WBS Contingency
Description Estimate
Number (15%)
1 Design the Rocket
1.1 Hire Engineers $100,000 $15,000
1.2 Purchase CAD Software $25,000
1.3 Create Drawings $10,000
Design the Rocket Total $135,000 $15,000
At least 8 risks
At least 3 are High or Extreme
WBS #
Description
Trigger
Contingency plan
Owner
WBS #
Description
Trigger
Contingency plan
Owner
WBS #
Description
Trigger
Contingency plan
Owner
Description
May have issues finding qualified rocket scientists
Specialized materials with single sourced suppliers
May have difficulty moving large structure down roads (may need permits or have to travel at night when traffic is reduced)
Sensors delicate and damage easily
Extreme heat and pressure may lead to damage of rocket or localized site
1.1
Super scary Risk
1 sentence - be specific
1 Paragraph - What are you going to do if the trigger hits
Who is responsible for executing the Contingency plan (Can be PM, can be SME, can be one of the project team - you decide)
2.2
Super scary Risk
1 sentence - be specific
1 Paragraph - What are you going to do if the trigger hits
Who is responsible for executing the Contingency plan
2.5
Super scary Risk
1 sentence - be specific
1 Paragraph - What are you going to do if the trigger hits
Who is responsible for executing the Contingency plan
Probability Impact Risk
4 3 High
4 5 Extreme