Required
Sl. No. Description of Material Unit Remarks
Quantity

1 Thermo Electric Generator (with all accessories) Nos 4

a) HSI Anode (with 50 m cable Tail) Nos 8


2
b) HSI Anode (with 5 m cable Tail) Nos 12
3 Mg Anodes (High Purity) Nos. 150
4 Permanent Reference Electrode Nos. 15
5 Zn Earth Electrodes Nos 10

6 Zn Earthing Ribbon (1 coil=152 meter) Coil 2

a) Cadweld Charge - 15 sq.mm Nos. 250

7 b) Cadweld Charge - 25 sq.mm Nos 50

c) Cadweld Charge - 35 sq.mm Nos 50

8 Cadweld Cap Nos 200


Excess 30 nos required
9 Surge Diverter Nos 40
for Existing pipeline
10 Cable Splicing Kit 3 way Nos 30

11 Royston Roybond 747 Primer Can 5

12 Polarization Coupon Nos. 4

13 Carboneous Backfill MT 9

14 Condensate Trap Nos 2

15 Cable Warning Tape Meter 500


16 Repair Tape Roll 5
a) Line Taps - 15 sq.mm Nos 15
b) Line Taps - 25 sq.mm Nos 15
17
c) Line Taps - 35 sq.mm Nos 10
Cables

a) 10 Sq. mm Cable Test Lead (Black) Meter 500

b) 10 Sq. mm Cable Test Lead


Meter 250
(Gray)

18 c) 10 Sq. mm Cable Test Lead (Red) Meter 250

d) 25 Sq. mm Earthing & Bonding


Meter 300
Cable (Black,Blue, Green)
e) 35 Sq. mm Black for Negative
Meter 300
feeder cable
f) 35 Sq. mm Red for groundbed (+Ve)
Meter 150
feeder cable

1
Required CP Materials List

Required
Sl. No. Description of Material Unit Remarks
Quantity

a) Cable Termination Lugs - 16 sq.mm Nos. 200

19 b) Cable Termination Lugs - 25 sq.mm Nos 30

c) Cable Termination Lugs - 35 sq.mm Nos 20

20 Anode Junction Box Nos 3

Bond Box/Test Post:


21 Test Post - PM-TS3 by PRO MARK Nos 110
Utility Supply (With Head). (3")

22 Negetive Distribution Box Nos 3

Excess 30 nos required


23 Insulating Joint Bond Box Nos 40
for Existing pipeline

24 Fisher Type 1301F Gas Regulator Nos 3


Excess 23 nos required
25 Current Interrupter (Nilsson Model 825) Nos 25 for Existing pipeline
KIRK CELL Protection of Cathodic
26 Nos 10
Protection Circuits by Kirk Engineering