Construction of Woqod Petrol Station at Onaiza-2

MATERIAL SUBMITTAL
FOR
AGGREGATE, BACKFILL MATERIAL, SUB-BASE
(SAND AND ROCK CRUSHERS (SARC)

Contract No.: TAAWL/ESD/14/01/19

Document No.: ALCO-WQD-CIV-MAS-0003 Rev.: 0

Project Phase: Construction

Prepared by: HSE Reviewed by Reviewed by: Approved by:


Name Mr. Leonard Jason Mr. Mohammed Abdullah Mr. Ali Rauf Engr. Praphul Kumar
Baltazar

Job Title QA/QC Engineer HSE Manager Project Coordinator Project Manager

Signature

Date JUL. 29, 2019 JUL. 29, 2019 JUL. 29, 2019 JUL. 29, 2019
HISTORY LOG

Rev No. Issue Date Purpose of Issue Revised Sections

0 JUL. 29, 2019 Issued for Approval


CONTENTS

1. Company profile
2. QHSE Certificate
3. QHSE Policy
4. Technical Data Sheet
4.1 Technical Data
4.2 MSDS
5. Compliance Statement
5.1 Compliance Statement
5.2 Test Result
6. Previous Approvals
7. Project List
8. Others
8.1 Method Statement
8.2 Product Photo
8.3 Warranty Certificate
1. COMPANY PROFILE
Sand And Rock Crushers

Mamoon AI Marabi
General Manager

Sand and Rock Crushers (SARC) is one of the leading


Companies that make a Comprehensive range of local lime-stone
aggregate (Sub-Base, Aggregate, Dune Sand, Powder, Dafan,
etc). Those materials are used by the building and civil
engineering industry.

We are deciding to be the optimum Company in Qatar and In


Future to be creating a network throughout the Gulf and the
Middle East to provide local services to their clients on a global
basis.

Since inception, SARC invested heavily in the research and


development with all required tests. .

._____________________ www.sarc.com.qa
Sand And Rock Crushers

Introduction

SARC established in to support the infrastructure of


2010
the state of Qatar and the piece through the provision of
various products from Sub-base and Aggregate approval of
the specification of the 2007-2010 country and the piece
through the presentation of the company's products to the
laboratories accredited by the state of Qatar.

Our Products

SARC use the best techniques and modern scientific


methods to get the best highest quality of construction
materials (Sub-Base {A-B-C}, Aggregate "with all sizes",
Backfill, Powder, Dune Sand).

Certifications:-

- Qatar Chamber Of Commerce & Industry (QCCI).


- International Organization for Standardization
(IS09001).
- Occupational Health and Safety Assessment System
(OHSHS18001) .

..._iiiiiiiiiii;;;;;;;;;;;;;;;iiiii::iOII;;;a::z:;::;z;l~:a:::~~.::::;:w;iiiiiii.,.... . .iiiiiliiil. .- - - - - - www.sarc.com. q a


Sand And Rock Crushers

Corporate Information:-

Company Name : Sand And Rock Crushers


Address : 55 El Azyzya-471 Ghaleb Bin Ali St,
Building No.3, Doha- Qatar
Telephone Number : +974- 44 833 353
Facsimile Number : +974- 44 775 775
Website : www.sarc.com.qa
Post Office Box :8964
Type of Business : Contracting of Excavation,
Demolition and Operation of
Quarries and Crushers
Date of Establishment : 20/10/2010

:AYDAADELKANAAN
Sign Authority : BADER MOHAMED N M AL-F AHID
: MAMOON ALMARABI

www.sarc.com.qa
2. QHSE CERTIFICATE
ISOQAR

Certificate of Registration
This is to certify that the Management System of:

Sand and Rock Crushers

P.O. Box: 8964, Building Number 442, Salwa Road 340,55 El Azyzya,
Doha, Qatar

has been approved by Alcumus ISOQAR and is compliant with the requirements of:

ISO 9001: 2015

Certificate Number: 10664-QlS-001


Initial Registration Date: 18 April2016
Re-issue Date: 01 April 2019
Expiry Date: 18 April 2022

Scope of Registration:

Manufacture and supply of aggregates, backfill and sub base. Procurement and supply of
wash sand ang dune sand

Signed :
Steve Stubley, Technical Director
(on behalf of Alcumus ISOQAR)

This certificate will remain current subject to the company maintaining its system to the required standard.
This will be monitored regularly by Alcumus ISOQAR.· Further clarification regarding the scope of this certificate
and the applicability of the relevant standards' requirements may be obtained by consulting Alcum us ISOQAR.
. .

Alcumus ISOQAR Limited Cobra Court, 1 Blackmore Road, Stretford, Manchester


M32 OQYT: +44 (0)161 865 3699 F: +44 (0)161 865 3685
This certificate is the property ofAlcumus !SOQAR and must be returned on request

0026
ISOQAR

Certificate of Registration
This is to certify that the Management System of:

Sand and Rock Crushers

P.O. Box: 8964, Building Number 442, Salwa Road 340, 55 El Azyzya,
Doha, Qatar

has been approved by Alcumus ISOQAR and is compliant with the requirements of:

ISO 45001: 2018

Certificate Number: 10664-0H5-001


Initial Registration Date: 18 April 2016
Re-issue Date: 01 April2019
Expiry Date: 18 April2022

Scope of Registration:

Manufacture and supply of aggregates, backfill and sub base. Procurement and supply of
wash sand and dune sand

Signed:
Steve Stubley, Technical Director
(on behalf of Alcumus ISOQAR)

This certificate will remain current subject to the company maintaining Its system to the required standard.
This will be monitored regularly by Alcumus ISOQAR. Further clarification regarding the scope of this certificate
and the applicability of the relevant standards' requirements may be obtained by consulting Alcumus ISOQAR.
. .

Alcumus ISOQAR Limited Cobra Court, 1 Blackmore Road, Stretford, Manchester


M32 OQYT: 744 (0)161 865 3699 F: +44 (0)161 865 3685
.
This certificiJte is the property ofAlcumiJS /SOQAR and miJSt be returned on request
3. QHSE POLICY
Sand And Rock cl~~ ~1 ~L..u
C R U S H E R S ~ '--' \ ' ,< ' J

Quality Policy

We, at Sand and Rock Crushers, commit


ourselves for supplying products that would
give complete satisfaction to our customers.
We will ·strive to achieve growth and leading
position in the market by;
• Supplying consistent quality of products to
our valued customers,

• Complying requirements and continually


improve the effectiveness of quality
management system, and

• Creating an environment of teamwork.

Tel. : +974 44833353 , Fax: +974 44775775 P.O. Box: 8964, Doha- Qatar. www.sarc.com.qa
Sand And Rock 4.tl~...) ...u1 ...u L.u
C R U S H E R S ~ ' .....) \ t <
.. ' t

Occupational, Health and Safety Policy

We, at Sand and Rock Crushers, engaged in crushing,


segregation and mixing of stone and rocks endeavour to
maintain the highest standards of Occupational Health
and Safety of our employees.
We are committed to;

• Prevent injury, ill Health and continual improvement in


OH&S performance,
• Comply with relevant laws and regulations as well as
take additional measures to maintain health and safe
work practices,
• Implement safe work practices,
• Maintain the site and neighbourhood clean and safe,
• Ensure safety during transport and handling of
materials, and
• Made available to the public

Eng. Mamoon AI Marabi


General Mana..~~

Tel. : +974 44833353 , Fax: +974 44775775 P.O. Box: 8964, Doha - Qatar, WINW.sarc.com .qa
4. 4. TECHNICAL DATA SHEET
4.1 TECHNICAL DATA
4.2 MSDS
4.1 TECHNICAL DATA
4.2 MSDS
5. COMPLIANCE STATEMENT
5.1 COMPLIANCE STATEMENT
5.2 TEST RESULT
5.1 COMPLIANCE STATEMENT
5.2 TEST RESULT
6. PREVIOUS APPROVALS
-
Ashghal 3/3/2019 9:30:10 AM PAGE 1/002 Fax Server

a-cGUl ~J~.l.!l.:L...ttA

dr' . ,~·--:-"':-;
-
'
- - i ,!,... ,,.,.,. .,- ;r:-· -·- s=·-= · -·t"-:r~-'==='=....., r et
Pub!k. Wa~~ Authority
•,....

~Jll ~ ,s-b.ii
Qatar Deserves The Best

R/t~.\tCO
~1 :1 /~NO·Pl-"f(i£

M/s Ramco Trading & Contracting Co. W.L.L


Doha -.Qatar 0 3 MAR 1019
P.O Box 15104
Tel: 445544001 Fax: 44554999,44554666
-RECEftVED
TO: _ _ _ __
Attention : ,\1L Kanal M E.ada1vi- Manc.ger i'.oad5 Division
BY : _ _ _ __

Project Code : lA 2018 C 019 I TIME: _ _ __


Project Title : RIW in Various Areas of Greater Doha Phase 6A
Contractor : AI-Mohannadi for levelling & Paving Roads

Subject : Materials & Prequalification Approval Sand & Rock Crusher, TPL

With references to your Letters RRDIV/AGL/T002/L0046/2019 REV.01-FCTS 2019/0006437/1, RRDIV/


PWA/ T002/LOOS6/ 2019-FCTS 2019/0003789/1, RRDIV/ AGL/T002/LOOSS/2019-FCTS 2019/0002887/1
RRDIV/ PWAf P 165/ L0073/ 2019 - FCTS 2019/0005604/1, RRDIV/ PWA/ P 165/ L0072/ 2019-fCTS
2019/0005606/1, RRDIV/ PWA/ P 165/ L0073/ 2019- FCTS 2019/0005604/1and the subj ect matter, please
find the status of the contractor's materials & Prequalification approval request proposed to use for the
titled project.

Ref Item- Manufacturer Supplier Status Remarks


BC Class A
RRDIV/
(AP 1494) Subj ect to the
AGL/T002/ Approved
Wearing compliance with
L0046/201 as Noted
Course QCS
9 REV.01
{AP 1504)
RRDIV/
· PWA/ Subject to the
M/s Sand & RoGk M/s ·Sand & Approved
T002/ Subgrade compliance with
Crushers . Rock Crushers as Noted
LOOS6/ QCS
'
2019 --

Cc:
Ashghal 2/10/2019 2 : 21:22 PM PAGE 1/001 Fax Server
<i.-olRJI Ju..JJ.lii ~
Pubfk Works AuthoritS~
d I
IIBIIIIIII 10/02/2019 2:16:55 PM
J........b...O.I~j-b..o
Qatar Deserves The Best IIIIIIIIIIIII~~IIHI~IIIIJIIIIIIII~IIIIIIIIII
2019/0002952/5

M/s Ramco Trading & Contracting Co. W.L.L


Doha- Qatar
P.O Box 15104
Tel: 44554400, Fax: 44554999,44554666
Attention : Mr. Kamal M Badawi-Manager Roads Division
Project Code : lA 2018 C 0191
Project Title : RIW Jn Various Areas of Greater Doha Phase 6A
Contractor : AI-Mohannadi for Levelling & Paving Roads
Subjt!tt : Materials Approval - BC Class A, B, WC, Prime &Tack Coat, SB, Kerb & Tiles
With references to your Letters RRDIV I AGL/T002/L0046/2018-FCTS2019/0002386/1,
RRDIV / AGL/T002/l0047 /2019-FCTS2019/0002395/1, RRDIV / AGL/T002/L0054/2019-FCTS
2019/0003092/1, RRDIV/AGL/T002/L0053/2019-FCTS 2019/0003088/land the subject matter, please find
the status of the contractor's materials approval request proposed to use for the titled project.

Ref Item Manufacturer Supplier Status Remarks


BC Class A(AP 1402)
RRDIV/AGl/TOO Wearing Course Certificates expired
Rejected
2/l0046/2018 (AP 1406, AP 1413)

Subject to the
RRDIVI AGL/TOO Prime coat Approved as
compliance with
2IL0046/2018 (Iter Prime HC) Noted
QCS
Subject to the
RRDIVI AGL/1'00 Tack Coat Approved as
compliance with
2/L9046/2018 (Iter T~ck ss lH) Noted
QCS

Subject to the
RRDIVI AGl/TOO Concrete Pavers and Approved as
compliance with
2/L0047I2019 Kerbstone Noted
QCS

Subject to the
RRDIV/ AGL/TOO M/sSand & M/sSand & Approved as
Subbase compliance with
2ll0054l2019 Rock Crushers Rock Crushers. Noted
QCS
Subject to the
RRDIV/AGL/TOO Approved as
BCdassB . compliance with
2IL0053/2019 Noted
' QCS

Regards CRji:J.fCO
~\t 11:V OJ- FJ(!E

Saoud Ali _fl A AI-Tamimi 1 ff FER 2019 ·.


Roads Project Management Department
Manag~r
RECEiVED
TO : _ ___ _ _
Cc:
BY : -'-·- - -- -
TIME·: _ _ __
I

eg1s
UM ALHOUL ECONOMIC ZONE
(QEZ·3)

Construction of utilities for arterial roads (north of north access road),


and design and construction of reservoirs Including pumping stations
and its connection to CP02 and CP03 at Urn Alhoul Special Economic
Zone (CP22 Utilities Connectivity)

MATERIAL SUBMITTAL DOCUMENT


of
AGGREGATE FOR PIPE BEDDING & SURROUNDING
·· · - - -

t--+"""o-.R~,,~·ec·t.~d--...;........,-.""''m!'l"'fttlft'"l'-czo3-CW10-coN·17
! • For lnformat1or:~
Document No.: -TSE·MAS-220011 Rev.: 2
Project Phase: CONSTRUCTION

· Name SUN VAN

QA/QC DEPlJN RISK TECHNICAL CONSTRUC QA/QC HSE PROJECT


Job Title & HSE MANAGER TION MANAGER MANAGER
ENGINEER MANAGER
MANAGER MANANGER

Signature

~te
2/6/2019 Aconex

El03·CW10·<.<JII· Ill I
Construction or
Common Utilities for
UmAihoul
monOI:.<:~ China Harbour Engg
t,:'~"::.~=~ 'ton1pany Url
eg1s
MAIL TYPE MAIL NUMBER REFERENCE NUMBER
Workflow Transmittal EGIS_lnt-WTRAN-001324 EGIS_Int-WTRAN-001324

Final (WF-000734) CHEC - EGIS - Technical Document - Re-submittals

From Mr Allan Mara igan - EGIS International

To (4) Mr KEITH SA TIAGO- China Harbour Engineering Company LTD. Doha Qatar (+3 more...)

Cc Mr Dhanavela Gunasekaran - MANATEQ

Sent Monday, 4 Fe ary 2019 6:11:45 PM GST (GMT +04:00)

Status N/A

DOCUMENT ATTACHMENTS (1)

I
I (0 selected)

Planned
Document Revision
File Revision Title Status Submission ,
No Date
Date

MATERIAL SUBMITTAL DOCUMENT


OF AGGREGATE FOR PIPE
A-
EZ03..CW10- BEDDING & SORROUNDING (2.36 -
Proceed-
JJ CHEC-TSE-
MAS-220011
2 23/01/2019 10mm FOR 250mm HOPE PIPE) (
2.36 - 14mm FOR 315mm HOPE
No
Comment
PIPE) SUPPLIER: SAND AND ROCK
CRUSHERS FOR TSE NETWORK

MESSAGE

Workflow Review History

The attached documents have completed the "CHEC - EGIS - Technical Document - Re-submittals" workflow with the following results :

This tntnsmil tal was automaficaly geneta/ed.

Doc No St p Participant Review Outcome Comments

EZ03-CW1 0-CHEC-TSE-MAS- E sOC A A - Proceed - No Please refer to


220011 C eck Maraslgan Comment attachment.
2/4(2019 Aeon ex

Peter Ghlcu Final (WF-000736) TORe-submittal Review - (02 Review ... 3:24PM
EGIS llllTERNATIONAL WORKFLOW TRANSMITTAL EGIS_INT-WTRAN.()()1317

EZ03·(.\'110 CO~I 18 I
Conslrucl1on of
Common Utilities for
UmAihoul
mQnQl:-_~9.Chlnd Harbour Engg.
~~=~ tOIOJlJily Ltd
eg1s
MAIL TYPE MAIL NUMBER REFERENCE NUMBER
Workflow Transmittal EGIS_Int-WTRAN-001317 EGIS_ lnt-WTRAN-001317

Final (WF-000736) TD Re- ubmittal Review- (02 Reviewers)

From Mr Peter Ghlc - EGIS International

To (4) Mr Allan Mara igan - EGIS International

Mr Manu] Kum r - EGIS International

Mr Balakrishn Savant- EGIS International

Mr Peter Ghic - EGIS International

Sent Monday, 4 February 2019 3:24:16 PM AST (GMT +03:00)

Status N/A

DOCUMENT ATIACHMENTS (1)

(0 selected)
I
l
I
Document Revision
Planned
File Revision Title Status Submission
No Date
I l Date

I . EZ03-CW10-
MATERIAL SUBMITTAL DOCUMENT OF
AGGREGATE FOR PIPE BEDDING &
SORROUNDING (2.36 -10mm FOR 250mm For
j CHEC-TSE- 2 23/01/2019
HOPE PIPE) ( 2.36 - 14mm FOR 315mm Approval
MAS-220011
HOPE PIPE) SUPPLIER: SAND AND ROCK
CRUSHERS FOR TSE NETWORK

MESSAGE

Workflow Review History

The attached documents have completed the • D Re-submlttal Review- (02 Reviewers)" workflow with the following results :

This tr~nsmlflal was ~ulottmlic,;}/y generaled.

httos://mea.aconex.com!LoQon 1/:
214/:1!019
Aconex
Doc No Step Participant Review Outcome Comments

EZ03-CW1 0-CHEC-TSE-MAS-220011 Co-Reviewer 1 M Kumar A - Proceed - No Comment

Co-Reviewer 2 B Savant A - Proceed - No Comment

SRE Final Review P Ghicu A - Proceed - No Comment

https://mea.ar.onex.corn/Logon
2/:
AI AUEnginm iog Co. W.L.l..
Tn4 11 J ' r •• I II Ctl tr
/
~
@).· ~· ..-~· .,.o.SJ.•
Pnv•te Engrne•nnt Of~e

I
Project :Development of old Souq at Al-khor ~ ~' ...;. ~·

Project No. 1128 ECG &-::tJW .rA:i):3:"'


E' ·GINEE!liNG COI>SuLTA>;TS GROUP ' '

MATERIAL SUBMITTAL
Date : 13-Jun-18
Submittal No: I Ref. No. AAE11128/MAT/CIVIL/AKIECG/38/2018
Revision :00

D ARCH • CIVIL OeLECTRICAL C)MECHANICAL

The following documents/Item are issued for:


• SOFTCOPY • HARDCOPY

0 INFORMATION 0 ACTIONO TO RECTIFY & RESUBMIO OTHER (Specify) . SSUED FOR APPROVAL

Descrip tion: MATERIAL SUBMITTAL FOR SUB BASE.

APPLICATION: CAR PARKING.


Specs Ref: Q.C.S 2014
B.Q.Q Ref: BOQ/EW/PG/2 OF 4 JITEM/G
B.S Ref:
Attachment

D
0
Sample
Catalogue •• Compliance Sheet


Test Certificate
• Technical Data Sheet Others
Manufacturer/Orgin: Sand And Rock Crushers.
Supplier/ Local Agent : Sand And Rock Crushers.
Address: Doha, Qatar
Agent Tel:+974-44833353 Fax:+974-44775775 Post Box: 8964

Delivery Date:
~ /

Contractor : AI Ali Engineering Co. W.L.L


Si~r /'ROJE<;T ENGINNER ' AHMEQ M~" ~\'
'\)
Received by :
Signed :
(Consultant)

Review Comments Il't"'t" J ~~ • f.,\ •... /.JI '' J

~ ~~~~'\&-
• t~Cil'lotfR""G CO,. S.A.T-...;1 SGRr..t.I:P •

~ "DEVE~1ENTO'Fmc, so c
taJ..~~tfo'\~ ~~~
AT AL·KHCR
CD A.:tJO t~ lnf

t-ct.A£e~·
I'M
AR\.H
SlR v
cv~~~s(~~ --- M "\.11

it ~~/ ~1f ~~;P) ~ ~ ~


FI. FC
c ~s

~ ~f~J-.n~ , ~~
SCH
Of I SlC . .~

0 APPROVED ~PROVED AS NOTED 0 REVISE & RES ~ G &-1l:l/.!Mt


• p~-• ~ ,_;~c;l ll TANT S GROUP!!I..t.
I u-5 u:
Review Completed By Consultant : / Status Stamp DEVELOPME NT OF OLD SOUQAT Al· KHOR
~
Signed : \. ~&\\j 8 : APPROVED AS NOTED
w~od Subltct to tncorporalion
of Cha • ndout&d
STATUS "" . . .-: - ;.r-_ Oate : . . ... ...

Received back by Contractor : Signed : ··~·····.


h" ~~~"Z'r?;,11•m
"'"~el pbuc 1
I
FAX NO. 44950900 P. 01
24-APR-2018 TUE 10:57 ARCHIVE-PWA
• a..-L..Jt Jl-,&..tJif ~
Public Works Authority

A. .•lloa·
- ---
M£Ade4Mb n PJrMM=_.- +=1

11e1111 a~~~~Waa . . . . . . . .,. ••• 1111 r: •••.._... ..... . Conn I cliDII


Woeb, On c.II Ca•r--.oc • •l2ft7

Nasser Refaan S a AI-Yaml


Assistant of Drainage Networks Operations &
Maintenanee Department

+'WE (f'\o.q.. • ~ • +'W£ re.-. •uPib· Jbl- "-9.d JTIAA • ....._.,.


P.O. Bac22t·~ ~-TeL : -t974C49S 11000· fn : +97444950900

#3483- 001
RBCBIVBI> FROI: &4950900
24,/04 2018 11:58
- 914 U109389
FAK NO. 44950900 P. 02
24-APR-2018 nJE 10:58 ARCHIVE-PWA


.....
- -~ •• J .'
.
...
CONTRACO.. ~......
.. ~

R&£ C0NiltDIPRDP605NI810009 I
Dire: ••• Apn12011 I , ! .
P11111cW.... A....IIJ 2018/00U615/1 4'

P.O. 8es: 221•


......o-r
Te M ................ JIIdwwiL(Jpln.... AM•W r nttDipl.
'
.............. :
"'-IA61n
Delaa A . ., . . Sew•• Set r ~ MIKclfueotlt Haue
CIRRI I:IIIR W..... OR c.IICelllnd, 0C ID2117
l'nJatiD .o\AIDOMIJI171MIIIIGS
CalndNe OCI1212117

Sl*jlcl

O.Sir•
.. ........... with . . u:quiaGLalll ofdie qiaea; kindly-., writiaa (0 tce:k JUIU' lppnMtl

... --- .....=


filr the Wlowina compay. pa' llelow;

...
--- - .---
___.

--- --
--- -----

'
,
I

--·-
__ ~._
UIW

...____
..__ ___ -..

-:::.:-:.:. -
........ ...... :~
......,..
....._ ·--~
._..
__,.
........ GIW


... . ---
~
.._ ...... ---·-··
- ------
'
~

- .::::.
,.__,..,_ IGIW

l76t .w ..., I o~,W ol't~ 10.000.000 ~ JU .,.t, I , . . ~,.all~ .,. v- " .....
P.O.SO.: z6S1 Dalla <ltf• I PMHp Upif.JI Q!ho.ooo.ooo I C.R No. tJ64 "" ... -

~\

#348S-002
U/04 %018 11:51
FAX tl). 44950900
P. 05
24-tWR-2018 1'UE 11:03 ARCHIVE-PWA

PRQI!CT IIANMEIIeNr ·MSeTS _..,._(DRAINAGE lEIWORk 0 6 M DEPMni!IIEN"n


~
,._,. ........... .. ........ ...... ...
=UWMM lf"-.:tsa-.-cel n•ou.HDWEU.IIECIKM
P0.1EC1' D-.MDOIIIIt7._,S
• ATTACIIUBIT8
~

. ..
I
1 I
, IM.L z

··--
--
I
r•u..
All

.~
~~ :
!MIA
·.....-:::~u.: ~ ..... t- -·
~·-·
r--'' 5 Rlllllla....

:~
~
'"'Suaaiii'W_&_ 'I IOQ I
i! IT.e:..--.F- ~.:.--..0&'1'-
... ~--~ I

,: ~
'NIAll
441717715 , .,_1191~ if'IA
1": tfW 1210Q D t__,. ·Aaatlt I
~~ QC8~ -111DJR~10
: ~~......_c.r:. s;rniiiiiJ 1..
...,=---~
1f ··Aaatlt L

.-...
12 1CifOI'IIlift I
• ...--::'--
~ ....
itM
1;
1'11
I GI'I

·~
I
I

: '-;
,,___.y...._.,_.,.-"'!;,
· or "'fE:.:ft . . . lft11
1::1
...... lllfWIDitt
1
ifiiUI

~ - · - ·- 1!1
Ill
~ ~
1: _...., ...- r--
o,

~~
..._co

.. I ,_
Cll*-l&· - - -
11M

- .........
~ ~
'
...,.......,............................ ...
:

~ ,.. . . . .
,

~~!8~ -,..
~ ,_ ~?"""""

- -~ \
~~ & . . Nim If - - -

~
c D -·--
•.-
""--s.J
D •-· ... ~~ •---
~~
~T
... ;----·----··
... ' --=lallld. =" k
IIIII&F"'IM•IIII
., .........-.,

--~ JA.R.EJIE
&DIIit
"'TM«Zk

•atsa-oos
RBCBIVBD ~: 44950900
%4/0t %018 u : 04
~9'74 Ul.09399
'-V oiiOJ\ CU J O uvn U I •.JU
---- -- - - - ..._- --- - - - - - - HKli11! Vt-rWA
- ... . - . ·-- - - - - -- FAX NO. 44950900
P. 01
cL..ol.a.ll J L..LWJJI ~
Public Works Authority
dlf! li
Hi5111iHHb
J_...b..QJJI ~ )-h.Ji 2S/3/2D18 12."45 PM
Qatar Deserves The Best
IIIIIIIWII IIIIIII
2018/0006438/5

Dlilll: 3/GJ/2018
,-,
CONTRACO
P.O. Box: 2658- Doha,
~~-+=:!'" I'J
fax: 44510788 1----_.--11--~
-----
FAO: Mr. Ashraf Mutwen: Pa0jed:8 Meneger .. Roada • lnfrutrvc:ture Department

S.I#Jcf:~· . . .- - -. . . . . . . . . o-Mr, 'l'n'lllle....


r DolaaWed~
• u. ZD17 mass G
I IUWIIlaa,_ANC ..... I
I CON"'''IACC

With references tD your lettltrs OONfRD/PfUl/P603/f'WA/18/0013-as 2018/0006077/1.


CON/RD/PRD/P603/PWA/18/0011· c:r5 2018/0005439/1 ad the subJect matter. plea~ e
find tbe status of the mat8I1IJs appronl requutpropoted tDUH fortbe tided Prqect.
Ref Item. Maaufacbuw SuPDller StatUII Remarks
SUbject to the
compUance wltb QCS.
Sample• tbaJl be
eollecDd from the
propo1ed Cnllher and
tMtad wllb appnwed
CONJR Tblrd Partr LaboratGrJ
D/PflD/ prtcr to tlte delivery.
N/tSand6 Approved
Pf11J3/P Qusher MJ•Sud• Rock
Buedantbe
WA/18 Rocken.hen Qusbet'8 •Notltd •ttsfactory t8lt resultl
/0019- matlll'lal abal1 be
CTS deltveNd to eltltlor
6071 permanent works.
approval subJect to the
satfsfactiJry compllanee

Ccl
+qVE ftqo.q •. , v&UIA +qVE ttqo .... , u9A.IJ.l• )hll - lbg..JI,friMI, '-'·I.P
P.O. Box: 22188 Doha, Qetar · Tel. : +97<4 4495 0000 • Fax : +974 4495 0900

www.ashghal.gov.qa
FAX NO. 44950900 P. 02
a...- WI JU...:.lll ~
Public Works Authority

n.=JIIilllb
J...,..A.Olll ~~
Qatar Deserve~ The Best

~Ktto the .xnnpllance


wlthAVL. QCS, qra.t,and
II QHDM. Tile IOumtofeac:b
1 component aDd
CON/R acc:eaorl• wllh orlaiaal
D/Pfm/ WU'l'8Jit¥• test ft!IIIUits
P603/P M/•Sf&ma M/•stama .w be subadtbld to
WA/18 Stadard Metal Metal Approwd
as Noted prior tD matallatlon tD an
/0011· TtdlcSips lndUitrles. 1Dd111tdes. approvad foundation.
crs ~r Qatar Matedal tnspectkm shaU
5439 be arrat~~ecl with re1eYant
PWA departmeat prior tD
hutaDatloa. approval
subject to 1he satisfiu:tory
comoUance.

saoud All A A AI-Tamlmt


Roads Project Management Department
Manager

+1Wt EEqc.q .. '~ltl, +qVf. Ef.qo•... , u~. )-b.§- b 9..JI .rnM ,v-uo
P.O. BOJC: 22188 Doha, Qatar· Tel. : +974 4495 0000 ·Fax: +974 4495 0900

www.ashghal.gov.qa
- ~ · - · ~o_?~H~-~U!t) ~~~ ~_f ~.S~- .. fU(~~l-~-~-PWA FAX NO. 44950900
• P. 03
. ·-· ····· ... .. ···- ----------------------

NTRACOwe

Mei~IOftll) Mr.I80Ud AltAI Tlllllml


Allnlpr, RMd Projw:t,.,.,.,..

. .... RIWan Arlit Pbalt·l


PWAIB1CIO»nDt1
"'201' c ass o
Raquett for Approval of Crulhert CCIIftplftJ

t764 ..:. - I 11).1 .Jv 10.000,000 tJ6.,.J ~ U"'t, I ,W · ~tll J6jl •V ·u- ISO fOQliMIII
ISO S4001'.,.
P.O.Iolc: ...sl Ooh& ~tar
.
I Pald-119 Capit.IJ Q8 so.ooo,ooo I CA No. s)'6.f
IISOHSAS llooi._.,

[11 ~
Parsons International Limited
PARSONS 1" Fl., Financial Square Building no. 4, AI Muntazah Signal, P.O. Box 2091 I Doha, Qatar
P: +974.440.58444 I F: +974.443.77434 I www.parsons.com
.).i ,t,..y 12091 .Y.VO • • fo,Jio ~! • 4 riJ ~I t,..t..ll ~ • J}'il ~I • ~ t,)>~.fol y _,...~
. I +974.443.77434 :...i 1+974.440.58444 :..:.
Externa I Document Transmttta
Project: Construction of East Industrial Transmittal No: EXW-P017-0001-QM-PAR-TN-02989
Road Between AI Muntazah References: EXW-P017 -0001-QM-TEK-PAR-TN-
Street and West Corridor 00079 Rev. C
(P017 C2)

Project ID: lA 2017 C 006 G Issue Date: 01 December 2018


PIL Filing Code: 01.50.04.01/08.51.08

Contract No: C2017/90 Reason for Issue: Respond to Document Submittal


No: 00079 Rev. C
Format Hard copy

To: Tekfen Construction & Installation Co. Issued By: Dai Lewis
P.O. Box 23584 Acting Senior Resident Engineer
Doha, Qatar

Attn: Ersin Cetinkaya Issue Method: By hand


Project Manager

Item Document No. Rev. Status Document Title Qty


PRE QUALIFICATION FILE OF SAND
A- No AND ROCK CRUSHERS (SARC) FOR
1 EXW-P017-0001-QM-TEK-PQ-00020 cc Objection BEDDING & SURROUNDING
1
MATERIAL
A- No
2 EXW-P017-0001-QM-PAR-CR-00189 cc Objection COMMENTS REPORT SHEET 1

Comments:
Please refer to the comments given in Comments Report Sheet No: EXW-P017-0001-QM-PAR-CR-00189 Rev. CC

Please acknowledge receipt by returning a signed copy of the Transmittal to the originator.

RECEIVED BY:

Dai Lewis
Acting Senior Resident Engineer Signature Date

cc: Eng. Ammar Jahangard Mahboub - Ashghal


Eng. Zainal Bapoo - Ashghal
Eng. Konstantinos Kalyvas - Ashghal

fs/dl/nf

Pa rsons PLUS envision more


Contractor: Authority: Authority's Sub-Representative:
draa I
H
TEKFEN CONSTRUCnON
n HDHHII
....,._.......,u,~ ~

0 dloH D .:!aoc.:l f V «" "- T h v u~ . ,


PARSONS

CONSTRUCTION OF EAST INDUSTRIAL ROAD BETWEEN AL MUNTAZAH STREET AND WEST CORRIDOR (P017 C2)

DOCUMENT SUBMITTAL
Reference No.: EXW/P017/0001 /QMITEKIPARITN/00079 Rev.: C Date: 29/11/2018

Previous Submittal No. (Before Bilge, If applicable):

0 DOCUMENT 0 SHOP DRAWING 0 AS-BUlLT DRAWING


Subject Descri ption:

PRE QUALIFICATION FILE OF SAND AND ROCK CRUSHERS (SARC) FOR BEDDING & SURROUNDING
MATERIAL

Q'J
\
1
Submittal Det ails:
1 /
Document No. Rev. Copies Description
/
PRE QUALI FICATION FILE OF SAND AND ROCK CRUSHERS (SARC) FOR
EXW-P0 17-0001 -QM-TEK-PQ-00020 cc 3
BEDDING & SURROUNDING MATERIAL

...
~
~
c
0
0

Submitted For:
0 INFORMATION 0 APPROVAL 0 CHEC KING 0 REVIEW & COMM ENT 0 NEW SUBMISSION
Co ntractor's Representative:

{
Name/Position Signature Date

Ersin Cetinkaya
Proejct Manager
ASR's Comments:
Signature: .~ Date: 29-Nov-18

~ C){j) Jf &:w ,- f)oc:r -a>ol


~ ~ --ku_
~M- fa~( -Cl~~qtj
..
>
~r,·~~ ~t~
5c
..
.. ~ ~9L4W. )~it-
~

c*JJ ~ L!l"L-} I<V


- .. "
Q.

et::
.c::> Name: Signature U\tuj)_ Date

Staj 2 0
(/)

·"'~ A No Objection D B No Objection as Noted D W Rejected 0 I For Information

~
.r::
.... ASR's Representative:
::>
c(
{lf.
Dai Lewis
Acting Senior Resident Engineer Signature I ;;UA) Date ) ) L. /Z

EXW·P017·0001·0 M· PAR·FO.OOOSO.Rev.CC 28. 11 20 18


Contractor: Authority: Authority's Sub-Representative:
i
HliHHII PARSONS
TEKFEN CONSTRUCTION ~JJ· ~~
Qatar Deserves Tho Oost

CONSTRUCTION OF EAST INDUSTRIAL ROAD BETWEEN AL MUNTAZAH STREET AND WEST


CORRIDOR (P017 C2)
VENDOR/SUB-CONTRACTOR APPROVAL REQUEST
Reference No.: EXW-P017 -0001-QM-TEK-PQ-00020 Rev.: CC Date: 29/11/2018
Description:
Vendor/Sub-Contractor Name: Sand & Rock Crushers (SARC)

Country of Origin: Qatar

Address: P.O.Box: 8964, Doha, Qatar

Vendor/Sub-Contractor Description (include make, model, activity, etc):

Sand and Rock Crushers (SARC) for Bedding & Surrounding Material

.£ lndended Works: Wet Utilities


u
mitted Attachments Checklist:
~c:
0 1. Organisation Chart Qf 7. ISO Cert & Manufacturer Quality Plan
0
2. Copies of Relevent Parts of Specs, BOO, Dwgs 0 8. Manufacturer's/Supplier's Guarantee
3. Commercial Licence/Register Qf 9. Previous Approvals
4. Technical Data/Catalogues 2f 10. List of Previous Projects
5. Calibration Certificates Oj 11 . End User's Acceptance
6. HSE Plan 121 12. Company Profile
0 13. Others

Contractor's Representative:

~'
Signature Dafe 29h 1/2018

Date 29/11/2018

• I
41
>
~
.l!l
c:
41
en
f Name: Date
~ Status:
0::
iJ
::;,
V)
B No Objection as Noted 0 W Rejected

en
~ ASR's Representative:
't:
0

~
<
Dai Lewis
Date
/ . l2 . 1~
EXW·P017 .0001·0M-PAR-f0-00046_Rev.CC 0908 2018
~

EXPRESSWAY PROGRAMME PARSONS


Pars ons P LUS envision more
P017 C2 Construction of East lndustnal Area Street Between AI Muntaza Street and West Corridor
Number of comments open ·
Number of comments carried to next stage ·
Number of comments closed • _
Total Number of Comments · 5

REV: CC DATE DOCUMENT RECEIVED: 29-Nov-18


DATE THIS CRS IS DUE FOR ISSUE: 13·Dec·18
Pre-Qualification File of sand and rock crushers (SARC) For
Bedding and Surrounding

Fazat ISSUE DATE: 1-0ec-18


Parsons

WORK PACKAGE SUBMITTED (REV):

SELECTION/DOCUMENT/ORA
WING NO.

Noted

··~·""~)\'--'~ FS
Reviewed Sy: ...........fl.J.·II···l·l't··1~····,..........

.:;:;::a e:;..,,,..,. u... :t.:A......


t
1./Z ./3
Englneer

EXW·P017·0001- QM·PAR· F0·00011_ Rev.CA 28.01.2017


.
l«C~
M.

~-~CIF--11011111181:1W1GE-~JTMD121D~S'III&I"
PROJECT IIAIWifMFNT-R.(MDS&INFRAS'fRUCIURE M=FAIRS

,_,_
ASHGIW..-PIB...ICWORICS MJIJIORII'i
MATERIALAPPROYALSUBIIfTTAL
-==-
I'NR'

A.Tt'ACtlleanS: -
t !
.LlU.
~- 2 I
I. . _ .
27~U ..........
[ ; I GW-ft 1-.r:CA l
4
·"~ I
liU.
ASillll lr,ASJMI111~'1T,IIIrnll '
,,....-...,.
,.,_, ..._.. ·-·-~ -· , ........ &es 13l7-Partt:2111& $ I~ ' I
!SuppB'al
• j!QQ

~ iP]sand aollflbS:Ousllers is-fa Rlx:ft~ lr Ia.. '


I
I~ .0. BoxII9IKDalllal. QICir if".O.bafOolla.Qar
I• ~ .,.
i! •~ .

....
114
Alt..: :10 Uc:alalsl I
~~ """"": ...... SIIG.6 Allt3a.-3.&.1 . _ - • (llalb.4). f'ldrage 2lfllllb. 11}. P.x.,g.s 3.~·· ,.
~ '<r....... .. Patt2CIIIa2.3.4 :- . ........ 19} In 1.--.-- .iACIIIIt M

,.......,
~ ...... 1- .. l flfQfclfa

""""II
1:;;;;;.;; i""' :14

-·--
115
lc
"T

IN
1~~&T,...._ radlllaflleblils...,CIIsflf&l:bllaapoaoioucsdian.

i! ;,..._,_ ,__,DDIS!wJr
---
INB!a(I.IIOid i<lllw
·17 llesiiJI~
II -AjlpRMII

IZ leo.
'~
..... -
tWA
,lVo

IIA.
.... 114
riA.
~
,,.,
LA
Foe" Ro811T...-d'l .........
~ tHJ-c.,t. I rkr/
'Wo ' ...,.. ~..-...~
I :. tllllw!J r·~r I PfHRD

~/
~ ~y
., r:JAI:onoad• ... ... o~

1:
·~
~
-7 S:o~jt:c.l- -}.; jJ..
'1rewuJ Jr~~~ ;r
?-r.ce 1 --
IJ(J;JC" ~£..!" a.q

,! g-oft"R/t.f
~
I We vwiiW ~eacfalelf ePe « •aa alllll81itY-._Silllalllllaaca••---- i =. ,. .
~I
f
DO:.<-" '
.....
-
~

ASHGHM

I~ 0 NatA!JpRM!d RECEIVED [ Fwlloor ............ """*-'


c:aa...D
I~ 0 1 OCT 2018
I~
I~ 't l fFfF t:n
_:...... I
·aaalft'~.....--
IA2017C047t -,
,.. iRett..OO
Panions lmletiiillbtal limited
PARSO NS 1" fl. Fi1a1aa1 Square Build;rcno.4 , AI Mllrlta13h Signal, P.O. lbt2091.J Oaha,. Q8CBt
P:+074A40!584C4 I F: 4o974A43.77434 J - ....-.mm
~;..._,> 12091 ."N)Q • ajii. l ip • 4 ti.J~~ ~ • .J.J'll ~ • ~.)i~_,il _y,,-..Jt
+974.443.77434 :ul+974.440.58444 :.:.

'Date 30 September 2018 Transmittal Ref: GECJA2017C0471-


UIV..QT-()()282
Doc. Control No.! 647597..0T-
IA2017C0471..00282
To : Ucc-tnfraRCNICI JY Malarial sent via:
P.O. Box 15427 f8l Hand Delivered 0 Fax
Doha, State of Qatar 0 E-mail 0
Tel : +974 4480 5448
Fax : +974 4480 6448

·Attention: Mr. Joee Ramon Domingo. Project Director


ProJect : GEC SeMces tor Local Roads a Drainage
Road Improvement of Immigration lnterobange Roundabout and 22nd February Street

SUbject Material SUbmltbll: Back Fill Material (G-75 mm).


Manufacturer/SUpplier: Mt• Sand and Rock&=:::: D?bai Qatar
We are sending you the followlnC:
0 Drawint;; 0 MOM 0 Pl.ans
0 Copy of Letter D Report 0 Change Order
D Calculations 0 Specifications ~Other

u Document No. Document Title Rev Copy Remarks


Otard/Soft)_
IA2017C0471.-UIV- Material Submittal: Back Fdl ~ (Q-75 mm).
1 rAA Hard HardCopy
C~T..Q0039

2 2018/0018625/5 Material Approval N/A Hard HardCopy

Tile above transrnitt!ll is:

0 Approved ~ Approved with Comments 0 to be ReviSed & Resubmitted 0 Rejected

0 For information 0 For Action

Comments: RECEIVED

Regards,

Samal AJ-Mandalawt
Resident Engineer 1 Engineer's Represen1atiVe.
Received by: _ _ _ __ Date:.__ _ _ _ Signature:._ _ _ __

Parsons PLUS envision more


PROJECTMANAGEIIEHT-ROADS & INFRAS'l'RUCTUREAFFAIRS
ASHGIW..-PUBUC WOfU(S MmtORitY
MATERIAL APPROVAL SUBMITTAL

S Reoe:tTest~ I
c Ma:uaauer's N8me &MdtMS s;,pp~ Mam8 &Adlffl!:s$ a eoa I
.. 'P.o.
0 s-f aid Roci;~
T Bad9640aha. Oabr
15-a:dRzxX~
p.o.a....~-.aae..
7 "-'ix.s~

a San-of*
I
!14
R
A 9 V'ian3t!IY IlL
ct~;;
;;~~;nR~;r---------1;soaii~~;;~
. ------------------------------t;~~~,;:;;:~~~fl~

-
'0 ~olMona.~&~ I
! ~2.5&<.2.6

acs:mt<tSe<: GP.IIt4~42<t. ~tC.flb.4.Pac:~ca~Jc2(BCI~~~~> 11).Pacb;lr3.~4 (!1o11
[Na.t8}&F'lldlllg:5UI!JHi>. t9) ..
,, C:.Cc.t.al~&.Apn!

'We~ lltaS;.opcOjllllllld IIIII!Br..esCDJaiiiY


<Mill C'onfQ:::fcfoc:umiiiCS ...& l!e lnlbm:3liangua..
a-&~·

We~ ll'le~atiiiCI1MalbandaM"/Ifla!tne !IUinn:sic:nQlmlllies-"t~


&.PWA~
Par<sons fntematloc'1311t.mitod
1" Fl. Frnanaal Square Bu:!d:ng no. 4 . ~ Munfazah Signal. P.O. Sox 20911 OdJa. Qatar
P: .g74.440.58444 I F: .gT4.443.77434 I -~"'
,;.t-4._,. 2091.Y.u"'• •P..:: >..:~•4 ~,;<,;l.•U~~•J,';~ ~. t::...f.~~fl j>~,k
-1-974.443.77434 !U 1 "'974.440.38444 !W

01 October 2018 Tra11Sl11ftmf Ref: GEC-fA20:1.7C047(...


UlV-OT-00297
Doc. Control No.: 647597..0T-
IA2017C04.71-00297
To UCC-InfraRoad N Material sent via;
P.O. Box: 15427 ~ Hand Oelivered 0 Fax
!:Yoha, State of Qatar 0 E-mcul 0
Tel : +9744480 5448
Fax : +974 4480 6448

Attention: Mr. Jose Ramonllomlngo, Proiect Director


Project GEC Services for l.acal Roads Be Drainage
Road Improvement of Immigration IDterdlange Roancfabout aad 22nd february Street

SubjeGt. : Material SubmllfaJ: Sub -Bas& Matedals.


Manufactun:r(Suppller. M/:t Smtd and Roc:k Crwlllen, Do&&;'Qatar

We ate sendiag you the following::


0 Drawings 0 MOM 0Plans
0 Copy of letter 0 Report 0Change Order
C. calculations 0 Specifications IXf Other
S# Document No.. Docamen:t: Title .Rev Copy Remarks
(Hanl
Asphalt Base Course Class A. Asphalt Base
Course Ctass B. Asphalt Wearing Course All -
Har'd
1 IA2017C0471-ULV-CL-MAT-00028 Pen. Grade 60/70. Prime Qlat. Tack coat CB-A Hard
Copy
(SS 1.11}, and Bitumen (Pen. Grade 60/70J.

Materials Approved - Bearing. Asphalt Mixes, Hard


2 2018/0018650/5 N/A Hard
MC TC and Chemical Anchors Copy

The above transrnlttaJ Is:

0 Approved !8J Approved with Comments 0 to be Revised & Resubmitted 0 Rejected

0 For fnformation 0 For Act1on


Comments;

Please refer to the comments on the attachment.

R-.~
. ,,.,
Samal~
Resident Engineer ( Englneer·s Representative.

Received by: _ _ _ _ _ Date:._ _ _ _ _ Signature:,_ _ _ __

Parsons PLUS envision more


PRO.IECTIIAifAGEMFNT~ & INf'RASt1lUC1UR AFFAIRS
tc:fi~
..-~
ASHGHAL- PU8UC WORKSAUTHORJlY
IIATERIAL APPROVAL SUBIIITTAL
........ _.,, ,
,_.,...ea
ATT~ r-
lllaf!QMJI.fiQ\D~Of'-~...........,.lr-ZZIIDFEBIII.WlYSTR8iJ

.....--
.. _
j
I
I'ID liiCCII I "-d N z I
1~18
,,.. l _(JIIJ-1! f ~ca ... I
lUllillilt_ ...
3
ltA
[IS 1377. l&8SI5\2
~· 5 ,"-" I
. ~s ; e '80Q j_
~~ !-~and Racfc CcliiiiiiiS 7 ~~~ I
I~ \P O Bcsll9640t*a.~ 1
P.O -11964!Jiala Ql!ar
8 I~
~
: 9 iw-w
*I
:~
!") 1"""'...........
rw. laoa~
6Part4a.-4.2A.. ,.....,.1 (8'alllo..4l, ~2(11i1No 11). ~:\Pzbge4~
:425 &42~ ~5-lllo..~ ~ In (,.....,r, &Agii!At
·~~~.
'. '-r-t. rBddy [..,...,
ifZ ,Crial!o_cl0.0 ~...
Is ~

:~~ ~ ~-
& T. . . . .Tclriclfoa1$wa.Qipflf&do _ .. ....,... ......
'14
115
1Ill
: C(1fllt

,Ill.
I
I

I~ - ·- ..
iu ,o...g.. ClllaulllioA
: iee..al Aci!MMI
1M
IM
:u.
iN l'' ......
Ia.-
'
(Z :c-O --
..-alused
l<n
'*
i•
..... ~ .... • ..... So:JjiOdf
'...mtalio.. ~ "'"
~~,._'!!$.,
For~ m; ~-rt#Jcb~ 1._~

·--v j.:-"""~ J;: ; ~-~~"l:f ~


~--~ L \_Q :\ , ... ~ . fdJ
.... '*-' t::=:J~&Rieanil
.DAppnrlelr- Y ~~~~~
....... .......
-

t~ ~---?> S.J.je<>t -b.~ ~~~'1.(; Q.~ CaJ~


1:
~~ o:JFv.,J J.-..,.;cr· O'Jffo I
[!
f~
( -\
We~: .... ........ .................. s,. f •• c uu: ~

ASH&tW. . ~
_...__ ~ .. r= ''"'
~ ONal~
I
,
~ ...
_,.,"U , .. r·:~"\(i ""':
.; ~ '-t• .J!A j • :;,_,_,;
·.
.i: 0 fUI!bor~Racai*IICS
I'
~
l c
L
I
E
N
T
,.. _..._,
I
__• I! tr"':-"'
..:]:.;.':-.
·r ·1::1;")
l,' ~<i 1'/C::..i71
_,.,.. fi
'
•t...
,:
.i',7MU.t'ljiWO~MJoHAGa( I
!J .. • •
• -
• • 111 . ......
'l ... - .. -J
Parso<IS ldematiGnaJ Umitll!!d
PARSONS 1• A.. finanl:ial Sq;ae ~ 110. 4, N 1IUnt!mllt5i01III. P.O.Ibt 2091( Datra. C)Dr
P: .g74A40.584441 F:,.g74A43.774341-~
_,l,i 04...,- 12091 .......,.. • •,;u.a i;.:! . 4 ,a.J~w..JI ~· d.,'~l ~. 4 tJJ.,.:U_p jJ,-.,h
+974.443.77434 :..al m4.440.5S444:.:.

Data 04 October 2018 Transmittal Ref: GECtA2017C0471-


UIV-0T.()()324
Doc. Control No.: 647597-0T-
IA2017C0471-00324
To ~ ~nfraRoad 1V Material sent via:
P.O. Bo)( l!i427 ~ Hand Oelrvered 0 Fax
Doha. State of Qatar 0 E-mail 0
Tel : +974 4480 5448
Fax : +974 4480 6448

Attention: Mr. Jose Ramon Domingo, Project Director


Project GEC Services for Local Roads & Drainage
Road Improvement of lnunlgratron Interchange Roundabout and 22nd February Street

Subject Material Submittal: Crushed Aggregate Base Course/Road Base.


Manufacturer(Supplier: M/s Sand and Rock Crushers, Doll;(, Qatar

We are sending you the following:


0 Drawings MOM 0 0 Plans
0 Copy of letter Report 0 0 Change Order
n catculatlons 0 Specifications 15<1 Other
St Document No. Document Title Rev Copy Remarks
(Hard
Material Submittal: Crushed Aggregate
I Hard
1 IA2017C0471-UlV-CI-MAT-00030 Base Course,'Road Base. CB-A Hard
Copy
Hard
2 2018/0018625/5 Materials Approval N/A Hard
Copy

The above transmittal Is:

0 Approved 18J Approved with Comments 0 to be Revised & Resubmitted 0 Rejected

0 For information 0 For Action

. . .5 -m_
comments:

::~·c-

Samal AI-Mandalawt
Resident Engineer 1 Engineer's Representative.

Received by: _ _ __ _ Date:_ __ __ Signature;.___ _ __

Parsons PLUS envision more


.,.

I .. Ma-rtal Submittal Form


hnpregil'

onc:o: Q11D1 •·Rev.cz tDat&21ll<l1120·J9


P'£01\!Ct 11(1ta0ll:
ProioclN:Imc: N BaYt::>taWwn ·AII<hor CiiY l>P/Q161UI14Pacxaoe 2& SP/Ct1612114 Packaoc 4
~nt: ASPIRE ZONl?
Ofl:lultont: KEO International Consul1ants Connctor: GSIC JV GaJfar • Salini4111~fo- Ci1nola JVl
Olc:ipllne . Civl 0 PUll~ O F'"" Fghtr.g
0HVAC O<».or~

I
,_.,ill o.t»/1: SUS-BASE CLASS B List of Enc/oetJro

QCS 2014 SECTtON I PART 4

MATERIALS

IIWerfal Specified SUB-BASE CLASS 8

SUB-8ASE ClAS$ B

SAND ANDROCKQWSHERS QATAR


I

' .
--· --. l

..;,..~-"'- Slan11:
I ~- " I'
. ..--
~J
~,

j
:_ ..-
~i
r:_:-1 r·- --

I'"
~
.:;:..-
;.;;g
.~ .
R..-tvedBy: ·-
/ 1/

......._,/ .... t r . \ / ---

C, Rejec:ted to be
0 Resubmitted

~D'S

-"
=---- - - - - !";.-.._,~
eo..- .. orCOCM*Q.-r-eiOaullmlla'o ulr!gll'ib rwoow<llles rroc-.. U.-llomcampi1011Ct...,.h~ofl'iiSOidl:v~- , . •
...... - 'IllS ...... ~ll~ofgoner;ol.....,.._willllho . . . . -oflhoprojoct---~-lho-olcft- II If>
~-· Tho.- re.- res~. """"9 -ll>i'OI. tor11'.e dtllgn of lire projoctor...:ll puis allh> p:ojocl he hi• det)grt ,..I>Oiltlib'lt-11•
·• lfni;n fcm>l poot of 111e Cotllnlct). tor coni!<~ 1nc1 ~ u CJJanm•• n diNnsbns. ae'tdi\!1 - .....,...os anc1 lldlnlquie ot ,_..,,....,
f:c-"'llh!I-WilhiNtctolborlra<IH.ond~lfne.1<11a--~-.ot"'~-!11oCG!:Il1tc:t
......... .---....
rt~~dl:./\re:c_:su~)

Ra~~l- By & Signatu~ {A$fllte) ~

~ .
Inspection Notification Request {INR) _,
_potor
..
22 •
I

PMCFM..CON-1505 I Local Roads & Drainage Program I Revis1011: 14


~ - .. c..;..,.

Date:
'J>" '- ,_
A Jt -

Oct. 2017
- · -
-
INR No: QS042-POQ-BTC-CON-INR-A10292 Revision No: 01

Project Title: LINK ROAD AND INFRASTRUCTURE TO SALWA BEACH RESORT PROJECT QS042
Project No: 05042 Date: 1 February 2018
BIN OMRAN TRADING AND
Contractor: GEC: AECOM
CONTRACTING
.... - , -• ~ ,_ -or~-.,~~- . ..__,,.,._,~----..,.._.,_ -
·l Part 1 - To be completed •by. Contractor
l~ ....,.• . .. -

Inspection Date & Time: 3/2/2018 9:00 AM


To the GEC· The work detailed below 1s ready for mspection. We request your attendance to inspect the works

0 Roads 0 Drainage 0 Utilities 0 Structures


0 Survey 0 landscaping ~ Materials 0 Others
Description of the Work t o be Inspected Location of the Work to be Inspected
SOURCE APPROVAL OF IMPORTED BACKFILL MATERIAL SAND AND ROCK CRUSHER PLANT
UMMBAB

Method Statement No: ITPNo, BOO Ref: Drawing No(s):


QS042-POO-BTC-CON-MST QS042-POO-BTC-CON-MNP 7.1
-A10096 -A1 0126

BINOMRAN
QS6U ·link Road to Sliwa Beach Rasor!
Date: 0 6,... 0 '2.. -I f.!_
Action Info S..!9_n
PM
Cft1
Name H.K.MANJUNATH Signature: PE
ENGR
QC
Position. Project Manager QS \
HSE
Date: 1 February 2018 Planning
3tore I
oc
tf.O
Fila
-
-

TliiS OOCUIAENT IS UNCONTROLLED ONCE PRINTED - lasl ponied :211/2018 3 42 PM


Page 1 o! 2
Inspection Notification Request (INR)

PMCFM-CON-1 505 Local Roads & Drainage Program

-
: Part 2 - To be completed by GEC

Date: Signature: Stamp:


Received by Supervision
Consultant

Supervision Consultant Inspector Comments

Position: Comments:

~ ''"t¥-(~) ~PI
~-~s

Supervision Consultant R~
Appro v t _ 9 Rejected: 0 Cancelled 0

Approval of the works will not release the contractor of its obligations and liabtltties under the contract

Name: Signature:

Position:

Date:

SRE I RE Comments

Date . Signature· Stamp:


Returned to
Contractor

THIS DOCUMENT IS UNCONTROLLED OHCE PRINTED U st pM'. ed 2111201113 42 PM


P119e 2o1 2
~COM
Transmittal Note
Transmittal No. 05042-POO-AEC-BTC-TML.00012
Subject INR • Source Approval of Imported Backfill Material
Sent Data 21-Jan-2018
Submission No. (as of 21-Jan-2018} CNS101868
Project Title Unk Roads and Infrastructure to Sa1wa Beach Resort
Project No 05042-POO
From Mr. Abdelsalam A. Salama
Resident Engineer
AECOM
Doha-Oatar
To Mr. H. K Manjunath
Project Manager
Bin Omran Trading & Contracting
Doha - Oatar
cc
Comments
Distribution
Company laaued For Date Task
Bin Onvan Trading & Action and 28-Jan-2018 For action
Contracting Response
Attachments
Document Number Rev. Tstte Medium Attachment Remark
Type
OS042-f>OO.-BTC-CON-!NR- 00-A INR -Source Approval of Imported HardCopy
All)292 Backfill Material

BINOMRAN
QSGU·UakRaadiiiS..It&lla-
Date: 2 - o\-~\R
AGIIGa Into :Sign
PM
CM
PE
ENGR
QC
QS
liSE
Plannilg
Stor•
DC
H.O
File
Sent by MaryAnn Eva (mary.eva@aecom.com) on 21-Jan-2018 at 11 :22

-
~or
Transmittal Note ~-·IDnlillopI

Transmittal No. QS042~TC-AEC-TML-00046

Sub)ec:t INR- Soun:e Approval of Imported Backfill Material


Sent Date 14-Jan-2018
Submission No. (as of 14.Jan-2018) CNS101868
Project Title Unk Roads and Infrastructure to Salwa Beach Resort
Project No QS042-POO
From Mr. H. K. Manjunath
Project Manager
Bin Omran Trading & Contracting
Doha-Qatar
To Mr. Abdelsalam A. Salama
Resident Engineer
AECOM
Daha-Qatar
cc
Comments
Distribution
Company lssuedFor Date Task
AECOM At::cerXance I 17..Jan-2018 For Approval
Approval
Attachments
Document Number Rev. nue lledlum Attachment Remark
Type
00 INR- Source Approval of Imported HardCopy
Baddill Material

Sent by Kuruppanthara f{aghavan Mohanadas (m.das@bOtc.com.qa) on 14-Jan-2018 at 17:0 5


Inspection Request

The work detaled below Is 0 Roads 0 Dl'ainaOe 0 Utilies 0 S'lnld1l'es 0 l.andscilplng 0 S!.IYey
avallable fM lnspeclan:
~ Hab!rials Olhers
work to be Inspected:

SOURce APPROVAL OF IMPORTED BAC)WILL MATERIAL

also subJected to quality control inspec4lon and have been alOidlnated with fuUe 'Mll1ts of other tradeS.

Name: tLK.MANJUNATH Date: 14-.1111·18

Commems Name I Date I Signatunl

Works Inspector

Land Surveyor

Material Engineer

Senior Site Engineer


Supervision General Comments :

WITH COM'4ENTS

We rebm hereby this Inspection Te5t Request, !he Approval shall not be con\"ued to Imply a
release the contraclor of ita obligations and iabl!ties under the coniJac;t.
Name: ABDELSALAAI A.SALA.IIA Pcurilion: R.E Signature:

RECEIVED BY SUPERVISION CONSULTANT:

(GEC Receipt of INR • Stamp, Date & Sign) (ConJtaclor Receipt of /NR- Stamp, Dat9 & Sign)
REQUEST FOR MATERIAL TESTING
Date ofS:u.,pling : '2..'-1 I 1!J-o1 g o,-.., ll....,.vec! • louRepooled :
Cuslome~ b~ l'c S:ampltd By :
Projccl <M'IIer Af-111"-,11tt l- Coasultaat: 0
Conwlllllt : lYE {prv, Clit!nt : 0
~fL

-- 0
~ : Labonolory:
Sample Laatfoa Sellded
Sub-Caalnlclor :
By :
Project :,$JI(L WA Bf:P-01 fl..li:_y,f11 ets~l} Name :
to~ : - uM'-\ ~A-5 /
Mob.No.
RFIIRFA. No. = .A-\u ~1-
Sample Type : f>c.tc.t. _f1!~ lA~ li.Ntt..{ Siptalllre:
Stlwcc ofMau:ri:sl :C ~l"'lo A1JD l~~c.t_ ["'rt.\~..Y P\.Mt
&mpl~ Pro«dun- Delivued B:r :

w Soil O A~
D& ofl.ayiJI&
D Aspb!lll ~
Class of Concrete
u Cement

MalOrrulm Nona! Si%a


(1'11111)~ •••••••
pmr.... No. FarmQGOSM Nos. ofCubes
NBmc ofPCDQO wbo
Boring No••••.••• ~ob S1andllrd Dellsicy
made the eadle
D2p!ll tmm)•.•..•.•• Require:! Thld.:Dr:ss (ifcores} Batdi{J!3 Time

··~
Test No.•..•••••. Cailio& Time
Sample No••••.••.•. r Laycr Casling Date
l " U.ycr j7days
Tc:st For
Sam;lllng PrUCCLitlrc. IU:t=" II Ill~ back side. 12.8 clays
DETAILS OF T Eb'T REQUIRED BY CUSIOMER:
S.No. Batla.bJ RcfNo. Material Description Qty. Test Required
llin .\ q. fl.oc..v- ro_ ~· L.f L -P./L
Drud,J't" ~ J.~ l fl
..3 Cl. .( 'rC-( flr1 ')f;tfl.~
/}

f-'e-
I
~ ~'-"
.I nlo P.
~ .- D
( l h'M'l'f) ~~') ~ ~...0:.~.,._.,~
Coodllion of Sample Upon R~pt: ~ 1
/1

,v 1"1\~'CV....

AUTHORIZATION FROM CUSTOMER l:lOR THE ABOVE REQUESTED TEST:


J.<or Ullllt'Betor For Coasllltant:
tvl A 1-tv'lOOP
Signature:~
Name: Nilme:
Contm:t:No.~,1f ~~'- Contact No. Signature:
FOR BATLABS USE ONLY
BATLA~S Receiving Stamp: Authorized Signablre:

-
1 11'2
.....g;.. ou
~~
.~ ..~ "~~~<#·~Jt
r8PIIt
LEIGHTON
ltokt\t& CONTRACTIC
Tedlnic81 Ntwrs - War Pnlpda OlplrltM~

DOCUIIENr SUBunTAL
I'NIId 1: . - . . ... a a-a . _.,.,..._ ne..t: G1CNI'JD11
fftllll" ~Lal IT•• ......RIIhd MallO s 8 Mlllllllllft
ll..Cftcltl COriiiiCtlna IO.IM WlL IAAHAAMAA W.. Pliiiiil DINJIIIII!Ie
at: ICEO Cat.,...
........ MD:. OTC781H.CQoC•\tA1•1M11 ~ X
Ra:llllu.-No.:1 Ia .......... For.. lftloflftllon
Ddt.' A5~1d

......
1!11~11

. ooc.. o ...... o....., o--.... [ ....


1111' •
~ · o-.
,,..,..,..~
......... 1 {
J
0DIIIIftGf811nG (DWO) O•ftiPICtiDI\ a -4*' tiT PI C]AapaN. p1U1pU q.,IMJ. FA1 (APTI
01•- licr canttruct~an llmmgl CIFCJ IIJ• MltlrilllltMl)
[J!Jhop cblll.
fSHOt
[]Aa·. . cnwlf91A81J)
C....,... ..... <MST'I
Q()rgtNibelrt cha~"'..CV IOCY)
QTMt !MUll l cel'll'cala (TACt
C]T_,., dac•..- ITDR)
OHSE ............(tt:SI!.
[JSUIC:fl CSK'T) QPnt-qu.iticlltlan lOFH) D()plq1tana ......,.,. MIIIUII 1~1
]Olea llfiNI(OlS)
...""·---tpGSJ ....._...... _._______.._.
8~Projld Ul_, l*n C'V'» [JPnlmd...tFarmrJ tNddllt t~Ael

•• ....
,a..]o... ~ IDEC1 OONttont)
filii II: t1 • • • _ . .. . . . . . . . . . . .

....
...,.. • .l.;IIW . . 11•.._.0r...tTeawb- "--'AM Mltlla;a "-'
-- c~~"'
Dltc!IIIIOI\
0.. -
-
f-•
a • 15-lDIMI Otelo4l
No'A
1'11111 ...i Aar:t& trw,_.
,....,.s:MS.,., Ca,.... co wu..,. o..eaa 101189.
-' ....................
Yarlll-=turw.

..... ...,. ~-·..tdfas:


.
. . . . . llplllll~~ "
I • QHDc-.
I&IL~Wtt! ~~.

• s.r...
,..,_ .. .... ... DaN - 01~

_..... ..,..,..
a•c:~••o••••-•
,,,._.._...............
Dl ' ... 1 "'-•tO~IWM......,..._ ~.....,..,._.,..,_.....,_ ..... -ac~,...._._

~ ~ ·~
(~ .
.
' INn!
~ ·-
~
.. Mtl,.,
fW ~~
............ ..;..
.
--·
UIOCAI.._. . . ..._,~ . . .

I •
~u · ... I

. . . . . . llr. -- ~- ....
.. :2:
A-:'& : 'ltD (J ~;,~~ .a'-!." 1

.-
~_;-.... '
• •vl•wlRE'EI •

~~: ·
,.
-
. '* ....
~ !jdf?

I• -
~~~r- ... ~·HOJ~f · .. .. · ··}/}J
~}1-
~
I>

...,_,.,.~ ... ......:. o.:rt 111 ....,11......-: .. ..," ... · DIM 11 l l$


euu-•., ..
'pL-, ~ fa tk c... rib.I.Jb.~ 5"~krl ''"' .....-<.._
~~MilUM"

:kfr-t\PPfiCMD WITH OOIIM:NJS ClD·~fBJ


::::1 • •
..................... [):sta~S( A-~--
·-
0 A APPADYEO N01'f0
......... llr: ~ - ........ ) :. ...... ·-·-
.............. ~ :. . . . . . f.. . ·;.lt~~:Ll~.JU~.I~ ~
- ~ ·-· .....

-..'..." ' L.~


-- o-J, GJ ~ ..... ,....... .......
··" ~

·-
,..,, ' f1V
____ ,,..... ........
,,. .,
.,.., ·- ... ,...,.,.. ~
la..t~
"',..,...._,J
..... I~
I ( • E: N FJ
\

.• - p~:: 'I '


~~ ~- If .. ··· \i '~~
\ I f: ~ •
..- ... ~
1 • • • d J r-J 1-1.
l\ -
-, .
J I.
.J
• J ~
.- .... / .1'..-...~J

L~~-'1
-r RECEI;;E..
• tm!rNI
"'· ....
.:).J. ,,l all
7. PROJECT LIST
Sand And Rock Crushers

THE MOST IMPORTANT PRO.JECTS IN


SL.NO
WHICH THE COMPANY PART ICIPATED
1 The north road project with Tekfen
2 The project of establishing the Doha
International Airport.
The project for the intersection of Barwa
3
Village
4 The project for QBC (Lusail Project CP4)
5 The project for AI ljarah (Lusail City)
The project for Buzwair company (AI·
6
Rayyan, Bani Hajer)
For Qatar Building Company
7
(GTC299,CP280,CP782,CP626-2,C278)
8 For GCC (QEZ1)
9 For Tenpo (Barwa AI Bahraha)
10 For HSP (Green Line/42)
11 For HBK (Lusail CP6C
12 For CCC (F-Ring road)
13 For Seashore group (AI Gharafa)
14 For Seashore (QDVC-BARWA AL KHORE)
15 For GCC (SPM-20413 DESS)
16 For HSP ( AI Rayyam)

www.sarc.com.qa
Sand And Rock Crushers

THE MOST IMPORTANT PROJECTS IN


SL.NO
WHICH THE COMPANY PARTICIPATED
17 For Gulf Contracting (Abu Samra)
18 For AI Ryum (Lusail CP-E21s)
19 For J&P (West Corridor)
20 For J&P (Orbital - Mesaied P023)
For AI Jaber and Partners (C-308
21
Mesaieed)
For HBK (Bani Hajer North Phase1 &2
22
Package-2)
For AI Ali Engineering (1104 Salwa
23
Resort)
For HLG Leigthon Contracting
24 (New Orbital HighWay Package-3
Ummsaieed to Salwa road)
For l&T (Design & Construction of AI
25
Wakrah bypass road ... P015)
For AI Jaber and Partners (AI Muntazah
26
Street Project)
For AI Jaber and Partners (South Site
27
Wide lnfra-C017)
For AI Mohanna Trading & Contracting
28 (RIW South of Greater Doha Zone 90-95
Phase-4 (Wakrah)

www.sarc.co1n.qa
Sand And Rock Crushers

THE MOST IMPORTANT PROJECTS IN


SL.NO
WHICH THE COMPANY PARTICIPATED
For Bin Omran Trading & Contracting
29
(1724 Link Road & Infra to Salwa)
30 For HBK (Qatar Acadamy-AI Khore)
For AI Mohanna Trading & Contracting
31 (RIW in AI Khore & AI Dhakhira Zone 74-
75 Phase-S)
For AI Mohanna Trading & Contracting
32 (Road Improvement Works in AI Rayyan
Phase -4)
For Castle ( Asphalt Road Works at Mega
33
reservoir PRPS-3- Rawdat Rashid)
For Contraco (P604 South of Graeter
34
I Doha Zone 90-95 Phase-S)
For Contraco (P603 RIW in AI Rayyan
35
Areas Phase...s)
For L&T and AI Sraiya Trading &
36 Contracting JV (Road & Infrastructure in
Doha Industrial Area Package-06)
For HBK (Doha Metro Phase-1-SY-RST-
37
Green Line-53001)
For Urban Concept Design W.l.L
38
(Wakrah Stadium Project)
39 For AALCO (GTC-762/2015)

vvww.sarc.com.qa
THE MOST IMPORTANT PROJECTS IN
SL.NO
WHICH THE COMPANY PARTICIPATED
For JAK Construction ( East Industrial
40
Road P01 7-C2 Proj ect)
41 For AI Bawakir Unicon Co. W.L.L
(Wakrah Stadium Project)
For AI Jaber Engineering W.L.L
42
(AI Rayyan Stadium Support Work)
For New Horizon Contracting &
43
Maintanance (GTC 558-2013 1)
44
45
46
47
48
49
50
51
52
53
54
55

www.sarc.com.qa
8. OTHERS
8.1 METHOD STATEMENT
8.2 PRODUCT PHOTO
8.3 WARRANTY CERTIFICATE
8.1 METHOD STATEMENT
8.2 PRODUCT PHOTO
8.3 WARRANTY CERTIFICATE