You are on page 1of 6

No.

:
PROCEDURE I-PR-3010.92-1400-970-KFH-151
CLIENT: SHEET:
TUPI BV E&P 1 of 6
JOB:
PRESALT FPSOs -
AREA:
PETROBRAS 66 (P-66)
TITLE:
IEIS – INSTRUCTION EXECUTION AND CORPORATE
ENG-E&P/
IEUEP-II/IEREPL
WELDING INSPECTION – BASE EQUIPMENT
IEREPL
PART I / EL-37492 / BASE SG-1223001 – M10
CONTRACT NR: TECH. RESP. / CREA No.:
CONSÓRCIO TOMÉ FERROSTAAL TARCISO J. MARQUES/ 0685046100
SER/FOR-011/2012
ELETRONIC FILE No.:
CAMAQ
Microsoft Word / V.2007 / I-PR-3010.92-1400-970-KFH-151_A.doc

INDEX OF REVISIONS

REV. DESCRIPTION AND/OR REVISED SHEETS


0 INITIAL ISSUE
A CERTIFIED – (ADF-P66-TB7-KFH-00332)

REV. 0 REV. A REV. B REV. C REV. D REV. E REV. F REV. G REV. H


DATE 07/15/2013 08/06/2013
DESIGN KFH KFH
EXECUTION SANDRA SANDRA
CHECK ROSANA ROSANA
APPROVAL MAURÍCIO MAURÍCIO
INFORMATION IN THIS DOCUMENT IS PROPERTY OF PETROBRAS, BEING PROHIBITED OUTSIDE OF THEIR PURPOSE
FORM OWNED TO PETROBRAS N-0381 REV. L
No.: REV.
PROCEDURE I-PR-3010.92-1400-970-KFH-151 A
AREA:
PETROBRAS 66 (P-66) 2 of 6
TUPI BV TITLE:
IEIS – INSTRUCTION EXECUTION AND WELDING CORPORATE
INSPECTION – BASE EQUIPMENT PART I / EL-
IEREPL
37492 / BASE SG-1223001 – M10

The guidelines of this procedure are given by the attached document.

ANNEX
IEIS – INSTRUCTION EXECUTION AND WELDING INSPECTION – BASE
EQUIPMENT PART I / EL-37492 / BASE SG-1223001 – IEIS-222/13 Rev.00
No.: REV.
PROCEDURE I-PR-3010.92-1400-970-KFH-151 A
AREA:
PETROBRAS 66 (P-66) 3 of 6
TUPI BV TITLE:
IEIS – INSTRUCTION EXECUTION AND WELDING CORPORATE
INSPECTION – BASE EQUIPMENT PART I / EL-
IEREPL
37492 / BASE SG-1223001 – M10
No.: REV.
PROCEDURE I-PR-3010.92-1400-970-KFH-151 A
AREA:
PETROBRAS 66 (P-66) 4 of 6
TUPI BV TITLE:
IEIS – INSTRUCTION EXECUTION AND WELDING CORPORATE
INSPECTION – BASE EQUIPMENT PART I / EL-
IEREPL
37492 / BASE SG-1223001 – M10
No.: REV.
PROCEDURE I-PR-3010.92-1400-970-KFH-151 A
AREA:
PETROBRAS 66 (P-66) 5 of 6
TUPI BV TITLE:
IEIS – INSTRUCTION EXECUTION AND WELDING CORPORATE
INSPECTION – BASE EQUIPMENT PART I / EL-
IEREPL
37492 / BASE SG-1223001 – M10
No.: REV.
PROCEDURE I-PR-3010.92-1400-970-KFH-151 A
AREA:
PETROBRAS 66 (P-66) 6 of 6
TUPI BV TITLE:
IEIS – INSTRUCTION EXECUTION AND WELDING CORPORATE
INSPECTION – BASE EQUIPMENT PART I / EL-
IEREPL
37492 / BASE SG-1223001 – M10

You might also like