Professional Documents
Culture Documents
RIBBON CALCULATION
2
50mm
LENGTH m.
RIBBON NUMBER NOTE 2
1 8.42
2
50mm 2 14.48
3 18.59
4 21.87
5 24.65
6 27.09
7 29.28 POSITIVE & ANODE CABLE
POSITIVE JUNCTION BOX TEST POST 8 31.26
9 33.08 NEGATIVE CABLE
10 34.75
Ref. 1 Ref. 2 Ref. 3 Ref. 4 Ref. 5
11 36.31 MONITORING CABLE
NEGATIVE JUNCTION BOX 12 37.76
13 39.11
14 40.38
15 41.58
16 42.70
17 43.76
18 44.76
19 45.70
20 46.59
21 47.43
2
2
35mm
35mm
35mm
35mm
35mm
35mm
16mm
16mm
16mm
16mm
16mm
16mm
22 48.22
23 48.97
24 49.68
25 50.34
2 2 26 50.96
50mm 50mm
27 51.55
28 52.10
29 52.61
30 53.09
31 53.53
32 53.94
33 54.32
34 54.67
35 54.99
36 55.27
37 55.53
38 55.76
39 55.95
RIBBON ANODE 40 56.12
41 56.26
42 56.38
43 56.50
N1 N3 44 56.53
45 56.54
46 56.54
47 56.53
48 56.50
P1 49 56.38
1
50 56.26
51 56.12
52 55.95
73
74
75
76
77
78
79
80
81
82
83
68 48.97
2 48.97
3 P3 69 48.22
3 55.76
70 47.43
4 55.76
71 46.59
9952T-901-DW-2410-0002
5 48.97
72 45.70
2 6 31.26
3 x LENGTH
DRAWING No.
SEE DETAIL 6
73 44.76
7 5.00
TYPICAL FOR CONDUCTOR BARS 1 TO 6 74 43.76
7 8 8 5.00
75 42.70
RE 76 41.58
77 40.38
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
84
85
86
87
88
89
90
10
9
1
2
3
8
4
6
7
78 39.11
P4 4 79 37.76
80 36.31
73
74
75
76
77
78
79
80
81
82
83
81 34.75
82 33.08
83 31.26
84 29.28
85 27.09
STOP ANODES AND
RE RE 86 24.65
CONDUCTORS 100mm.
FROM THE WALL 87 21.87
NOTE 2 88 18.59
P5 89 14.48
5
90 8.42
RE
P6 6 Paul-Anthony
Smith
2012.03.09
Digitally signed by
Salim Debbache
Date: 2012.03.09
Salim Debbache
2012.03.09
16:56:16 +01'00' 17:21:28 +01'00' 17:22:20 +01'00'
1 NTS 1
16mm 2
16mm 2
16mm 2
16mm 2
2
16mm
35mm 2
35mm 2
35mm 2
TRANSFORMER RECTIFIER
50mm 2
35mm2
35mm
(POSITIVE)
50mm 2
1
50mm 2
RE1*
TANK BOTTOM 2
RE2*
3
CONDUCTOR BARS RE3*
6 OFF
4
TRANSFORMER RECTIFIER
(NEGATIVE) RE4*
5
RE5*
CONCRETE FOUNDATION
6
* RE = REFERENCE ELECTRODES
TANK BOTTOM - NEGATIVE JUNCTION BOX - (NJB) TANK BOTTOM - POSITIVE JUNCTION BOX - (PJB) TANK BOTTOM - TEST POST - (TP)
TYPICAL MOUNTING ARRANGEMENT
A 09-03-12 ISSUED FOR REVIEW PAS SD SD
ACTIVITE AVAL
DIVISION RAFFINAGE
REHABILITATION & ADAPTATION PROJECT
ALGIERS REFINERY, ALGERIA
CATHODIC PROTECTION SCHEMATIC DIAGRAM
FOR NEW TANK BOTTOMS
JUNCTION BOXES FOR 6 CONDUCTOR BARS
1 NTS 2
9952T 901 DW 2410 0008 A
A1
TBA TBA 8 9 10 8
A
1
2 2 1 ISOLATED SUPPORTS
2 ISOLATED PLATE
11 3 SHUNTS
3 4 ISOLATED PANEL
5 VARIABLE RESISTORS
6 TERMINALS
12
7 MOUNTING LUGS
8 CABLE LUGS CRIMPING TYPE
4 4 9 REMOVABLE LINK
TBA
35mm 2
35mm 2
16mm 2
16mm 2
16mm 2
16mm 2
2
16mm
TRANSFORMER RECTIFIER
50mm 2
35mm 2
35mm 2
(POSITIVE)
50mm 2
1
50mm 2
RE1*
TANK BOTTOM
2 RE2*
3 CONDUCTOR BARS RE3*
5 OFF
TRANSFORMER RECTIFIER
(NEGATIVE) 4 RE4*
RE5*
CONCRETE FOUNDATION
5
* RE = REFERENCE ELECTRODES
TANK BOTTOM - NEGATIVE JUNCTION BOX - (NJB) TANK BOTTOM - POSITIVE JUNCTION BOX - (PJB) TANK BOTTOM - TEST POST - (TP)
TYPICAL MOUNTING ARRANGEMENT
A 09-03-12 ISSUED FOR REVIEW PAS SD SD
ACTIVITE AVAL
DIVISION RAFFINAGE
REHABILITATION & ADAPTATION PROJECT
ALGIERS REFINERY, ALGERIA
CATHODIC PROTECTION SCHEMATIC DIAGRAM
FOR NEW TANK BOTTOMS
JUNCTION BOXES FOR 5 CONDUCTOR BARS
1 NTS 3
9952T 901 DW 2410 0008 A
A1
SCHEDULE OF RIBBON ANODES 1. Refer to table for length, spacing and amount
of anodes and conductor bars.
TANK No. OF RIBBON
TANK NUMBER DIAMETER RIBBONS SPACING 2. Ribbon anodes & conductor bars to be cut
to actual length as determind on site
901-TK-205
901-TK-206 45m. 90 0.473m
RFCC FEED
RIBBON CALCULATION
LENGTH m.
RIBBON NUMBER NOTE 2
1 6.17
2 10.81
3 13.92
4 16.40
5 18.50
T.R. 6 20.35
POSITIVE & ANODE CABLE
7 22.00
8 23.49
NEGATIVE CABLE
9 24.86
10 26.12
2
50mm
2
23 36.84
16mm
16mm
16mm
16mm
16mm
16mm
24 37.37
25 37.87
26 38.34
27 38.78
28 39.19
2
2
35mm
35mm
35mm
35mm
35mm
29 39.58
30 39.94
2 2 31 40.27
50mm 50mm
32 40.59
33 40.87
34 41.13
35 41.37
36 41.59
37 41.78
38 41.95
39 42.10
40 42.23
41 42.33
42 42.42
43 42.48
44 42.52
45 42.54
46 42.54
47 42.52
48 42.48
RIBBON ANODE
49 42.42
CONDUCTOR BAR 50 42.33
N3 51 42.23 SCHEDULE OF CONDUCTOR BARS
PERFORATED PVC N1
PIPE 100mm DIA. 52 42.10
TANK No. OF BAR
53 41.95 TANK NUMBER DIAMETER BARS SPACING
54 41.78
901-TK-205
55 41.59 45m. 7 8.509m
P1 901-TK-206
1 56 41.37 RFCC FEED
57 41.13
CONDUCTOR BAR CALCULATION
58 40.87
RE REFERENCE ELECTRODE 59 40.59 LENGTH m.
BAR NUMBER NOTE 2
60 40.27
61 39.94 1 25.53
62 39.58 2 39.00
63 39.19 3 34.06
RE
64 38.78 4 39.00
2 P2
65 38.34 5 25.53
66 37.87 6 6.18
67 37.37 7 6.18
STOP ANODES AND 68 36.84 8 3.26
CONDUCTORS 100mm.
73
74
75
76
77
78
79
80
81
82
83
84
85
69 36.28
FROM THE WALL
70 35.68
NOTE 2
71 35.05
6
72 34.38
73 33.67
P3 3 8 74 32.91
75 32.12
RE 76 31.27
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
86
87
88
89
90
1 77 30.37
2
3
4
5
6
7
8
9
7 78 29.41
2
9952T-901-DW-2410-0002
3 x LENGTH
73
74
75
76
77
78
79
80
81
82
83
84
85
79 28.39
TYPICAL FOR CONDUCTOR BARS 1 TO 5 80 27.30
DRAWING No.
SEE DETAIL 6
81 26.12
82 24.86
4 83 23.49
84 22.00
P4 RE
85 20.35
86 18.50
87 16.40
88 13.92
RE
89 10.81
90 6.17
5
P5
2 No. SPOT WELDS
AT EVERY
INTERSECTION
N2
CRUSHED STONE
RING WALL
A 09-03-12 ISSUED FOR REVIEW PAS SD SD
CONDUCTOR BAR
RIBBON ANODE ACTIVITE AVAL
DIVISION RAFFINAGE
REHABILITATION & ADAPTATION PROJECT
ALGIERS REFINERY, ALGERIA
CATHODIC PROTECTION SCHEMATIC DIAGRAM
FOR NEW TANK BOTTOM
TANK No. 901-TK-205 & 206
1 NTS 4
9952T 901 DW 2410 0008 A
A0
TBA TBA 8 9 10 8
A
1
2 2 1 ISOLATED SUPPORTS
2 ISOLATED PLATE
11 3 SHUNTS
3 4 ISOLATED PANEL
5 VARIABLE RESISTORS
6 TERMINALS
12
7 MOUNTING LUGS
8 CABLE LUGS CRIMPING TYPE
4 4 9 REMOVABLE LINK
TBA
16mm 2
16mm 2
16mm 2
16mm 2
2
16mm
35mm 2
35mm 2
35mm 2
TRANSFORMER RECTIFIER
50mm 2
(POSITIVE)
50mm 2
50mm 2
RE1*
TANK BOTTOM 1
RE2*
2 CONDUCTOR BARS RE3*
3 OFF
TRANSFORMER RECTIFIER
(NEGATIVE) RE4*
3
RE5*
CONCRETE FOUNDATION
* RE = REFERENCE ELECTRODES
TANK BOTTOM - NEGATIVE JUNCTION BOX - (NJB) TANK BOTTOM - POSITIVE JUNCTION BOX - (PJB) TANK BOTTOM - TEST POST - (TP)
TYPICAL MOUNTING ARRANGEMENT
A 09-03-12 ISSUED FOR REVIEW PAS SD SD
ACTIVITE AVAL
DIVISION RAFFINAGE
REHABILITATION & ADAPTATION PROJECT
ALGIERS REFINERY, ALGERIA
CATHODIC PROTECTION SCHEMATIC DIAGRAM
FOR NEW TANK BOTTOMS
JUNCTION BOXES FOR 3 CONDUCTOR BARS
1 NTS 5
9952T 901 DW 2410 0008 A
A1
TBA TBA 8 9 10 8
A
1
2 2 1 ISOLATED SUPPORTS
2 ISOLATED PLATE
11 3 SHUNTS
3 4 ISOLATED PANEL
5 VARIABLE RESISTORS
6 TERMINALS
12
7 MOUNTING LUGS
8 CABLE LUGS CRIMPING TYPE
4 4 9 REMOVABLE LINK
TBA
16mm 2
16mm 2
2
2
16mm
16mm
16mm
35mm 2
35mm 2
TRANSFORMER RECTIFIER
50mm 2
(POSITIVE)
50mm 2
50mm 2
RE1*
TANK BOTTOM 1
RE2*
CONDUCTOR BARS RE3*
2 OFF
TRANSFORMER RECTIFIER CONCRETE FOUNDATION
(NEGATIVE) RE4*
2
RE5*
* RE = REFERENCE ELECTRODES
TANK BOTTOM - NEGATIVE JUNCTION BOX - (NJB) TANK BOTTOM - POSITIVE JUNCTION BOX - (PJB) TANK BOTTOM - TEST POST - (TP)
TYPICAL MOUNTING ARRANGEMENT
A 09-03-12 ISSUED FOR REVIEW PAS SD SD
ACTIVITE AVAL
DIVISION RAFFINAGE
REHABILITATION & ADAPTATION PROJECT
ALGIERS REFINERY, ALGERIA
CATHODIC PROTECTION SCHEMATIC DIAGRAM
FOR NEW TANK BOTTOMS
JUNCTION BOXES FOR 2 CONDUCTOR BARS
1 NTS 6
9952T 901 DW 2410 0008 A
A1
1. Refer to table for length, spacing and amount
SCHEDULE OF CONDUCTOR BARS SCHEDULE OF RIBBON ANODES of anodes and conductor bars.
2. Ribbon anodes & conductor bars to be cut to
TANK No. OF BAR TANK No. OF RIBBON
T.R. TANK NUMBER DIAMETER BARS SPACING TANK NUMBER DIAMETER RIBBONS SPACING
actual length as determind on site
901-TK-203 901-TK-203
901-TK-204 43m. 7 8.109m. 43m. 66 0.614m.
901-TK-204
GASOIL GASOIL
CONDUCTOR BAR CALCULATION RIBBON CALCULATION
50mm2
LENGTH m. LENGTH m.
BAR NUMBER NOTE 2 RIBBON NUMBER Note 2
50mm2
1 24.33 1 7.16
2 37.16 2 12.15
POSITIVE JUNCTION BOX 3 32.44 TEST POST 3 15.53
4 37.16 4 18.21
5 24.33 5 20.47
Ref. 1 Ref. 2 Ref. 3 Ref. 4 Ref. 5
6 6.13 6 22.44
NEGATIVE JUNCTION BOX 7 6.13 7 24.19
7 2.80 8 25.76
9 27.18
10 28.48
11 29.67
12 30.77
POSITIVE & ANODE CABLE
16mm2
16mm2
16mm2
13 31.78
16mm
16mm
16mm
14 32.72
15 33.58 NEGATIVE CABLE
16 34.38
17 35.12
MONITORING CABLE
18 35.80
19 36.43
20 37.00
50mm2 50mm2
21 37.53
22 38.00
23 38.44
24 38.83
25 39.18
26 39.49
27 39.75
35mm2
35mm2
35mm2
35mm2
35mm2
28 39.98
29 40.17
30 40.32
31 40.43
32 40.50
33 40.55
RIBBON ANODE 34 40.55
35 40.50
36 40.43
PERFORATED PVC 40.32
N1 N3 37
PIPE 100mm DIA.
38 40.17
39 39.98
40 39.75
41 39.49
42 39.18
P1 43 38.83
1 44 38.44
45 38.00
46 37.53
47 37.00
REFERENCE ELECTRODE 48 36.43
49 35.80
RE 50 35.12
51 34.38
52 33.58
53 32.72
54 31.78
RE
55 30.77
56 29.67
P2
2 28.48
9952T-901-DW-2410-0002
57
58 27.18
DRAWING No.
SEE DETAIL 6
59 25.76
CONDUCTOR BAR 60 24.19
61 22.44
62 20.47
63 18.21
54
55
56
57
58
59
60
61
62
63
64 15.53
65 12.15
6
66 7.16
P3
3 8
RE
12
11
15
34
35
36
40
41
42
43
44
45
46
47
48
49
50
51
52
53
64
65
66
10
13
14
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
3
4
5
6
1
2
7
8
9
37
38
39
7
54
55
56
57
58
59
60
61
62
63
2
3 x LENGTH
TYPICAL FOR CONDUCTOR BARS 1 TO 5
4
P4 STOP ANODES AND
RE CONDUCTORS 100mm.
FROM THE WALL
NOTE 2
RE
5
A 09-03-12 ISSUED FOR REVIEW PAS SD SD
2 No. SPOT WELDS
N2
AT EVERY
ACTIVITE AVAL
INTERSECTION DIVISION RAFFINAGE
CRUSHED STONE
RING WALL REHABILITATION & ADAPTATION PROJECT
ALGIERS REFINERY, ALGERIA
CATHODIC PROTECTION SCHEMATIC DIAGRAM
CONDUCTOR BAR
FOR NEW TANK BOTTOM
TANK No. 901-TK-203 & 204
RIBBON ANODE
1 NTS 7
9952T 901 DW 2410 0008 A
A0
SCHEDULE OF RIBBON ANODES 1. Refer to table for length, spacing and amount
of anodes and conductor bars.
TANK No. OF RIBBON
TANK NUMBER DIAMETER RIBBONS SPACING
901-TK-111
901-TK-112 30.5m. 47 0.635m.
901-TK-113
GASOIL
RIBBON CALCULATION
DISTANCE FROM
RIBBON NUMBER RIM m. LENGTH m.
1 0.41 6.06
T.R. 2 1.05 10.45
3 1.68 13.37
4 2.32 15.65
5 2.95 17.45
6 3.59 19.17
2
50mm
7 4.22 20.59
8 4.86 21.84
2 9 5.49 22.96
50mm
10 6.13 23.95
11 6.76 24.85
TEST POST 12 7.40 25.65
13 8.03 26.36
Ref. 1 Ref. 2 Ref. 3 Ref. 4 Ref. 5 14 8.67 26.99 POSITIVE & ANODE CABLE
POSITIVE JUNCTION BOX NEGATIVE JUNCTION BOX 15 9.30 27.56
16 9.93 28.05 NEGATIVE CABLE
17 10.57 28.48
18 11.21 28.84
MONITORING CABLE
19 11.84 29.15
20 12.48 29.40
2
2
16mm
16mm
16mm
16mm
16mm
16mm
35mm
35mm
35mm
21 13.11 29.59
22 13.75 29.72
23 14.38 29.80
24 15.01 29.83
25 15.65 29.80
2 2
50mm 50mm 26 16.29 29.72
27 16.92 29.59
28 17.56 29.40
29 18.19 29.15
30 18.83 28.84
SCHEDULE OF CONDUCTOR BARS
RIBBON ANODE 31 19.46 28.48
32 20.10 28.05 TANK No. OF BAR
TANK NUMBER DIAMETER BARS SPACING
33 20.73 27.56
PERFORATED PVC 34 21.37 26.99 901-TK-111
PIPE 100mm DIA. 35 22.00 26.36
901-TK-112 30.5m. 5 10.167m.
901-TK-113
36 22.64 25.65 GASOLINE
N1 N3 37 23.27 24.85
CONDUCTOR BAR CALCULATION
38 23.91 23.95
39 24.54 22.96 DISTANCE FROM
BAR NUMBER RIM m. LENGTH m.
40 25.18 21.84
41 25.81 20.59 1 4.85 21.83
42 26.45 19.17 2 15.01 23.18
1 43 27.08 17.45 3 25.18 21.83
44 27.72 15.65 4 SEE DETAIL 6 (NOTE 2) 5.72
P1 45 28.35 13.37 5 SEE DETAIL 6 (NOTE 2) 5.72
RE
46 28.99 10.45 6 15.01 1.60
9952T-901-DW-2410-0002
47 29.62 6.06
CONDUCTOR BAR
DRAWING No.
SEE DETAIL 6
STOP ANODES AND
CONDUCTORS 100mm. RE
FROM THE WALL
4
P2
2 6
RE
34
35
46
47
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
29
30
31
32
33
1
2
3
4
5
6
7
8
9
27
28
5
37
38
39
36
40
41
42
43
44
45
2
3 x LENGTH
TYPICAL FOR CONDUCTOR BARS 1 TO 3 RE
P3 REFERENCE ELECTRODE
RE 3
N2 2 No. SPOT WELDS
AT EVERY
CONCRETE INTERSECTION
RING WALL
CONDUCTOR BAR
RIBBON ANODE
A 09-03-12 ISSUED FOR REVIEW PAS SD SD
ACTIVITE AVAL
DIVISION RAFFINAGE
REHABILITATION & ADAPTATION PROJECT
ALGIERS REFINERY, ALGERIA
CATHODIC PROTECTION SCHEMATIC DIAGRAM
FOR NEW TANK BOTTOM
TANK No. 901-TK-111,112 &113
1 NTS 8
9952T 901 DW 2410 0008 A
A0
1. Refer to table for length, spacing and amount
of anodes and conductor bars.
SCHEDULE OF CONDUCTOR BARS SCHEDULE OF RIBBON ANODES
TANK No. OF BAR TANK No. OF RIBBON
TANK NUMBER DIAMETER BARS SPACING TANK NUMBER DIAMETER RIBBONS SPACING
901-TK-108 901-TK-108
901-TK-109 28.5m. 5 9.500m. 901-TK-109 28..5m. 44 0.634
H.T. NAPHTA H.T. NAPHTA
RIBBON CALCULATION
CONDUCTOR BAR CALCULATION
DISTANCE FROM
RIBBON NUMBER RIM m. LENGTH m.
DISTANCE FROM
BAR NUMBER RIM m. LENGTH m.
T.R. 1 4.54 20.04
1 0.43 5.99
2 1.06 10.17
2 14.04 20.45 3 1.69 12.95
3 23.54 20.04 4 2.33 15.13
4 SEE DETAIL 6 (NOTE 2) 5.07 5 2.96 16.93
5 SEE DETAIL 6 (NOTE 2) 5.07 6 3.60 18.48
3 14.04 1.61 7 4.23 19.82
8 4.86 21.00
9 5.50 22.05
10 6.13 22.98
TEST POST 11 6.77 23.80
12 7.40 24.53
13 8.03 25.18 POSITIVE & ANODE CABLE
Ref. 1 Ref. 2 Ref. 3 Ref. 4 Ref. 5
14 8.67 25.75
POSITIVE JUNCTION BOX NEGATIVE JUNCTION BOX 15 9.30 26.24
NEGATIVE CABLE
16 9.94 26.67
17 10.57 27.03
18 11.20 27.32 MONITORING CABLE
19 11.84 27.56
2
2
35mm
35mm
35mm
50mm
50mm
16mm
16mm
16mm
16mm
16mm
16mm
20 12.47 27.73
21 13.11 27.85
22 13.74 27.90
23 14.37 27.90
24 15.01 27.85
25 15.64 27.73
26 16.28 27.56
27 16.91 27.32
28 17.54 27.03
29 18.18 26.67
30 18.81 26.24
31 19.45 25.75
32 20.08 25.18
33 20.71 24.53
RIBBON ANODE
34 21.35 23.80
35 21.98 22.98
36 22.62 22.05
37 23.25 21.00
N1 N3 38 24.88 19.82
39 24.52 18.48
40 25.15 16.93
41 25.79 15.13
42 26.42 12.95
43 27.05 10.17
1
44 27.69 5.99
RE
P1
14037
9952T-901-DW-2410-0002
CONDUCTOR BAR
PERFORATED PVC
DRAWING No.
SEE DETAIL 6
PIPE 100mm DIA.
RE
4
P2 2 6
RE
42
43
44
34
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
29
30
31
32
33
1
2
3
4
5
6
7
8
9
5
25
26
27
28
41
37
38
39
35
36
40
2
3 x LENGTH
TYPICAL FOR CONDUCTOR BARS 1 TO 3 RE
RE
P3
3 REFERENCE ELECTRODE
STOP ANODES AND
CONDUCTORS 100mm. N2 2 No. SPOT WELDS
FROM THE WALL
AT EVERY
INTERSECTION
CONCRETE
RING WALL
CONDUCTOR BAR
RIBBON ANODE
A 09-03-12 ISSUED FOR REVIEW PAS SD SD
ACTIVITE AVAL
DIVISION RAFFINAGE
REHABILITATION & ADAPTATION PROJECT
ALGIERS REFINERY, ALGERIA
CATHODIC PROTECTION SCHEMATIC DIAGRAM
FOR NEW TANK BOTTOM
TANK No. 901-TK-108 & 109
1 NTS 9
9952T 901 DW 2410 0008 A
A0
TBA TBA 8 9 10 8
A
1
2 2 1 ISOLATED SUPPORTS
2 ISOLATED PLATE
11 3 SHUNTS
3 4 ISOLATED PANEL
5 VARIABLE RESISTORS
6 TERMINALS
12
7 MOUNTING LUGS
8 CABLE LUGS CRIMPING TYPE
4 4 9 REMOVABLE LINK
TBA
16mm 2
16mm 2
16mm 2
16mm 2
2
16mm
35mm2
TRANSFORMER RECTIFIER
50mm 2
(POSITIVE)
50mm 2
50mm 2
RE1*
TANK BOTTOM
RE2*
1
RE3*
TRANSFORMER RECTIFIER CONCRETE FOUNDATION
(NEGATIVE) RE4*
CONDUCTOR BARS RE5*
1 OFF
* RE = REFERENCE ELECTRODES
TANK BOTTOM - NEGATIVE JUNCTION BOX - (NJB) TANK BOTTOM - POSITIVE JUNCTION BOX - (PJB) TANK BOTTOM - TEST POST - (TP)
TYPICAL MOUNTING ARRANGEMENT
A 09-03-12 ISSUED FOR REVIEW PAS SD SD
ACTIVITE AVAL
DIVISION RAFFINAGE
REHABILITATION & ADAPTATION PROJECT
ALGIERS REFINERY, ALGERIA
CATHODIC PROTECTION SCHEMATIC DIAGRAM
FOR NEW TANK BOTTOMS
JUNCTION BOXES FOR 1 CONDUCTOR BAR
1 NTS 10
9952T 901 DW 2410 0008 A
A1
Notes
1. Refer to table for length, spacing and amount
SCHEDULE OF RIBBON ANODES of anodes and conductor bars.
TANK No. OF RIBBON
T.R. TANK NUMBER DIAMETER RIBBONS SPACING
901-TK-013
901-TK-014
901-TK-015
12m. 19 0.609
901-TK-016
H.T. HEAVY
2
NAPHTA
50mm
RIBBON CALCULATION
DISTANCE FROM
2 RIBBON NUMBER LENGTH m.
50mm RIM m.
1 0.52 3.68
2 1.13 6.22
3 1.74 7.81
4 2.35 8.96
5 2.96 9.83 POSITIVE & ANODE CABLE
6 3.56 10.49
TEST POST 7 4.17 10.97 NEGATIVE CABLE
8 4.78 11.30
Ref. 1 Ref. 2 Ref. 3 Ref. 4 Ref. 5 9 5.39 11.50 MONITORING CABLE
POSITIVE 10 6.00 11.56
JUNCTION BOX NEGATIVE JUNCTION BOX 11 6.61 11.50
12 7.22 11.30
13 7.83 10.97
14 8.44 10.49
2
2
35mm
35mm
16mm
16mm
16mm
16mm
16mm
16mm
15 9.05 9.83
16 9.654 8.96
17 10.263 7.81
18 10.872 6.22
19 11.48 3.68
2 2
50mm 50mm
RIBBON ANODE
N1 SCHEDULE OF CONDUCTOR BARS
N3
CONDUCTOR BAR
TANK No. OF BAR
TANK NUMBER DIAMETER BARS SPACING
901-TK-013
901-TK-014
901-TK-015 12m. 5 6m.
901-TK-016
H.T. HEAVY
NAPHTA
RE
1 CONDUCTOR BAR CALCULATION
PERFORATED PVC P1 DISTANCE FROM
PIPE 100mm DIA. BAR NUMBER RIM m. LENGTH m.
RE
1 2.88 9.88
2 8.88 9.88
3 SEE DETAIL 6 (NOTE 2) 2.97
3 4 SEE DETAIL 6 (NOTE 2) 2.97
5 5.88 1.21
5
RE
4
1
10
11
12
13
14
15
16
17
18
19
9952T-901-DW-2410-0002
1
9
2
3 x LENGTH
DRAWING No.
SEE DETAIL 6
TYPICAL FOR CONDUCTOR BARS 1 & 2
RE
2
STOP ANODES AND P2
CONDUCTORS 100mm.
A 09-03-12 ISSUED FOR REVIEW PAS SD SD
FROM THE WALL RE REFERENCE ELECTRODE
ACTIVITE AVAL
DIVISION RAFFINAGE
N2 2 No. SPOT WELDS
AT EVERY REHABILITATION & ADAPTATION PROJECT
INTERSECTION ALGIERS REFINERY, ALGERIA
CONCRETE
RING WALL
CATHODIC PROTECTION SCHEMATIC DIAGRAM
FOR NEW TANK BOTTOM
TANK No. 901-TK-013,014,015 & 016
CONDUCTOR BAR
1 NTS 11
RIBBON ANODE
901 DW 2410 0004 A
Notes
1. Refer to table for length, spacing and amount
of anodes and conductor bars.
SCHEDULE OF RIBBON ANODES
T.R. TANK NUMBER
TANK
DIAMETER
No. OF
RIBBONS
RIBBON
SPACING
580-TK-001 5m. 13 0.351M
AMINE
RIBBON CALCULATION POSITIVE & ANODE CABLE
2
50mm
DISTANCE FROM
RIBBON NUMBER RIM m. LENGTH m. NEGATIVE CABLE
1 0.28 1.75
2 0.63 2.91 MONITORING CABLE
3 0.98 3.60
2
50mm 4 1.33 4.05
5 1.68 4.34
6 2.03 4.51
7 2.38 4.56
TEST POST 8 2.73 4.51
9 3.08 4.34
10 3.43 4.05
Ref. 1 Ref. 2 Ref. 3 Ref. 4 Ref. 5
11 3.78 3.60
POSITIVE JUNCTION BOX NEGATIVE JUNCTION BOX 12 4.14 2.91
13 4.49 1.75
2
2
35mm
16mm
16mm
16mm
16mm
16mm
16mm
2 2
50mm 50mm
RIBBON ANODE
N1 N3
SCHEDULE OF CONDUCTOR BARS
TANK No. OF BAR
TANK NUMBER DIAMETER BARS SPACING
580-TK-001 5m. 3 5m
AMINE
PERFORATED PVC
9952T-901-DW-2410-0002
PIPE 100mm DIA. CONDUCTOR BAR
CONDUCTOR BAR CALCULATION
DRAWING No.
SEE DETAIL 6
RE
DISTANCE FROM
BAR NUMBER RIM m. LENGTH m.
1 SEE DETAIL 6 (NOTE 2) 1.38
RE
2 2.38 3.54
2 3 SEE DETAIL 6 (NOTE 2) 1.38
3 x LENGTH
1
P1 2
RE
3
10
11
12
13
1
9
STOP ANODES AND
CONDUCTORS 100mm. RE
FROM THE WALL
RE
REFERENCE ELECTRODE
A 09-03-12 ISSUED FOR REVIEW PAS SD SD
N2
ACTIVITE AVAL
CONCRETE 2 No. SPOT WELDS DIVISION RAFFINAGE
RING WALL AT EVERY
INTERSECTION REHABILITATION & ADAPTATION PROJECT
ALGIERS REFINERY, ALGERIA
CATHODIC PROTECTION SCHEMATIC DIAGRAM
FOR NEW TANK BOTTOM
TANK No. 580-TK-001
CONDUCTOR BAR
RIBBON ANODE
1 NTS 12
901 DW 2410 0008 A
SCHEDULE OF CONDUCTOR BARS SCHEDULE OF RIBBON ANODES 1. Refer to table for length, spacing and amount
of anodes and conductor bars.
TANK No. OF BAR TANK No. OF RIBBON
TANK NUMBER DIAMETER BARS SPACING TANK NUMBER DIAMETER RIBBONS SPACING
901-TK-011 901-TK-011
901-TK-012 20.5m. 5 10.25m 901-TK-012 20.5m. 47 0.422m
INTERNAL INTERNAL
FUEL OIL FUEL OIL
RIBBON CALCULATION
CONDUCTOR BAR CALCULATION
DISTANCE FROM
DISTANCE FROM RIBBON NUMBER RIM m. LENGTH m.
BAR NUMBER RIM m. LENGTH m.
1 0.30 4.00
1 4.89 16.96 POSITIVE & ANODE CABLE
T.R. 2 15.14 16.96
2 0.73 6.93
3 1.15 8.87
3 SEE DETAIL 6 (NOTE 2) 3.38
4 1.57 10.39 NEGATIVE CABLE
4 SEE DETAIL 6 (NOTE 2) 3.38
5 1.99 11.65
5 10.01 1.47 6 2.41 12.73
MONITORING CABLE
2
50mm
7 2.84 13.67
8 3.26 14.51
9 3.68 15.25
2
50mm 10 4.10 15.91
11 4.52 16.51
TEST POST 12 4.95 17.04
13 5.37 17.51
14 5.79 17.93
Ref. 1 Ref. 2 Ref. 3 Ref. 4 Ref. 5
15 6.21 18.31
POSITIVE JUNCTION BOX NEGATIVE JUNCTION BOX 16 6.63 18.63
17 7.06 18.92
18 7.48 19.16
19 7.90 19.37
20 8.32 19.53
2
16mm
16mm
16mm
16mm
16mm
16mm
21 8.74 19.66
2
2
35mm
35mm
22 9.17 19.75
23 9.59 19.80
24 10.01 19.82
25 10.43 19.80
26 10.85 19.75
2 2
27 11.28 19.66
50mm 50mm
28 11.70 19.53
29 12.12 19.37
30 12.54 19.16
31 12.96 18.92
32 13.39 18.63
33 13.81 18.31
34 14.23 17.93
35 14.65 17.51
36 15.07 17.04
37 15.5 16.51
38 15.92 15.91
39 16.34 15.25
40 16.76 14.51
41 17.18 13.67
RIBBON ANODE 42 17.61 12.73
43 18.03 11.65
44 18.45 10.39
N1 N3 45 18.87 8.87
46 19.29 6.93
47 19.72 4.00
CONDUCTOR BAR
9952T-901-DW-2410-0002
DRAWING No.
SEE DETAIL 6
1 RE
PERFORATED PVC P1
PIPE 100mm DIA.
RE
3
5 6
RE
10
11
12
13
14
15
16
17
18
19
21
22
23
24
25
26
27
32
33
34
35
36
37
45
46
47
1
2
3
4
5
6
7
8
9
28
29
30
31
4
38
39
40
41
42
43
44
2
3 x LENGTH
TYPICAL FOR CONDUCTOR BARS 1 & 2 RE
2 P2
RE
REFERENCE ELECTRODE
STOP ANODES AND
CONDUCTORS 100mm. 2 No. SPOT WELDS
FROM THE WALL N2
AT EVERY
INTERSECTION
90°
CONCRETE
RING WALL
CONDUCTOR BAR
RIBBON ANODE
A 09-03-12 ISSUED FOR REVIEW PAS SD SD
ACTIVITE AVAL
DIVISION RAFFINAGE
REHABILITATION & ADAPTATION PROJECT
ALGIERS REFINERY, ALGERIA
CATHODIC PROTECTION SCHEMATIC DIAGRAM
FOR NEW TANK BOTTOM
TANK No. 901-TK-011 & 012
1 NTS 13
9952T 901 DW 2410 0008 A
A0