Abbreviation Full Name

*FEED Front End Engineering Design


*HAZOP Hazard Operability
*P&ID Piping and Instrumentation Diagram
*Plot Plan Plant and Equipment Layout
BM / BQ Bill of Material, Bill of Quantity
D/S Data Sheet
DCS Distribute Control System
DEDD Detailed Engineering Design Data
DESP Detailed Engineering Schedule Progress
EPC Engineering, Procurement, Construction
EPCM Engineering, Procurement, Construction, Management
FAT Factory Acceptance Test
GA General arrangement
GTL Gas-to-Liquids Processing
IFA Issue for approval
IFC Issue for construction
Index Index
LNG Liquefied Natural Gas
LPG Liquefied Petroleum Gas
MCC Motor Control Centre
MTO Material Taking Off
NGL Natural Gas Liquids
PDS Plant Development System
PFD Process Flow Diagram
PMT Project Management Team
Rating Rating
RFC Release for Concept
RFD Release for Design
Shut Down (Equipment) Shut Down
SPEC Specifications
T&C Local and integrated commissioning
TBE Technical Bid Evaluation
Tie-in (Pipe) Tie-In
UFD Utility Flow Diagram
* Main
Discipline Involved
All
Process
Process
Piping
All
Process
Instrument
All
All
General

Equipment
Equipment
General
All
All
Instrument
General
General
Electrical, Instrument
Piping, civil, instrument, electrical
General
Piping
Process
All
Equipment
All
All
Equipment
All
Equipment
Equipment, Instrument
Piping
Process
Meanings / Remarks
Also called "Basic design and engineering package
Operation risk assessment for flammable process plants
The first and main drawing, from which the piping and other disciplines start design work.
Main drawing
For enquiry and quotation
Requirements / requisition / technical parameters to downstream disciplines for their design input

Weekly engineering progress monitoring system

Factory test before shipment


General layout

(Drawings) submit to client for approval


(After drawing approval) used for construction
Instrument list

Piping 3D design programme combination of database and drafting. Comprehensive.

Equipment selection

Equipment shut down for periodic maintenance


Technical requirements mainly used to get quotations from vendors and suppliers. Also used for construction quality contr
Local: individual; Integrated: all, the system; Commissioning: test, certified and put into use.
Review technical proposal from vendor based on specifications before proceeding to procurement.
To connect the new pipe line to the existing one