PROJECT
The Tornado Tower, also called the QIPCO Tower, The goal was to intelligently integrate all building
is an iconic building in Doha, the capital of Qatar, technology disciplines to make the Tornado Tower a
completed in 2008. The Tornado Tower is a monu- landmark for maximum security, energy efficiency
ment for Doha and building technology. With its and flexibility while offering the highest level of
intelligently networked building systems, the inte- comfort. The name Tornado was developed by the
rior of this building sets new standards. The desert design team to describe the distinctive, hyperbolic
metropolis of Doha has got a new 200-meter-high shape of the building. This form is enhanced by a
landmark. The tower enhances the skyline with its unique lighting system, designed especially for the
unique architecture. It has won the price of being tower. The kinetic light sculpture, by its movement
the best and tallest building in the Middle East and of light, suggests the torsion of a tornado. The light-
Africa by the Council for Tall Buildings and Urban ing system is programmable and can produce over
Habitat. 35,000 variations of lighting patterns to create a
stunning visual effect at night.
At night the high-rise with its state-of-the-art lighting
system becomes a shining example of innovative
building technology.
Karlheinz Beck,
Project Engineer, Wicona:
“In addition to helping to realize the architect’s vi-
sion for the building’s unique shape from ground to
roof, the unitized approach allowed the full height
glazed façade to be installed without scaffolding. It
also accommodates high building movement, the
high wind loadings that the tower will be subject to
and efficient drainage, particularly where the buil-
ding inclines.”
Performance: The PICVs installed for the fan sure drop compared to a traditional DRV and 2-way
coils have ±10% accuracy, 100% authority, 100% control valve configuration. The increase in ΔT and
stroke at all pre-settings with stem operation of the reduced pump head are estimated to have saved
modulating functionality as this valve design was more than 50% of the energy consumption versus
optimal for the customer selection criteria regard- traditional DRV with 2-way control valves and con-
ing product flexibility, installation flow, initial cost stant speed pumps.
and operations requirements. The PICVs installed
for the air handling units and heat exchangers have Reliability: The FlowCon SM valve has been in-
an accuracy of ±5% and operates over a 2,160° stalled in buildings globally for more than 10 years
rotation angle, have feedback option to BMS and at the time of order, making it the most well-proven
hold 100% authority at all times making it the most PICV valve in the industry. Based on their previ-
accurate PICV in the world. Besides the PICVs, a ous experiences the construction team felt “in good
variety of dynamic balancing valves holding ±5% hands” using the products of FlowCon.
accuracy was installed in heat exchanges, chillers
and cooling towers. Monitoring: The FlowCon SM valves installed fea-
tures a feedback function, which will allow the valve
The valve configuration supplied to the project en- to perform self-diagnostic. In case of any issues,
sures very accurate control of the HVAC system at the valve can request service through its feature,
all load conditions and operation sequences. With before any effect is noticed and reported.
the high accuracy, 100% authority and 100% stroke
the ΔT is optimized in the system. Besides the op-
timized ΔT, the valves installed have a low pres-
www.flowcon.com
D E N M A R K • D U B A I • U S A • C H I N A • S I N G A P O R E