• Contractor:
– Sangamo Construction Co.
– Emergency bearing replacement Beardstown
contract Cass Co.
IDOT Dist. 6
– Retained WHKS
2018 ACEC-IL / IDOT Bridge Seminar
Project Description
420’
960’
360’ 360’
E F
Span 13 E
E E F
Span 9 E
R-Jack ≈ 1.1*R-DL
V
Potential “propped cantilever” behavior
M
• At Floorbeam Web:
V – Eccentricity = + on bolts
M – fRES > Fv (Exist. A325 bolts)
P-T Bars
(Relieves prying Sliding
action in gusset surfaces
plate bolts) under jacks
Need to slide
existing bearing to
outside to remove
Prior Inspection
Report Sketch
Harness lanyard
Span 9 FB - West
• Detailed procedure
req’d to protect gusset
connection integrity
Lubricated
SS/TFE
sliding
surface (2-3
days for brg.
replacement)
2018 ACEC-IL / IDOT Bridge Seminar
Miscellaneous Design Issues
• RDL = 310 kips (Unit 1), 275 kips (Unit 2)
– From AASHTO rating software
– Agrees with exist. plan loading diagram
– But how much does it really weigh?!?
– Increased RDL 10% to account for misc.
weight (utilities, rust, etc….)
– JackDL ≈ 1.2*RDL (including propped cantilever
behavior)
?
Shop
Drawings
?
Shop
Don’t be afraid to inquire and Drawings
ask questions!!!!
WHKS Plans: Back Gouge/Field Weld