Professional Documents
Culture Documents
Simulasi CGF Dan PH
Simulasi CGF Dan PH
2/16/2019 3/18/2019
CCG CSL CGF CGF
2 mm TEREOS Basah Kering
KA % 7.3 62.9 47.0 12.0 KA %
Whiteness 36.0 Whiteness
Protein % 2.5 15.3 11.6 19.3 Protein %
Ratio 1.0 1.0 Ratio Bersih
Berat Bersih Gr 100.0 100.0 200.0 Berat Bersih Gr
Berat Kotor Gr 107.9 269.5 377.4 227.3 Berat Kotor Gr
Tambah air Lt Tambah air Lt
10.1 174.9
2/20/2019
CCG FML CGF CGF CCG
2 mm Miwon Basah Kering 6 mm
7.3 85.7 65.7 12.0 KA % 10.0
36.0 Whiteness 15.0
2.5 9.6 7.8 20.0 Protein % 2.5
1.0 0.5 Ratio 1.0
100.0 45.0 145.0 Berat Bersih Gr 100.0
107.9 314.7 422.6 164.8 Berat Kotor Gr 111.1
Tambah air Lt
18 Juni 2019
CCG FML CGF CGF CCG
2 mm Ajino Basah Kering 6 mm
7.3 51.3 30.8 12.0 KA % 10.0
36.0 Whiteness 35.2
2.5 27.3 15.7 20.0 Protein % 2.5
1.0 0.6 Ratio 1.0
100.0 60.0 160.0 Berat Bersih Gr 100.0
107.9 123.2 231.1 181.8 Berat Kotor Gr 111.1
Tambah air Lt
3 Juli 2019
2.346 CCG
6 mm
KA % 10.0
Whiteness 35.2
Protein % 2.5
Ratio 1.0
Berat Bersih Gr 100.0
Berat Kotor Gr 111.1
Tambah air Lt
2.3
470.0
2.7
403.3
2.7
133.1
3/15/2019
ph CCG = 5
pH Air Kapur = 12
pH Target = 6
Teori :
Berat CCG = 1 Kg (asumsi)
Berat Air Kapur = (1x5)+(12 x AK) = 6x(1+AK)
5 + 12AK = 6 + 6AK
12AK - 6 AK = 6 - 5
6AK = 1
AK= 1/6 = 0,17 Kg
Rumus :
CCG AK FINAL RATIO (Kg)
(pH) (pH) (pH) CCG AK
5 12 6 0.1 0.02
Biaya Produksi :
- Bahan Baku (Rendemen 60%) 69,375 Rp 400 Rp 27,750,000
- Biaya Bongkar 69,375 Rp 20 Rp 1,387,500
- Buruh Jemur 4 Rp 1,375,000 Rp 5,500,000
- Buruh Susun 2 Rp 2,000,000 Rp 4,000,000
- Karyawan Giling 6 Rp 1,703,000 Rp 10,218,000
- Uang Makan 2 Rp 250,000 Rp 500,000
- Maintenance/Repair 1 Rp 500,000 Rp 500,000
- Listrik PLN 3 Rp 5,140,800 Rp 15,422,400
- Packing (Karung+Benang Jahit) 2,775 Rp 1,315 Rp 3,649,125
TOTAL Rp 68,927,025.00