within the construction site.

(3) Hot work is not allowed in the (3) Hot work is not allowed in
basement(s) where the the basement(s) where the
temporary workers’ quarters temporary workers’ quarters
are located. are located.

b. Means of escape b. Means of escape

(1) For above ground levels, (1) For above ground levels,
provision of only one exit provision of only one exit
staircase is permitted staircase is permitted
provided that the one-way provided that the one-way
travel distance is complied travel distance is complied
with and the occupant load with Table 2.2A and the
does not exceed 20 persons on occupant load does not
any storey. The exit staircase exceed 20 persons on any
shall discharge directly to storey. The exit staircase
exterior open space. shall discharge directly to
exterior open space.
(2) At least two independent exit
staircases shall be provided (2) At least two independent
for the temporary workers’ exit staircases shall be
quarters located in basement provided for the temporary
levels or when the workers’ quarters located in
occupant load exceeds more basement levels or when the
than 20 persons on any storey. occupant load exceeds more
than 20 persons on any
c. Compartmentation aboveground storey.

(1) Cooking is only allowed at a (3) Every storey shall be


designated kitchen area, provided with exit facilities
including basement(s). Such for its occupant load. Only
kitchen, shall be enclosed those exits designated for
with at least 1-hr fire-rated escape of the workers shall
compartment wall and at least be included in the exit
½-hr fire-rated door and shall capacity calculations.
not be located within the
dormitory unit. c. Compartmentation

(2) Office and storage are (1) Cooking is only allowed at a


allowed in the basement(s) designated kitchen area,
where the temporary workers’ including basement(s).
quarters are located. They Such kitchen, shall be
shall be compartmented from enclosed with at least 1-hr
the accommodation areas fire-rated compartment wall
with at least 1-hr fire-rated and at least ½-hr fire-rated
compartment wall and at least door and shall not be located
½-hr fire-rated door. within the dormitory unit.

d. Fire engine access (2) Office and storage are


allowed in the basement(s)
(1) Provision of fire engine where the temporary
access road shall be provided workers’ quarters are
in accordance with the located. They shall be
requirements for the compartmented from the
development. Only the accommodation areas with
portion of the fire engine at least 1-hr fire-rated
access road serving the compartment wall and at
temporary workers’ quarters least ½-hr fire-rated door.
shall be made available.
(3) Only non-combustible
(2) Where the remotest materials shall be used for
temporary workers’ quarter is the construction of
located not more than 100m temporary workers’
away from the site entrance at quarters.
the public road, provision of
working private fire hydrant (4) The floor area of each
is exempted. worker bedroom or the total
floor area of a group of
(3) A temporary “dry” fire small worker bedrooms
hydrant is allowed. The “dry” shall not exceed 120m2.
fire hydrant shall be Compartment wall of
connected to a 150mm having fire resistance rating
diameter pipe, which shall be of at least 1-hr shall be
connected the other end to a provided to separate the
4-way breeching inlet. This bedrooms so as to limit
breeching inlet shall be within each compartment size to a
18m from any fire engine maximum of 120m2.
accessway or fire engine
access road having minimum (5) The worker bedrooms shall
4m width and within 50m be separated from the
from any wet fire hydrant. internal corridor by a wall
having fire resistance rating
e. Emergency power supply of at least 1-hr. Doors
opening into the internal
corridor shall have fire
Emergency power supply lasting at resistance rating of at least
least 2-hr shall be provided for all half an hour.
systems requiring it.
(6) The worker bedrooms shall
f. Firefighting systems be separated from the
external corridor by a wall
(1) Where dry riser system is having fire resistance
required for the main rating of at least 1-hr,
development, they shall be except that ventilation
commissioned and made openings of non-
operable for the storeys combustible construction
housing the temporary can be fixed at or above a
workers’ quarters during the level of 1.1m, measured
accommodation period. from the finished floor
level of the external
(2) Provision of automatic corridor to the sill height of
sprinkler system and smoke the opening. Doors
control system is exempted opening into the external
for basement provided all of corridor are not required to
the following requirements have fire resistance rating.
are complied with:
d. Fire engine access
(a) The basement is
effectively cross- (1) Provision of fire engine
ventilated as follows: access road shall be
provided in accordance
(i) no point within with the requirements for
the basement(s) is the development. Only the
more than 12m portion of the fire engine
from any vertical access road serving the
opening or void temporary workers’
for spaces that are
in between two quarters shall be made
openings or available.
voids;
(2) Every part of the required
(ii) no point shall be fire engine access road
more than 6m shall be within an
from any opening unobstructed distance of
or void for spaces 50m from the nearest
that are ventilated working fire hydrant.
by such opening Where the remotest
or void on only temporary workers’
one side; quarter is located not more
than 100m away from the
(iii) all ventilation site entrance at the public
openings shall be road, provision of working
at least 1000 x private fire hydrant is
600mm; and exempted.

(iv) the total (3) A temporary “dry” fire


aggregate area of hydrant is allowed. The
these voids and “dry” fire hydrant shall
vertical openings connected to a 150mm
shall be at least diameter pipe, which shall
20% of the total be connected the other end
basement floor to a 4-way breeching inlet.
area. This breeching inlet shall
be within 18m from any
(b) The occupant load is fire engine accessway or
computed based on 6m2 fire engine access road
per person. having minimum 4m width
and within 50m from any
wet fire hydrant.
(3) An automatic fire alarm
system shall be provided if e. Emergency power supply
provision of automatic fire
sprinkler system is exempted (1) Emergency power supply
for the temporary workers’ lasting at least 2-hr shall be
quarters located in the provided for all
basement(s). firefighting systems
serving the temporary
(4) For temporary workers’ workers’ quarters.
quarters located above ground
level, fire alarm system shall (2) The location,
be provided as stipulated arrangement, control and
under Table 6.3A. installation of electrical
wiring of the secondary
(5) Connection of fire protection source of power supply, be
systems to the approved alarm it in the form of battery,
monitoring company is not standby generator, inverter
required. or other accepted
equipment, shall be in
g. Engineered smoke control system accordance with Chapter
5.
Engineered smoke control and
sprinkler systems shall be required f. Firefighting systems
for the basement levels where the
workers’ quarters are located, if the (1) Where dry riser system is
provision of cross ventilation required for the main
stipulated in Cl.9.3.4.f. cannot be development, they shall
fulfilled. be commissioned and
made operable for the
h. Storage of hazardous materials storeys the temporary
workers’ quarters during
All stores of highly flammable the accommodation
substances shall be sited in open period.
space at a minimum distance of 5m
away from the building where the (2) Provision of automatic
temporary workers’ quarters are sprinkler system and
located and shall comply with the smoke control system is
relevant standards. exempted for basement
provided the basement is
effectively cross-
ventilated as follows:

(a) no point within the


basement(s) is more
than 12m from any
vertical opening or
void for spaces that
are in between two
openings or voids;

(b) no point shall be


more than 6m from
any opening or void
for spaces that are
ventilated by such
opening or void on
only one side;

(c) all ventilation


openings shall be at
least 1000 x 600mm;
and
(d) the total aggregate
area of these voids
and vertical
openings shall be at
least 20% of the
total basement floor
area.

(3) An automatic fire alarm


system shall be provided if
provision of automatic fire
sprinkler system is
exempted for the
temporary workers’
quarters located in the
basement(s).

(4) For temporary workers’


quarters located above
ground level, fire alarm
system shall be provided
as stipulated under Table
6.3A.

(5) Connection of fire


protection systems to the
approved alarm
monitoring company is
not required.

(6) Standby fire hoses can be


installed in lieu of the dry
riser system, on condition
that the temporary
workers’ quarters are
adequately covered by fire
hose reel(s).

(7) Provision of fire


extinguishers shall be in
accordance with Cl.6.1.

(8) Provision of fire hose


reels shall be in
accordance with Cl.6.2.8.

g. Engineered smoke control system

Engineered smoke control and


sprinkler systems shall be required
for the basement levels where the
workers’ quarters are located, if
the provision of cross ventilation
stipulated in Cl.9.3.4.f. cannot be
fulfilled.

h. Storage of hazardous materials

(1) All stores of highly


flammable substances
shall be sited in open
space at a minimum
distance of 5m away from
the building where the
temporary workers’
quarters are located and
shall comply with the
relevant standards.

(2) All LPG cylinder


installations serving the
temporary workers’
quarters shall be in
accordance with Cl.10.1.

i. Occupant load

The occupant load shall be based


on the floor area of the temporary
workers’ quarters on the basis of
3m2 per person, excluding non-
simultaneous areas such as toilets,
kitchens etc., or the actual number
of occupants for which each
occupied space of the floor is
designed as shown on the plan,
whichever is greater.

j. Emergency lighting and exit signs

Emergency lightings and exit


signs serving the temporary
workers’ quarters shall be in
accordance with Cl.8.1.
Annex A
Occupant load Occupant load

The occupant load shall be based on the The occupant load shall be based on the
floor area of the temporary workers’ floor area of the temporary workers’
quarters on the basis of 3m2 per person, quarters on the basis of 3m26m2 per
3 9.3.4i. 30 July 2020 1 Feb 2021 Revised excluding non-simultaneous areas such as person, excluding non-simultaneous areas
toilets, kitchens etc., or the actual number of such as toilets, kitchens etc., or the actual
occupants for which each occupied space of number of occupants for which each
the floor is designed as shown on the plan, occupied space of the floor is designed as
whichever is greater. shown on the plan, whichever is greater.

Occupant load factor for dormitory - Occupant load factor for dormitory - 3m2
4 Table 1.4B 30 July 2020 1 Feb 2021 Revised 3m2/person (bed room area only) 6m2/person (bed room area only)