F _____

JOB TITLE / AIM: JSA for Cold box washing (External) with Demin water
JSA DATE: 15/03/07 JSA NO./ REVISION: 00
SUPERVISOR/ JSA LEADER: Waseem SCRIBE: Aamir Aziz Khan
PARTICIPANTS: Shahid,Asif
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1.Mobilization of Equipment & workers
 Pneumatic Pump
 Air Compressor
 Cherry Picker use
2. Washing the external structure (Working on elevated platform (Cherry Picker))
3.Demobilization

Alternatives Considered: N/A

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the Hse personnel is the first response in case of
emergency

Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)

1 Mobilization of equipment Unauthorised equipment/tools brought out to Before mobilizing any equipment/tools make sure
 Pneumatic Pump site that the E &P Personnel & BHP got inspected the
 Air Compressor equipment. Checklist are in equipment Tag shall
be obtained from E&P
 Demin Water Boozer
Ensure that pumps and air compressor shall be in
Cherry picker
good and working condition.
Whip checks shall be installed on every Chicago
couplings on air compressors , Pneumatic Pumps
Ensure that checklist shall be made available with
water boozer and checked by E&P
Unskilled and uninducted personnel starting Ensure that all personnel prior to start the have
the job been inducted and oriented about the hazard in the
job site. Only trained personnel shall do the
activity.
Workers starting the job unfit to work All personnel must be undergone fitness for work
assessment thru Del doctor
Workers starting the job without JSA JSA must be in place prior to work. Ensure all the
persons take part in the toolbox meeting
discussion. Persons signed at the back of JSA on
daily basis.

Hand Injury Ensure proper hauling of materials/get help if


required. Hand gloves shall be worn at all times.
Back injury Ensure proper posture and positioning shall be
maintained
Miscommunication Ensure standby radio fully charge are in place at all
times
Ensure that area to be secured and barricaded with
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)

signage( wet surface )in place


Slips Ensure that slow movement shall be maintained.
Watch steps during job execution.
2 Washing the external structure Water spillage on to the electrical DBs, Ensure that washing shall be done in a way that no
(Working on elevated platform Electrical appliance electrical equipments come across its way
(Cherry Picker)) While washing ensure that all EWP panels are
covered with Polythene bag
Area where washing shall be done a bund shall be
made of soil / Sand to avoid water spillage. Surface
shall be clean
Rainy coat shall be worn while washing is in
progress.

3 Demobilization Same Proper house keeping shall be done prior to


demobilization