Project needs and cost

In this project we are proposing to have a computer laboratory for students at Leyte
National High School (LNHS). The size of this building is 16' x 24' (391 sq. ft.), and the
maximum capacity is 15. The budget for making this building is Php700,000 and the labor for
the construction worker is Php200.00 per day. Project Computer Lab will start in the fall of
2021 and take two academic years, with full implementation occurring in the 2023-2024 school
year. day.
I. Materials for making a Building
Materials Needed Cost

Wood 50,000
Block and brick 50,000
Sand 30,000
Concrete 20,000
Glass 30,000
Cement composites 50,000
Rock 40,000
Crushed bricks (for foundation) 20,000

Plywood 30,000
Labor 200,000
Other Expenses 180,000
Total: Php700,000

The budget for the equipment of Computer Laboratory is 2,500,000.


II. Equipment of Computer Laboratory
Items Quantity Cost
Monitor 19” 15pcs 300,000
Keyboards 15pcs 50,000
Mouse 15pcs 20,000
Server 3pcs 500,000
Network cables 1box 200,000
Tables 15pcs 50,000
Projector 2pcs 200,000
White Board 1pc 20,000
Ceiling Fan 2pcs 50,000
Software 500,000
Other Expenses 300,000
Total: Php2,190,000