You are on page 1of 27

Scaffolding

Supervisor I
Certification Study Guide

Job Skills Curriculum & Testing Unit


Program Development & Evaluation Division
Training & Development
June 2019
© Saudi Arabian Oil Company, 2019.
All rights reserved. No portion of this book may be reproduced, by any process or
technique, without the express written consent of the Saudi Arabian Oil Company.
Scaffolding Supervisor I
Certification Study Guide

Table of Contents
Purpose of the study guide.......................................................... 1

Saudi Aramco scaffolding supervisor I certification process...... 2

TOI 07-05 requirements................................................................ 3

G.I. 8.001 scaffold certificate definition...................................... 6

Scope of the scaffold supervisor I certification tests.................. 7

Purpose of the scaffolding supervisor I certification tests......... 8

Prerequisite for the Saudi Aramco scaffold


supervisor I certification test........................................................ 9

Introduction to the scaffold supervisor I written


certification test.......................................................................... 10

Introduction to the scaffold supervisor I performance


certification test.......................................................................... 11

Introduction to the scaffold supervisor I re-certification test.. 12

Test duration and contents........................................................ 13

Reference material..................................................................... 14

Written certification test (pre-test)............................................ 15

Examples of scaffold certification performance test sheets..... 23


INFORMATION SHEET

Purpose of the study guide


This study guide is designed to prepare the candidates
for the (theoretical) online written and (practical)
performance certification tests. This study guide specifies:

• Which topics are covered in each of the scaffold


supervisor I (theoretical) online written certification
tests
• The types of questions in the scaffold supervisor I
(theoretical) online written certification tests
• What is required of the candidate in the scaffold
supervisor I (practical) performance certification
tests

Certification Study Guide June 2019 1


INFORMATION SHEET

Saudi Aramco scaffolding supervisor I


certification process
1. Saudi Aramco or contractor employee submits his
certification request to a Saudi Aramco initiator

2. Saudi Aramco initiator uploads the request onto


the certification tracking system (CTS)

3. Candidate is scheduled for his written certification


test

4. Successful written test candidates are schedule for


their performance test

5. Successful candidates are issued Saudi Aramco


scaffolding supervisor I certificate

2 June 2019 Scaffolding Supervisor I


INFORMATION SHEET

TOI 07-05 requirements


A candidate who fails his initial certification online
or performance test must wait 30 days before being
allowed a second test.

A candidate who fails his second certification online or


performance test must submit proof of remedial training
(Saudi Aramco employees must complete ITC refresher
course) to be allowed a third certification test.

A candidate who fails his third certification online or


performance test must wait 12 months before being
allowed another certification test.

Certification Study Guide June 2019 3


4
Figure 1
SCAFFOLD SUPERVISOR I (THEORETICAL)

June 2019
WRITTEN CERTIFICATION FLOW CHART
INFORMATION SHEET

INITIAL (FIRST) TEST SECOND RE-TEST THIRD RE-TEST

Candidate takes Scaffold Candidate who fails initial Scaf- Candidate who fails second Candidate who fails his
Supervisor I written fold Supervisor I written certifi- Scaffold Supervisor I written third test must wait 12
certification test cation test is allowed another certification test is allowed a months before being
test after 30 days third test if he submits proof allowed another Scaffold
FAILS FAILS of remedial training FAILS Supervisor I certification
PASSES PASSES test
PASSES

Scaffold Supervisor I (Theoretical) Written Certification Flow Chart


Candidate takes Scaffold Candidate takes Scaffold Candidate takes Scaffold
Supervisor I performance Supervisor I performance Supervisor I performance
certification test certification test certification test

PASSES PASSES PASSES

Scaffold Supervisor I Scaffold Supervisor I Scaffold Supervisor I


certificate certificate certificate
ISSUED ISSUED ISSUED

Scaffolding Supervisor I
Scaffold Supervisor I (Theoretical) Written Certification Flow Chart
Figure 2
SCAFFOLD SUPERVISOR I (PRACTICAL)
PERFORMANCE CERTIFICATION FLOW CHART

Certification Study Guide


INITIAL (FIRST) TEST SECOND RE-TEST THIRD RE-TEST

Candidate takes Scaffold Candidate who fails initial Scaf- Candidate who fails second Scaf- Candidate who fails his
Supervisor I performance fold Supervisor I performance fold Supervisor I performance third test must wait 12
certification test certification test is allowed a certification test is allowed a months before being
second test after 30 days third test if he submits proof of allowed another Scaffold
remedial training Supervisor I certification
FAILS FAILS FAILS test

PASSES PASSES PASSES

Scaffold Supervisor I (Practical) Performance Certification Flow Chart


Scaffold Supervisor I Scaffold Supervisor I Scaffold Supervisor I
certificate certificate certificate
ISSUED ISSUED ISSUED

June 2019
5
INFORMATION SHEET

Scaffold Supervisor I (Practical) Performance Certification Flow Chart


INFORMATION SHEET

G.I. 8.001 scaffold certificate definition


A certified Saudi Aramco supervisor I can supervise,
inspect, and sign scaffold tags for all scaffolds.

6 June 2019 Scaffolding Supervisor I


INFORMATION SHEET

Scope of the scaffold supervisor I


certification tests
Saudi Aramco scaffold certification tests covers the
certification of Saudi Aramco employees and contractor
employees as defined in G.I. 8.001 (Safety requirements
for scaffolds supervisor I).

Certification Study Guide June 2019 7


INFORMATION SHEET

Purpose of the scaffolding supervisor I


certification tests
To determine if the Saudi Aramco employee or
contractor employee has the necessary (theoretical)
written knowledge and (practical) performance skills, as
defined in G.I.8001 (Safety requirements for scaffolds
supervisor I), and in the construction safety manual
(CSM) chapter II-2, II-3, and II-5 (elevated work areas,
ladders, and scaffolds), to perform at the work site as
a scaffold supervisor I.

8 June 2019 Scaffolding Supervisor I


INFORMATION SHEET

Prerequisite for the Saudi Aramco


scaffold supervisor I certification test
At least five years of scaffold erection experience is
required before seeking certification as a certified Saudi
Aramco scaffold supervisor I.

Certification Study Guide June 2019 9


INFORMATION SHEET

Introduction to the scaffold supervisor


I written certification test
Description
A written online computer test consisting of approximately
40 theoretical questions that cover Saudi Aramco G.I.
8.001 (Safety requirements for scaffolding), construction
safety manual (CSM) chapter II-2, II-3, and II-5 (elevated
work areas, ladders, and scaffolds), and working
procedures and practices for the safe erection, alteration,
and dismantling of scaffolding.

Subjects covered

• Duties and responsibilities of a scaffold supervisor I


• Inspection and tagging procedures required
• Interpreting scaffold plans
• Fall protection
• Conditions and installation of portable ladders
• Usage and storage of scaffold components
• Load duty ratings of scaffolds
• Conditions for safe scaffold foundations
• Configurations of bracing tube and coupler
• Installations of guys, ties, rakers, anchors, and
outriggers
• Scaffold working platform construction
• Scaffold landing construction
• Installation of tube and coupler scaffold components
• Construction of mobile and tower scaffolds
• Construction of underhung scaffolds
• Safe erection, alteration, and dismantling of
scaffolds

Note: All candidates must have minimum computer skills and


English language understanding to be able to undertake Saudi
Aramco scaffold supervisor I certification tests.

10 June 2019 Scaffolding Supervisor I


INFORMATION SHEET

Introduction to the scaffold supervisor


I performance certification test
Description
The (practical) performance test requires the candidate
to inspect, identify, and document which parts of tube
and coupler scaffolds are acceptable and document all
the faults and their corrective actions (refer to example
of the performance inspection sheet).

Purpose
To determine if the Saudi Aramco employee or contractor
employee has the (practical) performance skills set
out in G.I 8.001 (Scaffolding supervisor I certificate
requirements).

Certification Study Guide June 2019 11


INFORMATION SHEET

Introduction to the scaffold supervisor


I re-certification test
Description
The Saudi Aramco scaffold supervisor I re-certification
test consists of a (theoretical) written online computer
and (practical) performance test.

Note: The Saudi Aramco scaffold supervisor I re-certification test is


the same certification test as the initial certification test.

Who should apply for re-certification


The Saudi Aramco Employee or contractor employee
should apply for re-certification approximately one
month before the expiry date of his certificate.

Purpose
To determine if the Saudi Aramco employee or contractor
employee has retained the (Theoretical) written
knowledge and (practical) performance skills set out in
G.I 8.001 (Scaffold supervisor I requirements).

Note: Line organizations are responsible for tracking expiration


dates and submitting employee nominations with sufficient lead time
to prevent a lapse in certification validity.

12 June 2019 Scaffolding Supervisor I


INFORMATION SHEET

Test duration and contents


The Saudi Aramco scaffold supervisor I certification
test consists of a (theoretical) written online computer
test and a (practical) performance test. Successful
completion of the theoretical/written online computer
test, qualifies the candidate to be able to take the
(practical) performance test.

The Saudi Aramco scaffold supervisor I written online


test duration is 90 minutes and consists of approximately
40 questions.

The Saudi Aramco scaffold supervisor I performance test


is conducted over a period of one day.

Certification Study Guide June 2019 13


INFORMATION SHEET

Reference material
Saudi Aramco G.I.8001 (Safety requirements for scaffolds)

Saudi Aramco construction safety manual (CSM) chapter


II-2, II-3, and II-5

14 June 2019 Scaffolding Supervisor I


INFORMATION SHEET

Written certification test (pre-test)


Introduction
The Saudi Aramco scaffold supervisor I (theoretical)
written certification test consists of questions on the
following topics:

• Safe erection, alteration, and dismantling of


scaffolds
• The duties and responsibilities of a scaffold
supervisor I
• Inspection and tagging procedures
• Interpreting scaffold plans
• Fall protection for scaffold crews
• Installation and conditions of portable ladders
• Usage and storage of scaffold components
• Load ratings of scaffolds
• Conditions for scaffold foundations
• Bracing configurations of tube and coupler scaffolds
• Installation of guys, ties, rakers, anchors, and
outriggers
• Scaffold working platform construction
• Scaffold landing construction
• Installation of tube and coupler scaffold components
• Construction of mobile and tower scaffolds
• Construction of underhung scaffolds
• Construction of bracket scaffolds

The following section includes some sample questions


for each of the topics on which you will be tested. If
you have difficulty answering the questions, refer to
the listed references.

Certification Study Guide June 2019 15


INFORMATION SHEET

Sample questions
Safe erection, alteration, and dismantling of
scaffolds
1. How close to a live unprotected powerline would
you construct a metal scaffold?

2. What is the danger where a scaffold is being


constructed close to machinery with moving parts?

The duties and responsibilities of a scaffold


supervisor I
1. When should a scaffold supervisor not sign a
scaffold tag?

2. When should a scaffold supervisor have a valid


certificate?

16 June 2019 Scaffolding Supervisor I


INFORMATION SHEET

Inspection and tagging procedures


1. What is the meaning of a yellow scaff tag?

2. Where should a scaff tag be positioned?

Interpreting scaffold plans


1. Who should prepare a scaffold plan?

2. Who reviews a scaffold plan over 12.2 meters?

Fall protection for scaffold crews


1. Fall protection systems may be secured to the
scaffold. True or false?

2. You must wear fall protection at a minimum height


of two feet. True or false?

Certification Study Guide June 2019 17


INFORMATION SHEET

Installation and conditions for portable ladders


1. How is the ladder opening in a tower frame
scaffold’s working platform usually protected?

2. Would you fix the ladder access to a tower frame


scaffold internally or externally?

Usage and storage of scaffold components


1. What must you do to damaged scaffold components?

2. Are you allowed to mix scaffold components?

Load ratings of scaffolds


1. What is the maximum allowable load on a flexible
steel wire?

2. What is the maximum load in each bay of a heavy


duty working platform?

18 June 2019 Scaffolding Supervisor I


INFORMATION SHEET

Conditions for scaffold foundations


1. When a scaffold is built on soil, what would you
place under the baseplate?

2. What is the minimum width of timber you use as


a sole board?

Bracing configurations of tube and coupler


scaffolds
1. Where should bracing be installed on a mobile
scaffold?

2. All scaffold bracing must be installed in the same


direction. True or false?

Installation of guys, ties, rakers, anchors, and


outriggers
1. Mobile scaffolds do not require outriggers. True
or false?

2. At what angle do rakers have to be installed?

Certification Study Guide June 2019 19


INFORMATION SHEET

Scaffold working platform construction


1. At what height above the working platform would
you fix a guardrail?

2. What is the minimum width of a light duty working


platform?

Scaffold landing construction


1. What is the minimum width of clear access along
a working platform for persons with hand tools
only?

2. What is the minimum required size of scaffold


landing at heights above 12m?

20 June 2019 Scaffolding Supervisor I


INFORMATION SHEET

Installation of tube and coupler scaffold


components
1. Are gaps allowed between the planks of a working
platform?

2. What is the minimum size of a square baseplate?

Construction of mobile and tower scaffolds


1. Why is plan bracing needed in a mobile scaffold?

2. Can a castor for a mobile scaffold have a pneumatic


tire?

Construction of underhung scaffolds


1. Check coupler must be installed at the top only
when erecting underhung scaffolds. True or false?

2. Single box ties must be used on all underhung


scaffolds. True or false?

Certification Study Guide June 2019 21


INFORMATION SHEET

Construction of bracket scaffolds


1. When platform brackets (hop ups) are fixed
between lifts, where would you place the extra
working platform?

2. Would you fix platform brackets (hop ups) on the


inside of the scaffold or on the outside of the
scaffold?

22 June 2019 Scaffolding Supervisor I


INFORMATION SHEET

Examples of scaffold certification performance test sheets


Tube and coupler scaffold
BASE (SILLS, BASE PLATES, ETC.)

Descriptions of faults Required corrective action

POSTS (STANDARDS)

Descriptions of faults Required corrective action

RUNNER (LEDGERS)

Descriptions of faults Required corrective action

BEARERS (TRANSOMS)

Descriptions of faults Required corrective action

BRACING

Descriptions of faults Required corrective action

OUTRIGGERS AND TIES

Descriptions of faults Required corrective action

GUARDRAILS

Descriptions of faults Required corrective action

PLANKS (BOARDS) AND TOEBOARDS

Descriptions of faults Required corrective action

LADDERS AND ACCESS

Descriptions of faults Required corrective action

Certification Study Guide June 2019 23


INFORMATION SHEET

Underhung scaffold
BASE (SILLS, BASE PLATES, ETC.)

Descriptions of faults Required corrective action

POSTS (STANDARDS)

Descriptions of faults Required corrective action

RUNNER (LEDGERS)

Descriptions of faults Required corrective action

BEARERS (TRANSOMS)

Descriptions of faults Required corrective action

BRACING

Descriptions of faults Required corrective action

OUTRIGGERS AND TIES

Descriptions of faults Required corrective action

GUARDRAILS

Descriptions of faults Required corrective action

PLANKS (BOARDS) AND TOEBOARDS

Descriptions of faults Required corrective action

LADDERS AND ACCESS

Descriptions of faults Required corrective action

Candidate’s signature:

Candidate’s ID number:

Note: All boxes must be filled

24 June 2019 Scaffolding Supervisor I