You are on page 1of 21

CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55

Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019


Mar Apr May Jun Jul Aug Sep Oct Nov Dec
CONMET PROJECT
MILESTONE
Project Start
Structural Top-off
Project Completion
SITE ADAPTATION WORKS 25-May-19, SITE ADAPTATION WORKS
Preliminary Investigation
Preliminary Investigation
Clearing and Grubbing
Clearing and Grubbing
Survey Survey
Site Protection and FencingSite Protection and Fencing
Excavation Excavation
Dewatering Dewatering
Soil Poisoning Soil Poisoning
Gravel bedding after pile hacking Gravel bedding after pile hacking
Sheet Piling Sheet Piling
Backfilling Backfilling
STRUCTURAL WORKS
FOUNDATION 15-May-19, FOUNDATION
Foundation 10-Apr-19, Foundation
Pile Foundation 10-Apr-19, Pile Foundation
Pile Driving Pile Driving
Pile Hacking Pile Hacking
Reinforcement 22-Apr-19, Reinforcement
R - Pile Cap R - Pile Cap
R - Footing Tie Beam R - Footing Tie Beam
R - Septic Tank R - Septic Tank
R - Concrete Columns R - Concrete Columns
R - Shear Wall R - Shear Wall
Formworks 11-May-19, Formworks
F - Pile Cap F - Pile Cap
F - Footing Tie Beam F - Footing Tie Beam
F - Septic Tank F - Septic Tank

Actual Level of Effort Remaining Work Page 1 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
F - Concrete Columns F - Concrete Columns
F - Shear Wall F - Shear Wall
Concreting Works 15-May-19, Concreting Works
C - Pile Cap C - Pile Cap
C - Footing Tie Beam C - Footing Tie Beam
C - Septic Tank C - Septic Tank
C - Concrete Columns C - Concrete Columns
C - Shear Wall C - Shear Wall
1st Level Structural 27-Jun-19, 1st Level Structural
Reinforcements 19-Jun-19, Reinforcements
R - Beams R - Beams
R - Slab on Grade R - Slab on Grade
R - Concrete Columns R - Concrete Columns
R - Shear Walls R - Shear Walls
R - Stairs R - Stairs
Formworks 24-Jun-19, Formworks
F - Beams F - Beams
F - Slab on Grade F - Slab on Grade
F - Concrete Columns F - Concrete Columns
F - Shear Walls F - Shear Walls
F - Stairs F - Stairs
Concreting Works 27-Jun-19, Concreting Works
C - Beams C - Beams
C - Slab on Grade C - Slab on Grade
C - Concrete Columns C - Concrete Columns
C - Shear Walls C - Shear Walls
C - Stairs C - Stairs
Mezzanine Level Structural 17-Jul-19, Mezzanine Level Structural
Reinforcements 09-Jul-19, Reinforcements
R - Beams R - Beams
R - Slab on Grade R - Slab on Grade
R - Concrete Columns R - Concrete Columns
R - Shear Walls R - Shear Walls

Actual Level of Effort Remaining Work Page 2 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
R - Stairs R - Stairs
Formworks 13-Jul-19, Formworks
F - Beams F - Beams
F - Slab on Grade F - Slab on Grade
F - Concrete Columns F - Concrete Columns
F - Shear Walls F - Shear Walls
F - Stairs F - Stairs
Concreting Works 17-Jul-19, Concreting Works
C - Beams C - Beams
C - Slab on Grade C - Slab on Grade
C - Concrete Columns C - Concrete Columns
C - Shear Walls C - Shear Walls
C - Stairs C - Stairs
2nd Level Structural 05-Aug-19, 2nd Level Structural
3rd Level Structural 28-Aug-19, 3rd Level Structural
Reinforcements 17-Aug-19, Reinforcements
R - Beams R - Beams
R - Slab on Grade R - Slab on Grade
R - Concrete Columns R - Concrete Columns
R - Shear Walls R - Shear Walls
R - Stairs R - Stairs
Formworks 23-Aug-19, Formworks
F - Beams F - Beams
F - Slab on Grade F - Slab on Grade
F - Concrete Columns F - Concrete Columns
F - Shear Walls F - Shear Walls
F - Stairs F - Stairs
Concreting Works 28-Aug-19, Concreting Works
C - Beams C - Beams
C - Slab on Grade C - Slab on Grade
C - Concrete Columns C - Concrete Columns
C - Shear Walls C - Shear Walls
C - Stairs C - Stairs

Actual Level of Effort Remaining Work Page 3 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
4th Level Structural 16-Sep-19, 4th Level Structural
Reinforcements 07-Sep-19, Reinforcements
R - Beams R - Beams
R - Slab on Grade R - Slab on Grade
R - Concrete Columns R - Concrete Columns
R - Shear Walls R - Shear Walls
R - Stairs R - Stairs
Formworks 12-Sep-19, Formworks
F - Beams F - Beams
F - Slab on Grade F - Slab on Grade
F - Concrete Columns F - Concrete Columns
F - Shear Walls F - Shear Walls
F - Stairs F - Stairs
Concreting Works 16-Sep-19, Concreting Works
C - Beams C - Beams
C - Slab on Grade C - Slab on Grade
C - Concrete Columns C - Concrete Columns
C - Shear Walls C - Shear Walls
C - Stairs C - Stairs
5th Level Structural 04-Oct-19, 5th Level Structural
Reinforcements 26-Sep-19, Reinforcements
R - Beams R - Beams
R - Slab on Grade R - Slab on Grade
R - Concrete Columns R - Concrete Columns
R - Shear Walls R - Shear Walls
R - Stairs R - Stairs
Formworks 01-Oct-19, Formworks
F - Beams F - Beams
F - Slab on Grade F - Slab on Grade
F - Concrete Columns F - Concrete Columns
F - Shear Walls F - Shear Walls
F - Stairs F - Stairs
Concreting Works 04-Oct-19, Concreting Works

Actual Level of Effort Remaining Work Page 4 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
C - Beams C - Beams
C - Slab on Grade C - Slab on Grade
C - Concrete Columns C - Concrete Columns
C - Shear Walls C - Shear Walls
C - Stairs C - Stairs
6th Level Structural 23-Oct-19, 6th Level Structural
Reinforcements 15-Oct-19, Reinforcements
R - Beams R - Beams
R - Slab on Grade R - Slab on Grade
R - Concrete Columns R - Concrete Columns
R - Shear Walls R - Shear Walls
R - Stairs R - Stairs
Formworks 19-Oct-19, Formworks
F - Beams F - Beams
F - Slab on Grade F - Slab on Grade
F - Concrete Columns F - Concrete Columns
F - Shear Walls F - Shear Walls
F - Stairs F - Stairs
Concreting Works 23-Oct-19, Concreting Works
C - Beams C - Beams
C - Slab on Grade C - Slab on Grade
C - Concrete Columns C - Concrete Columns
C - Shear Walls C - Shear Walls
C - Stairs C - Stairs
7th Level Structural 13-Nov-19, 7th Level Structural
Reinforcements 05-Nov-19, Reinforcements
R - Beams R - Beams
R - Slab on Grade R - Slab on Grade
R - Concrete Columns R - Concrete Columns
R - Shear Walls R - Shear Walls
R - Stairs R - Stairs
Formworks 09-Nov-19, Formworks
F - Beams F - Beams

Actual Level of Effort Remaining Work Page 5 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
F - Slab on Grade F - Slab on Grade
F - Concrete Columns F - Concrete Columns
F - Shear Walls F - Shear Walls
F - Stairs F - Stairs
Concreting Works 13-Nov-19, Concreting Works
C - Beams C - Beams
C - Slab on Grade C - Slab on Grade
C - Concrete Columns C - Concrete Columns
C - Shear Walls C - Shear Walls
C - Stairs C - Stairs
8th Level Structural 03-Dec-19, 8th Level Structural
Reinforcements 23-Nov-19, Reinforcements
R - Beams R - Beams
R - Slab on Grade R - Slab on Grade
R - Concrete Columns R - Concrete Columns
R - Shear Walls R - Shear Walls
R - Stairs R - Stairs
Formworks 28-Nov-19, Formworks
F - Beams F - Beams
F - Slab on Grade F - Slab on Grade
F - Concrete Columns F - Concrete Columns
F - Shear Walls F - Shear Walls
F - Stairs F - Stairs
Concreting Works 03-Dec-19, Concreting Works
C - Beams C - Beams
C - Slab on Grade C - Slab on Grade
C - Concrete Columns C - Concrete Columns
C - Shear Walls C - Shear Walls
C - Stairs C - Stairs
9th Level Structural 21-Dec-19, 9th Level S
Reinforcements 13-Dec-19, Reinforcements
R - Beams R - Beams
R - Slab on Grade R - Slab on Grade

Actual Level of Effort Remaining Work Page 6 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
R - Concrete Columns R - Concrete Columns
R - Shear Walls R - Shear Walls
R - Stairs R - Stairs
Formworks 18-Dec-19, Formworks
F - Beams F - Beams
F - Slab on Grade F - Slab on Grade
F - Concrete Columns F - Concrete Columns
F - Shear Walls F - Shear Walls
F - Stairs F - Stairs
Concreting Works 21-Dec-19, Concreting
C - Beams C - Beams
C - Slab on Grade C - Slab on Grade
C - Concrete Columns C - Concrete Columns
C - Shear Walls C - Shear Walls
C - Stairs C - Stairs
10th Level Structural
Reinforcements
R - Beams
R - Slab on Grade R - Slab on Grade
R - Concrete Columns
R - Shear Walls
R - Stairs R - Stairs
Formworks
F - Beams
F - Slab on Grade F - Slab on Grade
F - Concrete Columns
F - Shear Walls
F - Stairs
Concreting Works
C - Beams
C - Slab on Grade C - Slab on Grade
C - Concrete Columns
C - Shear Walls

Actual Level of Effort Remaining Work Page 7 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
C - Stairs
Roof Deck Structural
Reinforcements
R - Beams
R - Slab on Grade
R - Concrete Columns
R - Shear Walls
Formworks
F - Beams
F - Slab on Grade
F - Concrete Columns
F - Shear Walls
Concreting Works
C - Beams
C - Slab on Grade
C - Concrete Columns
C - Shear Walls
Roofing Installation
Roofing Installation
BASIC ARCHITECTURAL WORKS
1st Floor Level
Masonry Works 28-Sep-19, Masonry Works
Steel Reinforcement for Walls Steel Reinforcement for Walls
CHB Laying of Walls CHB Laying of Walls
Lintel Beams (Doors & Windows) Lintel Beams (Doors & Windows)
Plastering Plastering
Stair Finishing Stair Finishing
Ceiling Works
Installation of Ceiling Frames
Installation of Ceiling Boards
Tiling Works
Setting Out & Tile Laying
Metal Works 27-Sep-19, Metal Works

Actual Level of Effort Remaining Work Page 8 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Stair Railings Stair Railings
Painting Works
Skim Coating
Interior Ceiling Painting
Interior Wall Painting
Doors and Windows
Installation of Window Panel Installation of Window Panel
Installation of Door Panel
Installation of Window Installation of Window
Installation of Door with Ironmongery
Installation of Grilles
Mezzanine Level
Masonry Works 01-Oct-19, Masonry Works
Steel Reinforcement for Walls Steel Reinforcement for Walls
CHB Laying of Walls CHB Laying of Walls
Lintel Beams (Doors & Windows) Lintel Beams (Doors & Windows)
Plastering Plastering
Ceiling Works
Installation of Ceiling Frames
Installation of Ceiling Boards
Tiling Works
Setting Out & Tile Laying
Metal Works
Painting Works
Skim Coating
Interior Ceiling Painting
Interior Wall Painting
Doors and Windows
Installation of Door Panel
Installation of Door with Ironmongery
Installation of Grilles
2nd Floor Level
3rd Floor Level

Actual Level of Effort Remaining Work Page 9 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Masonry Works 18-Nov-19, Masonry Works
Steel Reinforcement for Walls Steel Reinforcement for Walls
CHB Laying of Walls CHB Laying of Walls
Lintel Beams (Doors & Windows) Lintel Beams (Doors & Windows)
Plastering Plastering
Stair Finishing Stair Finishing
Ceiling Works
Installation of Ceiling Frames
Installation of Ceiling Boards
Tiling Works
Setting Out & Tile Laying
Metal Works 13-Nov-19, Metal Works
Stair Railings Stair Railings
Painting Works
Skim Coating
Interior Ceiling Painting
Interior Wall Painting
Doors and Windows
Installation of Window Panel Installation of Window Panel
Installation of Door Panel
Installation of Window Installation of Window
Installation of Door with Ironmongery
Installation of Grilles
4th Floor Level
5th Floor Level
Masonry Works
Steel Reinforcement for Walls Steel Reinforcement for Wa
CHB Laying of Walls CHB Laying of Walls
Lintel Beams (Doors & Windows) Lintel Beams (Doors & W
Plastering
Stair Finishing Stair Finishing
Ceiling Works
Installation of Ceiling Frames

Actual Level of Effort Remaining Work Page 10 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Installation of Ceiling Boards
Tiling Works
Setting Out & Tile Laying
Metal Works 21-Dec-19, Metal Wor
Stair Railings Stair Railings
Painting Works
Skim Coating
Interior Ceiling Painting
Interior Wall Painting
Doors and Windows
Installation of Window Panel
Installation of Door Panel
Installation of Window
Installation of Door with Ironmongery
Installation of Grilles
6th Floor Level
Masonry Works
Steel Reinforcement for Walls
CHB Laying of Walls
Lintel Beams (Doors & Windows)
Plastering
Stair Finishing
Ceiling Works
Installation of Ceiling Frames
Installation of Ceiling Boards
Tiling Works
Setting Out & Tile Laying
Metal Works
Stair Railings
Painting Works
Skim Coating
Interior Ceiling Painting
Interior Wall Painting

Actual Level of Effort Remaining Work Page 11 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Doors and Windows
Installation of Window Panel
Installation of Door Panel
Installation of Window
Installation of Door with Ironmongery
Installation of Grilles
7th Floor Level
Masonry Works
Steel Reinforcement for Walls
CHB Laying of Walls
Lintel Beams (Doors & Windows)
Plastering
Stair Finishing
Ceiling Works
Installation of Ceiling Frames
Installation of Ceiling Boards
Tiling Works
Setting Out & Tile Laying
Metal Works
Stair Railings
Painting Works
Skim Coating
Interior Ceiling Painting
Interior Wall Painting
Doors and Windows
Installation of Window Panel
Installation of Door Panel
Installation of Window
Installation of Door with Ironmongery
Installation of Grilles
8th Floor Level
Masonry Works
Steel Reinforcement for Walls

Actual Level of Effort Remaining Work Page 12 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
CHB Laying of Walls
Lintel Beams (Doors & Windows)
Plastering
Stair Finishing
Ceiling Works
Installation of Ceiling Frames
Installation of Ceiling Boards
Tiling Works
Setting Out & Tile Laying
Metal Works
Stair Railings
Painting Works
Skim Coating
Interior Ceiling Painting
Interior Wall Painting
Doors and Windows
Installation of Window Panel
Installation of Door Panel
Installation of Window
Installation of Door with Ironmongery
Installation of Grilles
9th Floor Level
Masonry Works
Steel Reinforcement for Walls
CHB Laying of Walls
Lintel Beams (Doors & Windows)
Plastering
Stair Finishing
Ceiling Works
Installation of Ceiling Frames
Installation of Ceiling Boards
Tiling Works
Setting Out & Tile Laying

Actual Level of Effort Remaining Work Page 13 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Metal Works
Stair Railings
Painting Works
Skim Coating
Interior Ceiling Painting
Interior Wall Painting
Doors and Windows
Installation of Window Panel
Installation of Door Panel
Installation of Window
Installation of Door with Ironmongery
Installation of Grilles
10th Floor Level
Masonry Works
Steel Reinforcement for Walls
CHB Laying of Walls
Lintel Beams (Doors & Windows)
Plastering
Stair Finishing
Ceiling Works
Installation of Ceiling Frames
Installation of Ceiling Boards
Tiling Works
Setting Out & Tile Laying
Metal Works
Stair Railings
Painting Works
Skim Coating
Interior Ceiling Painting
Interior Wall Painting
Doors and Windows
Installation of Window Panel
Installation of Door Panel

Actual Level of Effort Remaining Work Page 14 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Installation of Window
Installation of Door with Ironmongery
Installation of Grilles
Roof Deck
Masonry Works
Steel Reinforcement for Walls
CHB Laying of Walls
Lintel Beams (Doors & Windows)
Plastering
Ceiling Works
Installation of Ceiling Frames
Installation of Ceiling Boards
Tiling Works
Setting Out & Tile Laying
Metal Works
Balcony Railings
Painting Works
Skim Coating
Interior Ceiling Painting
Interior Wall Painting
Doors and Windows
Installation of Window Panel
Installation of Door Panel
Installation of Window
Installation of Door with Ironmongery
Exterior Painting
Exterior Painting From First Floor
THERMAL AND MOISTURE PROTECTION
1st Floor Level 30-Sep-19, 1st Floor Level
Waterproofing membrane forT&B Waterproofing membrane for T&B
Mezzanine Level
2nd Floor Level 25-Oct-19, 2nd Floor Level
Waterproofing membrane forT&B Waterproofing membrane forT&B

Actual Level of Effort Remaining Work Page 15 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
3rd Floor Level 15-Nov-19, 3rd Floor Level
Waterproofing membrane forT&B Waterproofing membrane forT&B
4th Floor Level 05-Dec-19, 4th Floor Level
Waterproofing membrane forT&B Waterproofing membrane forT&
5th Floor Level
Waterproofing membrane forT&B
6th Floor Level
Waterproofing membrane forT&B
7th Floor Level
Waterproofing membrane forT&B
8th Floor Level
Waterproofing membrane forT&B
9th Floor Level
Waterproofing membrane forT&B
10th Floor Level
Waterproofing membrane forT&B
Roof Deck
Waterproofing membrane for Balcony
MEPFS
MECHANICAL WORKS
1st Floor Level
HVAC Systems
Mezzanine Level
HVAC Systems
2nd Floor Level
HVAC Systems
3rd Floor Level
HVAC Systems
4th Floor Level
HVAC Systems
5th Floor Level
HVAC Systems
6th Floor Level

Actual Level of Effort Remaining Work Page 16 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
HVAC Systems
7th Floor Level
HVAC Systems
8th Floor Level
HVAC Systems
9th Floor Level
HVAC Systems
10th Floor Level
HVAC Systems
Roof Deck
HVAC Systems
ELECTRICAL WORKS
First Fix: Roughing Installation
1st Floor RI 1st Floor RI
Mezzanine Floor RI Mezzanine Floor RI
2nd Floor RI 2nd Floor RI
3rd Floor RI 3rd Floor RI
4th Floor RI 4th Floor RI
5th Floor RI 5th Floor RI
6th Floor RI 6th Floor RI
7th Floor RI 7th Floor RI
8th Floor RI 8th Floor RI
9th Floor RI 9th Floor RI
10th Floor RI 10th Floor RI
Roof Deck RI
Second Fix: Cable Pulling (Wiring)
1st Floor CP (wiring)
Mezzanine Floor CP (wiring)
2nd Floor CP (wiring)
3rd Floor CP (wiring)
4th Floor CP (wiring)
5th Floor CP (wiring)
6th Floor CP (wiring)

Actual Level of Effort Remaining Work Page 17 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
7th Floor CP (wiring)
8th Floor CP (wiring)
9th Floor CP (wiring)
10th Floor CP (wiring)
Roof Deck CP (wiring)
Final Fix: Electrical Fixtures
1st Floor EF
Mezzanine EF
2nd Floor EF
3rd Floor EF
4th Floor EF
5th Floor EF
6th Floor EF
7th Floor EF
8th Floor EF
9th Floor EF
10th Floor EF
Roof Deck EF
PLUMBING WORKS
Installation of Drainage System
1st Floor DS 1st Floor DS
Mezzanine Floor DS Mezzanine Floor DS
2nd Floor DS 2nd Floor DS
3rd Floor DS 3rd Floor DS
4th Floor DS 4th Floor DS
5th Floor DS 5th Floor DS
6th Floor DS
7th Floor DS
8th Floor DS
9th Floor DS
10th Floor DS
Roof Deck DS

Actual Level of Effort Remaining Work Page 18 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Installation of Water Supply System
1st Floor WSS 1st Floor WSS
Mezzanine Floor WSS Mezzanine Floor WSS
2nd Floor WSS 2nd Floor WSS
3rd Floor WSS 3rd Floor WSS
4th Floor WSS 4th Floor WSS
5th Floor WSS 5th Floor WSS
6th Floor WSS
7th Floor WSS
8th Floor WSS
9th Floor WSS
10th Floor WSS
Roof Deck WSS
Installation of Fixtures
1st Floor Fixtures
2nd Floor Fixtures
3rd Floor Fixtures
4th Floor Fixtures
5th Floor Fixtures
6th Floor Fixtures
7th Floor Fixtures
8th Floor Fixtures
9th Floor Fixtures
10th Floor Fixtures
Roof Deck Fixtures
FIRE PROTECTION WORKS
1st Floor Level 25-Sep-19, 1st Floor Level
1st Fix: Hanger 1st Fix: Hanger
2nd Fix: Pipes 2nd Fix: Pipes
3rd Fix: Sprinklers 3rd Fix: Sprinklers
Mezzanine Level 27-Sep-19, Mezzanine Level
1st Fix: Hanger 1st Fix: Hanger
2nd Fix: Pipes 2nd Fix: Pipes

Actual Level of Effort Remaining Work Page 19 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
3rd Fix: Sprinklers 3rd Fix: Sprinklers
2nd Floor Level 19-Oct-19, 2nd Floor Level
1st Fix: Hanger 1st Fix: Hanger
2nd Fix: Pipes 2nd Fix: Pipes
3rd Fix: Sprinklers 3rd Fix: Sprinklers
3rd Floor Level 09-Nov-19, 3rd Floor Level
1st Fix: Hanger 1st Fix: Hanger
2nd Fix: Pipes 2nd Fix: Pipes
3rd Fix: Sprinklers 3rd Fix: Sprinklers
4th Floor Level 28-Nov-19, 4th Floor Level
1st Fix: Hanger 1st Fix: Hanger
2nd Fix: Pipes 2nd Fix: Pipes
3rd Fix: Sprinklers 3rd Fix: Sprinklers
5th Floor Level 18-Dec-19, 5th Floor Lev
1st Fix: Hanger 1st Fix: Hanger
2nd Fix: Pipes 2nd Fix: Pipes
3rd Fix: Sprinklers 3rd Fix: Sprinklers
6th Floor Level
1st Fix: Hanger
2nd Fix: Pipes
3rd Fix: Sprinklers
7th Floor Level
1st Fix: Hanger
2nd Fix: Pipes
3rd Fix: Sprinklers
8th Floor Level
1st Fix: Hanger
2nd Fix: Pipes
3rd Fix: Sprinklers
9th Floor Level
1st Fix: Hanger
2nd Fix: Pipes
3rd Fix: Sprinklers

Actual Level of Effort Remaining Work Page 20 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation
CONMET PROJECT Classic Schedule Layout 26-Jan-19 04:55
Activity Name Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
10th Floor Level
1st Fix: Hanger
2nd Fix: Pipes
3rd Fix: Sprinklers
Roof Deck
1st Fix: Hanger
2nd Fix: Pipes
3rd Fix: Sprinklers
CONVEYING SYSTEMS
Elevator Installation
Elevator Inspection
Elevator Testing and Commissioning
Tower Crane Dismantling

Actual Level of Effort Remaining Work Page 21 of 21 TASK filter: All Activities
Actual Work Critical Remaining Work © Oracle Corporation