JX Nippon Oil & Gas Exploration (Malaysia)
a Limited
INSPECTION TEST RECORD (ITR) - A
FLUSHING POS-A
Project No. 14st Deandey e
Project Title xe fabrication tor Decanter 2 Gping Pajedt =
Facllities =
INFORMATION
Test PackageNo | Ns. | Flushing Flow rate ESA
‘system Flushing Medium WEE
‘Sub System Lo Flush Duration
Location Dee sed Flushing Date oSEPAF
INSPECTION / TEST OK N/A] P/L
No
Verify to ensure that all piping construction / installation activities as per
approved test package limit have been completed including all pipe
supports.
‘All weld inspection and NDE are complete and traceability and history
records complete and cleared by QA/QC Dest.
Ensure that Conformity Line Check has been performed —
Check that injection point and drain out point are completed as per test,
pack mark-up.
Ensure that water quality is 2s per Code & Standard water quality 1
requirements for applicable pipe materials.
Equipment is bypassed and spectacle blinded.
A
Valve status in accordance with flushing and testing procedure.
Ensure all low point drains and high vent points are flushed.
NA
Ensure that all piping lines in this test package have been flushed
Ensure that piping system has been drained out and followed by drying.
Protection / preservation required and completed -if not immediately
followed by hycito testing of same piping flushed.
10
Record data as below:
Injection Paint_| Flow rate Drain Point Result
Page 1 of 2&
IX Nippon Oil & Gas Exploration (Malaysia)
Limited
INSPECTION TEST RECORD (ITR) - A
FLUSHING
PO3-A
COMMENT(S) AND ADDITIONAL INFORMATION
Pushing [ Blowing might be nerded betore obbshore msfalindron
~lontarinedien [sa odor might jek rab He py poo!
desing tae transportation
COMPLETED BY VERIFIED BY ACCEPTED BY
Designation Contractor Representative JX NIPPON. JX NIPPON Discipline
Inspector Engineer
‘Company | wa
Name ERM [S/oniac\e\, onl aaa ane | Badr Simian
Signature Bory
Date [e[20 RLF [ asforhow MMAn LO
Page 2 of 2