HSE LINE 6

FAST METRO PROJECT


CORRECTIVE ACTION REPORT (CAR)

(CAR) in Reference To: Electrical installation inspection (CAR) submitted on: June 30, 2020
Issued by / Dept.: fast
Issued on JUNE 29 2020 HSE Engineer: JOHN VINCENT CLEOFE
Location: LINE 4B1/4D1

(1) CAR Status:

(2) Date closed/To be


No. Description Corrective Action Taken Location
rectified (TBR) on:

(3) In-charge:
The electrical cable is raised 4B1
1 - The electrical cable lied on ((1) closed
slightly to prevent damage
the ground which might
deteriorate overtime or saturation to the water when it (2)30/6/20
rains
3)citiscape

Page 1 of 3
HSE LINE 6
FAST METRO PROJECT
CORRECTIVE ACTION REPORT (CAR)
ELECTRICAL CABLE SPLICING Electrical cable with slicing was 4B1 ((1) closed
replaced by new electrical cable
WAS FOUND
(2)30/6/20

3)citiscape

The electrical cable are exposed Electrical cable place overheard to ((1) closed
to water protect from damage or water
flows (2)30/6/20

3)citiscape

Page 1 of 3
HSE LINE 6
FAST METRO PROJECT
CORRECTIVE ACTION REPORT (CAR)
UNSAFE INSTALLATION OF Electrical cable is fix and installed ((1) closed
ELECTRICAL or multiple properly
installation (2)30/6/20

3)citiscape