Orrosion Nder Nsulation: Atiphon
Orrosion Nder Nsulation: Atiphon
Under
Insulation
Loop steam drum
Consultant
External damage
Subject to stress
Subject to thinning
corrosion cracking
• CUI is the mainly problem in petrochemical
plant.
• Current Inspection Program is not consider
corrosion under insulation problem.
• Increase Reliability of Plant.
Reference TPE
Conclusion and Future action Plan
Flange Tee
Valve
Common Locations on Piping Systems
Susceptible to CUI
Ve
nt
No
Yes
No
Yes
- 12 -
Check Sheet
- 13 -
Loop steam drum
TE-201
PM-500 A,B
PE-302
TD-1203
TD-1201
TD-1210
TA-203A
PE-502
PD-1205
List up Equipment
No. Line No. No. Line No.
10BW-0201-4B-3P2-H3-17K 1S-0201-2B-P2
10BW-0202-4B-3P2-H3-17K 1S-0202-1.5B-P2
10BW-0203-2B-1P2-H3-13.5K 1S-0203-2B-P2
10BW-0205-3B-P2(1S1(V))-H2-5K 1S-0205-3B-P2
10BW-0208-6B-1P2-H3-13.5K 25SC-0001-6B-3P2-H3-28.5K
10BW-0209-6B-1P2-H3-13.5K 25SC-0001-6B-3S1-H3-28.5K
10S-0006-4B-1P2-H3-13.5K 25SC-0004-6B-3S1-H3-28.5K
10SC-0001-6B-1S1(V)-H3-13.5K 3BW-0201-3B-1P2-H2-13.5K
10SC-0002-4B-1P2-H3-13.5K 3BW-0202-3B-1P2-H2-13.5K
1BW-0201-6B-P2-H-9.5K 3BW-0203-1B-1S1(V)-H2-5K
1BW-0202-6B-P2-H-9.5K 3BW-0203-1B-P2-H2-5K
1BW-0203-1.5B-1S1(V)-H-5K 3BW-0204-3B-P2-H2-5K
1BW-0205-2B-P2-H-9.5K 3BW-0204-4B-PS(1S1(V))-H2-5K
1BW-0206-3B-P2-H-9.5K 3BW-0205-3B-P2-H2-5K
1BW-0210-6B-P2-H-5K 3S-0001-12B-P2-H2-5K
1BW-0211-8B-P2-H-5K 3S-0009-4B-P2-H2-5K
1BW-0212-8B-P2-H-5K 3SC-0008-8B-1S1(V)-H2-5K
1BW-2202-4B-P2-H-5K 3SC-0202-3B-P2(1S1(V))-H2-5K
1S-0001-4B-P2-H-5K 3SC-5502-4B-P2-H2-5K
1S-0005-6B-P2-H-5K LPW-0001-3B-1S1(J)-H-13.5K
- 15 -
List up Equipment
No. Line No. No. Line No.
10BW-0205-3B-P2(1S1(V))-H2-5K
25SC-0001-6B-3S1-H3-28.5K
25SC-0004-6B-3S1-H3-28.5K
10SC-0001-6B-1S1(V)-H3-13.5K
1BW-0201-6B-P2-H-9.5K 3BW-0203-1B-1S1(V)-H2-5K
1BW-0202-6B-P2-H-9.5K
1BW-0203-1.5B-1S1(V)-H-5K
1BW-0205-2B-P2-H-9.5K 3BW-0204-4B-PS(1S1(V))-H2-5K
1BW-0206-3B-P2-H-9.5K
1BW-0210-6B-P2-H-5K
1BW-0211-8B-P2-H-5K
1BW-0212-8B-P2-H-5K 3SC-0008-8B-1S1(V)-H2-5K
1BW-2202-4B-P2-H-5K 3SC-0202-3B-P2(1S1(V))-H2-5K
1S-0001-4B-P2-H-5K
1S-0005-6B-P2-H-5K LPW-0001-3B-1S1(J)-H-13.5K
- 16 -
Collection Data
Collection Data
Collection Data
Consequence of failure rating
Consequence
1 2 3 4 5
class
No / Slight Minor Local Major Extensive
Economics Damage Damage Damage Damage Damage
< 0.4 M 0.4 – 4 M 4 – 40 M 40 – 400 M > 400 M
No / Slight Multiple
Health & Safe Minor Injury Major Injury Single Injury
Injury Injury
No / Slight Minor Localized Major Massive
Environment
effect effect effect effect effect
Select 3
Example
- 20 -
Probability Score Table of Carbon Steel
Initial
Operating Wall thickness Internal corrosion External coil / External
Point Coating Insulation Type
Temperature surface feature / erosion rate Steam tracing environment
Status
> 175 0C
Full QA paint
0 Or Negligible Not present Inside Building
protection
< -5 0C
Perlite
Foamglass Rarely wetted
Low High Integrity
1 150 – 175 0C Closed cell >7.1 mm (<10% of the
( < 0.1 mm/y) design
Foam (right time)
type)
< 4 mm or
Permanently
surface at
wetted (e.g.
Unpainted or location of High Low Integrity
5 50 – 120 0C condensation,
Unknown reinforcement ( >0.4 mm/y) design
cooling tower
ring & other
dripping water
5+5+1+1+1+0+1 = 14 water traps
score Example
Probability Score Table of Stainless Steel
Rarely wetted
High Integrity
2 (<10% of the
design
time)
Permanently
Normal QA paint
protection field
wetted (e.g.
Medium Integrity
4 120 – 150 0C weld at condensation,
design
construction cooling tower
dripping water
score
- 22 -
CUI Criticality ranking
Example
- 23 -
CUI Confidence rating
CUI Confidence Questions Yes Interm NO
Cladding and Insulation conditions
-Cladding/Insulation fully maintained : Yes
+1 0 -1
0 -1 + 0 = - 1
-Cladding/Insulation normal : Interm
-Cladding/Insulation in poor condition : NO
Multiple reliable inspections for CUI have been carried been
carried out
-Frequent inspection and selective delagly fallowed by
+1 0 -1
appropriate remedial action : Yes
-Inspection irregular / not standard : Interm
- No proper inspections : No
Monitoring CUI promoting condition
- The pressure of all possible CUI promoting condition
(see susceptibility categories) has been established and
quantified : Yes
- The operating temperature is monitored and constantly +1 0 -1
in identified rouge and coating condition is know /
established : Interm
- The operating temperature is not established or the
coating condition is not know : No
score Example
- 24 -
Strategy Matrix for Carbon Steel
Strategy 3
Example
- 25 -
Strategy Matrix for Stainless Steel
- 26 -
Strategies for Carbon steel
Strategies for Carbon steel
Strategies for Stainless Steel
Strategy flowchart
Strategy 3
Yes No
Piping > 8 in
Yes No
Significant
CUI found
Significant
CUI found No
Repair and Paint Yes
Medium High
Medium
Noinspection
Strategy Matrix
Strategy
Strategy
No inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Strategy flowchart
Strategy 3
Yes No
Piping > 8 in
Yes No
Significant
CUI found
Significant
CUI found No
Repair and Paint Yes
Corrosion
Think of module
Friendship
Thank You
N/A = not available