How to prepare Construction Quotations and  Question

Estimate?

I am really happy to join and I would like to ask what are items to be taken into
consideration when preparing quotation for construction works and approximate
cost of each item on the post of construction work supervisor.

Simply I would like to ask when I get a job of supervisor and the client asks to
present quotation for work.

 in progress 9  Construction (https://theconstructor.org/question-category/construction/)


 3 years
 1 Answer (https://theconstructor.org/question/how-to-prepare-construction-quotations-
estimates/#comments)
 18273 views   0

About Gopal Mishra (https://theconstructor.org/author/gopal-mishra/)

Gopal Mishra is a Civil Engineer from NIT Calicut and has more than 10 years of
experience in Civil Engineering and Construction. He is the founder of The Constructor.

Follow Me

 (https://www.facebook.com/TheConstructor/)  (https://twitter.com/theconstructor2)
(https://plus.google.com/+TheconstructorOrg) (mailto:gopal.nitc@gmail.com)

Answer ( 1 )

Gopal Mishra (https://theconstructor.org/author/gopal-mishra/)

  0

https://theconstructor.org/question/how-to-prepare-construction-quotations-estimates/ 1/2
2019/10/24 How to prepare Quotations and Estimate for Construction Works?

 Oct 18, 2017 at 13:57 (https://theconstructor.org/question/how-to-prepare-construction-


quotations-estimates/#comment-26288)

 Reply

Preparation of quotation for construction works depends on the type of


work to be carried out. Whenever a quotation is required by the client for
particular work, they provide the detailed specification of works to be
carried out.

For example, if quote for brickwork is required by the client, the details
about type of work such as brickwork in superstructure or substructure,
or at particular height, the mix proportion of cement and sand, etc. are
provided. All you have to do is to estimate the unit rate for the brickwork
for the given specification of the work and provide the rate to the client.

For estimating unit rate of brickwork, the cost of materials such as bricks,
cement, sand and water, the labor required for unit work done, cost / rent
of tools and equipment, contractor’s profit, contingencies etc. need to be
calculated and summed up.

Thus to estimate the cost of unit quantity of particular work, the cost of
materials, tools, equipment, labor, transportation, profit, contingencies
etc. shall be considered for the calculation.

Leave An Answer

Sorry, you do not have a permission to answer to this question .

Next question  (https://theconstructor.org/question/why-voids-considered-calculation-material-


quantities-mortar/)

©2019 The Constructor - Civil Engineering Home

https://theconstructor.org/question/how-to-prepare-construction-quotations-estimates/ 2/2

You might also like