CLUSTER
ACCEPTANCE
Cluster ID 2G Cluster 8
Band 2G
Customer Telkomsel
FINAL ACCEPTANCE
Company: Ericsson Network Modernization
Cluster KPI Acceptance
Prepared by: Rudolf S Last Update: 28-Dec-2015
Report
Doc. Number: EID/X/X-15 Page: 1/15 Version: 1.0
MODERNIZATION CERTIFICATE
Reference Number: - - -
Band: 2G
Area: Riau Daratan
Cluster ID: 1st Tier 118
Previous Configuration:
BSC Name BVTBK1 Cluster Name Cluster 8
Macro NE 14 NE IBS NE -
Micro NE - Total Sites 14 NE
New Configuration:
BSC Name BVTBK1 Cluster Name Cluster 8
Macro NE 14 NE IBS NE -
Micro NE - Total NE 14 NE
PT. Ericsson hereby certifies that the relevant parts of the works referred to in this Conditional Acceptance Certificate complies
with the Network Expansion Procurement Agreement, in particular the Specifications and this has successfully passed the
Acceptance Tests on the particular cluster basis.
Counter Signatures:
Telkomsel EID
1. Content:............................................................................................................................................................................3
2. Executive Summary..........................................................................................................................................................4
3. Network Modernization Cluster Overview......................................................................................................................4
4. NE List..............................................................................................................................................................................6
5. OSS Statistics KPI Evaluation..........................................................................................................................................6
6. Drive Test Performance Evaluation..................................................................................................................................8
6.1 Drive Test and Static Test Point Location Map....................................................................................................8
6.2 Mobile Drive Test KPI Evaluation......................................................................................................................9
6.3 Static Drive Test KPI Evaluation..........................................................................................................................9
6.4 Drive Test Result Plot.........................................................................................................................................10
6.5.1 Cell Coverage Area...............................................................................................................................10
6.5.2 RxLevel Sub (dBm) – Idle Mode.........................................................................................................10
6.5.3 RxQual Sub – Dedicated Mode............................................................................................................11
6.5.4 SQI (Speech Quality Index) – Dedicated Mode...................................................................................12
7. Activities.........................................................................................................................................................................13
8. Recommendation............................................................................................................................................................13
9. Daily Chart Post Modernization OSS KPI.....................................................................................................................14
10. Panoramic Info.............................................................................................................................................................15
List of Figure:
List of Table:
2. Executive Summary
This document is an official BSS Network Modernization KPI Acceptance Report which indicates that the Implementation Procedure
has been performed and the KPI measurement result has fulfilled the acceptance value. Ericsson is glad and proud to conclude that
since the Modernization Period, an impressive improvement to Telkomsel’s network performance has been achieved. There were a
lot of activities that had been carried out to improve the network performance.
These measurements were collected, post processed and analyzed according to the agreed process as specified in the BSS
Network Modernization KPI Acceptance Methodology / Procedures. For a description of the used equipment, the details for particular
measurements and the process for data collection and processing please refer to the above-mentioned document. This KPI
Acceptance Report is made according to the agreement document describing the area and the applicable design rules and values.
This document will be submitted in Hardcopy and Softcopy included supporting data.
Figure 2: 2G Cluster 8
2G
TDR -1.5% SDSR, HOSR, TBF UL Est SR, TBF DL Est SR, TBF Comp SR - 95%
Formula Formula
α-β MIP Target β-α MIP Target
α-β>=1.5% MIN(α-(α*40%),TM) β-α>= 3% α+((100%-α)*40%)
1.5%>α-β>=1% MIN(α-(α*30%),TM) 3%>β-α>=2% α+((100%-α)*30%)
1%>α-β>=0.5% MIN(α-(α*25%),TM) 2%>β-α>=1% α+((100%-α)*25%)
0.5%>α-β>=0 MIN(α-(α*20%),TM) 1%>β-α>=0 α+((100%-α)*20%)
0>α-β α-(α*10%) 0>β-α α+((100%-α)*10%)
Table 3 shows the Post Modernization KPI values for 5 consecutive days in daily basis and the aggregation of 5 consecutive days
KPI.
The above OSS statistics KPIs have been evaluated following agreed OSS statistics KPI scoring methodology. KPI scoring is
applied to avoid clusters can’t be accepted due to one KPI value not meet the baseline while the other value has already met.
Table 4 shows the comparison of OSS statistics KPI values and the final score of each KPI.
Post
KPI Target MIP Modernization Delta Score Comment
Value
The OSS statistics KPI evaluation result shows that both OSS statistics KPI acceptance criterias are not Passed due to has spike 14
Feb 2016 .
• 4 OSS KPIs >= Modernization Target – 30%
• Total OSS KPIs Acceptance Score >= 100
Company: Ericsson Network Modernization
Cluster KPI Acceptance
Prepared by: Rudolf S Last Update: 28-Dec-2015
Report
Doc. Number: EID/X/X-15 Page: 7/15 Version: 1.0
6. Drive Test Performance Evaluation
7. Activities
Tuning activities have been performed in 2G Cluster 08 in order to solve the identified problems, optimize the performance as well as
to achieve the targeted KPIs.
All tuning activities are summarized in Table 9.
8. Recommendation
Availability Tranding not stabil, payload trending show increase after Modernization program, Channel Balancing & Adjust
NumreqEgprsbpc is recommendation to maintain Congestion &TBF Performance
Table 9: Panoramic