I am really happy to join and I would like to ask what are items to be taken into
consideration when preparing quotation for construction works and approximate
cost of each item on the post of construction work supervisor.
Simply I would like to ask when I get a job of supervisor and the client asks to
present quotation for work.
Gopal Mishra is a Civil Engineer from NIT Calicut and has more than 10 years of
experience in Civil Engineering and Construction. He is the founder of The Constructor.
Follow Me
(https://www.facebook.com/TheConstructor/) (https://twitter.com/theconstructor2)
(https://plus.google.com/+TheconstructorOrg) (mailto:gopal.nitc@gmail.com)
Answer ( 1 )
0
https://theconstructor.org/question/how-to-prepare-construction-quotations-estimates/ 1/2
2019/10/24 How to prepare Quotations and Estimate for Construction Works?
Reply
For example, if quote for brickwork is required by the client, the details
about type of work such as brickwork in superstructure or substructure,
or at particular height, the mix proportion of cement and sand, etc. are
provided. All you have to do is to estimate the unit rate for the brickwork
for the given specification of the work and provide the rate to the client.
For estimating unit rate of brickwork, the cost of materials such as bricks,
cement, sand and water, the labor required for unit work done, cost / rent
of tools and equipment, contractor’s profit, contingencies etc. need to be
calculated and summed up.
Thus to estimate the cost of unit quantity of particular work, the cost of
materials, tools, equipment, labor, transportation, profit, contingencies
etc. shall be considered for the calculation.