Suite 1912, Herrera Tower

98 Herrera cor. Valero Sts.,


Salcedo Village, Makati City, Phils.
Tel. Nos. 845-2260 to 62
Fax No. 845-1187
E-mail: daabcede@access.net.ph

CONSTRUCTION BULLETIN
DAAA NO. 02-2007
(PHASE 1 and 2)
ALUMINUM WORKS
DATE : NOVEMBER 19, 2007
ATTTENTION : AUST-PHILS ALUMINUM INT’L., INC./
NEW GOLDEN CITY BUILDERS
FROM : GLORIO O. CORTEZ, JR.
SUBJECT : MEZZA RESIDENCES

I. DAAA RFA NO. : A-20


II. CONTRACTORS REFERENCE : None
DOCUMENT FOR THIS
CONSTRUCTION BULLETIN
III. DETAILS OF CONTRACTORS :  Change of width of W19A in Towers 1 & 2
CONCERNS from 2.20m to 2.00m due to conflict in window
schedule and detailed floor plan.
 Change of width of W6 in Towers 3 and 4 from
1.77m to 1.55m to consider the alignment of
window openings.
IV. DESIGNER’S RESPONSE / COMMENT

ITEM DAAA REMARKS

As per ASYA’s comments:


 Follow 2.00 m width as shown in revised
For W-19A for Towers 1 and 2
window.
 This should not affect existing dimension
requirements for residential units.
 Deductive to aluminum and glazing works.

For W-6 for Towers 3 and 4  Follow 1.55 m as shown in revised window
since pre-cast was already installed at 16th –
succeeding levels.
 Deductive to Aluminum and Glazing works.
 See attached DAAA Request for Approval
A-20.

V. TIME IMPACT : None


COST IMPACT : Deductive from Aluminum and Glass Works
VI. DOCUMENTATION FLOW
DATE RECEIVED BY DESIGNER: November 15, 2007
DATE OF SUBMITTED BY : November 17, 2007
DESIGNER

NOTE:
Contractor is required to submit above mentioned requirement of Designer 3 to 4 days upon receipt of this
Construction Bulletin.
PREPARED BY: APPROVED BY: RECEIVED BY: COPY FURNISHED TO:

Name:_____________ Name:_______________
BUTCH NARVADEZ GLORIO O. CORTEZ, JR Company:__________ Company: SMDC
Project Resident Manager Date:______________ Date:________________

RONALD S. CREDO

SHEILA DE CASTRO

/conversion/tmp/activity_task_scratch/528506682.doc
JOSE MICHAEL HERNAL

/conversion/tmp/activity_task_scratch/528506682.doc