No.: PARTICULARS QTY UOM UNIT COST AMOUNT WT % 1ST MONTH 2ND MONTH 3RD MONTH 4TH MONTH
A. DIRECT COST: W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
1. SURVEY WORKS 87,480.00 sqm 1.50 ₱ 131,220.00 0.23% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
2. CLEARING AND GRUBBING 87,480.00 sqm 10.00 ₱ 874,800.00 1.50% 0.38% 0.38% 0.38% 0.38%
3. EARTHWORKS (Excavation & Engineering Fill) 1.00 lot 2,328,615.00 ₱ 2,328,615.00 4.00% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50%
4. ROADWORKS:
Road Excavation/Cutting 17,036.00 cum 30.00 ₱ 511,080.00 0.88% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
Road Engineering Fill 12,815.00 cum 45.00 ₱ 576,675.00 0.99% 0.12% 0.12% 0.12% 0.12% 0.12% 0.12% 0.12% 0.12%
Coarse Materials & Preparation 21,343.00 sqm 111.54 ₱ 2,380,520.80 4.09% 0.17% 0.17% 0.17% 0.17%
Road & Alleys 17,922.00 sqm 904.05 ₱ 16,202,401.02 27.82% 1.16% 1.16% 1.16% 1.16%
Curbs & Gutter 6,833.00 lm 507.53 ₱ 3,467,964.73 5.95% 0.23% 0.23%
Concrete Sidewalk 3,726.00 sqm 442.14 ₱ 1,647,412.00 2.83%
5. SLOPE PROTECTION:
SP-1: Gravity Type Retaining Wall, Dimension: 2.00m(L) x 2.00m(H) 7.00 nos 17,658.73 ₱ 123,611.09 0.21% 0.11% 0.11%
SP-2: Gravity Type Retaining Walll, Dimension: 2.00m(L) x 3.00m(H) 5.00 nos 37,718.49 ₱ 188,592.45 0.32% 0.16% 0.16%
SP-3: Gravity Type Retaining Walll, Dimension: 5.00m(L) x 3.00m(H) 1.00 nos 95,467.23 ₱ 95,467.23 0.16% 0.16%
CHB Wall-1: 6" w/o Buttress Wall (Max. H = 1.00m) 438.00 lm 5,724.48 ₱ 2,507,323.93 4.30% 0.72% 0.72% 0.72% 0.72% 0.72% 0.72%
CHB Wall-2: 6" w/ Buttress Wall (Max. H = 2.00m) 266.00 lm 6,767.92 ₱ 1,800,266.37 3.09% 0.52% 0.52% 0.52% 0.52% 0.52% 0.52%
CHB Wall-3: 6" w/ Buttress Wal (Max. H = 3.00m) 115.00 lm 9,498.24 ₱ 1,092,297.80 1.88% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31%
6. RETAINING WALL FOR SPLIT ELEVATION:
RW-1: Retaining Wall (0.80m - 1.00m) 15.00 lm 3,044.33 ₱ 45,665.00 0.08% 0.03% 0.03% 0.03%
RW-2: Retaining Wall (0.60m - 0.79m) 77.00 lm 2,717.19 ₱ 209,223.44 0.36% 0.09% 0.09% 0.09% 0.09%
7. SEWERLINE:
Manholes (300mmØ to 900mmØ) 184.00 nos 71,339.55 ₱ 1,546,865.48 2.66% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13%
Reinforced Concrete Piping 2,986.00 lm 816.67 ₱ 2,438,580.00 4.19% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21%
Steel Grating 27.00 lm 2,893.79 ₱ 78,132.39 0.13%
8. CONSTRUCTION OF BRIDGE:
All necessary works for grouted riprap, Class A Mixture (Wingwall,
Riprap, Railing Guards, RCP & Shear Key Apron), Gabion Wall,
Roadway, 1.00 lot 287,671.40 ₱ 4,067,926.90 6.98% 1.16% 1.16% 1.16% 1.16% 1.16% 1.16%
Curbs & Gutter, Concrete Sidewalk, Cyclone Fence, General Cleaning
& Hauling Works
9. WATERLINE:
uPVC Piping C-150, including installation of fittings, line valves,
4,134.00 lm 1,427.18 ₱ 5,899,980.36 10.13% 0.30% 0.30% 0.30% 0.30%
hydrants, air release valves & household connections.
10. PERIMETER FENCE:
4" CHB FENCE (Standard Height = 1.8m) 1,645.00 lm 3,830.44 ₱ 6,301,075.28 10.82% 0.49% 0.49% 0.49% 0.49% 0.49% 0.49% 0.49% 0.49% 0.49% 0.49%
CYCLONE FENCE (Standard Height = 1.8m) 450.00 lm 2,745.15 ₱ 1,235,317.01 2.12% 0.18% 0.18% 0.18% 0.18%
A. INDIRECT COST
Mobilization & Demobilization 1.00 lot 200,000.00 ₱ 200,000.00 0.34% 0.04% 0.04% 0.04% 0.04%
Tools/Machines Needed, Temporary Connections, Power & Water,
Temporary Facilities (Barracks & Warehouse), Site Management, and 1.00 lot 2,295,020.27 ₱ 2,295,020.27 3.94% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08%
Contractor's Tax-EWT, 2%
₱ 58,246,033.56 100.00%
WEEKLY ACCOMPLISHMENTS 0.51% 0.51% 0.51% 0.51% 1.86% 1.86% 2.58% 2.91% 3.56% 3.92% 3.20% 3.20% 4.51% 4.51% 3.90% 3.36%
MONTHLY ACCOMPLISHMENTS 2.02% 9.21% 13.88% 16.27%
0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17%
1.16% 1.16% 1.16% 1.16% 1.16% 1.16% 1.16% 1.16% 1.16% 1.16% 1.16% 1.16% 1.16% 1.16% 1.16% 1.16% 1.16% 1.16% 1.16% 1.16%
0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13%
0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21%
0.07% 0.07%
0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.49% 0.49% 0.49% 0.49% 0.49% 0.49% 0.49% 0.49% 0.49% 0.49% 0.49% 0.49%
0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18%
0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08%
3.06% 3.06% 3.06% 3.06% 3.13% 3.13% 3.06% 3.06% 2.89% 2.89% 2.89% 2.89% 2.19% 2.19% 2.05% 2.05% 2.05% 2.05% 2.05% 2.05% 0.72% 0.72% 0.72% 0.72% 0.49% 0.49% 0.39% 0.39% 0.42% 0.42% 0.13% 0.13%
12.25% 12.39% 11.54% 8.47% 8.21% 2.89% 1.76% 1.10%