GENERAL
APCO Attarat Power Company
GPEC China Energy Engineering Group GuangDong Power Engineering Co., Ltd
MM Mott Macdonald
NEPCO National Electric Power Company
WP WorleyParsons
A
A/G Above ground
B
BEDD Basic Engineering Design Data
BOM Bill of Materials
BOP Balance of Plant
C
CAD Computer aided drafting
CADD Computer aided drafting and design
CCR Central Control Room
CO Change Order
D
DC or dc Direct Current
DCS Distributed Control System
DWG Drawing
DTDP Discipline Task and Deliverable Plans
E
EMS Enterprise Management System
EPC Engineer, Procure, Construct
EPS Electrostatic‐Fabric Integrated Deducting Precipitator
ER Engineering Requisition
ETA Estimated Time of Arrival
ETAP Electrical Transient Analyzer Program
F
FAT Factory Acceptance Test
G
GPS Global Positioning System
GSM Global System for Mobile
GSUT generator step‐up (GSU) transformer
H
H&MB Heat and Mass Balance
HAZOP Hazard and Operability study
HVAC Heating, Ventilating and Air Conditioning
HYSYS Process Simulation Software Package
I
2X235 MW Attarat Oil Shale Power Plant ‐ Jordan
I/O Input/ Output
IFB Issue for Bid
IFC Issued for Construction
IMS Information Management System – IBM Software package
ITP Inspection and Test Plan
J
JIS Japanese Institute for Standardisation
JO Job Order
K
L
L/D Length to Diameter ratio
LAN Local Area Network
LCC Life Cycle Cost
M
MAOP Maximum Allowable Operating Pressure
MAWP Maximum Allowable Working Pressure
MCR Maximum Continuous Rating
MDR Manufacturer’s Data Report
MOE Manager of Engineering
MTO Material Take Off
N
NDE Non‐Destructive Examination
NEMA National Electrical Manufacturers Association
NPS Nominal Pipe Size
NPSH Net Positive Suction Head
NPSHa Net Positive Suction Head available
NPSHr Net Positive Suction Head required
NPT National Pipe Thread standard
O
OD Outside Diameter
OPC Open Connectivity (Comms standard for industrial automation)
P
P&ID Piping and Instrument Diagram
PAT Performance Acceptance Test
PCR Project Change Request
PEM Project Execution Manual
PEP Project Execution Plan
PFD Process Flow Diagram
PM Project Manager, Project Management
PMI Positive Material Identification
PO, PO# Purchase Order, PO number
PPE Personal Protective Equipment
2X235 MW Attarat Oil Shale Power Plant ‐ Jordan
Q
QA Quality Assurance
QA/QC Quality Assurance/ Quality Contyrol
QC Quality Control
Qtr Quarter, year segment
R
RGB Red, Green, Blue (video signals)
RH Relative Humidity
S
SDR Supplier Drawing and Data
SDRL Supplier Data Requirements List
SID Safety In Design
SIL Safety Integrity Level
SOW Scope of Work
SPI SmartPlant Instrumentation (Tool)
STG Steam Turbine Generator
T
TBD To Be Decided
TBE Technical Bid Evaluation
TCS Turbine Control System
TDS Total Dissolved Solids
TQ Technical Query
U
UBC Uniform Building Code (UBC 1997)
U/G Underground
V
VFD Variable Frequency Drive
VMS Vibration Monitoring System (packages)
VSD Variable Speed Drive
VT Voltage Transformer
W
WAN Wide Area Network
WBS Work Breakdown Structure
WIFI Wireless Fidelity
WIP Work in progress
X
Y
Z