(CAR) in Reference To: DAILY INSPECTION (CAR) submitted on: August 5 2019
REPORT
Issued by / Dept.: John Vincent Cleofe
Fast Sr HSE Engineer:
Issued on AUGUST 4, 2019 Location: 6.1.3 SECTION 3
(3) In-charge:
2 Barriers are too close to the edge of MOVE BACKWARD 1meter because of Section3 ((1) closed
the excavation access
Hazard & Consequences (2)4/8/19
The extra loading can make the sides of
the excavation more likely to collapse 3)aqualia
FALL IN
TRENCH COLLAPSE OR BARRIER
FALL IN CAN CAUSE SEVERE
INJURY OR FATALITY
Page
HSE LINE 6
FAST METRO PROJECT
CORRECTIVE ACTION REPORT (CAR)
4 Huge Gap OR OPEN barrier of the done hard barrier Section3 ((1) na
excavation
Hazard & Consequences (2)30/7/19
Page
HSE LINE 6
FAST METRO PROJECT
CORRECTIVE ACTION REPORT (CAR)
OPEN BARRIER CAN CAUSE OF 3)aqualia
FALLING OF WORKERS OR VISITOR
WHICH MIGHT RESULT TO SEVERE
INJURY