SYSTEM COMPLETION DOSSIER
INFRASTRUCTURE (PILE)
( SD-MC-01-01 )
INDEX
No Description Page
II Turnover Documents
1. System Description
2. List of Pile Drawing
3. Summary of Field Inspection Report
4. Punch List
System No.
SD-MC-01-01
System Turn Over Notice
This certificate acknowledges that the above package as define, has been erected/assembled in full accordance
with design and vendor drawings and has been inspected, tested, completed and pre-commissioned except as
shown in the attach exception list. All outstanding work is defined in the attached punch list or noted below. This
package will be under control of commissioning group upon acceptance.
We hereby agree that the above system as define, fully complies with the requirement of CONSTRUCTION
COMPLETION. This certificate documents the transfer of care, custody and control of the system to the
OWNER.
The system is now safe and ready for commissioning activities to begin.
Construction Client Operation
Representative Representative Representative
System Number : 01 - 01
I.1
I.2
II.1
System Description
SYSTEM COMPLETION DOSSIER
PILING WORKS
( SD-MC-01-01 )
II.2
II.3
II.4
Punch List
SYSTEM COMPLETION DOSSIER
PILING WORKS
( SD-MC-01-01 )
III.1
III.2
III.3
III.4
System No. :
System Definition :
Associated Sub-System
Associated Drawings
Comments
We hereby agree that the above system as defined that fully complies with the requirements of
Construction Completion. The system is now safe and ready for commissioning to begin even the
outstanding work is still on progress that will not affected the commissioning works.
▼
8 8.1 Issue for Review
Notice of
Ready for Start-up
(RFSU) ▶ 9 9.1 Within 7 calendar days
after receipt of RFSU
RFSU Certificate
10 ◀ 10.1 Punch Clear (Item "D")
Commssioning &
Performance Test
▶ 11 11.1 Within 7 calendar days
after performance test
Provisional Acceptance
Certificate