HSE LINE 6

FAST METRO PROJECT


CORRECTIVE ACTION REPORT (CAR)

(CAR) in Reference To: (CAR) Submitted on: 24 August 2017


Safety Officer Daily Observation Report #001

5A1 - 5A6
Issued by / Dept.:
Sultan Abdulrahman Fallatah
Waheed

Issued on:
24 August 2017

(1) CAR Status:

(2) Date closed/To be


No. Description Corrective Action Taken Location
rectified (TBR) on:

(3) In-charge:
1 Line 5 (1) Open
Immediately advice to sub-
contractor representative for (2) TBR
immediate replace. (3) WOOSUN

Defective plug need immediate


replace
2 Line 5 (1) Closed.
Advice the sub-contractor (2) 24 Aug 2017
representative to barricade the
material properly. (3) WOOSUN

Action taken.

Temporary storage of material


found without proper barricade.

Page 1 of 2
HSE LINE 6
FAST METRO PROJECT
CORRECTIVE ACTION REPORT (CAR)
3 Line 5 (1) Closed.
The immediate action has been (2) 24 Aug 2017
taken.

Action taken

Missing of Wooden covers at


the middle of tunnel can cause
a trip injury.

Page 1 of 2