You are on page 1of 1

8 7 6 5 4 3 2 1

15,0 barg
H2 TO VENTLINE
35
SV Deo
H PI Deo H

34

34
PI
15,0 barg 15,0 barg
1108
XV1 H-A XV3 H-A HV2 H-A
PT Deo SV Da_H SV Db_H
2 PTZ
1107
TE H-U
DPT H-U HV_DPT_H-U HV1 H-A HV3 H-A
TT DPT
TE3 Deo 1160 582

TTZ 1
1103

TE1 Deo TE4 Deo


G TT TT G
F H-U
1104 735
TE2 Deo PI BPR H-U
6

TTZ PI
734 1160

35

34
1 XV12 7,0 barg
XV11
H2 TO USER
H_DEO 35
BPR H-U XV2 H-U NRV2 H-U BV H-U

2
DEOXO
F F
XV4 XV3
HV S2_H
6

S-2 S-2
MS_DEO
S-3 S-3 FO FO
6
S-4 S-4
XV1 XV2
TE HPS
C_DEO S-1 HX1_R S-1 HX2_R
TE
676
6

P165338A-GGS-1
H2 FROM GGS
FT AD_DEO
6
E FO FO E
BV_H
XV10 XV9
P165338A-N2P-1
N2 TO HPS
3
PI Da_H PI Db_H
NRV1 N
PI PI
1128 1138

TE Da In TE Db In
TT TT
1121 1131
TE3 Da_H TE3 Db_H
TTZ 1 TTZ 1
D 1123 1133 HAZARDOUS AREA: Zone 2, GAS GROUP IIC, TEMPERATURE CLASS T1 D
DRYER_A DRYER_B
TE4 Da_H TE4 Db_H
TT TT
TE1 Da_H 726 TE1 Db_H 727

TT TT
1124 1134
TE2 Da_H TE2 Db_H
TTZ TTZ
729 728

1 H DA_H 1
H DB_H
C C

P165338A-CH-1
CHILLED WATER OUT
304

TE Da Out TE Db Out
TT TT
1122 1132
P165338A-CH-1
CHILLED WATER IN
304
XV6 XV5
C_R

B B
05 06/06/2018 PFA RDA Add XV1 H-A
XV8 XV7
04 06/04/2018 DVR PFA For Construction
MS_R 03 19/03/2018 DVR

Rev. Date Drawn By Chk'd By Description Adjustments


Customer Project Drawn By
Ebner Pakistan P165338 DVR
FT AD_R Unit Checked By
A PFA
HySTAT Date
XV AD R-A 06/06/2018
A Description A
P&ID Hydrogen Purification System System Rev.
HPS 05
P165338A-HPS-1
XV AD Deo-A All rights reserved. This drawing and the information contained therein is confidential and the sole and exclusive property of
Hydrogenics Corporation. No use of, or disclosure of, this drawing and the information contained therein shall be made without the
prior written permission of Hydrogenics Corporation. All authorized reproductions of this drawing shall bear this notice.

8 7 6 5 4 3 2 1