Architect:

Kohn Pederson Fox LOTTE WORLD TOWER


Engineer:
Leslie E. Robertson (SOUTH KOREA)
Associates (LERA)
Y EAR O F C OMPLETION : 2016 PROJECT DURATION: 42 MOUNTH
Special points of inter-
Core Technologies for Super Tall Building Construction
est:

 Construction Technol- The response was casted with


apartments that are com-
ogy For The Mega Mat a single concrete placement in
mon in Korea). order to secure structural
Foundation
B) Construction Tech- integrity and construction peri-
 High Strength Con- nology For The Mega od.
crete Technology Mat Foundation This foundation uses steel re-
 Structural Design bar and couplers with a diame-
lotte world tower founda- ter of 51 mm and a Bar Chair
Concept & Safety tion uses mega mat founda- system is applied to accommo-
 Surveying Technology tion because this building is date working conditions under
In Super Tall Building a super structure consisting a thickness of 6.5 m. in addi-
of 750,000 tons of vertical tion there is also a high
 Special Heavy Equip- load to the ground. that strength of 50 MPa and ultra-
ment much vertical load is neces- low heat controlling the hydra-
sary because it can secure tion heat of concrete which is
 Dimension Of Col-
all structural stability to
umns And Core Walls self-developed.
maintain the safety and
On Each Floor
usefulness of structures C) High Strength Con-
A) General Information that resist lateral loads. the crete Technology
Lotte World Tower's design size of the mega met foun-
dation are: width and It's important to use high
forms are inspired by modern
length of 71.7 m, thickness strength concrete for sky-
aesthetic forms such as ceramics
of 6.5 m and total volume scrapers that require high-
and porcelain. the shape of the
of 31,203 m3. speed construction and lean
Lotte World tower is sleek and
structures. concrete mix de-
smaller, it illustrates the topog-
signs must be optimized and
Realiza- Lotte Con- raphy of the rocky mountains of
high quality control of con-
tion strution Seoul. The building is program-
crete engineering is very nec-
matically multifunctional and
Structure Office essary for construction man-
exceeds that in other buildings.
administra- Inside the Lotte World Tower agement.
tion there are retails, offices, seven-
versatility star luxury hotels, and officetel
Structure High (a combination of offices and
type Buildings
(skyscraper) High strength concrete used for high strength concrete, Poly-
the Lotte World Tower project mix F (patent ownership).
Construc- Straight is 50-80 MPa which is applied to previously the optimization of
tion mega-columns and core walls the proportion of concrete
method for vertical sections, mat pads, mixture design mixes from
and flat plates for horizontal raw material analysis through
Number 123 members according to the floor. laboratory tests and the RMC
of Floors 80 MPa of high quality concrete (ready-mixed concrete) BP
placed a total of 77,255 m3. Test. According to the results
concrete through many actual of the simulation applied to
Large 505.300 sqm
sized mock-up experiments with mixed concrete construction,
High 514,25 m analysis and measurement of 5,300 concrete trucks were
hydration heat to carry out qual- used for 30 hours and finally
ity control to meet the 3 hour succeeded in complet-
fire retardant capacity by using ing.concrete installation.
spalling resistance material for
Page 2 LOTTE WORLD TOWER

D) Structural Design Concept & Safety System

The Lotte World Tower There are also 72 71.7 m x 72 m The Lotte World tower struc-
structural system consists of a rafts with a thickness of 6.5 m and ture system is made of earth-
gravity resistance system and a a volume of 31,203 m³ installed as a quake-resistant structural sys-
lateral force resistance system. foundation. This large foundation tems and is resistant to lateral
The Lotte World Tower gravi- consists of 4,200 tons of steel rein- loads. Earthquake resistant
ty resistance system consists of forcement, including 5.1 cm in di- structure consists of core
a core wall located in the mid- ameter, and 80,000 tons of high- walls, 8 mega columns and
dle to the 123th floor and 8 strength concrete and is able to floor plates with steel bars. The
mega columns located around handle a vertical load of 750,000 core wall is placed in the mid-
the perimeter and a steel plate tons which produces towers. dle of the building up to the
floor structure. there are 108 123th floor, 8 mega columns
poles with a length of 30 me- are placed around the building.
ters and a diameter of 1 m The core wall handles 60% of
mounted on a layer of hard the tower load, while the re-
soil as reinforcement. maining 40% is handled by
mega columns.

There are also Series


truss belts that distribute
the Diagrid structure to
the configuration of the
columns on the hotel
floor, as well as the col-
umns on the hotel floor
to the mega columns on
the office floor. Only two
levels of outriggers bind
around mega columns
with concrete cores
needed to control hori-
zontal and vertical move-
ments in buildings as a
Lotte World Tower Gravity Resistance System and result of wind loads. For
Construction. structural stability of sky-
scrapers a SHM
(Structural Health Moni-
Lateral load resistant structure system in toring) is installed, a sys-
this building consists of outrigger and belt tem for measuring and
frame mounted on the floor 39- 44 which analyzing structural re-
is a mechanical floor, 72-76 which is a pro- sponses caused by wind
tection, 104 - 107 which is a sky lobby and loads, earthquakes, etc.
hotel area facilities, on the 102nd floor this technology can main-
above which contains offices, museums and tain the super safe condi-
observation rooms. tion of the structure.

Tower Lateral Force Resistance System and Constructiaons


Year Of Completion: 2016 Page 3

E) Surveying Technology In Super Tall Building

the more a building is taller the


more important the survey tech-
nology will be. technology in high
-rise building construction is nec-
essary to build vertically accu-
rately because if construction
verticality is wrong, the building
cannot stand vertically so the
building cannot withstand vertical
and lateral loads safely.Lotte
World Tower uses GNSS climate change and time so that construction can be carried out in a timely man-
(Global Navigation Satellite Sys- ner, increasing the level of precision and accuracy and strictly managing alignment
tems) by using more than 3 satel- by monitoring the real-time movement of buildings. According to the ACI specifi-
lites that rotate throughout the cation standard, guidelines for straightness are intensified 75 mm from 150 mm,
earth. This makes it possible to but the actual construction is managed 25 mm.
carry out measurements without
an external environment such as

 Special Heavy Equipment


To build skyscrapers, special At the top of the building, the 2nd public tower is used to
equipment such as tower lift material and workers, and a shuttle hoist is installed for
cranes, hoists and high- the upper part of the interior construction. At this point,
pressure concrete pumps are all towers and common winches are destroyed except for
needed. The hoist is an im- the third winch. The hoist is also useful in installing and
portant transportation tool for operating high pressure pumping, piping and CPB
workers and materials in build- (Concrete Placing Boom) for pumping high-performance
ing tall buildings because it is concrete to heights of more than 500 m (which is sent to
tasked with lifting material. the location using mixed concrete) .Diameter and thick-
elevator operation plan for ness of high pressure pumps must be determined after
construction is also very im- considering the high pressure pumping load. Also, the type
portant because we need to and location of the CPB (Concrete Placing Boom) must be
count the number of hoists and chosen based on the radius of the concrete placement and
choose the location and type, changes in building plans. Lotte World Tower installed and
to minimize disturbances operated 4 high pressure pumps which had a maximum
between site conditions and output of 777 horsepower, 7 high pressure pipes, and 3
the order of construction. CPB in accordance with the construction period.
F) Dimension Of Columns
And Core Walls On Each Floor

Lotte World Tower Floor 2-86 uses a slab-on-truss steel floor plate, while the 87-
101 floor uses a 225-300mm thickness flat plate system with panels falling around the
column. For the upper part of the building which contains offices, museums and ob-
servation rooms, a steel plate with a slab-on-truss deck is also used. While the floor
in the basement to the first floor is made of reinforced concrete. Despite the pointed
shape, but the design of the structure of this building is quite effective in minimizing
wind loads.
LOTTE WORLD TOWER

Rebar : Rebar, also known as reinforcement the orientation and volume of hydraulic frac-
steel and reinforcing steel, is a steel bar tures, and the response of structures to vari-
or mesh of steelwires used in reinforced ous influences such as loading and foundation
concrete and masonry structures to
settlement.
strengthen and hold the concretein ten- Accelerometer : a device that measures proper
sion. To improve the quality of the bond acceleration.Proper acceleration, being the
with the concrete, the surface of rebar is acceleration (or rate of change of velocity) of a
often patterned. body in its own instantaneous rest frame,is not
Mat foundation : Mat foundation is also the same as coordinate acceleration, being the
known as the raft foundation. It is a con-
acceleration in a fixed coordinate system
tinuous thick concreteslab on the soil Positive Displacement flow meters : the only
that extends the entire footprint of the flow measuring technology to directly measure
building and increases the soil bearing the volume of fluid that passes though the flow
capacity power. This foundation supports meter. It achieves this by trapping pockets of
the entire building loads and safely trans- fluid between rotating components housed
fer it to the ground. within a high precision chamber. This can be
Reverse Circulation Drill : Reverse Cir- compared to repeatedly filling a beaker with
culation Drill Method is considered to be fluid and pouring the contents downstream
the most suitable and economical con- while counting the number of times the beaker
struction method for the pile construc-
is filled.
tion. The advantage of this method in- Tower crane : type of machine, generally
cludes the maintenance of required pile equipped with a hoist rope, wire ropes or
verticality, short construction time and chains, and sheaves, that can be used both to
lower budget, etc. lift and lower materials and to move them
Beam: structural element that primarily horizontally. It is mainly used for lifting heavy
DICTIONARY resists loads applied laterally to the
beam's axis. Its mode of deflection is
things and transporting them to other places.
The device uses one or more simple machines
primarily by bending. The loads applied to create mechanical advantage and thus move
to the beam result in reaction forces at
loads beyond the normal capability of a human.
the beam's support points. The total
Hoist : device used for lifting or lowering a load
effect of all the forces acting on the
by means of a drum or lift-wheel around which
beam is to produce shear forces and
rope or chain wraps. It may be manually oper-
bending moments within the beam, that
in turn induce internal stresses, strains ated, electrically or pneumatically driven and
and deflections of the beam. Beams are may use chain, fiber or wire rope as its lifting
characterized by their manner of sup- medium.
port, profile (shape of cross-section),
equilibrium conditions, length, and their Diagrid : is a design for building large buildings
with steel that create triangular structures with
material.
Outriggers : rigid horizontal struc- tures diagonal support beams. This is a triangulation
designed to improve building overturning beam system, straight or curved, and horizon-
stiffness and strength by connecting the tal rings that together form a structural system
building core or spine to distant col- for skyscrapers.
umns. Outriggers have been used in tall,
narrow buildings for nearly half a centu- Porcelain : is a ceramic material made by heating.
ry, but the design principle has been used
for millennia. Elevator : is a vertical transportation that is used
Belt truss : Belt truss connects outer pe- to transport people or goods
rimeter column of a building and offer a
wider perimeter to resist lateral deflec-
tion of building. In order to mobilize the
additional axial stiffness of several col-
umns and provide for torsional stiffness,
a belt truss can be used at the outrigger
levels.
Tiltmeter : a sensitive inclinometer de-
signed to measure very small changes
from the vertical level, either on the
ground or in structures. Tiltmeters are
used extensively for monitoring volca-
noes, the response of dams to filling, the
small movements of potential landslides,