You are on page 1of 4

BILL OF QUANTITIES

Project : Global Onkolab Farma PT. Dankos


Job : Supply and Installation HVAC System
Sub Bill : Equipment HVAC

Local Material Labour Cost


No. Description Volume Unit Total Unit Total
(Rp.) (Rp.) (Rp.) (Rp.)
I Equipment
A Unit AHU
a AHU G-1.01 ( Area FG Warehouse below 25⁰C ) 1 Unit 200,000,000 200,000,000 2,000,000 2,000,000
- Air Flow Rate : 3.500 cfm
- Total Static Pressure : 4 in wg
- Include Outdoor Unit : ex Hitachi
b AHU G-1.02 ( Area RM Cepha Warehouse below 25⁰C ) 1 Unit 190,000,000 190,000,000 2,000,000 2,000,000
- Air Flow Rate : 2.600 cfm
- Total Static Pressure : 4 in wg
- Include Outdoor Unit : ex Hitachi
c AHU G-1.03 ( Polycell Warehouse ) 1 Unit 223,000,000 223,000,000 2,000,000 2,000,000
- Air Flow Rate : 4,400cfm
- Total Static Pressure : 4 in wg
- Include Outdoor Unit : ex Hitachi
d AHU G-1.04 ( Sampling room, CNC On/Off , ...) 1 Unit 137,000,000 137,000,000 2,000,000 2,000,000
- Air Flow Rate : 1.000 cfm
- Total Static Pressure : 7 in wg
- Include Outdoor Unit : ex Hitachi
e AHU G-1.05 ( Area PM Warehouse) 1 Unit 570,000,000 570,000,000 3,000,000 3,000,000
- Air Flow Rate : 32.000 cfm
- Total Static Pressure : 4 in wg
- Include Outdoor Unit : ex Hitachi
f AHU G-1.06 ( Area FG Warehouse) 1 Unit 280,000,000 280,000,000 3,000,000 3,000,000
- Air Flow Rate : 13000 cfm
- Total Static Pressure : 4 in wg
- Include Outdoor Unit : ex Hitachi
g AHU G-2.01 ( Capsule Warehouse below 25⁰C ) 1 Unit 173,514,000 173,514,000 3,000,000 3,000,000
- Air Flow Rate : 2.600 cfm Air Flow Coil : 800 cfm
- Total Static Pressure : 4 in wg
- Include Outdoor Unit : ex Hitachi
h AHU G-2.02 ( RM & FG Warehouse below 25⁰C ) 1 Unit 193,837,000 193,837,000 3,000,000 3,000,000
- Air Flow Rate : 3.000 cfm Air Flow Coil : 1.200 cfm
- Total Static Pressure : 4 in wg
- Include Outdoor Unit : ex Hitachi
i Dudukan Base AHU 10 set 6,000,000 60,000,000 1,500,000 15,000,000

B Ducting Work
1 'Supply Duct c/w 1 INCH CLOSED CELL NITRILE RUBBER INSULATION
a AHU G-1.01 ( Area FG Warehouse below 25⁰C ) 170 Mtr 500,000 85,000,000 100,000 17,000,000
b AHU G-1.02 ( Area RM Cepha Warehouse below 25⁰C ) 60 Mtr 500,000 30,000,000 100,000 6,000,000
c AHU G-1.03 ( Polycell Warehouse ) 64 Mtr 500,000 32,000,000 100,000 6,400,000
d AHU G-1.04 ( Sampling room, CNC On/Off , ...) 36 Mtr 500,000 18,000,000 100,000 3,600,000
e AHU G-1.05 ( Area PM Warehouse) 325 Mtr 500,000 162,500,000 100,000 32,500,000
f AHU G-1.06 ( Area FG Warehouse) 140 Mtr 500,000 70,000,000 100,000 14,000,000
g AHU G-2.01 ( Capsule Warehouse below 25⁰C ) 62 Mtr 500,000 31,000,000 100,000 6,200,000
h AHU G-2.02 ( RM & FG Warehouse below 25⁰C ) 140 Mtr 500,000 70,000,000 100,000 14,000,000

2 Return Duct c/w 19 MM CLOSED CELL NITRILE RUBBER Insulation


a AHU G-1.01 ( Area FG Warehouse below 25⁰C ) 75 Mtr 480,000 36,000,000 100,000 7,500,000
b AHU G-1.02 ( Area RM Cepha Warehouse below 25⁰C ) 80 Mtr 480,000 38,400,000 100,000 8,000,000
c AHU G-1.03 ( Polycell Warehouse ) 92 Mtr 480,000 44,160,000 100,000 9,200,000
d AHU G-1.04 ( Sampling room, CNC On/Off , ...) 46 Mtr 480,000 22,080,000 100,000 4,600,000
e AHU G-1.05 ( Area PM Warehouse) 485 Mtr 480,000 232,800,000 100,000 48,500,000
f AHU G-1.06 ( Area FG Warehouse) 140 Mtr 480,000 67,200,000 100,000 14,000,000
g AHU G-2.01 ( Capsule Warehouse below 25⁰C ) 35 Mtr 480,000 16,800,000 100,000 3,500,000
h AHU G-2.02 ( RM & FG Warehouse below 25⁰C ) 25 Mtr 480,000 12,000,000 100,000 2,500,000

3 Textile Duct untuk Area PM & FG warehouse 8 set 15,500,000 124,000,000 1,000,000 8,000,000

4 FRESH AIR DUCT TANPA ISOLASI 32 Mtr 350,000 11,200,000 100,000 3,200,000

5 Support & Material Bantu 1 lot 20,000,000 20,000,000

C Unit Intake & Exhaust Fan


a IF 2.03G 1 Unit 10,500,000 10,500,000 650,000 650,000
Air Flow Capacity : 1.300 cfm
b EF 2.03G 1 Unit 10,500,000 10,500,000 650,000 650,000
Air Flow Capacity : 1.300 cfm
c Support & Material Bantu 1 lot 15,000,000

D AC DX
Lantai 1
R. Adm & PM Wall Mounted 2PK 2 unit 8,000,000 16,000,000 500,000 1,000,000
R. Adm Receiving Wall Mounted 2 PK 2 unit 8,000,000 16,000,000 500,000 1,000,000

PT. DANKOS Page 1 HVAC EQM


BILL OF QUANTITIES
Project : Global Onkolab Farma PT. Dankos
Job : Supply and Installation HVAC System
Sub Bill : Equipment HVAC

Local Material Labour Cost


No. Description Volume Unit Total Unit Total
(Rp.) (Rp.) (Rp.) (Rp.)
R. tolak & Musnah Wall Mounted 2 PK 2 unit 8,000,000 16,000,000 500,000 1,000,000

Lantai 2
Kantor AC Cassette 3 x 3 PK 2 unit 16,000,000 32,000,000 500,000 1,000,000
Manager Wall Mounted 1 PK 1 Unit 5,000,000 5,000,000 500,000 500,000
Analisa Sample Wall Mounted 2 x 2PK 2 Unit 8,000,000 16,000,000 500,000 1,000,000
Etiket Warehouse Wall Mounted 3 X 2 PK 3 Unit 8,000,000 24,000,000 500,000 1,500,000

E Pemipaan Pipa Refrigerant


AHU G-1.01 ( Area FG Warehouse below 25⁰C ) 15 mtr 365,000 5,475,000 50,000 750,000
AHU G-1.02 ( Area RM Cepha Warehouse below 25⁰C ) 15 mtr 365,000 5,475,000 50,000 750,000
AHU G-1.03 ( Polycell Warehouse ) 15 mtr 365,000 5,475,000 50,000 750,000
AHU G-1.04 ( Sampling room, CNC On/Off , ...) 15 mtr 365,000 5,475,000 50,000 750,000
AHU G-1.05 ( Area PM Warehouse) 90 mtr 365,000 32,850,000 50,000 4,500,000
AHU G-1.06 ( Area FG Warehouse) 45 mtr 365,000 16,425,000 50,000 2,250,000
AHU G-2.01 ( Capsule Warehouse below 25⁰C ) 15 mtr 365,000 5,475,000 50,000 750,000
AHU G-2.02 ( RM & FG Warehouse below 25⁰C ) 15 mtr 365,000 5,475,000 50,000 750,000
AC D R. Adm & PM 12 mtr 315,000 3,780,000 50,000 600,000
AC D R. Adm Receiving 12 mtr 315,000 3,780,000 50,000 600,000
AC D R. tolak & Musnah 12 mtr 315,000 3,780,000 50,000 600,000
AC D Kantor 12 mtr 315,000 3,780,000 50,000 600,000
AC D Manager 12 mtr 315,000 3,780,000 50,000 600,000
AC D Analisa Sample 12 mtr 315,000 3,780,000 50,000 600,000
AC D Etiket Warehouse 12 mtr 315,000 3,780,000 50,000 600,000
Support & Material Bantu 1 lot 20,000,000 20,000,000

F Pemipaan Pipa Drainage


AHU G-1.01 ( Area FG Warehouse below 25⁰C ) 1 set 600,000 600,000 200,000 200,000
AHU G-1.02 ( Area RM Cepha Warehouse below 25⁰C ) 1 set 600,000 600,000 200,000 200,000
AHU G-1.03 ( Polycell Warehouse ) 1 set 600,000 600,000 200,000 200,000
AHU G-1.04 ( Sampling room, CNC On/Off , ...) 1 set 600,000 600,000 200,000 200,000
AHU G-1.05 ( Area PM Warehouse) 1 set 600,000 600,000 200,000 200,000
AHU G-1.06 ( Area FG Warehouse) 1 set 600,000 600,000 200,000 200,000
AHU G-2.01 ( Capsule Warehouse below 25⁰C ) 1 set 600,000 600,000 200,000 200,000
AHU G-2.02 ( RM & FG Warehouse below 25⁰C ) 1 set 600,000 600,000 200,000 200,000
AC D R. Adm & PM 1 set 450,000 450,000 100,000 100,000
AC D R. Adm Receiving 1 set 450,000 450,000 100,000 100,000
AC D R. tolak & Musnah 1 set 450,000 450,000 100,000 100,000
AC D Kantor 1 set 450,000 450,000 100,000 100,000
AC D Manager 1 set 450,000 450,000 100,000 100,000
AC D Analisa Sample 1 set 450,000 450,000 100,000 100,000
AC D Etiket Warehouse 1 set 450,000 450,000 100,000 100,000
Support & Material Bantu 1 lot 1,500,000 1,500,000

Sub Total 3,434,526,000 269,750,000


TOTAL 3,704,276,000

PT. DANKOS Page 2 HVAC EQM


PT. DELTAMAS SOLUSINDO
Jl. Kelapa Gading Barat Blok CB 3
No.02 Gading Serpong - Tangerang
MATERIAL APPROVAL PT. DANKOS FARMA
Telp : (021) 54200431, 5474323 REQUEST DRAFT LIST Kawasan Industri Pulogadung Jl. Rawagatel Blok III-S
Fax : (021) 54210906 Kav. 35 - 39, Jatinegara, Kec. Cakung, Daerah Khusus
Ibukota Jakarta, 13930

STATUS KETERANGAN
No No Material Apprtoval Material Name Brand/Type SUBMIT RECEIVE
APR AWN RJT

Robatherm The Air


1 DMS/MAR/DF-CWH/HVAC/001 AHU Robatherm 1.01
Handling Company
Robatherm The Air
2 DMS/MAR/DF-CWH/HVAC/002 AHU Robatherm 1.02
Handling Company
Robatherm The Air
3 DMS/MAR/DF-CWH/HVAC/003 AHU Robatherm 1.03 Handling Company
Robatherm The Air
4 DMS/MAR/DF-CWH/HVAC/004 AHU Robatherm 1.04 Handling Company
Robatherm The Air
5 DMS/MAR/DF-CWH/HVAC/005 AHU Robatherm 1.05 Handling Company
Robatherm The Air
6 DMS/MAR/DF-CWH/HVAC/006 AHU Robatherm 3.01 Handling Company
Robatherm The Air
7 DMS/MAR/DF-CWH/HVAC/007 AHU Robatherm 3.02 Handling Company
Robatherm The Air
8 DMS/MAR/DF-CWH/HVAC/008 AHU Robatherm 3.03
Handling Company
Robatherm The Air
9 DMS/MAR/DF-CWH/HVAC/009 AHU Robatherm 3.04
Handling Company
Robatherm The Air
10 DMS/MAR/DF-CWH/HVAC/010 AHU Robatherm 3.05
Handling Company
Ari Armaturen BARA
11 DMS/MAR/DF-CWH/HVAC/011 Y Strainer
Y Strainer
Ari Armaturen ARI-
12 DMS/MAR/DF-CWH/HVAC/012 Globe Valve
FABA 046
Ari Armaturen ARI
13 DMS/MAR/DF-CWH/HVAC/013 Check Valve
CHECKO 001

14 DMS/MAR/DF-CWH/HVAC/014 Pressure Gauge Scheimer R100

Ari Armaturen ARI-


15 DMS/MAR/DF-CWH/HVAC/015 Pressure Reducing Valve
PREDU Fig.12.701

16 DMS/MAR/DF-CWH/HVAC/016 Pressure Transmitter Aplisens PCE-28

ari Armaturen ARI


17 DMS/MAR/DF-CWH/HVAC/017 Safety Valve
SAFE
Ari Armaturen CONA
18 DMS/MAR/DF-CWH/HVAC/018 Vacuum Breaker 655

19 DMS/MAR/DF-CWH/HVAC/019 #REF! #REF!

20 DMS/MAR/DF-CWH/HVAC/020 #REF! #REF!

21 DMS/MAR/DF-CWH/HVAC/021 #REF! #REF!

22 DMS/MAR/DF-CWH/HVAC/022

23 DMS/MAR/DF-CWH/HVAC/023

24 DMS/MAR/DF-CWH/HVAC/024

25 DMS/MAR/DF-CWH/HVAC/025

26 DMS/MAR/DF-CWH/HVAC/026

27 DMS/MAR/DF-CWH/HVAC/027

28 DMS/MAR/DF-CWH/HVAC/028

29 DMS/MAR/DF-CWH/HVAC/029

Page 3 of 4
PT. DELTAMAS SOLUSINDO
Jl. Kelapa Gading Barat Blok CB 3
MATERIAL APPROVAL
No.02 Gading Serpong - Tangerang REQUEST PT. DANKOS FARMA
Telp : (021) 54200431, 5474323 Kawasan Industri Pulogadung Jl. Rawagatel Blok III-S
Fax : (021) 54210906 Kav. 35 - 39, Jatinegara, Kec. Cakung, Daerah Khusus
( MAR ) Ibukota Jakarta, 13930

Project Code :
Project Name : SUPPLY & INSTALLATION HVAC SYSTEM
Location : PT DANKOS FARMA
Scope : □ Civil □ Electrical □ Electronic □ HVAC
□ Mechanical □ Plumbing □ etc
Date : - 2020
MAR No : DMS/MAR/DkF/HVAC/001

Material Name : Gate Valve


Brand : Armaturen
Model/Type :
Specification : see brosur

Refferences : BoQ

Quantity : 1 LOT
Area To Be Used :

Attachments : □ Brochure □ Certificate □ Drawing □ Sample


□ Test Result □ etc

Approval : □ Approved □ Approved With Note □ Rejected

Description/Comment :

PT. Deltamas Solusindo PT. Phapros


Prepared By Checked & Approved By Reviewed By Approved By

( ) ( ) ( ) ( )

You might also like