'W' WIDTH

REFER TO SCHEDULE MISCELLANEOUS NOTES:


REFER TO PLAN FOR WALL
FOR STARTER INFORMATION REFER TO DRAWING S00.001 FOR GENERAL NOTES.
BARS REFER TO
COLUMN DETAILS
REINFORCEMENT COVERS
SL82 MESH TOP CORE FOOTING INTERIOR

REFER TO SCHEDULE
ELEMENT TOP 50mm

'L' LENGTH
REFER TO DRAWING ABC-ST-04.15 5N20 T & B BTM 75mm

400
FOR SUBBASE DETAILS N16-250 TIES SIDES 75mm

'X' BARS
LAID 1st
NOTE:
REFER TO 600

D
ENSURE ALL STARTER BARS FOR WALL ARE PLACED
SCHEDULE FOR PRIOR TO POURING FOOTING. STARTER BARS TO MATCH
'Y' BARS REINFORCEMENT WALL VERTICAL REINFORCEMENT.
LAID 2nd PAD FOOTING NOTES APPLICABLE TO ALL PAD FOOTINGS:
1. ENSURE ALL STARTER BARS FOR COLUMNS AND WALLS ARE
LENGTH x WIDTH PLACED PRIOR TO POURING CONCRETE.
TYPICAL STRIP FOOTING 'SF1' DETAIL
PLAN VIEW SECTION VIEW SCALE 1 : 20

PAD FOOTING SCHEDULE

PAD
BASEMENT LEVEL 9 PAD FOOTINGS - 12000 kPa
* BASEMENT LEVEL 8 PAD FOOTINGS - 8000 kPa
* 6000 kPa
* CONCRETE
DIMENSIONS REINFORCEMENT DIMENSIONS REINFORCEMENT DIMENSIONS REINFORCEMENT STRENGTH
L W D 'X' BARS 'Y' BARS L W D 'X' BARS 'Y' BARS L W D 'X' BARS 'Y' BARS
PF1 1400 800 600 N20-200 N20-200 1600 1000 650 N20-200 N20-200 1800 1200 700 N24-250 N24-250 40 MPa
PF2 1500 1000 650 N20-150 N20-150 1700 1250 700 N24-200 N24-200 1900 1500 750 N24-150 N24-150 40 MPa
PF3 1500 1100 650 N24-225 N24-225 1750 1350 700 N24-200 N24-200 2000 1600 800 N24-150 N24-150 40 MPa
PF3A - - - - - 1750 1350 1910 N24-200 N24-200 - - - - - 40 MPa
PF4 1600 1300 650 N24-150 N24-150 - - - - - 2100 1800 850 N24-150 N24-150 40 MPa
PF5 1600 1400 700 N24-150 N24-150 - - - - - 2200 2000 950 N28-150 N28-150 50 MPa
PF6 1800 1800 850 N28-150 N28-150 2200 2200 1000 N28-150 N28-150 2400 2400 1100 N28-150 N28-150 50 MPa
PF7 2000 2000 900 N28-100 N28-100 2400 2400 1150 N28-150 N28-150 2700 2700 1250 N28-100 N28-100 50 MPa STRIP FOOTING
PF8 2100 2100 950 N28-150 N28-150 2500 2500 1150 N28-100 N28-100 2900 2900 1300 N28-100 N28-100 50 MPa REINFORCEMENT TO EXTEND
500 BEYOND CENTRE OF PAD 500
PF9 2200 2200 950 N28-150 N28-150 2700 2700 1200 N28-100 N28-100 3100 3100 1350 N28-100 N28-100 50 MPa
FOOTING WHERE APPLICABLE
PF9A - - - - - 2700 2700 3110 N28-100 N28-100 - - - - - 50 MPa
PF9B - - - - - 2700 2700 2430 N28-100 N28-100 3100 3100 1350 N28-100 N28-100 50 MPa
PF10 2700 2700 1050 N32-150 N32-150 - - - - - 3700 3700 1600 N32-100 N32-100 50 MPa
PF11 2800 1200 750 N24-150 N24-150 - - - - - 3500 1800 1050 N24-100 N24-100 50 MPa
PF12 2400 2400 950 N28-100 N28-100 3000 3000 1300 N28-100 N28-100 3400 3400 1500 N28-100 N28-100 50 MPa
PF12A - - - - - 3000 3000 2840 N28-100 N28-100 - - - - - 50 MPa
BOTTOM REINFORCEMENT INDICATED
PF13 1900 1550 750 N28-200 N28-200 - - - - - 4200 2750 1450 N28-100 N28-100 50 MPa
(TOP REINFORCEMENT SIMILAR)
PF14 3600 1400 900 N28-150 N28-150 3900 1800 1100 N28-150 N28-150 4300 2100 1250 N28-100 N28-100 50 MPa
PF15 2700 1300 800 N28-150 N28-150 3100 1700 1000 N28-150 N28-150 3400 2000 1150 N28-150 N28-150 50 MPa
PF16 1800 1450 700 N24-250 N24-250 - - - - - 2400 2050 900 N28-150 N28-150 50 MPa
'T' I N T E R S E C T I O N 'L' C O R N E R REINFORCEMENT SPLICE DETAIL
CROSS INTERSECTION SIMILAR

TYPICAL COLUMN PAD FOOTING DETAIL STRIP / PAD FOOTING JUNCTION NOTE: EACH LAYER OF TRENCH MESH IS TO BE MADE 'CONTINUOUS' BY LAPPING
SCALE 1 : 20 WHERE REQUIRED AS FOLLOWS -
PROVIDED SPOON TESTING OF 50% OF - AT 'T' INTERSECTIONS AND '+' INTERSECTIONS - FOR THE FULL WIDTH OF THE
* FOOTINGS IS UNDERTAKEN AS PER TRENCH MESH
GEOTECHNICAL ENGINEER'S REQUIREMENTS - AT 'L' CORNERS - FOR FULL WIDTH OF TRENCH MESH
- AT SPLICES WHERE NEEDED - 500mm MINIMUM

PLAN VIEWS - STRIP FOOTINGS

STEP
'S'

STEP
'S'
REFER COLUMN PROVIDE N16-400 U-BARS
SCHEDULE WITH N16 CORNER BAR
FULL DEPTH OF FOOTING

SL82 MESH TOP REFER TO DRAWING ABC-ST-04.15

DPETH

DPETH
FOR SUBBASE DETAILS Z - BARS TO MATCH SIZE AND NUMBER OF

'D'

'D'
LONGITUDINAL BARS IN FOOTING. COG
1000 MINIMUM

PAD FOOTING SHOWN APPROXIMATE REFER SCHEDULE


REFER TO PAD FOOTING DETAILS ON 1.5 x D FOR REINFORCEMENT 1.5 x D
THIS PAGE FOR DETAILS
INCLUDE THE OUTER COLUMN CLOSED TIE
ALL THE WAY TO THE BOTTOM OF THE FOOTING
'S' LESS THAN OR EQUAL TO 200mm 'S' GREATER THAN 'D' BUT LESS THAN 1.5 x 'D'

STRIP FOOTING STEPPING DETAILS


REFER TO CORE
ENSURE FOOTING REINFOCEMENT IS AT
BASE DETAIL
BOTTOM OF THE FOOTING.
HEIGHT OF REINFORCEMENT TO BE REFER TO CORE WALL ELEVATIONS
SCHEDULED TO MATCH FOR REINFORCEMENT DETAILS
THE DEPTH NOTED IN THE FOOTING
REFER TO ARCHITECTURAL
MIN
300

SCHEDULE ON THIS DRAWING


DRAWINGS FOR CORE WALL SETOUT
FULLY SCABBLE AND CLEAN CONSTRUCTION
200 JOINT. APPLY BONDING AGENT TO ALL 200
REFER TO DEPTH OF EXCAVATION AS NOTED
ON THE DETAILED EARTHWORKS PLAN MIN CONTACT SURFACES. TYPICAL MIN
1
1
DAMP-PROOF MEMBRANE

REFER
PLAN
ON 50mm MIN SAND BED.
TYPICAL.
DENOTES ZONE OF
INFLUENCE FILL VOIDS WITH CEMENT
STABILIZED SAND, USE NO FINES
FOOTING ADJACENT TO LIFT CORE PIT CONCRETE, ENSURE NO VOIDS fc' =
15MPa
REFER TO RELEVANT CORE BASE DRAWING
FOR REINFORCEMENT DETAILS

NOTE:
PAD FOOTING ADJACENT TO THE LOW LEVEL
SHORING WALL OR TO LIFT CORE PITS NOTE:
1. ENSURE ALL STARTER BARS FOR WALLS ARE
ARE TO BE FOUNDED 300mm BELOW THE ZONE OF PLACED PRIOR TO POURING CONCRETE.
INFLUENCE OF THE ADJACENT STRUCTURE. 2. REFER TO FOUNDATION NOTES FOR BEARING
IF UNSURE, PLEASE CONTACT THE ENGINEER MATERIAL AND MINIMUM BEARING PRESSURE.

PRIOR TO CONSTRUCTION OF FOOTING.

TYPICAL STAIR BASE DETAIL


1:20

05 29.04.21 ISSUED FOR CONSTRUCTION AV JOB NUMBER: DRG NUMBER:

ISSUED FOR CONSTRUCTION RHODES STAGE 2 DEVELOPMENT 19072 S02.015


abc CONSULTANTS
04 23.04.21 ISSUED FOR CONSTRUCTION AV
COPYRIGHT
34 WALKER STREET

29/04/2021 12:19:38 PM
03 26.03.21 ISSUED FOR CONSTRUCTION AV All rights reserved.
These drawings, plans and specifications and the structural & civil engineers RHODES NSW DESIGNED BY: DATE:

02 23.02.21 ISSUED FOR CONSTRUCTION AV copyright are the property of ABC Consultants and must RC September.2019
not be used, reproduced or copied wholly or in part Phone: (02) 9746 9201 Street Address Postal Address
NOTE: DO NOT SCALE OFF DRAWINGS. REFER TO 01 10.02.21 ISSUED FOR CONSTRUCTION AV
without the written permission of ABC Consultants. Fax: (02) 9746 9207 Suite 2, Level 1, Building C PO Box 3339 DRAWN BY: SCALE: SIZE: REV:
ARCHITECTURAL PLANS. VERIFY DIMENSIONS ON SITE. Email: info@abc-consultants.com.au 1 Homebush Bay Drive NORTH STRATHFIELD NSW 2137
FOUNDATION DETAILS
Web: www.abc-consultants.com.au RHODES NSW 2138
REV DATE REVISION DESCRIPTION BY KS 1:20 @ A0 A0 05