WIDTH(W) = 81 m Terrian Category = 2 HEIGHT(H) = 11 m Bay Spacing(sidewall) = 7.6 End = 8.1 SLOPE = 1 10 Enclosed Condition 0.2 -0.2
Calculation for wind pressure :
k1 = 1.00 General building, As per Table-1 of IS-875-Part-3 k2 = 1.010 For Terrian category 2 as per Table 2, Clause: 6.3.2.1-b k3 = 1.00 Upwind slope is less than 3 degree k4 = 1.00 for Non Cyclonic Region Vz = k1xk2xK3xK4XVb = 47.47 m/s wind pressure Pz = 0.6Vz^2 = 1352.05 N/m2 = 1.35 kN/m2 Kd = 0.9 (Directionality factor) Ka = 0.9 (Area Averaging factor) Kc = 0.9 (Combination factor for pressure & Suction) Design wind pressure Pd(not be taken less than 0.7Pz) KdxKaxKcxPz = 0.99 kN/m2 H/W = 0.14 h/w≤0.5 L/W = 1.31 1<l/w≤1.5
Wind load on frame
CASE-1- WIND ACROSS THE RIDGE(ZERO DEGREE) Positive Cpi SURFACE Cpe Cpi Cp=(Cpe-Cpi) Wind load on frame A 0.70 0.2 0.50 0.5x0.99x7.6= 3.76 EF -0.94 0.2 -1.14 -1.14x0.99x7.6= -8.58 GH -0.40 0.2 -0.60 -0.6x0.99x7.6= -4.51 B -0.25 0.2 -0.45 -0.45x0.99x7.6= -3.39 C -0.60 0.2 -0.80 -0.8x0.99x8.1= -6.42 D -0.60 0.2 -0.80 -0.8x0.99x8.1= -6.42 CASE-2- WIND ACROSS THE RIDGE(ZERO DEGREE) Negative Cpi SURFACE Cpe Cpi Cpe-Cpi Wind load on frame A 0.70 -0.2 0.9 0.9x0.99x7.6= 6.77 EF -0.94 -0.2 -0.74 -0.74x0.99x7.6= -5.57 GH -0.40 -0.2 -0.2 -0.2x0.99x7.6= -1.50 B -0.25 -0.2 -0.05 -0.05x0.99x7.6= -0.38 C -0.60 -0.2 -0.4 -0.4x0.99x8.1= -3.21 D -0.60 -0.2 -0.4 -0.4x0.99x8.1= -3.21
CASE-3- WIND PARALLEL TO RIDGE(90 DEGREE) WITH Posative Cpi
SURFACE Cpe Cpi Cpe-Cpi Wind load on frame A -0.50 0.2 -0.7 -0.7x0.99x7.6= -5.27 EG -0.80 0.2 -1 -1x0.99x7.6= -7.52 EG -0.80 0.2 -1 -1x0.99x7.6= -7.52 B -0.50 0.2 -0.7 -0.7x0.99x7.6= -5.27 C 0.70 0.2 0.5 0.5x0.99x8.1= 4.01 D -0.10 0.2 -0.3 -0.3x0.99x8.1= -2.41 CASE-4- WIND PARALLEL TO RIDGE(90 DEGREE) WITH Negative Cpi SURFACE Cpe Cpi Cpe-Cpi Wind load on frame A -0.50 -0.2 -0.3 -0.3x0.99x7.6= -2.26 EG -0.80 -0.2 -0.6 -0.6x0.99x7.6= -4.51 EG -0.80 -0.2 -0.6 -0.6x0.99x7.6= -4.51 B -0.50 -0.2 -0.3 -0.3x0.99x7.6= -2.26 C 0.70 -0.2 0.9 0.9x0.99x8.1= 7.22 D -0.10 -0.2 0.1 0.1x0.99x8.1= 0.80